13
TAX MAP KEY/LOCATION MAP ZONING MAP P.Q. ZONING LEGEND P.Q. WAYNE TOWNSHIP PASSAIC COUNTY SITE PLAN APPLICATION BLOCK 3510, LOT 157 TAX MAP SHEET 35.02 NEW JERSEY PRELIMINARY & FINAL SITE PLAN P.Q. BLOCK LOT QUALIFIER OWNER NAME AND ADDRESS GRAPHIC SCALE UTILITIES / AUTHORITIES GRAPHIC SCALE GRAPHIC SCALE 200' RADIUS NEIGHBORING PROPERTY DATA PER CERTIFIED PROPERTY OWNERS LISTING DATED 05-05-2015 SHEET INDEX

SITE PLAN APPLICATION - LoopNet

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

TAX MAPKEY/LOCATION MAP ZONING MAP

P.Q.

ZONING LEGEND

P.Q.

WAYNE TOWNSHIPPASSAIC COUNTY

SITE PLAN APPLICATION

BLOCK 3510, LOT 157TAX MAP SHEET 35.02

NEW JERSEY

PRELIMINARY & FINAL SITE PLAN

P.Q.

BLOCK LOT QUALIFIER OWNER NAME AND ADDRESS

GRAPHIC SCALE

UTILITIES / AUTHORITIES

GRAPHIC SCALE GRAPHIC SCALE

200' RADIUS NEIGHBORING PROPERTY DATA PER CERTIFIEDPROPERTY OWNERS LISTING DATED 05-05-2015

SHEET INDEX

PROPOSED BUILDING "B"2,250 SF FOOTPRINT

PROPOSED BUILDING "A"4,250 SF FOOTPRINT

17' WIDE PROPOSED ROADWIDENING AREA TO BEDEDICATED TO PASSAICCOUNTY (HATCHED)7,406 SF (0.17 Ac)

10' WIDE PROPOSED ROADWIDENING AREA TO BEDEDICATED TO PASSAICCOUNTY (HATCHED)5,535 SF (0.13 Ac)

PROPOSED AREA(POST RIGHT-OF-WAY DEDICATION)

266,795 SF (6.12 Ac)

PROPOSED PARKING SPACE ANALYSIS

INSERT A

INSERT B

DESIGN VEHICLE

USES

≤2.5 STY/

6 FT

50 FT

4,250 SF

PROPOSED AREA(POST RIGHT-OF-WAY DEDICATION)

266,795 SF (6.12 Ac)PROPOSED BUILDING "A"

4,250 SF FOOTPRINTFFF: 199.00

STORM

WATER RECH

ARGE

FACILITY

GRAPHIC SCALE

PROPOSED AREA(POST RIGHT-OF-WAY DEDICATION)

266,795 SF (6.12 Ac)

PROPOSED BUILDING "B"2,250 SF FOOTPRINT

FFF: 199.00

PROPOSED BUILDING "A"4,250 SF FOOTPRINT

FFF: 199.00

STORM

WATER RECH

ARGE

FACILITY

STORM

WATER RECH

ARGE

FACILITY

GRAPHIC SCALE

PROPOSED BUILDING "B"2,250 SF FOOTPRINT

FFF: 199.00

PROPOSED BUILDING "A"4,250 SF FOOTPRINT

FFF: 199.00

DRAINAGE AREA

CATCH BASIN #1

0.135 Ac IMPERVIOUS

0.006 Ac PERVIOUS

DRAINAGE AREACATCH BASIN #2

0.070 Ac IMPERVIOUS0.003 Ac PERVIOUS

DRAINAGE AREACATCH BASIN #4

0.151 Ac IMPERVIOUS0.082 Ac PERVIOUS

DRAINAG

E AREA

CATCH BASIN

#5

0.081 Ac IMPERVIO

US

0.010 Ac PERVIOU

S

DRAINAGE AREACATCH BASIN #3

0.202 Ac IMPERVIOUS0.104 Ac PERVIOUS

DRAINAG

E AREA

CATCH BASIN

#7

0.091 Ac IMPERVIO

US

0.004 Ac PERVIOU

S

DRAINAGE AREACATCH BASIN #6

0.032 Ac IMPERVIOUS0.017 Ac PERVIOUS

GRAPHIC SCALE

PROPOSED AREA(POST RIGHT-OF-WAY DEDICATION)

266,795 SF (6.12 Ac)

GRAPHIC SCALE

A-1

A-2

B-3

A-4

B-5

B-6

B-7

B-8

C-9

A-10

A-11

A-12

B-13

C-14

D-15

D-16

D-17

D-18

PROPOSED AREA(POST RIGHT-OF-WAY DEDICATION)

266,795 SF (6.12 Ac)

LEGEND

7-A G-26

GRAPHIC SCALE

LUMINAIRE LOCATIONS

No. Label X Y Z MH Orientation Tilt

Location

1 A -384.4 318.3 25.0 25.0 196.0 0.0

2 A -358.4 222.8 25.0 25.0 53.1 0.0

3 B -220.3 323.4 25.0 25.0 238.1 0.0

4 A -166.1 103.5 25.0 25.0 -35.6 0.0

5 B -327.9 322.5 25.0 25.0 153.3 0.0

6 B -185.5 270.8 25.0 25.0 238.1 0.0

7 B -151.0 218.3 25.0 25.0 238.1 0.0

8 B -114.9 165.2 25.0 25.0 238.1 0.0

9 C -225.0 193.0 25.0 25.0 238.9 0.0

10 A -325.8 172.7 25.0 25.0 53.1 0.0

11 A -292.7 122.2 25.0 25.0 53.1 0.0

12 A -255.2 82.0 25.0 25.0 53.1 0.0

13 B -99.4 109.6 25.0 25.0 28.2 0.0

14 C -503.5 344.4 25.0 25.0 69.0 0.0

15 D -254.6 246.2 3.0 3.0 0.0 0.0

16 D -269.9 270.3 3.0 3.0 0.0 0.0

17 D -239.0 222.2 3.0 3.0 0.0 0.0

18 D -205.1 170.3 3.0 3.0 0.0 0.0

LUMINAIRE SCHEDULE

Symbol Label Qty File Lumens LLF WattsCatalog Number Description Lamp

A 6 P21-3-55LA-

NW-EHSS.ies

Absolute 1.00 52

B 6 P21-4-55LA-

NW-EHSS.ies

Absolute 1.00 52

C 2 P21-4-55LA-

NW.ies

Absolute 1.00 53.8

D 4 FN1-24LU-3K-

DB.ies

Absolute 1.00 45.9

P21-3-55LA-NW-

EHSS

PUREFORM (P21)

(1) LIGHT ARRAY OF 48

LEDs DRIVEN AT 350mA

P21-4-55LA-NW-

EHSS

PUREFORM (P21)

(1) LIGHT ARRAY OF 48

LEDs DRIVEN AT 350mA

P21-4-55LA-NW PUREFORM (P21)

(1) LIGHT ARRAY OF 48

LEDs DRIVEN AT 350mA

FN1-24LU-3K-DB

SQUARE LED BOLLARD

w/ SPECULAR

ALUMINUM HEAT-SINK

24 - NICHIA LEDs

WITH HOUSE SIDE SHIELD

WITH HOUSE SIDE SHIELD

SEE 'LIGHTING PLAN' FOR FIXTUREDETAILS

SHRUB PLANTING

350 NW BRP

25' BRP

FN1 24LU-3K DB

PROPOSED AREA(POST RIGHT-OF-WAY DEDICATION)

266,795 SF (6.12 Ac)TEM

P. TOPSO

IL STOCK

PILE

100 LFSTABILIZED

CONSTRUCTIONENTRANCE

100 LFSTABILIZED

CONSTRUCTIONENTRANCE

GRAPHIC SCALE

SOIL EROSION AND SEDIMENT CONTROL NOTES1. All soil erosion and sediment control practices on this plan will be constructed in accordance with the "New Jersey Standards forSoil Erosion and Sediment Control" 7th Edition last revised January 2014. These measures will be installed prior to any major soildisturbance or in their proper sequence and maintained until permanent protection is established.

2. All soil to be exposed or stockpiled for a period of greater than 14 days, and not under active construction, will be temporarilyseeded and hay mulched or otherwise provided with vegetative cover. This temporary cover shall be maintained until such timewhereby permanent restabilization is established.

3. Seeding Dates: The following seeding dates are best recommended to establish permanent vegetative cover within most locationsin the HEPSCD: Spring - 3/1-5/15 and Fall - 8/15 - 10/1

4. Sediment fences are to be properly trenched and maintained until permanent vegetative cover is established

5. All storm drainage inlets shall be protected by one of the practices accepted in the Standards, and protection shall remain untilpermanent stabilization has been established. Storm drainage outlet points shall be protected as required before they becomefunctional.

6. Mulch materials shall be un-rotted small grain straw applied at the rate of 70 to 90 pounds per 1,000 square feet and anchored witha mulch anchoring tool, liquid mulch binders, or netting tie down. Other suitable materials may be used if approved by the SoilConservation District.

7. All erosion control devices shall be periodically inspected, maintained and corrected by the contractor. Any damage incurred byerosion shall be rectified immediately.

8. The Hudson-Essex-Passaic Soil Conservation District will be notified in writing at least 48 hours prior to any soil disturbingactivities. Fax - (973) 364-0784 OR email - [email protected]

9. The applicant must obtain a District issued Report-of-Compliance prior to applying for the Certificate of Occupancy orTemporary Certificate of Occupancy from the respective municipality, NJ - DCA or any other controlling agency. Contact theDistrict at 973-364-0786 to request a Final Inspection, giving advanced notice upon completion of the restabilization measures. Aperformance deposit may be posted with the District when winter weather or snow cover prohibits the proper application of seed,mulch, fertilizer or hydro-seed.

10. Paved roadways must be kept clean at all times. Do not utilize a fire or garden hose to clean roads unless the runoff is directed to aproperly designed and functioning sediment basin. Water pumped out of the excavated areas contains sediments that must be removedprior to discharging to receiving bodies of water using removable pumping stations, sump pits, portable sedimentation tanks and/or siltcontrol bags.

11. All surfaces having lawn or landscaping as final cover are to be provided topsoil prior to re-seeding, sodding or planting. A depthof 5 inches (unsettled) is recommended.

12. All plan revisions must be submitted to the District for proper review and approval.

13. A crushed stone wheel cleaning tracking-pad is to be installed at all site exits using 2 ½ -1"crushed angular stone (ASTM 2 or 3) toa minimum length of 50 feet and minimum depth of 6". All driveways must be provided with crushed stone until paving is complete.

14. Steep slopes incurring disturbance may require additional stabilization measures. These "special" measures shall be designed bythe applicant's engineer and be approved by the Soil Conservation District.

15. The Hudson-Essex-Passaic Soil Conservation District shall be notified, in writing, for the sale of any portion of the projector for the sale of individual lots. New owners' information shall be provided. Additional measures deemed necessary byDistrict officials shall be implemented as conditions warrant.

AREA OF DISTURBANCE

RECOMMENDED CULTIVARS

TEMPORARY STOCK PILE

PLAN VIEW

PROFILE

STABILIZED CONSTRUCTION ENTRANCE

SILT FENCE & REINFORCED SILT FENCE

SITE LOCATION(ZONE 6b)

MULCHING

MULCHING

DUST CONTROL

SEEDING

SEEDBED PREPARATION

SITE PREPARATION

SEEDBED PREPARATION

SITE PREPARATION

SEEDING

SEEDING (TEMPORARY) RATES & DATES

STANDARDS FOR TEMPORARY VEGETATIVE COVER SEEDING (PERMANENT) RATES & DATES

STANDARDS FOR PERMANENT VEGETATIVE COVER

LIMESTONE APPLICATION RATE BY SOIL TEXTURELIMESTONE APPLICATION RATE BY SOIL TEXTURE

CONSTRUCTION SEQUENCE

FIGURE 1-1 COASTAL PLAIN SEDIMENTS WITHPOTENTIAL TO FORM ACID (SULFATE) SOILS

SITELOCATION

INLET PROTECTION DETAIL

CATCH BASIN

HANDICAP PARKING SIGN VAN HANDICAP PARKING SIGN

"STOP" SIGN

NO LEFT TURN SIGN

"DO NOT ENTER" SIGN "ONE WAY" SIGN

"KEEP RIGHT" SIGN

CLEAN OUT

PIPE TRENCH

REFUSE SCREENING

RETAINING WALL

SIDEWALK (ON-SITE)

DEPRESSED CURB AT DRIVEWAYS

SITE PAVEMENT

SANITARY SEWER LATERAL & INSPECTION RISER DETAIL "KEEP RIGHT" SIGN "DRIVE THRU" SIGN "NO PARKING, LOADING &UNLOADING ONLY" SIGN

BELGIAN BLOCK CURB

SIDEWALK ADDITION DUE TO OBSTRUCTIONS

COUNTY CURB RAMP

NJDOT H/C CURB RAMP TYPE 7

REFUSE ENCLOSURE