Page 1: Sika at Work · PDF filecontract will be administered under the FIDIC Conditions of Contract for Plan and Design Build, (First Edition, 1999). Conclusion:

No. 18.12 – April 2012 Infrastructure Project

Sika

at W

ork

Bridge Projects in SerbiaFull Range Solutions for New Construction and Refurbishment

Page 2: Sika at Work · PDF filecontract will be administered under the FIDIC Conditions of Contract for Plan and Design Build, (First Edition, 1999). Conclusion:

The ‘Beska’ Bridge – New Construction

The ongoing construction of ‘Beska’ bridge is taking part between the cities of Novi Sad and Belgrade near the town of Beska as part of the full, 4-lane development of the E75 motorway (part of the Pan-European Corridor 10).

The Design-Build Contract includes planning and construction of this bridge. With 2,213 m length it is the longest bridge construction in all of Serbia and the largest bridge in Europe currently being built. The bridge is crossing the Danube river with spans of 60 m + 105 m + 210 m + 105 m + 60 m. Three bridge piers are constructed in the river. The bridge have a height above ground of up to 40 m. The ‘cantilever meth-od of construction’ was used to build the wide spans of the bridge crossing the river. This girders were concreted and pre-stressed in short, balanced 5-m-sections on both sides of the piers at the same time (balance beams). Once the centre of the span was reached, the framework carriage is moved to the next pier and the procedure was repeated until the overhanging girders joined in the middle of a span.

Sika SolutionHRWR / Superplasticizersn Sika® ViscoCrete®-3077/-5380WR / Plasticizersn Plastiment® 20 ROther Admixtures & Additivesn SikaAer®, Separol® EP, Separol® N, Rugasol®-2 W, Sika Antisol® S, BetonloserConcrete Repair and Protection / Ready to use Mortarsn Sika® MonoTop®-610/-620/-910 N/-412 N, SikaTop®-122 SP, SikaTop® Armatec 110 EpoCem, SikaRefit®

Groutingn SikaGrout®-212/-318Waterproofing / Injectionn Sikadur®-Combiflex® SG-10 M 200, Sika®

Injection-451, Sika® Ergodur 500 ProStructural Bonding / Rigid Bonding / Anchoringn Sika AnchorFix®-2, Sikadur®-31 Rapid, Colma Reiniger

Page 3: Sika at Work · PDF filecontract will be administered under the FIDIC Conditions of Contract for Plan and Design Build, (First Edition, 1999). Conclusion:

The Bridge Design was completed by Buro Stuttgart – Leonhardt, Andra und Partner Beratende Ingenieure VBI, GmbH. Public Enterprise ‘Roads of Serbia’ is the investor and the Main Contractor is Alpine Mayreder Bau GmbH together with DSD Bruckenbau GmbH. The leading Sub-Contractors are Osijek Koteks, Mostogradnja and GPS. ‘Beska’ bridge is currently the longest bridge which is being built in Europe.

Conclusion:Sika’s local team full support and service together with high quality products provided intensive participation in this very important project.

Page 4: Sika at Work · PDF filecontract will be administered under the FIDIC Conditions of Contract for Plan and Design Build, (First Edition, 1999). Conclusion:

The ‘Sava’ Bridge – New Construction

The new cable stayed bridge, which will pass over the tip of Ada Ciganlija island, carries six traffic lanes and a double track light rail line as well as two pedestrian/cycling lanes. The bridge is a 6 span, con-tinuous superstructure with an overall length of 929 meters and deck width of 45.04 m. The main support system is a single pylon asymmet-ric cable stayed structure. The pylon is 200 meters high.

In the category of SINGLE-pylon cable-stayed bridges, with its 376 m main span and deck width of 45 m together with the 200 m pylon, Sava bridge is the largest asimmetric cable-stayed bridge being con-structed in the world at this present time, with almost 16.935 m2 of main span handing on ONE pylon.

With a main span of 376 m, the bridge over river Sava shall rank in the top 10 list of long span cable-stayed bridges constructed in Europe.

Sika SolutionHRWR / Superplasticizersn Sika® ViscoCrete®-3077WR / Plasticizersn Plastiment® 20 ROther Admixtures & Additivesn Sika Antisol® Sn Rugasol®-2 Wn Sika® BetonloserConcrete Repair and Protection / Ready to use Mortarsn SikaTop®-122 SPn SikaRefit®

Concrete Repair and Protection / Site Batch Mortarsn SikaLatex® EmulsionIndustrial Coating / Corrosion Protectionn SikaCor® EG Systemn Sikagard®-177n Sika® Permacor® 3326 EG-HGrouting / Resin Groutsn Sikadur®-42Structural Bonding / Rigid Bondingn Sikadur®-31Waterproofing / Jointsn Sikadur®-Combiflex® Plusn SikaSwell®-P-2507-HWaterproofing / Rigid Waterproofingn Sika®-4aOther productsn Sikadur®-52 Injectionn Sikadur®-501, Colma Cleaner

Belgrade ‘beauty’ rises with Sika

Page 5: Sika at Work · PDF filecontract will be administered under the FIDIC Conditions of Contract for Plan and Design Build, (First Edition, 1999). Conclusion:

The Preliminary Design was completed by Ponting Maribor, DDC Ljubljana & CPV Novi Sad in 2006, as a first-awarded concept design proposal on international competition in 2004. The bridge is to be con-structed using a Design-Build approach, with the detailed design to be completed by the contractor ‘Porr Technobau und Umwelt AG’. The contract will be administered under the FIDIC Conditions of Contract for Plan and Design Build, (First Edition, 1999).

Conclusion:Quality of Sika product and Sika’s experience guide this project to the successful end.

Page 6: Sika at Work · PDF filecontract will be administered under the FIDIC Conditions of Contract for Plan and Design Build, (First Edition, 1999). Conclusion:

‘Gazela’ is the most important bridge in Belgrade across the Sava river. It was built within four years (1966-1970).

The bridge is 332 m long and 27.5 m wide, with three lanes in each direction, and total road width of 21.8 m. It is constructed as a combi-nation of beam and arch, with shallow-frame beam and diagonal steel-concrete abutments. The maximum height of the span centre is 22.8 m at median water level.

The bridge is chief connection line between city center and New Belgrade, and also carries the transit traffic on E70 and E75 highways through Belgrade. As such, it is extremely overloaded and a cause of frequent congestion, as it leans on the main Belgrade’s Mostar inter-change. On average over 160,000 vehicles cross it every day (not-withstanding the impeded flow), even it was designed to be used by 40,000.

Sika SolutionStructural Bonding / Structural Strengtheningn Sika® CarboDur® Lamelle S 812/S912/S1012n SikaWrap®-230 C Rolls 300 mm/600mmn Sikadur®-330n Sikadur®-30Structural Bonding / Rigid Bondingn Sikadur®-31/41 CF NormalConcrete Repair and Protection / Ready to use mortarsn SikaTop®-122 SPn Sikadur®-32n SikaTop®-Armatec 110 EpoCemConcrete Repair and Protection / Concrete Protectionn Sikagard®-700 Sn Sikagard®-680 S BetoncolorWater reducers / HRWRn Sika®ViscoCrete®-3070Other Admixtures & Additives / Concrete Essentialsn Separol® NInjectionn Sika® Injection Packer MPS 13/115, MPS 13/70n Sika® Injection Pump EL1n Sikadur®-52 InjectionSealing and Bondingn Sika® Primer-3 Nn Fugenprofil 6/10/20/25 mmn Sikaflex® PRO-3 WFGrouting / Cementitious Groutsn SikaGrout®-212Other productsn Thinner C, Sika® Colma Cleaner, Sikadur®-501

The ‘Gazela’ Bridge – Refurbishment

Page 7: Sika at Work · PDF filecontract will be administered under the FIDIC Conditions of Contract for Plan and Design Build, (First Edition, 1999). Conclusion:

Refurbishment project was done by local company ‘Mostprojekt’. The investor is Public Enterprise ‘Roads of Serbia’ and the Main Contractor is company ‘Strabag AG’ from Austria. The Main Subcontractor is domestic company ‘Mostogradnja’ together with local companies ‘Beograd put’ (asphalt) and ‘zolacija’ (bridge deck insulation and anti-skid system).

Conclusion:Sika’s high experienced local team introduced innovative Sika’s tech-nologies and provided all necessary technical support which leaded to successful project realization.

Page 8: Sika at Work · PDF filecontract will be administered under the FIDIC Conditions of Contract for Plan and Design Build, (First Edition, 1999). Conclusion:

Sika Services AGCorporate Business Unit ContractorsSpeckstrasse 22CH-8330 PfäffikonSwitzerlandPhone +41 58 436 23 64 Fax +41 58 436 23 77www.sika.com

Our most current General Sales Conditions shall apply. Please consult the Product Data Sheet prior to any use and pro-cessing. ©

Sik

a Se

rvic

es A

G / B

U Co

ntra

ctor

s / S

AW /

04.2

012

/ CM

S / I

D: 2

3814

These reference projects are from:

Sika SerbiaAutoput za Novi Sad 244b11273 Zemun-BatajnicaPhone +381 11 377 43 37Fax +381 11 377 47 31www.sika.co.rs