PROJECT SITE: E. PRESIDENT ST. GOEBEL AVE. HARRY TRUMAN PKWY. E. GWINNETT ST. PENNSYLVANIA AVE. CHECKED BY: DRAWN BY: DATE: PROJECT: REVISIONS: 1 A 2 3 4 5 B C D WWW.LS3P.COM SAVANNAH, GEORGIA 31401 TEL. 912.695.2111 FAX 912.298.0206 321 WEST CONGRESS STREET SUITE 301 5201-163640 11.18.2016 JJM JTH COPYRIGHT 2016 ALL RIGHTS RESERVED PRINTED OR ELECTRONIC DRAWINGS AND DOCUMENTATION MAY NOT BE REPRODUCED IN ANY FORM WITHOUT WRITTEN PERMISSION FROM LS3P ASSOCIATES LTD. MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS NO. DESCRIPTION DATE INITIAL FACILITY# - 625-4066 OFFICE UPGRADES CONSTRUCTION DOCUMENTS SHUMAN ELEMENTARY SCHOOL 415 GOEBEL AVENUE SAVANNAH, GA 31404 HOME OF THE SCHOLARS 415 GOEBEL AVENUE SAVANNAH, GEORGIA 31401 COVER SHEET G000 PIN: 2-0040-10-003 CONSTRUCTION SET 02/01/2017 SHUMAN ELEMENTARY SCHOOL OFFICE UPGRADES / RENOVATIONS OWNER: SAVANNAH - CHATHAM COUNTY PUBLIC SCHOOL SYSTEM KEVIN RALSTON 208 BULL STREET SAVANNAH, GEORGIA 31401 (P) 912-395-1259 (E) [email protected] FACILITY# 625-4066 FTE - 746 SCCPSS PROJECT NUMBER - BID C17-15 SHEET NUMBER SHEET NAME SHEET ISSUE DATE CURRENT SHEET RELEASE DATE COVER SHEET GENERAL NOTES FLOOR PLANS FINISH SCHEDULE & DETAILS CABINETRY ELEVATIONS & DETAILS G000 G001 A101 A201 A202 ARCHITECT: LS3P ASSOCIATES LTD. NEIL DAWSON, AIA 321 W. CONGRESS STREET, SUITE 301 SAVANNAH, GEORGIA 31401 (P) 912-695-2111 (E) [email protected] MAIN ENTRY KEY PLAN KEY PLAN FIRE MARSHAL CERTIFICATION GENERAL ARCHITECTURAL RUCTION DRAWING INDEX PROJECT AREA: ADMINISTRATION OFFICE & NEW SECURITY WALL MEDIA CENTER CAFETERIA DEDUCTIVE ALTERNATES ALTERNATE NO. 1 (DEDUCTIVE): THE LVT FLOORING SCHEDULED IN ADMINISTRATION CORRIDOR 106 AND BREAKROOM 108 SHALL BE MODIFIED TO VCT.

SHUMAN ELEMENTARY SCHOOL E. PRESIDENT ST. OFFICE …internet.savannah.chatham.k12.ga.us/district...construction set 02/01/2017 pin: 2-0040-10-003 shuman elementary school office upgrades

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SHUMAN ELEMENTARY SCHOOL E. PRESIDENT ST. OFFICE …internet.savannah.chatham.k12.ga.us/district...construction set 02/01/2017 pin: 2-0040-10-003 shuman elementary school office upgrades

PROJECT SITE:

E. PRESIDENT ST.

GOEB

EL A

VE.

HARR

Y TR

UMAN

PKW

Y.

E. GWINNETT ST.

PENN

SYLV

ANIA

AVE

.

CHECKED BY:

DRAWN BY:

DATE:

PROJECT:

REVISIONS:

1

A

2 3 4 5

B

C

D

WWW.LS3P.COM

SAVANNAH, GEORGIA 31401

TEL. 912.695.2111 FAX 912.298.0206

321 WEST CONGRESS STREET SUITE 301

5201-163640

11.18.2016

JJM

JTH

COPYRIGHT 2016

ALL RIGHTS RESERVED

PRINTED OR ELECTRONIC DRAWINGS

AND DOCUMENTATION MAY NOT BE

REPRODUCED IN ANY FORM WITHOUT

WRITTEN PERMISSION FROM LS3P

ASSOCIATES LTD.

MEMBERS OF THE AMERICAN INSTITUTE

OF ARCHITECTS

NO. DESCRIPTION DATE INITIAL

FACILITY# - 625-4066

OFFICE UPGRADES

CONSTRUCTION DOCUMENTS

SHUMAN

ELEMENTARY

SCHOOL

415 GOEBEL AVENUE

SAVANNAH, GA 31404

HOME OF THE SCHOLARS

415 GOEBEL AVENUESAVANNAH, GEORGIA 31401

COVER SHEET

G000

PIN: 2-0040-10-003

CONSTRUCTION SET 02/01/2017

SHUMAN ELEMENTARY SCHOOLOFFICE UPGRADES / RENOVATIONS

OWNER: SAVANNAH - CHATHAM COUNTY PUBLIC SCHOOL SYSTEMKEVIN RALSTON208 BULL STREETSAVANNAH, GEORGIA 31401(P) 912-395-1259(E) [email protected]

FACILITY# 625-4066FTE - 746

SCCPSS PROJECT NUMBER - BID C17-15

SHEET NUMBER SHEET NAMESHEET ISSUE

DATECURRENT SHEETRELEASE DATE

COVER SHEETGENERAL NOTES

FLOOR PLANSFINISH SCHEDULE & DETAILSCABINETRY ELEVATIONS & DETAILS

G000G001

A101A201A202

ARCHITECT: LS3P ASSOCIATES LTD.NEIL DAWSON, AIA321 W. CONGRESS STREET, SUITE 301SAVANNAH, GEORGIA 31401(P) 912-695-2111(E) [email protected]

MAIN ENTRY

KEY PLAN

KEY PLAN

FIRE MARSHAL CERTIFICATION

GENERAL

ARCHITECTURAL

RUCTION

DRAWING INDEX

PROJECT AREA:

ADMINISTRATION OFFICE

& NEW SECURITY WALL

MEDIA

CENTER

CAFETERIA

DEDUCTIVE ALTERNATES

ALTERNATE NO. 1 (DEDUCTIVE): THE LVT FLOORING SCHEDULED IN ADMINISTRATION CORRIDOR 106 AND

BREAKROOM 108 SHALL BE MODIFIED TO VCT.

Page 2: SHUMAN ELEMENTARY SCHOOL E. PRESIDENT ST. OFFICE …internet.savannah.chatham.k12.ga.us/district...construction set 02/01/2017 pin: 2-0040-10-003 shuman elementary school office upgrades
Page 3: SHUMAN ELEMENTARY SCHOOL E. PRESIDENT ST. OFFICE …internet.savannah.chatham.k12.ga.us/district...construction set 02/01/2017 pin: 2-0040-10-003 shuman elementary school office upgrades
Page 4: SHUMAN ELEMENTARY SCHOOL E. PRESIDENT ST. OFFICE …internet.savannah.chatham.k12.ga.us/district...construction set 02/01/2017 pin: 2-0040-10-003 shuman elementary school office upgrades

SECURED ENTRY CORRIDOR

ROOMNUMBER ROOM NAME MATERIAL

101

FINISH SCHEDULE

BASE

FLOOR

MATERIAL

WALLS

N E S W

CEILING

MATERIAL HEIGHT REMARKS

001

WAITING AREA

ACT-0*

ACT-0

TERR-0 PT-0 / (PT-4 @STOREFRONT*)

PT-0 PT-0 PT-0

LVT-1 RB-1 PT-1 PT-1 PT-1 PT-2

*REPLACE CLG. TILES AS NEEDED FOR NEW SCHED. WORK,PAINT EXIST. ADMIN. H.M. STOREFRONT AS INDICATED-

102 ADMINISTRATION103104105106107108

DATA CLERKPRINCIPALFIRE ALARMCORRIDORCONFERENCEBREAK ROOM

109 CORRIDOR LVT-1 RB-1

LVT-1 / CPT-1 RB-1CPT-1CPT-1

RB-1RB-1RB-1RB-1RB-1RB-1

LVT-1LVT-1**CPT-1LVT-1**

PT-1 PT-1 PT-1 PT-2PT-1 PT-1 PT-1 PT-1PT-1 PT-1 PT-1 PT-1PT-1 PT-1 PT-1 PT-1PT-1 PT-1 PT-1 PT-1PT-1 PT-1 PT-1 PT-1PT-1 PT-1 PT-1 PT-1PT-1 PT-1 PT-1 PT-2

ACT-0ACT-0ACT-0ACT-0ACT-0ACT-0ACT-0ACT-0

-

-**SEE SPEC. 01 23 00 ALTERNATE #1

-

-

---------

**SEE SPEC. 01 23 00 ALTERNATE #1

110 WORK ROOM111

WOMEN112MEN113

VESTIBULE VCT-0 RB-1RB-1

TILE BS-0TILE BS-0

PT-3PT-3

PT-3PT-3

PT-3PT-3

PT-3PT-3

ACT-0ACT-0ACT-0ACT-0

VCT-0

TILE-0TILE-0

PT-3 PT-3 PT-3 PT-3PT-1 PT-1 PT-1 PT-1 -

---

RB-1

----

--

-

OPENOPEN

7'-0

"2"

±2'

-6" V

.I.F.

1"

±9'

-9" V

.I.F.

±2'-512"

EQ. (±5'-5" V.I.F.) 10"512" 6'-6" EQ. (±5'-5" V.I.F.)10" 51

2"

±19'-11" V.I.F.

2" 2" 2"±2'-512" 2" 3'-0" 2"3'-0"2"

OPEN

±2'-512"2"2" ±2'-512" 2"

6"

1'-0

"2'

-6"

7'-0

"2"

±2'

-6" V

.I.F.

1"

2"

HEIG

HT O

F H.

M.

HORI

Z. M

ULLI

ON

TOM

ATCH

EXI

STIN

G

2" ±5'-1" V.I.F. 2" 2" 6'-2" 2"

3'-6

"

2"±5'-1" V.I.F.2"

PILASTER W/IMPACT GYP. WRAP

H.M.STOREFRONT W/LAMINATED SAFETY

GLAZING, TYP

COLUMN W/IMPACT GYP. WRAP

SOLID CORE WD.SECURITY DOOR W/NARROW VISION LITE

GC TO COORDINATE ALLROUGH-IN REQUIREMENTS FOROWNER PROVIDED EQUIPMENTPRIOR TO FRAMING WALL

CL

G1 G1

G1 G1G2 G2

G1

G1 G1

G1

A5A201

POWER SUPPLY & CONTROLLERFOR ACCESS CONTROL MOUNTED

ABOVE ACT CEILING

1/2" DOOR UNDERCUT

REMOVABLEMULLION

HARDWAREAS SCHED.

2"

FLOOR BASE AS SCHED. BELOW H.M.STOREFRONT & AT BASE OF COLUMNS

/ PILASTERS, CONTRACTOR TOCOORD. HEIGHT & REVEAL OF BASE

BELOW H.M. STOREFRONT TO MATCHEXISTING CONDITION AT OFFICE

STOREFRONT & SEE SECTION

PAIR OF DOORS & DOORFRAME BY OWNER / G.C.

INSTALLED. DOOR BYOWNER TO INCLUDE

REMOVABLE MULLION,REMOTE ENTRY & CARD

READER, G.C. TO COORD.

H.M. STOREFRONT W/ LAMINATEDSAFETY GLAZING AS SCHED.

F.R.T. WD. SHIM AS NEEDED

EXISTING TERRAZOFLOORING TO REMAIN

NOTE: ALL WOOD FRAMING,BLOCKING / NAILERS &STRUCTURAL WD. PANELS TOBE FIRE RETARDANT TREATEDWOOD (F.R.T.), TYP.

2"2"

D5A201

RESILIENT FLOOR BASE AS SCHED.OVER IMPACT GYP (PAINTED BLACK)

COLUMN BEYOND W/ IMPACT GYP.WRAP BEYOND

MTL. STUD FRAMING BELOW H.M.STOREFRONT TO MATCH EXISTING

CONTRACTOR TO COORD. HEIGHT & REVEAL OF BASEBELOW H.M. STOREFRONT TO MATCH EXISTINGCONDITION AT OFFICE STOREFRONT, TYP.

HEIG

HT O

F H.

M. H

ORI

Z. M

ULLI

ON

TO M

ATCH

EXI

STIN

G

3"MIN.

10" 512"±5'-5" V.I.F.

6"

4"EQ

.EQ

.

6" MTL. STUD WALL FRAMING,EXTEND STUDS & SECURE TOBOTTOM OF STRUCTURE ABOVE

H.M. STOREFRONT W/LAMINATED SAFETYGLAZING AS SCHED.

H.M. FRAME & SOLID COREWD. SECURITY DOOR W/

NARROW VISION LITE

MAINTAIN CLEARANCE FORREQUIRED ELECTRICAL DEVICE(CENTERED ON COLUMN)

COLUMN W/ IMPACT GYP. WRAP

F.R.T. WD. SHIMS, TYP.

MTL. DRYWALL CORNER BEAD, TYP.

MODIFY EXISTING CEILING GRID ASREQUIRED FOR LIMITS OF NEWCONSTRUCTION & PROVIDE NEW CEILINGTILES AT RECONFIGURED GRID LOCATIONTO MATCH EXISTING

COLUMN BEYOND W/ IMPACT GYP.WRAP BEYOND

PROVIDE STOPS IN H.M.STOREFRONT TO ALLOW FORFUTURE GLAZING

H.M. STOREFRONT W/LAMINATED SAFETYGLAZING AS SCHED.7'

-0"

2"±

2'-6

" V.I.

F.1"

±9'

-9" V

.I.F.

METAL STUD HEADER

6" MTL. STUD FRAMING @ 24"O.C., EXTEND STUDS & SECURE TOBOTTOM OF STRUCTURE ABOVE

ACCESS CONTROL POWERSUPPLY, CONTROLLER, &POWER (FROM NEAREST

AVAILABLE PANEL /CIRCUIT) BY OWNER. GC

TO COORD. ALL ROUGH-INREQUIREMENTS FOR

OWNER PROVIDEDEQUIPMENT PRIOR TO

FRAMING WALL

OPENING IN H.M. STOREFRONT,SEE ELEVATION

BRACE AT 4'-0" O.C.

1. PROVIDE ADA-COMPLIANT FLOOR THRESHOLDS AT ALL FLOORING TRANSITIONS, TYP.2. ALL H.M. FRAMES IN PROJECT AREA TO BE PREPPED & REPAINTED (PT-4), TYP.3. ALL FINISHES SHOULD BE SUBMITTED FOR OWNER APPROVAL PRIOR TO ORDERING

GENERAL FINISH NOTES

LEGEND / FINISH SELECTIONS

MATERIAL BASIS OF DESIGNMANUFACTURER

PRODUCT / COLLECTION COLOR

VCT (VCT-1)**SEE SPEC. 01 23 00 ALTERNATE #1

VCT (VCT-0)

LVT (LVT-1)

EXISTING TO REMAINTHE AZROCK COLLECTIONSTANDARD PRICE T.B.D.

- -

TANDUS CENTIVA VENUE SERIES (QUICKSHIP)CARPET (CPT-0) EXISTING TO REMAIN - -CARPET (CPT-1) SHAW CONTRACT GROUPBROADLOOM HOMAGE

T.B.D.

T.B.D.

BASE (BS-0) EXIST. TO REMAIN - -RESILIENT BASE (RB-1) JOHNSONITE 4" WALL BASE T.B.D.

T.B.D.PLASTIC LAMINATE (PL-1)SOLID SURFACE (SS-1)

ADMIN. WALL PAINT (PT-1)ADMIN. ACCENT WALL PAINT (PT-2)TOILET WALL PAINT (PT-3)H.M. DOOR FRAMES PAINT (PT-4)CABINETRY REVEAL PAINT (PT-5)ACOUSTIC CEILING TILE (ACT-0)

T.B.D.

T.B.D.T.B.D.T.B.D.T.B.D.T.B.D.

HARMONYSHERWIN WILLIAMSHARMONYSHERWIN WILLIAMSHARMONYSHERWIN WILLIAMSHARMONYSHERWIN WILLIAMSHARMONYSHERWIN WILLIAMS

EXIST. TO REMAIN -

CORIAN PRIVATE COLLECTION ("D")WILSONART STANDARD LAMINATE

-

TERRAZZO (TERR-0) EXISTING TO REMAIN - -

TILE (TILE-0) EXISTING TO REMAIN - -

PAINT (PT-0) EXISTING TO REMAIN - -

1. REFER TO MANUFACTURER'S SPECIFICATIONS FOR ROUGH OPENING REQUIREMENTS.2. G.C. TO FIELD-VERIFY ALL DIMENSIONS PRIOR TO ORDERING DOORS.3. PROVIDE TEMPERED GLAZING AS REQUIRED BY CODE. SEE DOOR TYPES / GLAZING SCHEDULE FOR TEMPERED LOCATIONS OF GLAZING IN DOORS, TYP.4. SEE PLANS FOR SWING INDICATIONS.5. G.C. TO COORD. SHOP DRAWINGS FOR ALL DOORS AND GLAZING W/ ARCHITECT / OWNER PRIOR TO FABRICATION.6. SEE SPECIFICATIONS FOR DOOR HARDWARE SCHEDULE

GENERAL DOOR NOTES:

DOOR SCHEDULE

DOORNUMBER NOMINAL SIZEROOM NAME TYPE REMARKSDESCRIPTION MANUF. MODEL NO.

102A

001A

RECEPTION

SECURED ENTRY CORRIDOR

3'-0" X 2'-6" GATE AT RECEPTION CABINETRYB

(2) 3'-0" X 7'-0" SOLID CORE WD. SECURITY DOOR W/ NARROW VISION LITEA

-

- - 001A DOOR & H.M. FRAME BY OWNER; G.C. TO PAINT FRAME, STAIN &VARNISH PAIR OF DOORS TO MATCH EXISTING INT. DOORS & COORD. /INSTALL. DOOR HARDWARE BY OWNER TO INCLUDE REMOTE ENTRY & CARDREADER; GC TO COORD. ALL ROUGH-IN REQUIREMENTS FOR OWNERPROVIDED EQUIPMENT PRIOR TO FRAMING WALL.

HARDWARE

B

A

- 2" SOLID CORE DR. FINISH VENEER TO MATCH CASEWORK

GATE

A

3'-0" 2" 3'-0"

7'-0

"

3'-0"

2'-2

"4"

B

2'-6

"

GLAZING SCHEDULE

G2:G1: 1/4" CLEAR TEMPERED / .030 PVB LAYER / 1/4" CLEAR TEMPERED

1/4" CLEAR TEMPERED

1. CONTRACTOR TO FIELD-VERIFY ALL DIMENSIONS PRIOR TO ORDERING DOORS.2. CONTRACTOR TO COORD. SHOP DRAWINGS / SAMPLES FOR GLAZING W/ ARCHITECT /

OWNER PRIOR TO FABRICATION.

GENERAL GLAZING NOTES:

CHECKED BY:

DRAWN BY:

DATE:

PROJECT:

REVISIONS:

1

A

2 3 4 5

B

C

D

WWW.LS3P.COM

SAVANNAH, GEORGIA 31401

TEL. 912.695.2111 FAX 912.298.0206

321 WEST CONGRESS STREET SUITE 301

5201-163640

11.18.2016

JJM

JTH

COPYRIGHT 2016

ALL RIGHTS RESERVED

PRINTED OR ELECTRONIC DRAWINGS

AND DOCUMENTATION MAY NOT BE

REPRODUCED IN ANY FORM WITHOUT

WRITTEN PERMISSION FROM LS3P

ASSOCIATES LTD.

MEMBERS OF THE AMERICAN INSTITUTE

OF ARCHITECTS

NO. DESCRIPTION DATE INITIAL

FACILITY# - 625-4066

OFFICE UPGRADES

CONSTRUCTION DOCUMENTS

SHUMAN

ELEMENTARY

SCHOOL

415 GOEBEL AVENUE

SAVANNAH, GA 31404

HOME OF THE SCHOLARS

FINISH SCHEDULE

& DETAILS

A201

NTS

FINISH SCHEDULE

1-1/2" = 1'-0"

SECTION OF SECURITY WALL

1/2" = 1'-0"

H.M.STOREFRONT ELEVATION AT SECURITY WALL

PLAN SECTION OF SECURITY WALL

NTS

FINISH SELECTIONS & FINISH NOTES

A3

C1

A5

1-1/2" = 1'-0"

D5

A1

NTS

DOOR SCHEDULE & NOTES

B1

1/4" = 1'-0"

DOOR TYPES

C3

NTS

GLAZING SCHEDULE & NOTES

D3

Page 5: SHUMAN ELEMENTARY SCHOOL E. PRESIDENT ST. OFFICE …internet.savannah.chatham.k12.ga.us/district...construction set 02/01/2017 pin: 2-0040-10-003 shuman elementary school office upgrades