Site Survey Check List

Embed Size (px)

Citation preview

  • 8/15/2019 Site Survey Check List

    1/20

    Project VTS

    42xx-040P/18-Feb-03

    Site S urvey Check List

    VOC5060

    Project VTS

    Author: Approved by:

    ___________________ ____________________Name Name

    Site Survey C heck List

  • 8/15/2019 Site Survey Check List

    2/20

    Project VTS

    42xx-040P/18-Feb-03

    2016 N ORCONTROL IT ASAll rights r eserv ed

    No p art of this work covered by the copy righthereon may be r eproduced or otherwise copied

    without prior p ermission fromNORCONTROL IT AS

    Site Survey C heck List

  • 8/15/2019 Site Survey Check List

    3/20

    Project VTS

    42xx-040P/18-Feb-03

    DOCUMENT STATUS

    Issue No. Date/Year Inc. by Issue No. Date/Year Inc. by

    CHANGES IN DOCUMENT

    Issue ECO Paragraph Paragraph Heading/No. No. No. Description of Change

    Site Survey Check List i

  • 8/15/2019 Site Survey Check List

    4/20

    Project VTS

    42xx-040P/18-Feb-03

    Site Survey Check List ii

  • 8/15/2019 Site Survey Check List

    5/20

    Project VTS

    42xx-040P/18-Feb-03

    TABLE OF CONTENTS

    Section Page

    1. P ROJECT I NTRODUCTION ............................................ 11.1 C USTOMER C ONTACT ...................................... 1

    2. H ARDWARE C HECK L IST ............................................ 22.1 B UILDINGS ............................. 2

    2.2 P HYSICAL D IMENSIONS AND E NTRANCES ..................................................... 2

    2.3 C ABLING ............................ 3

    2.4 P OWER ........................... 3

    2.5 C ONTROL R OOM .................................. 4

    2.6 E QUIPMENT R OOM .................................... 4

    2.7 L IGHT C ONDITIONS .................................... 5

    2.8 M ASTS .......................... 5

    2.9 R ADAR .......................... 6

    2.10 L INK E QUIPMENT .................................. 6

    2.11 D OCUMENTATION .................................. 7

    2.12 I NSTALLATION E QUIPMENT ......................................... 7

    2.13 C OMMENTS /N OTES .................................... 8

    3. S OFTWARE C HECK L IST ........................................... 93.1 M AP ........................ 9

    3.2 C ONFIGURATION .................................. 9

    3.3 C OMMENTS /N OTES .................................... 10

    Site Survey Check List iii

  • 8/15/2019 Site Survey Check List

    6/20

    Project VTS

    42xx-040P/18-Feb-03

    - This p age i s i ntentionally left blank -

    Site Survey Check List iv

  • 8/15/2019 Site Survey Check List

    7/20

    Project VTS

    42xx-040P/18-Feb-03

    1. PROJECT INTRODUCTION

    Customer :

    Project :

    Project Number :

    Performed By : Date :

    The p urpose o f this Si te Survey Check List is t o get all the rel evant data a bout the si te a searly as p ossible i n a sp ecic p roject.

    This list is p repared for a maximum system where the person responsible for t he SiteSurvey will ll in the r elevant information.

    1.1 Customer Contact

    Customer Name Responsibility Tlx/Fax/Tlf

    CC Radar 1 Radar 2

    a. Necessary with admission to enter area? _____ _____ _____

    b. Working hours? _____ _____ _____

    c. Recommended lodging? _____ _____ _____

    Site Survey Check List 1

  • 8/15/2019 Site Survey Check List

    8/20

    Project VTS

    42xx-040P/18-Feb-03

    2. HARDWARE CHECK LIST

    2.1 Buildings Notes

    a. All construction works nished (buildings/power/datalinks)? _____

    b. If not, when will it be nished? _____

    c. Storage place ready? _____

    d. OK to perform unpacking at storage place? _____

    e. Mentioned at para. 3? _____

    f. Workshop for NCSS during installation available? _____

    2.2 Physical Dimensions and Entrances

    a. Check place for consoles for sufficient spacing. _____

    b. Check place for antennas for sufficient spacing. _____

    c. Check place for wallmounted equipment for sufficient spacing. _____

    d. How is it possible to take equipment to proposed location? _____

    e. Check door/window openings for enough width. _____

    f. Is there any angled corridors/stairways causing problems? _____

    g. Can the lift/oor/roof/walls take the weight of the equipment? _____

    Site Survey Check List 2

  • 8/15/2019 Site Survey Check List

    9/20

    Project VTS

    42xx-040P/18-Feb-03

    2.3 Cabling Notes

    a. Customer responsibility? _____

    b. Cable layout. Where can the cables be running? _____

    c. Dimensions on cable ducts. _____

    d. Cable lengths. _____

    e. Any connection boxes to be used/mounted? Give dimensions! _____

    f. Re.e):Any special types (ex/indoor/outdoor)? _____

    g. Re.e):Which connectors are used? _____

    h. Re.e):NCSS to deliver boxes? _____

    i. Any regulations/requirements of cable trunks or cable trays in computeroor? _____

    2.4 Power Note: NCSS personnel is no t certied to do installation works on AC Line

    Voltage (110/220 VAC).

    a. Available power. Indicate voltage/frequency/number of phases. _____

    b. What is the power source domestic/generator/via regula _____

    c. Satisfactory quality on power? NCSS will test with line analyzer. _____

    d. Check type of connection (plug type). _____

    e. Dene fuse values available/to be installed. Ref spec. _____

    f. Grounding. Ref. spec. _____

    Site Survey Check List 3

  • 8/15/2019 Site Survey Check List

    10/20

    Project VTS

    42xx-040P/18-Feb-03

    g. Size of cable passages roof/wall/oor/cabinets. _____

    Site Survey Check List 4

  • 8/15/2019 Site Survey Check List

    11/20

    Project VTS

    42xx-040P/18-Feb-03

    2.5 Control Room Notes

    a. Make a drawing/sketch of the room with measures. Also put in wantedposition of all equipment to b e i nstalled. ( Consoles, printers,videorecorders etc). _____

    b. What is the room temperature/humidity? _____

    c. Is the room air-conditioned? _____

    d. Is there a Data-oor? _____

    e. Floor material (wood, armoured concrete). _____

    f. Wall materials. _____

    g. Any existing equipment to be installed into consoles? _____

    h. Give exact dimensions on parts mentioned under para.g). Ref spec. _____

    i. How is it to physically install parts mentioned u nder para.g) ( problemswith cables, dismantling, obstructions etc). _____

    j. Who is going to make the installation mentioned _____

    2.6 Equipment Room

    a. Make a drawing/sketch of the room with measures. _____

    b. Also put in wanted position of equipment to be _____

    c. What is the room temperature/humidity? Is the room air-conditioned? _____

    d. Is there a Data-oor? _____

    e. Floor material (wood, armoured concrete). _____

    Site Survey Check List 5

  • 8/15/2019 Site Survey Check List

    12/20

    Project VTS

    42xx-040P/18-Feb-03

    f. Wall materials. _____

    Site Survey Check List 6

  • 8/15/2019 Site Survey Check List

    13/20

    Project VTS

    42xx-040P/18-Feb-03

    2.7 Light Conditions Notes

    a. How is the room/rooms lighted? _____

    b. Windows causing reections on the screens? _____

    c. Colour on walls/ceiling. _____

    d. Anything to be changed? _____

    e. NCIT to deliver some special screening/illumination? _____

    2.8 Masts Note: NCIT has no competence on ci vil works concerning masts, and

    appropriate exp ertise m ust be b rought in from subcontractors.

    a. Is a mast to be installed? _____

    b. State height. _____

    c. Foundation. _____

    d. Meteorological conditions (max. wind force etc). _____

    e. Lightning conductor. _____

    f. Mast lights to be mounted? _____

    g. Local safety requirements (ladders, rails, signs etc) _____

    h. Weight of equipment to be installed in mast. _____

    Site Survey Check List 7

  • 8/15/2019 Site Survey Check List

    14/20

    Project VTS

    42xx-040P/18-Feb-03

    2.9 Radar Notes

    a. Position of antenna. Give exact geographical LAT/LON position. _____

    b. Available power. Re. 2.4 Power. _____

    c. How is the possibilities to transport the antennato the site? _____

    d. Polemast to be mounted? _____

    e. Polemast baseplate to be dened. _____

    f. Radar coverage area. Make a sketch on a map. Ref. Project Spec. _____

    g. Sight from site. Any obstructions causing blind sectors? Ref. Project Spec. _____

    h. Customer to get frequency assignment for radar. _____

    i. Customer to get RADIATION Warning Sign. _____

    j. Distance from antenna to MTR. _____

    k. Mounting method for waveguide to mast. _____

    l. New Remote Control to existing radar? _____

    m. Who is going to do the interface engineering and installation? _____

    2.10 Link Equipmenta. Position of antenna. _____

    b. Available power. Re. 2.4 Power. _____

    c. How is the possibilities to transport the antenna to the site? _____

    d. How will it be to perform service (place around, height etc)? _____

    Site Survey Check List 8

  • 8/15/2019 Site Survey Check List

    15/20

    Project VTS

    42xx-040P/18-Feb-03

    e. Sight from site. Any obstructions? _____

    f. Line of sight over land or sea (diversity)? _____

    g. Customer to get frequency assignment for link. _____

    Site Survey Check List 9

  • 8/15/2019 Site Survey Check List

    16/20

    Project VTS

    42xx-040P/18-Feb-03

    2.11 Documentation Notes

    a. Get information for existing equipment to be integrated/used in newsystem (radar video level, radar antenna bearing etc). _____

    b. Get "Map Information" (safety areas, cables overlays, etc. Ref. SW Site Survey List. _____

    c. Photos from site. _____

    2.12 Installation Equipmenta. What kind of tools are required? _____

    b. What kind ot tools are available? _____

    c. Where to get in and any who to contact. _____

    Site Survey Check List 10

  • 8/15/2019 Site Survey Check List

    17/20

    Project VTS

    42xx-040P/18-Feb-03

    2.13 Comments/Notes

    Section Comment OK

    Site Survey Check List 11

  • 8/15/2019 Site Survey Check List

    18/20

    Project VTS

    42xx-040P/18-Feb-03

    3. SOFTWARE CHECK LIST

    3.1 Map Notes

    a. Indicate map limits. _____

    b. Give accurate radar positions. _____

    c. Radar positions to be marked on synthetic map? _____

    d. What is going to be displayed? _____

    e. Display overlay. What should be possible to remove? _____

    f. Give wanted colours on items mentioned under d). _____

    g. Position of Reference Points. _____

    3.2 Congurationa. If more than 1 console, which is the Integrating Console? _____

    b. If the console(s) shall have spec _____

    c. Navigation Channels to be implemented? _____

    d. If yes on para. c), make map on wanted positions. _____

    e. Buoy Surveillance to be implemented? _____

    f. If yes in para. e), make buoylist with position and name. _____

    g. Make a list over wanted sites with name and positions. _____

    h. Radar index connected to Site index or not? _____

    i. If 2 x RTS, which radar to which RTS. _____

    Site Survey Check List 12

  • 8/15/2019 Site Survey Check List

    19/20

    Project VTS

    42xx-040P/18-Feb-03

    j. Wanted RDC connections. _____