    Site Tests for Distribution Boards

    1. Name plate verication as per approved drawings2. Chec for locing s!stem is provided for the doors of the panel". Chec for warning plate # danger signs are provided$. Chec for tightness of all bolts% clamps% and terminals

    &. 'arth connection chec6. 'arth continuit! for complete panel(. Chec if apparatus with a voltage e)ceeding the limits of e)tra*low voltage

    are attached to lids% doors cover plates% etc.% of the panel% are connected with

    protective earth conductor.+. Chec for protective circuits within an ,SS'-B/ shall not include a

    disconnecting device 0switch% disconnector% etc..1. Cleanliness of insulators and bushings 0if an!2. Chec all moving parts of panels are properl! lubricated and not corrode.". Chec availabilit! of space heaters # dehumidiers as per approved drawings

    $. Chec operation of space heaters # dehumidiers and settings of the same asper approved drawings.

    &. Chec interchangeabilit! of similar t!pes of breaers 0if an!. Chec ,uto # -anual operation 0closing#opening of breaers for(. abeling # tagging for the installed components as per approved drawings.+. Chec ratings # t!pe of the various items installed 0rela!s% breaers% -CBs%

    -CCBs% 3CDs% Contactors% CTs% 4Ts% etc. as per approved drawings.5. Chec trip settings of the various items installed 03ela!s% Breaers% -CCBs%

    3CDs% etc. as per approved drawings.16.Chec for proper dressing# bunching of wires and cables.11.Chec for an! damage of insulation of wires and cables.

    12.Chec for t!pe and si7e of cables#wires as per approved drawings.1".Chec proper identication for cables#wires for power and control wiring as

    per approved drawings.1$.Chec phase se8uence of the phases for proper connections.1&.Chec for mechanical # electrical interlocs operation.1.Chec for protective devices for operation and correct settings as per

    drawings.1(.Chec for insulation resistance1+.9igh voltage test15.Chec for all the e)posed live parts were protected b! providing insulating

    material sheets26.:isual chec of switching devices and other e8uipments for damage.21. Chec for proper operation of indications and meters.22.Chec that in order to prevent unauthori7ed operation% withdraw able parts

    ma! be provided with means for a padloc or loc to secure them in one or

    more of their positions.