  • 8/19/2019 Siae Installation Guide ALCplus2

    1/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 1 of  40 

    ALS Series Microwave Radio for Point‐to‐Point 

    application 

    ALCplus2 IDU 

    AS ODU 

    IP/ SDH/ PDH 

    Installation Guide 

  • 8/19/2019 Siae Installation Guide ALCplus2

    2/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 2 of  40 

  • 8/19/2019 Siae Installation Guide ALCplus2

    3/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 3 of  40 

    Purpose 

    This Document is intended as an installation  guide for deploying Siae equipment ALS series model 

    ALCpus2 into customer ‘s network. It is not intended as installation instruction for any civil works 

    and intended

     to

     follow

     on

     from

     previous

     installation

     guides.

     

    Intended Audience 

    The document is intended for all field staff  that will be involved in Siae microwave deployment 

    Pre Installation 

    Prior to installation any new link the contractor will be required a completed Scope of  Works 

    documents “SOW” . The SOW document contains all the information for the installation, 

    commissioning and integration of  the new equipments. The SOW contains the following 

    information 

    Link parameters 

    Link frequencies 

    Proposed License details 

    Network Element IP addresses 

    IDU installation location 

    DC 

    Power Supply

     terminations

     

    ODU installation location 

    IF cable routing 

    Installation brief  ( How the installation will be done, any arrangement of  existing equipment, 

    Antenna mounting  installation) 

    Integration brief  ( How the integration of  the network element will be completed, Outage 

    Requirements of 

     each

     circuit)

     

    System Architecture ALS series  – ALCplus2 

    Siae Microwave link ALS series model ALCplus2  is consist of   2 main equipments which is IDU 

    (Indoor Unit) and ODU ( Outdoor Unit) 

    Indoor Unit of  ALCplus2 have 2 main types 

    1.ALCplus2 IDU ‐18xE1 +4xGE + 2xSTM‐1 +Nodal Bus 

  • 8/19/2019 Siae Installation Guide ALCplus2

    4/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 4 of  40 

    7 654 3 2 1 

    108  91 

    Figure 1. ALCplus 2 IDU  – 18xE1 + 4xGE + 2xSTM‐1 + Nodal Bus 

    1.  TMN‐access (ETH, USB‐B, RS232) 

    2.  ETH payload 10/100/1000 RJ45 FE/GE 

    3.  STM‐1 payload  With SFP modules 

    4.  2xE1 payload 

    o  Traffic 

    o  Sync Input/Output (G703/ 2 MHz clock or HDB3 AIS) 

    o  Traffic + EOC (G704 framing) 

    5.  CAT6 proprietary expansion Bus Traffic 

    6.  nxE1 payload on SCSI connectors (120/75 ohm) 

    7.  Power Supply 

    8.  ETH payload with optical GE  SFP modules 

    9.  Alarm IN/OUT 

    10.IDU‐ODU cables interfaces 

    2.ALCplus2 IDU ‐34xE1 + 4xGE + 2xSTM‐1 

    8 1  9   10

    3   4  6   7 2 1 

    Figure 2.ALCplus2  – 34xE1 + 4xGE + 2xSTM‐1 

    10.  TMN‐access (ETH, USB‐B, RS232) 

    11.  ETH payload

     10/100/1000

     RJ45

     FE/GE

     

    12.  STM‐1 payload  With SFP modules 

    13.  2xE1 payload 

    o  Traffic 

    o  Sync Input/Output (G703/ 2 MHz clock or HDB3 AIS) 

    o  Traffic + EOC (G704 framing) 

    14.  CAT6 proprietary expansion Bus Traffic 

    15.  nxE1 payload on SCSI connectors (120/75 ohm) 

    16.  Power Supply 

    17.  ETH payload with optical GE  SFP modules 

    18.  Alarm IN/OUT

     10.  IDU‐ODU cables interfaces 

  • 8/19/2019 Siae Installation Guide ALCplus2

    5/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 5 of  40 

    Installation of  IDU unit 

    The AlCplus 2 IDU shall be install inside the standard 19 inch rack  which be required for the spacing 

    on rack equal 1RU. 

    42 U

    DC Distribution

    SIAE ALCplus 2 IDU

    E1 Main Distribution Frame

    19 Inch Rack Front View 

    Rectifier DC Distribution and On Off Breaker

    IDU 1 RU

    E1 Wiring Connection Panel 

    Figure 3.IDU Rack installation 

  • 8/19/2019 Siae Installation Guide ALCplus2

    6/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 6 of  40 

    ALCplus 2 ODU Unit 

    ASN ODU : supports all modulation schemes (4/8/16/32/64/128/256 QAM) and all capacity from 8 

    Mbit/s to 400 Mbit/s. ASN ODU doesn’t require any hardware change if  configured  frequency 

    reuse (independence

     from

     XPIC

     functionality

     ) and

     compatible

     with

     all

     type

     of 

     IDU.

     This

     model

     provides up to 20 dB ATPC. 

    Please note that ASN ODU version without the Isolator will not be performed for the functionality 

    of  RF Loop back. 

    AS ODU: supports all modulation schemes (4/8/16/32/64/128/256 QAM) and all capacity from 8 

    Mbit/s to 400 Mbit/s. ASN ODU doesn’t require any hardware change if  configured  frequency 

    reuse (independence from XPIC functionality ) and compatible with all type of  IDU. This model 

    provides up to 40 dB ATPC. 

    Figure 4. ASN ODU 

    Figure 5.AS

     ODU

     

    Installation of  ODU unit 

  • 8/19/2019 Siae Installation Guide ALCplus2

    7/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 7 of  40 

    The ALCplus 2 ODU can be installing  variety of  ODU configurations and this is the following 

    common  configurations. 

    1+0 Configuration with Integrated Antenna 

    1+0 Configuration with Separated Antenna 

    1+1 Configuration with Integrated Antenna 

    1+1 Configuration with Separated Antenna 

    1+0 Configuration with Integrated Antenna 

    Siae 1+0 with integrated antenna, the Dish mounts  directly onto the pole mount bracket, the ODU 

    mounts directly

     onto

     the

     back

     of 

     the

     Pole

     mounting

     bracket.

     

    Figure 

    6. 

    ODU 

    1+0 

    with 

    Integrated 

    Antenna 

  • 8/19/2019 Siae Installation Guide ALCplus2

    8/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 8 of  40 

    Vertical Polarization  Horizontal Polarization 

    Figure 7. ODU 1+0 with Integrated antenna and Polarization installation. 

  • 8/19/2019 Siae Installation Guide ALCplus2

    9/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 9 of  40 

    1+0 Configuration with Separated Antenna 

    Step 1 : Install Antenna sliding strip onto antenna pole mounting. 

    Figure 8. Ant‐sliding Strip 

    Step 2: Install support bracket. 

    Figure 9. Bracket installation 

  • 8/19/2019 Siae Installation Guide ALCplus2

    10/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 10 of  40 

    Step 3: Install the ODU mounting bracket. 

    Figure 10. ODU  Mounting Bracket 

    Step 4: There are 3 possible installation scenarios for mounting the ODU mounting bracket onto the 

    support bracket, depending on the orientation of  the antenna to be connected to the  ODU 

    mounting bracket

     can

     be

     installed

     to

     the

     left,

     right

     or

     straight

     on.

     

    Figure 11.Direction to install the ODU mounting bracket 

    Step 5: Install Wave Guide onto the Brass wave guide flange. 

  • 8/19/2019 Siae Installation Guide ALCplus2

    11/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 11 of  40 

    Figure 12. Wave Guide install to ODU mounting Flange 

    Step 6: install ODU onto the Mounting Bracket is straight forward but can be easily installed 

    incorrectly if  the wrong installation method is used, there are three items that need to be aligned 

    correctly for the installation procedure to work, first the Brass Wave Guide Flange needs to be 

    installed in the Vertically position , then the reference tooth and the Raised weldment must also 

    line up, please see picture below. 

  • 8/19/2019 Siae Installation Guide ALCplus2

    12/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 12 of  40 

    Rotate ODU Clockwise  Final Position ODU Correctly 

    Figure 13. ODU mounting into the Bracket as Vertical  Polarization  Position 

    Please note that on the correctly installed ODU handle will always face down and toward to left hand side 

    .Checking if  the Polarization be mounted as a Wrong Position then it will be the “Cross Wave Guide” the 

    receive level at the far end will be ‐30 dB lower than the calculated level. 

    Figure 14. Shown the ODU mounting Correctly and Incorrectly Position 

  • 8/19/2019 Siae Installation Guide ALCplus2

    13/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 13 of  40 

    1+1 Configuration with Separated Antenna 

    Siae 1+1 Separated Antenna solution , use 2xODUs connected to the RF Hybrid Branching (RF 

    Power Slitter) and Mount directly onto the RF Flexible Wave Guide which other side of  Flexible 

    Wave Guide mount onto the back of  single polarization Antenna Dish. 

    Figure 15. RF Hybrid Branching 

    Please note that the Flange Type of  the RF Hybrid Branching will be different depending on 

    Frequency Range. At the Figure 15. shown RF Hybrid branching for 6GHz. 

    Wage Guide Installation 

    When ODU and RF Hybrid Branching need to be installed with separate antenna .Extra care should 

    be taken

     when

     installing

     the

     Flexible

     Wave

     Guide,

     this

     is

     because

     the

     RF

     integrity

     of 

     the

     flexible

     

    wave guide can be easily compromised incorrectly. Below is an Flexible wave guide minimum E 

    plane and H plane bending.  Figure 15.1 Shown the example Flexible Wave Guide Bending Value. 

  • 8/19/2019 Siae Installation Guide ALCplus2

    14/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 14 of  40 

    Figure 15.2 : Details of  RF Hybrid Branching Unit for mounting 2xODUs 

  • 8/19/2019 Siae Installation Guide ALCplus2

    15/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 15 of  40 

    Figure 16. Shown 2xODUs mounting onto the RF Hybrid Branching 

    ODU 1 (Main) mounting to RT1 side and ODU 2 (Standby) mounting to RT2 side for radio 

    configuration as 1+1 Hot Standby. 

    Figure 16.1: Shown reverse viewed 

  • 8/19/2019 Siae Installation Guide ALCplus2

    16/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 16 of  40 

    Figure 17. Rear side ODU mounting for configuration as 1+1 or 2(1+0) 

    Please note that incase to installed ODU as 2x(1+0) ,always ensure that the “A” ODU installed at the 

    Left hand side and the “B” ODU installed at the Right hand side when view from the rear. 

  • 8/19/2019 Siae Installation Guide ALCplus2

    17/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 17 of  40 

    Figure 18. 1+1 ODU completed install to RF Hybrid Branching  and Flexible Wave Guide 

  • 8/19/2019 Siae Installation Guide ALCplus2

    18/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 18 of  40 

    Flexible Wave Guide Support ( Optional) 

    When the Flexible Wave Guide is installed at the High Position on Tower and facing with the strong 

    wind ,The Flexible Wave Guide must be properly supported by using a threaded rod wave guide 

    support system

     with

     the

     correct

     sized

     wave

     guide

     rubber

     boot.

     

    Figure 19.Shown the Flexible Wave Guide Support system. 

    1+1 Configuration with Integrated Antenna 

    Siae 1+1 Integrated Antenna solution , use 2xODUs connected to the RF Hybrid Branching (RF 

    Power Slitter) , Mount directly  onto the back of  single polarization Antenna Dish. 

    Figure 20.Polarization on back of  Dish  – Single Pol. 

  • 8/19/2019 Siae Installation Guide ALCplus2

    19/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 19 of  40 

    Figure 21.1+1 RF Hybrid Branching Unit for installing to Integrated Antenna 

  • 8/19/2019 Siae Installation Guide ALCplus2

    20/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 20 of  40 

    Step1 : Mount the RF Hybrid Branching Direct to the Back end of  Antenna 

    Figure 22. Install the Hybrid to Antenna 

  • 8/19/2019 Siae Installation Guide ALCplus2

    21/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 21 of  40 

    Step 2: Mount the ODU onto the RF Hybrid Branching 

    Figure 23.ODU Completely Installation 

    Please note that the Polarization  between the RF Hybrid Branching and Antenna must be the same 

    Grounding  system 

    1.Groudning IDU 

    2.Grounding ODU 

    3.Grounding IF Cable 

    4.Grounding Surge Suppressor 

    Grounding IDU 

    Use the Siae grounding Kit provide with the IDU to make an Earth Grounding cable from the Siae IDU 

    chassis  mount stud to the vertical earth bar (Green Line)  which is installed inside the 19 inch rack. 

  • 8/19/2019 Siae Installation Guide ALCplus2

    22/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 22 of  40 

    Figure 24. Grounding IDU 

    Siae IDU Grounding Point 

    Inside  Rack Grounding 

    SIAE IDU

    Siae Grounding

     Kit

     , contains

     

    ‐1x6mm/M6 Crimp Lug 

    ‐2x 6mm. blade connectors 

    ‐ 2x Heat Shirk pieces 

    ‐1m 6mm.Grounding Cable 

  • 8/19/2019 Siae Installation Guide ALCplus2

    23/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 23 of  40 

    Grounding ODU 

    Every ODU installed into the Microwave Radio Network will need to be connected to a Lightening 

    Grounding system .A minimum 25mm Grounding cable to be run to the closest Lightening Bar or Grounding 

    structure. If  there is no available lightening protection grounding bar  the ODU can be grounded to the 

    structure, either using a angle tower adaptor or bolted directly to the structure, all grounding connection 

    will have electrical bonding plate applied and all paint/grease removed from the contact point. 

  • 8/19/2019 Siae Installation Guide ALCplus2

    24/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 24 of  40 

    Grounding connection off. 

    Situation then it is permitted  to leave this 

    Top of  the Tower/Monoploe, if  this is the 

    Impossible to grounding the IF cable at the 

    With the variety of  tower configurations 

    Within the Mobile network, it is sometime 

    Figure 25.

     The

     ODU

     and

     Tower

     Grounding

     Structure

     

  • 8/19/2019 Siae Installation Guide ALCplus2

    25/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 25 of  40 

    Figure 26. ODU Grounding Point 

    Figure 27. SIae ODU Grounding Kit ,Contians 

    ‐  2m 25mm  Grounding Calbe 

    ‐  2x25mm/M8 Lug 

    ‐  2x Heat Shrink pieces 

  • 8/19/2019 Siae Installation Guide ALCplus2

    26/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 26 of  40 

    Grounding IF Cable 

    All coaxial IF cables installed into the Microwave Radio Network will  be required to be connected the 

    grounding . Both PDH or SDH or IP Radio will follow this standard. There are 2 types  of  the IF cable that will 

    be usually used for the PDH and SDH which is LDF4‐50 and LMR400 , for the standard grounding kit for this 

    2 cables is UEK 1 for LMR400 and UEK2 for LDF4‐50. 

    Figure 28.

     Grounding

     kit

     UEK2

     for

     LDF4

    ‐50

     

    UEK1 and

     UEK2

     Universal

     Earth

     Kit

     cable

     sizing

     

    Figure 29. Installed of  UEK2 Kit 

  • 8/19/2019 Siae Installation Guide ALCplus2

    27/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 27 of  40 

    Grounding Surge Suppressor (Option) 

    The Grounding of  Surge Suppressor may be required to be installed  at the Site that need strongly 

    Lightening protection. The Lightening surge suppressor will be installed outside the equipment shelter or 

    room as see below diagram. 

    Figure 30.Grounding Surge Suppressor installation Diagram 

    DC Power Connection 

    DC cable type 

    Black or White 2 core electrical flex is is to be used between the RIM and DC power supply, 

    normally the color code for DC is Black & Blue, (Black ) +ve connected to the buss bar ,(Blue)  –ve 

    terminated to MCB ( Main Circuit Breaker), Any color conductors can be used but they need to have the 

    correct color heat shrink applied to the exposed ends to hide the incorrect color , example black heat shrink 

    over brown color conductor. 

    DC cable size 

    1.5 sqmm minimum for dc cable run’s less than 10m , for cable run over 10 m ,2.5 sqmm cable to be 

    installed. 

    Circuit Breakers 

    Normally most of  Mobile Operator require different standard of  this MCB , but there is a main 

    supplier in the market , which is Merlin Gerin “C” Curve MCB ,only to be installed into 19 Inch rack DC 

    Distribution, second supplier is Moellor “C” Curve MCB only to be installed inside the Eltek DC Distribution , 

    Other type

     can

     be

     used

     but

     not

     required

     much

     by

     the

     Mobile

     Operator.

     

  • 8/19/2019 Siae Installation Guide ALCplus2

    28/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 28 of  40 

    1+0 Modular/Compact  Link MCB rating 6A or 10A 

    1+1 Modular link MCB Link  rating 2x6A or 10A 

    1+0 XPIC Modular /Compact link MCB rating 6A or 10A 

    1+1 XPIC Modular/Compact link MCB rating 2x6A or 10A 

    When the Protected link is to be installed , the installer must ensure that the A leg DC MCB and B leg DC 

    MCB are not located right  beside each other, put as much as separation as possible between them, this is 

    used as protection against accidentally leaning or dropping tools on to the DC Distribution panel and both 

    DC feeds are switches off. 

    DC Connection 

    Equipment end of  the Flex cable must be soldered into the DC connector pins , making sure  not 

    stray copper strands are present that could in the future short out to the case. MCB/Grounding end, each 

    end of  the exposed flex cable , black and blue need to be crimped into a ferrel of  the correct size, these 

    ends are then  inserted into the MCB (Bule)  –ve and Black +ve into the buss bar. 

    RIM DC Power connector 

    Input Voltage Range 40.8‐57.6 Vdc (Positive Ground) , Each RIM card Is protected internally by 3A 

    125V very fast blow Fuse, Note this not soldered and  field replacement. 

    Figure 31.DC Connector from the front view 

    Figure 32. DC Connector and Completed Connector 

  • 8/19/2019 Siae Installation Guide ALCplus2

    29/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 29 of  40 

    Link Commissioning 

    The Link commissioning engineer must be familiar with Siae SCT/LCT or WebLCT software and how 

    to set up the Siae ALCplus2 .The Link commissioning  are required as the following 

    1.  Pan and Tilt antenna for the Maximum Receive Signal Level 

    2.  Ensure the  Receive Level meets the specified level in the Link calculation sheet 

    3.  If  specified level is not achieved +/‐ 3dB variation from the value in a link calculation are acceptable 

    Link Commissioning  Pan & Tilt adjustment for integrated antenna solution please also refer to the 

    manufacture installation instructions. 

    Link Commissioning RSSI 

    Below is the a graph of  received signal RSSI which is plotted against voltage, this voltage  reading  is taken 

    from ODU’s  BNC connector. An analogue 0‐3 volt Multi Meter is recommended for taking these 

    instruments as it is response time quicker than a digital multi meter (DMM) and easier to get the peak 

    receive level. 

  • 8/19/2019 Siae Installation Guide ALCplus2

    30/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 30 of  40 

    r  

    Figure 33. Detected Voltage Versus the RF Receive Level 

    Field Engineer  can  also monitor the RX level by monitor at the screen of   software WeBLCT 

    Please note that Maximum Receive Level of  ALCplus 2 must not strong over than ‐20 dBm to avoid the 

    situation of 

     RX

     saturate.

     

  • 8/19/2019 Siae Installation Guide ALCplus2

    31/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 31 of  40 

    Figure 34  RX Level monitor by WebLCT 

    SNR must 

    be at lest 

    33.6 dB to 

    operating 

    modulation 

    at 256QAM 

    For operating the Link as Adaptive Modulation (ACM) the Modulation  from 4QM to  256QAM  of   link 

    will shift

     up

     or

     Shift

     down

     depending

     on

     the

     Receive

     SNR

     ( Signal

     to

     Noise

     Ratio)

     . 

  • 8/19/2019 Siae Installation Guide ALCplus2

    32/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 32 of  40 

    Link Configuration 

    After commissioning the link and meets the Maximum Receive Level or meets the value that specified in 

    Link calculation, then engineer must set up the Mian configuration of  the link which are , 

    1.  Frequency Channel 

    2.  Modulation 

    3.  Channel Bandwidth 

    4.  TX Power 

    5.  Capacity 

    Frequency Channel Setting 

    Connect to the IDU at LCT (USB port) by using the program WebLCT , then selected  the menu Radio  Brach 

    1A , if  the configuration is 1+1 Hot Standby when adjust the frequency at the Mian Radio ( 1A) then the 

    Standby Radio ( 2A) will follow automatically, but if  the configuration is 1+1 Frequency Diversity , then the 

    software WebLCT will be required to set up Frequency Channel of  Radio 1 A and Radio 2A and must be 

    Different Channel otherwise the software will warning and not allow user to apply the configuration. 

    TX/RX Frequency 

    range and Ch. 

    Currently Operating

     

    Move UP and Down 

    arrow to adjust CH. 

    Frequency ( 250 KHz 

    step) 

    Figure 35. Frequency Channel Setting on WebLCT 

  • 8/19/2019 Siae Installation Guide ALCplus2

    33/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 33 of  40 

    Please note that at the same link the Frequency of  Both site (Local &Remote) must be set as the Same 

    Channel And on this menu ,field Engineer must be set the sub‐menu as 

    ‐  Carrier Only  must be “Off” 

    ‐  RT PSU must be “On” 

    ‐  TX Transmitter  must be “On” 

    Modulation Setting 

    Siae ALCplus 2 can be set the modulation  as Fix Modulation (ACM Disable) or Adaptive Modulation (ACM 

    Enable). Please also remind that the link ( Local& Remote site) must be set as the same. 

    For Fix

     Mode

     Modulation

     ,set

     ACM

     Engine

     as”Disable”

     and

     Set

     TX

     Power

     Constant

     Peak

     Mode

     as

     “Disable”

     

    also. Then select the modulation as your specified. 

    For Adaptive Modulation , set ACM Engine as “Enable” and TX power Constant Peak mode can be set as 

    “Disable” then the TX Power Mode will work as “Average” which all modulation scheme from 4QAM to 

    256QAM will be have the same TX Power, but if  set TX Power Constant Peak mode as “Enable” then the TX 

    Power Mode will work as “Peak “  then at each modulation scheme will work as different TX Power ,see 

    below 

    ACM Engine 

    set as 

    Disable or 

    Enable 

    Figure 36.Modulation

     Mode

     Setting

     

  • 8/19/2019 Siae Installation Guide ALCplus2

    34/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 34 of  40 

    Figure 37.TX Power Constant Peak Mode Setting and TX Power Mode 

    TX Power Constant 

    Peak Mode Disable 

    and TX Power Mode 

    is “Average” and 

    Click at View 

    Current Config. To 

    View TX Power 

    Mode at each 

    Modulation Level

    TX Power Mode “Avera e”

  • 8/19/2019 Siae Installation Guide ALCplus2

    35/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 35 of  40 

    TX Power 

    Constant Peak 

    Mode set

     as

     

    “Enable” 

    Figure 38.TX Power Constant Peak Mode setting as “Enable” 

    Figure 39. TX Power Mode Peak

     

    Modulation Level (Upper & Lower) setting 

    After the ACM Engine be set as “Enable” user be also set the Upper Modulation ( Highest is 256QAM) and 

    Lower Modulation ( Lowest 4QAM) , Example if  the highest modulation need only 128QAM and Lowest 

    need only 32QAM , then the ACM engine will running Up‐shift and Down  –shift only between 

    128QAM,64QAm and 32QAM. 

  • 8/19/2019 Siae Installation Guide ALCplus2

    36/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 36 of  40 

    Figure 40. 

    Channel Bandwidth Setting 

    Figure 41. 

    For setting the Bandwidth and Modulation must be set as the Bandwidth with the Lower Modulation 

    ,Example if  the required Bandwidth is 56 MHz and ACM range is 4QAM to 256QAM then selected the 

    relative of  Bandwidth and Modulation as 56 MHz‐4QAM.as figure  below. 

    Setting 

    Upper and 

    Lower mod. 

  • 8/19/2019 Siae Installation Guide ALCplus2

    37/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 37 of  40 

    Figure 42. 

    TX Power Setting 

    There are 2 mode to set the TX power, which is Manual and Automatic (ATPC) 

    Figure 43. 

  • 8/19/2019 Siae Installation Guide ALCplus2

    38/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 38 of  40 

    IF user selected the TX power control mode as Automatic (ATPC) , user also have to set the Threshold of  

    Local PRx  High and Low range at least 3 dB different. User also can setting the Range of  Minimum TX 

    power to relative with the Power Mode “Peak” to make the ACM adjust the TX power suitable at each 

    modulation level. This Example set the Max TX Power is 23  dBmand Min TX Power is 22 dBm 

    Figure 44. 

    Adjust the Min and 

    Max of  the TX power 

    when setting the TX 

    power control as ATPC 

    After completely setting the TX Power Control ,then click at View Current ATPC Power ,To monitor the 

    result of  setting. 

    Figure 45. View  Current ATPC Power. 

  • 8/19/2019 Siae Installation Guide ALCplus2

    39/40

     

    Created By Monthien Satantoranin  : Siae Microelettronica South East Asia  Page 39 of  40 

    Capacity Setting 

    1)  Setting E1 traffic , Permanent E1 and Extra E1 ,result of  setting as figure below. 

    Figure 46. 

    Permanent 

    E1  setting 

    Max is 60E1 

    Extra E1 

    setting at 

    each 

    modulation 

    level 

    Maximum  E1 capacity that can be set at each 

    modulation 

    level 

    Permanent 

    +Extra)

     Click at View Current Config. To see the result of  setting 

    Figure 47.

     Show

     the

     Table

     of 

     Ethernet

     Capacity

     and

     TDM

     Traffic

     at

     Each

     modulation

     Level

     

  • 8/19/2019 Siae Installation Guide ALCplus2

    40/40

     

    2) Ethernet Capacity will reverse to the Capacity of  E1 traffic automatically , if  reduce the E1 then its 

    will be increase the Ethernet Capacity as shown in figure 47.