Shuttle In Sling Ready For Lift In VAB TRANSPORTATION COST REDUCTIONS START TIME CHANGE: $1,120,000 ELIMINATE CHOICE TRANSPORTATION: $1,260,000

Shuttle In Sling Ready For Lift In VAB

Embed Size (px)

DESCRIPTION

TRANSPORTATION COST REDUCTIONS. START TIME CHANGE: $1,120,000 ELIMINATE CHOICE TRANSPORTATION: $1,260,000. Shuttle In Sling Ready For Lift In VAB. BREVARD TRANSPORTATION 432 SCHOOL BUS ROUTES. Goal : Increase 3 Run Routes. START TIME ADJUSTMENT CURRENT. Elementary8:00-2:30 - PowerPoint PPT Presentation

Citation preview

Page 1: Shuttle In Sling Ready For Lift In VAB

Shuttle In Sling Ready For Lift In VAB

TRANSPORTATION COST REDUCTIONS

START TIME CHANGE: $1,120,000ELIMINATE CHOICE TRANSPORTATION: $1,260,000

Page 2: Shuttle In Sling Ready For Lift In VAB

BREVARD TRANSPORTATION432 SCHOOL BUS ROUTES

# %

1 Run 69 16

2 Run 187 43

3 Run 176 41

Goal: Increase 3 Run Routes

Page 3: Shuttle In Sling Ready For Lift In VAB

START TIME ADJUSTMENTCURRENT

Elementary 8:00-2:30High School 8:30-3:15Middle School 9:15-4:00

PROPOSED +15 MINUTES Elementary 8:00-2:30High School 8:45-3:30Middle School 9:30-4:15

Page 4: Shuttle In Sling Ready For Lift In VAB

START TIME ADJUSTMENTS RESULTS

28 BUS ROUTES X $40,000 ROUTE =

$1,120,000 REDUCTION

CURRENT REDUCTION NEW TOTAL

432 -28 404

Page 5: Shuttle In Sling Ready For Lift In VAB

ELIMINATE CHOICE TRANSPORTATION

ELEMENTARY 24 BUS RUNS $480,000

SECONDARY 39 BUS RUNS $780,000 63 TOTAL CHOICE RUNS

63 Bus Runs x $20,000 = $1,260,000 REDUCTION