12
Silver Lake Sediment Cap Five‐Year Monitoring Citizens Coordinating Council March 28, 2019

Silver Lake Sediment Cap Five‐Year Monitoring

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Silver Lake Sediment Cap Five‐Year Monitoring

Silver Lake Sediment Cap Five‐Year Monitoring

Citizens Coordinating Council

March 28, 2019

Page 2: Silver Lake Sediment Cap Five‐Year Monitoring

Summary of Remediation 2012 through 2013

• Removal and off‐site disposal of the following: o 400 cubic yards of sediment near a former 

GE outfall. o 2,900 cubic yards of soil, sediment and 

debris from the lower bank. o 9,200 cubic yards of bank soil and debris

• Bank restoration with clean fill and native vegetation.

• Sediment capped with a sand‐topsoil mix with a minimum total organic carbon (TOC) content of 0.5%.

Page 3: Silver Lake Sediment Cap Five‐Year Monitoring

Photos obtained and provided by Avatar Environmental

Page 4: Silver Lake Sediment Cap Five‐Year Monitoring

 

  

    

17

monitoring locations for cap thickness

monitoring locations for cap thickness AND sediment PCB levels

near‐shore cap monitoring locations (construction only, now covered with stone)

Silver Lake

Silver Lake‐ Cap Monitoring 5 Years After Cap Completion

1

2

3 5

8

4

6

9

14

13

12

11

10

7

16

15

18

17

19

20

21

Page 5: Silver Lake Sediment Cap Five‐Year Monitoring

  

 

 

      

 

  

 

 

6” Bioturbation Layer

6” Chemical Isolation Layer

2” Sacrificial Mixing Layer

On‐going natural sediment Lake deposition

Provides a layer for aquatic organisms and prevents mixing of the  bioturbation & isolation layers

Controls migration of PCBs from under‐lying sediments to surface water

Prevents contamination of chemical Isolation layer during cap placement

Native Lake Sediment

Silver Lake Sediment Cap Design In‐lake Portion: No Geotextile or Armor Stone 

Page 6: Silver Lake Sediment Cap Five‐Year Monitoring

Example core samples:  Silver Lake cap and  underlying sediment

M. Argue photo

 

Page 7: Silver Lake Sediment Cap Five‐Year Monitoring

Representative Silver Lake Core for Processing

Page 8: Silver Lake Sediment Cap Five‐Year Monitoring

■ ■ ■ ■ ■ ■ •

14

• .A

• • ► ~ 4 •

• 4 ► 1,, 1 4 ► 14 • • ► . • ~

Cap Th

ickn

ess, inches

Silver Lake Sediment Cap Thickness Annual Data from 2013 to 2018 40

2013 2014 2015 2016 2017 2018 Average of Six Years

35 12‐inch cap thickness

30

25

20

15

10

5

0

See Tables 1 and 4 and Figure 2 from GE's 2018 Monitoring of Cap Thickness and Integrity, Cap Isoloation Layer, and Deposition on Cap Surface Reportfor additional notes regarding core thickness measurement results.

Page 9: Silver Lake Sediment Cap Five‐Year Monitoring

   

 

                   

 

   

   

  

                                      

 

   

0

1

2

3

4

5

6

7

8Interval

TOP

REM

Mixing

TOP

REM

Mixing

TOP

REM

Mixing

TOP

REM

Mixing

TOP

REM

Mixing

TOP

REM

Mixing

TOP

REM

Mixing

TOP

REM

Mixing

TOP

REM

Mixing

TOP

REM

Mixing

Sample ID SL‐CAP‐01 SL‐CAP‐04 SL‐CAP‐06 SL‐CAP‐08 SL‐CAP‐10 SL‐CAP‐12 SL‐CAP‐14 SL‐CAP‐16 SL‐CAP‐19 SL‐CAP‐20

Silver Lake Sediment Cap PCB Data Immediatley Following Cap Construction and  1 & 5‐Year Post Contruction

2013 Immediate

2014 (Year 1)

2018 (Year 5)

Total P

CB (m

g/kg

dry weigh

t)

PCB concentration in the Mixing Interval at SL‐CAP‐01 in 2013 was 51.8ppm. That full concentration is not shown on the Mixing Interval graph to reduce Y‐axis scale. 

Non detected concentration represents half the associated reporting limit.  For additonal notes see Tables 2 and 5 from GE's 2018 Monitoring of Cap Thickness and Integrity, Cap Isoloation Layer, and Deposition on Cap Surface Report.

1.4 Interval

TOP

ISO

TOP

ISO

TOP

ISO

TOP

ISO

TOP

ISO

TOP

ISO

TOP

ISO

TOP

ISO

TOP

ISO

TOP

ISO

Sample SL‐CAP‐01 SL‐CAP‐04 SL‐CAP‐06 SL‐CAP‐08 SL‐CAP‐10 SL‐CAP‐12 SL‐CAP‐14 SL‐CAP‐16 SL‐CAP‐19 SL‐CAP‐20

2013 Immediate

2014 (Year 1)

2018 (Year 5)

Non detected concentration representshalf the associated reporting limit.  For additonal notes see Tables 2 and 5 from GE's 2018 Monitoringof Cap Thickness and Integrity, Cap Isoloation Layer, and Deposition on Cap Surface Report.

ISO is the Isolation Layer

Silver Lake Sediment Cap PCB Data Immediatley Following Cap Construction and 1 & 5‐Year Post Contruction

1.2

1

0.8

0.6

0.4

0.2

0

Total P

CB (m

g/kg

dry

weigh

t)

Page 10: Silver Lake Sediment Cap Five‐Year Monitoring

  

 

                

  

 

 

Sedimen

t PCB

con

centratio

n – pa

rts pe

r million

20,000

800

600

400

200

MAX*

Sediment PCB Levels Five Years After Capping

Average PCB levels in the top foot of the lake bottom are 99.9% LOWER with the sediment cap now in place.

AVG*

Pre‐capping AVG=0.05     MAX=0.24 AVG=0.26 MAX=0.99

*NOT including an outlier of 20,689 ppm Isolation Layer Top Layer

Page 11: Silver Lake Sediment Cap Five‐Year Monitoring

 

 

Next Steps • Continued long term monitoring and maintenance; 

next cap sampling event scheduled for the Summer of 2023.

• Cap thickness and PCBs analysis will be assessed at the same 10 locations that PCB analysis has been performed at during the first 5 years of monitoring.

• Cap thickness will be assessed at 3 additional locations where the 2018 monitoring event showed the cap to be less than 14” thick (but still above 12”).

Page 12: Silver Lake Sediment Cap Five‐Year Monitoring

23

Photos obtained and provided by Avatar Environmental