5
GENERAL ASBESTOS NOTES APPLICABLE TO SK-1 1. THE CONTRACTOR SHALL COORDINATE ALL ASBESTOS REMOVAL WORK WITH OWNER'S REPRESENTATIVE AND OTHER CONTRACTORS. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AN EMERGENCY PROJECT VARIANCE PER 12 NYCRR PART 56-11.2.. 3. CEILINGS & CEILING SUPPORTS, ETC. SHALL BE REMOVED UNDER ASBESTOS ABATEMENT CONTRACT WORK WHERE INDICATED. 4. ALL ASBESTOS MATERIALS REMOVED SHALL BE DISPOSED OF AS AN ACM. 5. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND QUANTITIES, BEFORE START OF WORK. 6. THE CONTRACTOR SHALL PERFORM ALL CONTRACT WORK IN ACCORDANCE WITH CONTRACT SPECIFICATIONS, 12 NYCRR PART 56, OSHA 1926.1101, NESHAPS 40 CFR PART 61, AHERA 40 CFR PART 763 AND ALL OTHER APPLICABLE CODES. 7. THE CONTRACTOR SHALL MAINTAIN SECURITY IN THE BUILDING AND WORK AREA AT ALL TIMES, FOR THE DURATION OF THE ASBESTOS REMOVAL PROJECT. 8. IF THE BUILDING ENVELOPE BECOMES EXPOSED AS A RESULT OF THIS WORK, THE CONTRACTOR SHALL PROVIDE TEMPORARY WEATHER AND SECURITY PROTECTION AND SHALL MAINTAIN UNTIL THE PERMANENT BUILDING ENVELOPE HAS BEEN RESTORED. CONTRACTOR SHALL BE RESPONSIBLE FOR FULL RESTORATION OF DAMAGED AREAS. 9. ASBESTOS TRANSPORT ROUTE TO BE COORDINATED WITH THE OWNER'S REPRESENTATIVE. 10. CONTRACTOR SHALL COORDINATE SHUT DOWN AND LOCK OUT OF ELECTRICAL POWER WITH OWNER'S REPRESENTATIVE. ALL TEMPORARY POWER TO THE WORK AREA SHALL BE BROUGHT IN FROM OUTSIDE THE WORK AREA THROUGH A GROUND-FAULT CIRCUIT INTERRUPTER AT THE SOURCE OF THE POWER. 11. MOVEABLE OBJECTS SHALL BE REMOVED BY THE ABATEMENT CONTRACTOR AND SHALL BE PRE-CLEANED PER CODE RULE 56 AND SHALL BE DISPOSED OF AS A NON-CONTAMINATED WASTE. 12. VARIATIONS (+/- 10%) IN QUANTITIES AND LOCATIONS OF ACM SHALL BE CONSIDERED AS HAVING NO IMPACT ON CONTRACT PRICE AND/OR SCHEDULE OF THIS CONTRACT. 13. THE OWNER IS RESPONSIBLE TO CONTRACT FOR NYSDOL PROJECT MONITORING / AIR SAMPLING TECHNICIAN SERVICES. OSHA PERSONAL AIR MONITORING IS THE RESPONSIBILITY OF THE CONTRACTOR. 14. CONTRACTOR SHALL REQUEST AND RECEIVE PROJECT MONITOR AND OWNER'S REPRESENTATIVE APPROVAL BEFORE ASBESTOS REMOVAL IS UNDERTAKEN. 15. CONTRACTOR TO HEPA VACUUM EXISTING NON-MOVABLE EQUIPMENT PRIOR TO COVERING WITH PROTECTIVE PLASTIC SHEETING. 16. UNDER NO CIRCUMSTANCES SHALL CONTAMINATED WASTEWATER ENTER THE SANITARY SEWER SYSTEM. ALL WASTE WATER SHALL BE FILTERED THROUGH A SYSTEM WITH AT LEAST 5.0 MICRON PARTICLE SIZE COLLECTION CAPABILITY. CONTRACTOR SHALL BE RESPONSIBLE FOR FULL RESTORATION OF DAMAGED AREAS. 17. IF WATER LEAKS THROUGH THE CONTAINMENT AREAS, OR FROM THE DECONTAMINATION AREA, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WATER DAMAGE. CONTRACTOR SHALL DOCUMENT ALL PRE-EXISTING WATER DAMAGE PRIOR TO ESTABLISHING CONTAINMENT AREAS. 18. IF SUSPECT OR ASBESTOS MATERIAL IS DISCOVERED, NOT PREVIOUSLY IDENTIFIED, CEASE OPERATIONS AND NOTIFY THE OWNER AND/OR OWNER'S REPRESENTATIVE IMMEDIATELY. 19. CONTRACTOR SHALL IDENTIFY AND INCLUDE IN THEIR BID ALL DEMOLITION REMOVALS SHOWN ON THE ARCHITECTURAL, PLUMBING, ELECTRICAL AND MECHANICAL DEMOLITION PLANS. 20. REFER TO ARCHITECTURAL DRAWING FOR GENERAL DEMOLITION NOTES. 21. APPROVAL OF THE QUANTITY AND EXTENT OF THIS WORK MUST BE APPROVED BY CONSULTANT AND OWNER PRIOR TO THE START OF WORK. LEAD PAINT NOTE APPLICABLE TO SK-1 SURFACES CONTAINING LEAD PAINT ARE PRESENT IN THE RENOVATION AREA. ALTERATIONS TO PAINTED SURFACES CONTAINING LEAD SHALL BE PERFORMED BY THE GENERAL CONTRACTOR IN ACCORDANCE WITH 40 CFR PART 735 AND 29 CFR 1926.62. ASBESTOS ABATEMENT NOTES APPLICABLE TO SK-1 DEB1 CORRIDOR REMOVALS. OTHERS TO REMOVE NON-AC ACOUSTICAL CEILING TILE INCLUDING LIGHT FIXTURES, LOUVERS, CEILING SUPPORT SYSTEM AND ANY OTHER APPURTENANCES ATTACHED TO THE CEILING IN ENTIRETY WITHIN CORRIDOR AND DISPOSE OF AS CONSTRUCTION DEBRIS. OTHERS TO REMOVE NON-AC PLASTER AND LATHE CEILING, WOOD CEILING JOISTS, LOWER PLENUM IN ENTIRETY, AND DISPOSE OF AS CONSTRUCTION DEBRIS. CONTRACTOR TO PLASTICIZE FLOORS AND WALLS UP TO UPPER PLENUM. CONTRACTOR TO REMOVE PERIMETER NON-AC PLASTER AND LATHE CEILINGS, UPPER PLENUM, CONTAMINATED WITH AC ROOFING DEBRIS AND DISPOSE OF AS AN ACM. CONTRACTOR TO INSTALL CRITICAL BARRIERS IN UPPER PLENUM. CONTRACTOR TO REMOVE REMAINING ASBESTOS CONTAMINATED PLASTER AND LATHE CEILING AND DISPOSE OF AS AN ACM. (1) LAYER OF WOOD RAFTERS AND (1) LAYER OF WOOD FRAMED OVERBUILD, AND TONGUE/GROOVE ROOF SHEATHING IN SECOND PLENUM CORRIDORS SHALL REMAIN UNDAMAGED AND BE DECONTAMINATED USING HEPA-VACUUMS AND WET CLEANING METHODS. ANY REMAINING FRAMING OR EDGING IN THE CEILING PLENUM SHALL BE DECONTAMINATED USING HEPA-VACUUMS AND WET CLEANING METHODS. DEB2 CLASSROOM REMOVALS. OTHERS TO REMOVE NON-AC ACOUSTICAL CEILING TILE INCLUDING LIGHT FIXTURES, LOUVERS, CEILING SUPPORT SYSTEM AND ANY OTHER APPURTENANCES ATTACHED TO THE CEILING IN ENTIRETY WITHIN CLASSROOMS AND DISPOSE OF AS CONSTRUCTION DEBRIS. CONTRACTOR TO PLASTICIZE FLOORS AND WALLS UP TO THE METAL CEILING. REMOVE PERIMETER CEILINGS AND ASSOCIATED NON-AC TAR PAPER CONTAMINATED WITH AC ROOFING DEBRIS AND DISPOSE OF AS AN ACM. PLASTICIZE WALLS TO ROOF DECK. CONTRACTOR TO REMOVE REMAINING ASBESTOS CONTAMINATED METAL CEILING. METAL CEILINGS SHALL BE SALVAGED AND TURNED OVER TO OWNER AS REQUIRED TO PROVIDE FOR REUSE. CONTRACTOR SHALL CAREFULLY SALVAGE WHOLE METAL PANELS PROVIDING MINIMAL TO NO DAMAGE IN THE AMOUNT OF 1,000 SF. THE REMAINING CEILINGS SHALL BE DECONTAMINATED AND DISPOSED OF AS CONSTRUCTION DEBRIS. (1) LAYER OF WOOD RAFTERS AND (1) LAYER OF WOOD FRAMED OVERBUILD, AND TONGUE/GROOVE ROOF SHEATHING SHALL REMAIN UNDAMAGED AND BE DECONTAMINATED USING HEPA-VACUUMS AND WET CLEANING METHODS. ANY REMAINING FRAMING OR EDGING IN THE CEILING PLENUM SHALL BE DECONTAMINATED USING HEPA-VACUUMS AND WET CLEANING METHODS. DEB3 AUDITORIUM/GYMNASIUM/STAGE REMOVALS. OTHERS TO REMOVE NON-AC ACOUSTICAL CEILING TILE INCLUDING LIGHT FIXTURES, LOUVERS, CEILING SUPPORT SYSTEM AND ANY OTHER APPURTENANCES ATTACHED TO THE CEILING IN ENTIRETY WITHIN AUDITORIUM/GYMNASIUM/STAGE AND DISPOSE OF AS CONSTRUCTION DEBRIS. CONTRACTOR TO PLASTICIZE WORKING SURFACES AND WALLS UP TO NON-AC PLASTER CEILING. CONTRACTOR TO REMOVE PERIMETER NON-AC PLASTER AND LATHE CEILINGS CONTAMINATED WITH AC ROOFING DEBRIS AND DISPOSE OF AS AN ACM. CONTRACTOR TO INSTALL CRITICAL BARRIERS IN UPPER PLENUM. REMOVE REMAINING ASBESTOS CONTAMINATED PLASTER AND LATHE CEILING AND DISPOSE OF AS AN ACM. (1) LAYER OF WOOD RAFTERS AND (1) LAYER OF WOOD FRAMED OVERBUILD, AND TONGUE/GROOVE ROOF SHEATHING SHALL REMAIN UNDAMAGED AND BE DECONTAMINATED USING HEPA-VACUUMS AND WET CLEANING METHODS. ANY REMAINING FRAMING OR EDGING IN THE CEILING PLENUM SHALL BE DECONTAMINATED USING HEPA-VACUUMS AND WET CLEANING METHODS. DEB4 1972 ADDITION CLASSROOMS AND KITCHEN AREA REMOVALS. CONTRACTOR TO PLASTICIZE WORKING SURFACES AND WALLS UP TO ASBESTOS CONTAMINATED ACOUSTICAL CEILING TILES AND/OR HARD CEILING BOARD. CONTRACTOR TO REMOVE PERIMETER ACOUSTICAL CEILING TILES AND DISPOSE OF AS AN ACM. CONTRACTOR TO INSTALL CRITICAL BARRIERS IN PLENUM. CONTRACTOR TO REMOVE REMAINING ACOUSTICAL CEILING TILES CONTAMINATED WITH AC ROOFING DEBRIS INCLUDING LIGHT FIXTURES, LOUVERS, CEILING SUPPORT SYSTEM, AND ANY OTHER APPURTENANCES ATTACHED TO THE CEILING IN ENTIRETY AND DISPOSE OF AS AS ACM. ANY REMAINING FRAMING OR EDGING IN THE CEILING PLENUM SHALL BE DECONTAMINATED USING HEPA-VACUUMS AND WET CLEANING METHODS. LEGEND AC ASBESTOS CONTAINING ACM ASBESTOS CONTAINING MATERIAL SF SQUARE FEET DEB1 ROOFING DEBRIS IN CORRIDORS DEB2 ROOFING DEBRIS IN CLASSROOMS DEB3 ROOFING DEBRIS IN AUDITORIUM/GYMNASIUM/STAGE DEB4 ROOFING DEBRIS IN 1972 ADDITION CLASSROOMS AND KITCHEN AREA APPROXIMATE REMOVAL LOCATIONS APPROXIMATE ASBESTOS REMOVAL QUANTITIES APPLICABLE TO SK-1 (FOR REFERENCE ONLY) DEB1 8,200 SF DEB2 18,300 SF DEB3 3,500 SF DEB4 1,000 SF CORRIDOR H101 CORRIDOR H102 2637 SF AUDITORIUM/GYMNASIUM 109 631 SF 2ND GRADE SPEC ED 6:1:1 114A 721 SF MUSIC ROOM 114 59 SF EXIT 5 EX 5 CORRIDOR H103 194 SF GIRLS' TOILET 112B 43 SF MENS' TOILET 112 39 SF WOMENS' TOILET 112A 421 SF KITCHEN 113A 2035 SF CAFETERIA 113 143 SF CUSTODIAL 113B 234 SF OT/PT/ BAND OFFICE 113C 190 SF SPEECH 113D 221 SF HARD/HEARING OFFICE 113F 166 SF HARD/HEARING OFFICE 113G 552 SF CORRIDOR H105 43 SF TOILET 115A 560 SF COMPUTER LAB 115 1500 SF LIBRARY 116 108 SF BOOK STOR 117 10 SF SINK 117A 178 SF MENS' TOILET 117B 96 SF SERVER/DATA CL 116A 709 SF 5TH GRADE CLASSROOM 118 716 SF 5TH GRADE CLASSROOM 119 107 SF EXIT 6 EX 6 715 SF 3RD GRADE CLASSROOM 120 717 SF 3RD GRADE CLASSROOM 121 713 SF 3RD GRADE SPEC ED 6:1:1 122 166 SF OFFICE 123 139 SF OFFICE STORAGE 123A 205 SF CLERK 123B 255 SF PRINCIPAL 123C 29 SF TOILET 123D 53 SF EXIT 1 EX1 154 SF PE OFFICE 109A 154 SF PARENT LIAISON/ BAND OFFICE 109B 660 SF STAGE 109J UPPER FAN ROOM 121 SF PE STORAGE 109E 116 SF PE STOR 109F 11 SF TOILET 109G 113 SF CUST. 109H 92 SF CUST. 109I 323 SF 4TH GRADE CLASSROOM 111A 709 SF 4TH GRADE CLASSROOM 111 46 SF EXIT 4 EX 4 189 SF BOYS' TOILET 110A 844 SF KINDERGARTEN CLASSROOM 110 179 SF RESOURCE ROOM 110B 244 SF ALCOVE 110C 133 SF SINK ROOM 110D 26 SF TOILET 110E 201 SF SPECIALIST OFFICE 110F 27 SF H/C TOILET 110G 8 SF MOP ROOM 110L 293 SF TEACHERS LOUNGE 108 33 SF H/C TOILET 108A 179 SF VICE PRINCIPAL 107D 181 SF WOMENS' TOILET 107A 10 SF SINK 107B 201 SF STAIR 107C 42 SF CLOSET 107E 713 SF 1ST GRADE CLASSROOM 107 714 SF 2ND GRADE CLASSROOM 106 107 SF EXIT 2 EX 2 712 SF 2ND GRADE CLASSROOM 105 716 SF 1ST GRADE CLASSROOM 104 716 SF KINDERGARTEN CLASSROOM 103 102 SF COPIER 102 197 SF NURSE 102A 27 SF TOILET 102D 143 SF TCOSE/ESEL 101A 141 SF PSYCH/TCOSE 101B 56 SF GROUNDS EQUIP 114 45 SF EXIT 8 EX 8 23 SF EXIT 7 EX 7 63 SF STAIR 2 ST 2 557 SF BALCONY 2B 88 SF STOR 2C 762 SF 6TH GRADE CLASSROOM 128 761 SF 6TH GRADE CLASSROOM 127 52 SF TOILET 125A 51 SF TOILET 124A 765 SF PRE-K 130 761 SF UNASSIGNED 129 51 SF TOILET 126A 52 SF TOILET 217A UPPER BOILER ROOM UPPER AUDITORIUM/ GYMNASIUM 1972 1921 1972 1921 1921 1921 1990 1962 DEB2 DEB1 DEB1 DEB1 DEB1 DEB1 DEB1 DEB1 DEB4 DEB4 DEB2 DEB2 DEB2 DEB2 DEB2 DEB2 DEB2 DEB3 DEB4 DEB4 PROJ # DRAWN BY DATE ADDENDUM #3 SHEET REVISED SKETCH NUMBER 0RRG\1RODQ ,QF 4415 Euclid Avenue Suite 100 Cleveland, OH 44103 Phone: (216) 432-0696 Fax: (216) 432-0699 SED No. 26-16-00-01-0-001-022 FOR SK-1 16307.01 05/24/2017 CHILDREN'S SCHOOL OF ROCHESTER - ADDITION/RENOVATION Rochester Joint Schools Construction Board 85 Hillside Ave, Rochester, NY 14610 CS SK-1 THRU SK-5

SK-1 · 3.ceilings & ceiling supports, etc. shall be removed under asbestos abatement contract work where indicated. 4.all asbestos materials removed shall be disposed of as an acm

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SK-1 · 3.ceilings & ceiling supports, etc. shall be removed under asbestos abatement contract work where indicated. 4.all asbestos materials removed shall be disposed of as an acm

GENERAL ASBESTOS NOTES APPLICABLE TO SK-1

1. THE CONTRACTOR SHALL COORDINATE ALL ASBESTOS REMOVAL WORK WITH OWNER'S REPRESENTATIVE AND OTHER CONTRACTORS.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AN EMERGENCY PROJECT VARIANCE PER 12 NYCRR PART 56-11.2..

3. CEILINGS & CEILING SUPPORTS, ETC. SHALL BE REMOVED UNDER ASBESTOS ABATEMENT CONTRACT WORK WHERE INDICATED.

4. ALL ASBESTOS MATERIALS REMOVED SHALL BE DISPOSED OF AS AN ACM.

5. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND QUANTITIES, BEFORE START OF WORK.

6. THE CONTRACTOR SHALL PERFORM ALL CONTRACT WORK IN ACCORDANCE WITH CONTRACT SPECIFICATIONS, 12 NYCRR PART 56, OSHA

1926.1101, NESHAPS 40 CFR PART 61, AHERA 40 CFR PART 763 AND ALL OTHER APPLICABLE CODES.

7. THE CONTRACTOR SHALL MAINTAIN SECURITY IN THE BUILDING AND WORK AREA AT ALL TIMES, FOR THE DURATION OF THE ASBESTOS

REMOVAL PROJECT.

8. IF THE BUILDING ENVELOPE BECOMES EXPOSED AS A RESULT OF THIS WORK, THE CONTRACTOR SHALL PROVIDE TEMPORARY WEATHER

AND SECURITY PROTECTION AND SHALL MAINTAIN UNTIL THE PERMANENT BUILDING ENVELOPE HAS BEEN RESTORED. CONTRACTOR SHALL

BE RESPONSIBLE FOR FULL RESTORATION OF DAMAGED AREAS.

9. ASBESTOS TRANSPORT ROUTE TO BE COORDINATED WITH THE OWNER'S REPRESENTATIVE.

10. CONTRACTOR SHALL COORDINATE SHUT DOWN AND LOCK OUT OF ELECTRICAL POWER WITH OWNER'S REPRESENTATIVE. ALL TEMPORARY

POWER TO THE WORK AREA SHALL BE BROUGHT IN FROM OUTSIDE THE WORK AREA THROUGH A GROUND-FAULT CIRCUIT INTERRUPTER AT

THE SOURCE OF THE POWER.

11. MOVEABLE OBJECTS SHALL BE REMOVED BY THE ABATEMENT CONTRACTOR AND SHALL BE PRE-CLEANED PER CODE RULE 56 AND SHALL BE

DISPOSED OF AS A NON-CONTAMINATED WASTE.

12. VARIATIONS (+/- 10%) IN QUANTITIES AND LOCATIONS OF ACM SHALL BE CONSIDERED AS HAVING NO IMPACT ON CONTRACT PRICE AND/OR

SCHEDULE OF THIS CONTRACT.

13. THE OWNER IS RESPONSIBLE TO CONTRACT FOR NYSDOL PROJECT MONITORING / AIR SAMPLING TECHNICIAN SERVICES. OSHA PERSONAL

AIR MONITORING IS THE RESPONSIBILITY OF THE CONTRACTOR.

14. CONTRACTOR SHALL REQUEST AND RECEIVE PROJECT MONITOR AND OWNER'S REPRESENTATIVE APPROVAL BEFORE ASBESTOS REMOVAL

IS UNDERTAKEN.

15. CONTRACTOR TO HEPA VACUUM EXISTING NON-MOVABLE EQUIPMENT PRIOR TO COVERING WITH PROTECTIVE PLASTIC SHEETING.

16. UNDER NO CIRCUMSTANCES SHALL CONTAMINATED WASTEWATER ENTER THE SANITARY SEWER SYSTEM. ALL WASTE WATER SHALL BE

FILTERED THROUGH A SYSTEM WITH AT LEAST 5.0 MICRON PARTICLE SIZE COLLECTION CAPABILITY. CONTRACTOR SHALL BE RESPONSIBLE

FOR FULL RESTORATION OF DAMAGED AREAS.

17. IF WATER LEAKS THROUGH THE CONTAINMENT AREAS, OR FROM THE DECONTAMINATION AREA, THE CONTRACTOR SHALL BE RESPONSIBLE

FOR ALL WATER DAMAGE. CONTRACTOR SHALL DOCUMENT ALL PRE-EXISTING WATER DAMAGE PRIOR TO ESTABLISHING CONTAINMENT

AREAS.

18. IF SUSPECT OR ASBESTOS MATERIAL IS DISCOVERED, NOT PREVIOUSLY IDENTIFIED, CEASE OPERATIONS AND NOTIFY THE OWNER AND/OR

OWNER'S REPRESENTATIVE IMMEDIATELY.

19. CONTRACTOR SHALL IDENTIFY AND INCLUDE IN THEIR BID ALL DEMOLITION REMOVALS SHOWN ON THE ARCHITECTURAL, PLUMBING,

ELECTRICAL AND MECHANICAL DEMOLITION PLANS.

20. REFER TO ARCHITECTURAL DRAWING FOR GENERAL DEMOLITION NOTES.

21. APPROVAL OF THE QUANTITY AND EXTENT OF THIS WORK MUST BE APPROVED BY CONSULTANT AND OWNER PRIOR TO THE START OF

WORK. 

LEAD PAINT NOTE APPLICABLE TO SK-1

SURFACES CONTAINING LEAD PAINT ARE PRESENT IN THE RENOVATION AREA. ALTERATIONS TO PAINTED SURFACES CONTAINING

LEAD SHALL BE PERFORMED BY THE GENERAL CONTRACTOR IN ACCORDANCE WITH 40 CFR PART 735 AND 29 CFR 1926.62.

ASBESTOS ABATEMENT NOTES APPLICABLE TO SK-1

DEB1 CORRIDOR REMOVALS. OTHERS TO REMOVE NON-AC ACOUSTICAL CEILING TILE INCLUDING LIGHT FIXTURES, LOUVERS, CEILING

SUPPORT SYSTEM AND ANY OTHER APPURTENANCES ATTACHED TO THE CEILING IN ENTIRETY WITHIN CORRIDOR AND DISPOSE

OF AS CONSTRUCTION DEBRIS. OTHERS TO REMOVE NON-AC PLASTER AND LATHE CEILING, WOOD CEILING JOISTS, LOWER

PLENUM IN ENTIRETY, AND DISPOSE OF AS CONSTRUCTION DEBRIS. CONTRACTOR TO PLASTICIZE FLOORS AND WALLS UP TO

UPPER PLENUM. CONTRACTOR TO REMOVE PERIMETER NON-AC PLASTER AND LATHE CEILINGS, UPPER PLENUM, CONTAMINATED

WITH AC ROOFING DEBRIS AND DISPOSE OF AS AN ACM. CONTRACTOR TO INSTALL CRITICAL BARRIERS IN UPPER PLENUM.

CONTRACTOR TO REMOVE REMAINING ASBESTOS CONTAMINATED PLASTER AND LATHE CEILING AND DISPOSE OF AS AN ACM. (1)

LAYER OF WOOD RAFTERS AND (1) LAYER OF WOOD FRAMED OVERBUILD, AND TONGUE/GROOVE ROOF SHEATHING IN SECOND

PLENUM CORRIDORS SHALL REMAIN UNDAMAGED AND BE DECONTAMINATED USING HEPA-VACUUMS AND WET CLEANING

METHODS. ANY REMAINING FRAMING OR EDGING IN THE CEILING PLENUM SHALL BE DECONTAMINATED USING HEPA-VACUUMS

AND WET CLEANING METHODS.

DEB2 CLASSROOM REMOVALS. OTHERS TO REMOVE NON-AC ACOUSTICAL CEILING TILE INCLUDING LIGHT FIXTURES, LOUVERS, CEILING

SUPPORT SYSTEM AND ANY OTHER APPURTENANCES ATTACHED TO THE CEILING IN ENTIRETY WITHIN CLASSROOMS AND DISPOSE

OF AS CONSTRUCTION DEBRIS. CONTRACTOR TO PLASTICIZE FLOORS AND WALLS UP TO THE METAL CEILING. REMOVE

PERIMETER CEILINGS AND ASSOCIATED NON-AC TAR PAPER CONTAMINATED WITH AC ROOFING DEBRIS AND DISPOSE OF AS AN

ACM. PLASTICIZE WALLS TO ROOF DECK. CONTRACTOR TO REMOVE REMAINING ASBESTOS CONTAMINATED METAL CEILING.

METAL CEILINGS SHALL BE SALVAGED AND TURNED OVER TO OWNER AS REQUIRED TO PROVIDE FOR REUSE. CONTRACTOR SHALL

CAREFULLY SALVAGE WHOLE METAL PANELS PROVIDING MINIMAL TO NO DAMAGE IN THE AMOUNT OF 1,000 SF. THE REMAINING

CEILINGS SHALL BE DECONTAMINATED AND DISPOSED OF AS CONSTRUCTION DEBRIS. (1) LAYER OF WOOD RAFTERS AND (1)

LAYER OF WOOD FRAMED OVERBUILD, AND TONGUE/GROOVE ROOF SHEATHING SHALL REMAIN UNDAMAGED AND BE

DECONTAMINATED USING HEPA-VACUUMS AND WET CLEANING METHODS. ANY REMAINING FRAMING OR EDGING IN THE CEILING

PLENUM SHALL BE DECONTAMINATED USING HEPA-VACUUMS AND WET CLEANING METHODS.

DEB3 AUDITORIUM/GYMNASIUM/STAGE REMOVALS. OTHERS TO REMOVE NON-AC ACOUSTICAL CEILING TILE INCLUDING LIGHT FIXTURES,

LOUVERS, CEILING SUPPORT SYSTEM AND ANY OTHER APPURTENANCES ATTACHED TO THE CEILING IN ENTIRETY WITHIN

AUDITORIUM/GYMNASIUM/STAGE AND DISPOSE OF AS CONSTRUCTION DEBRIS. CONTRACTOR TO PLASTICIZE WORKING

SURFACES AND WALLS UP TO NON-AC PLASTER CEILING. CONTRACTOR TO REMOVE PERIMETER NON-AC PLASTER AND LATHE

CEILINGS CONTAMINATED WITH AC ROOFING DEBRIS AND DISPOSE OF AS AN ACM. CONTRACTOR TO INSTALL CRITICAL BARRIERS

IN UPPER PLENUM. REMOVE REMAINING ASBESTOS CONTAMINATED PLASTER AND LATHE CEILING AND DISPOSE OF AS AN ACM. (1)

LAYER OF WOOD RAFTERS AND (1) LAYER OF WOOD FRAMED OVERBUILD, AND TONGUE/GROOVE ROOF SHEATHING SHALL REMAIN

UNDAMAGED AND BE DECONTAMINATED USING HEPA-VACUUMS AND WET CLEANING METHODS. ANY REMAINING FRAMING OR

EDGING IN THE CEILING PLENUM SHALL BE DECONTAMINATED USING HEPA-VACUUMS AND WET CLEANING METHODS.

DEB4 1972 ADDITION CLASSROOMS AND KITCHEN AREA REMOVALS. CONTRACTOR TO PLASTICIZE WORKING SURFACES AND WALLS UP

TO ASBESTOS CONTAMINATED ACOUSTICAL CEILING TILES AND/OR HARD CEILING BOARD. CONTRACTOR TO REMOVE PERIMETER

ACOUSTICAL CEILING TILES AND DISPOSE OF AS AN ACM. CONTRACTOR TO INSTALL CRITICAL BARRIERS IN PLENUM.

CONTRACTOR TO REMOVE REMAINING ACOUSTICAL CEILING TILES CONTAMINATED WITH AC ROOFING DEBRIS INCLUDING LIGHT

FIXTURES, LOUVERS, CEILING SUPPORT SYSTEM, AND ANY OTHER APPURTENANCES ATTACHED TO THE CEILING IN ENTIRETY AND

DISPOSE OF AS AS ACM. ANY REMAINING FRAMING OR EDGING IN THE CEILING PLENUM SHALL BE DECONTAMINATED USING

HEPA-VACUUMS AND WET CLEANING METHODS.

LEGEND

AC ASBESTOS CONTAINING

ACM ASBESTOS CONTAINING MATERIAL

SF SQUARE FEET

DEB1 ROOFING DEBRIS IN CORRIDORS

DEB2 ROOFING DEBRIS IN CLASSROOMS

DEB3 ROOFING DEBRIS IN AUDITORIUM/GYMNASIUM/STAGE

DEB4 ROOFING DEBRIS IN 1972 ADDITION CLASSROOMS AND KITCHEN AREA

APPROXIMATE REMOVAL LOCATIONS

APPROXIMATE ASBESTOS REMOVAL QUANTITIES

APPLICABLE TO SK-1

(FOR REFERENCE ONLY)

DEB18,200 SF

DEB218,300 SF

DEB33,500 SF

DEB41,000 SF

CORR

IDOR

H101

CORRIDORH102

2637 SF

AUDITORIUM/GYMNASIUM109

631 SF

2ND GRADE SPEC ED6:1:1114A 721 SF

MUSIC ROOM114

59 SF

EXIT 5EX 5

CORRIDORH103

194 SF

GIRLS' TOILET112B

43 SF

MENS' TOILET112

39 SF

WOMENS' TOILET112A

421 SF

KITCHEN113A

2035 SF

CAFETERIA113143 SF

CUSTODIAL113B

234 SF

OT/PT/ BAND OFFICE113C

190 SF

SPEECH113D

221 SF

HARD/HEARING OFFICE113F

166 SF

HARD/HEARING OFFICE113G

552 S

F

CORR

IDOR

H105

43 SF

TOILET115A

560 SF

COMPUTER LAB115

1500 SF

LIBRARY116

108 SF

BOOK STOR117

10 SF

SINK117A

178 SF

MENS' TOILET117B

96 SF

SERVER/DATA CL116A

709 SF

5TH GRADECLASSROOM

118

716 SF

5TH GRADECLASSROOM

119

107 SF

EXIT 6EX 6

715 SF

3RD GRADECLASSROOM

120

717 SF

3RD GRADECLASSROOM

121

713 SF

3RD GRADE SPEC ED6:1:1122

166 SF

OFFICE123

139 SF

OFFICE STORAGE123A

205 SF

CLERK123B

255 SF

PRINCIPAL123C

29 SF

TOILET123D

53 SF

EXIT 1EX1

154 SF

PE OFFICE109A

154 SF

PARENT LIAISON/ BANDOFFICE

109B

660 SF

STAGE109J

UPPER FAN ROOM

121 SF

PE STORAGE109E

116 SF

PE STOR109F

11 SF

TOILET109G

113 SF

CUST.109H

92 SF

CUST.109I

323 SF

4TH GRADECLASSROOM

111A709 SF

4TH GRADECLASSROOM

111

46 SF

EXIT 4EX 4

189 S

F

BOYS

' TOI

LET

110A

844 SF

KINDERGARTENCLASSROOM

110

179 SF

RESOURCE ROOM110B

244 SF

ALCOVE110C

133 SF

SINK ROOM110D

26 SF

TOILET110E

201 SF

SPECIALIST OFFICE110F

27 SF

H/C TOILET110G

8 SF

MOP ROOM110L

293 SF

TEACHERS LOUNGE108

33 SF

H/C TOILET108A

179 SF

VICE PRINCIPAL107D

181 S

F

WOM

ENS'

TOI

LET

107A

10 SF

SINK107B

201 SF

STAIR107C

42 SF

CLOSET107E

713 SF

1ST GRADECLASSROOM

107

714 SF

2ND GRADECLASSROOM

106

107 SF

EXIT 2EX 2

712 SF

2ND GRADECLASSROOM

105

716 SF

1ST GRADECLASSROOM

104

716 SF

KINDERGARTENCLASSROOM

103

102 SF

COPIER102

197 SF

NURSE102A

27 SF

TOILET102D

143 SF

TCOSE/ESEL101A

141 SF

PSYCH/TCOSE101B

56 SF

GROUNDS EQUIP114

45 SF

EXIT 8EX 8

23 SF

EXIT 7EX 7

63 SF

STAIR 2ST 2

557 SF

BALCONY2B

88 SF

STOR2C

762 SF

6TH GRADECLASSROOM

128

761 SF

6TH GRADECLASSROOM

127

52 SF

TOILET125A

51 SF

TOILET124A

765 SF

PRE-K130

761 SF

UNASSIGNED129

51 SF

TOILET126A

52 SF

TOILET217A

UPPER BOILERROOM

UPPER AUDITORIUM/GYMNASIUM

19

72

19

21

19

72

19

21

19

21

1

9

2

1

1

9

9

0

19

62

DEB2

DEB1

DEB1

DEB1

DEB1

DEB1

DEB1

DEB1

DEB4

DEB4

DEB2

DEB2

DEB2

DEB2

DEB2

DEB2

DEB2

DEB3

DEB4

DEB4

PROJ # DRAWN BY DATE

ADDENDUM #3 SHEET REVISED

SKETCH NUMBER

© 2016 Moody/Nolan Inc.

4415 Euclid AvenueSuite 100Cleveland, OH 44103

Phone: (216) 432-0696Fax: (216) 432-0699

SED No. 26-16-00-01-0-001-022

FOR SK-116307.01 05/24/2017

CHILDREN'S SCHOOL OF ROCHESTER -

ADDITION/RENOVATION

Rochester Joint Schools Construction Board

85 Hillside Ave, Rochester, NY 14610

CS

SK-1 THRU SK-5

AutoCAD SHX Text
DN.
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN.
AutoCAD SHX Text
DN.
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN.
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN.
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN.
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
REFERENCE ARCHITECTURAL DEMO DRAWINGS AND COORDINATE WITH CONSTRUCTION MANAGER FOR CONSTRUCTION DEBRIS AND NON-AC DEMOLITION NOT TO BE DISPOSED OF AS AN ACM
Page 2: SK-1 · 3.ceilings & ceiling supports, etc. shall be removed under asbestos abatement contract work where indicated. 4.all asbestos materials removed shall be disposed of as an acm

PROJ # DRAWN BY DATE

ADDENDUM #3 SHEET REVISED

SKETCH NUMBER

© 2016 Moody/Nolan Inc.

4415 Euclid AvenueSuite 100Cleveland, OH 44103

Phone: (216) 432-0696Fax: (216) 432-0699

SED No. 26-16-00-01-0-001-022

FOR SK-216307.01 05/24/2017

CHILDREN'S SCHOOL OF ROCHESTER -

ADDITION/RENOVATION

Rochester Joint Schools Construction Board

85 Hillside Ave, Rochester, NY 14610

ALS

SECTION THROUGH TYPICAL 1931 CLASSROOM

SHOWING CEILING CONSTRUCTION

SECTION THROUGH EXISTING CORRIDOR

AT 1972 BUILDING ADDITION

INTERIOR ELEVATION THROUGH

CORRIDOR SHOWING PLENUM SPACE

SECTION THROUGH TYPICAL 1972 ADDITION

CLASSROOM AND CORRIDOR COSNTRUCTION

SK-1 THRU SK-5

AutoCAD SHX Text
2"x10" @ 16" O.C.
AutoCAD SHX Text
METAL CEILING
AutoCAD SHX Text
EL.+16'-0"
AutoCAD SHX Text
EL.+11'-6 "58"
AutoCAD SHX Text
L-6
AutoCAD SHX Text
SUSPENDED ACOUSTICAL CEILING
AutoCAD SHX Text
18" H6 @ 4'-0" O.C.
AutoCAD SHX Text
BUILT-UP ROOFING
AutoCAD SHX Text
STEEL DECK
AutoCAD SHX Text
INSULATION
AutoCAD SHX Text
BRIDGING
AutoCAD SHX Text
3'-2"x1'-0" GRILLED OPENING
AutoCAD SHX Text
SUSPENDED ACOUSTICAL CEILING
AutoCAD SHX Text
3'-4"x6"L
AutoCAD SHX Text
TERRAZZO BASE
AutoCAD SHX Text
2"x8" - 12" O.C.
AutoCAD SHX Text
FLOOR OF BICYCLE ROOM - 9'-0"
AutoCAD SHX Text
2'-6"
AutoCAD SHX Text
FLASHING
AutoCAD SHX Text
2"x10" - 16" O.C.
AutoCAD SHX Text
PLASTER
AutoCAD SHX Text
2"x8"x12" O.C.
AutoCAD SHX Text
6"x8"x " PLATE UNDER 14" PLATE UNDER PRESENT BEAM, WHERE COLUMN IS REMOVED & SHORE BEAM IS REQUIRED
AutoCAD SHX Text
NEW CANT STRIP AND FLASHING
AutoCAD SHX Text
TOP OF ROOF DECK EL.+16'-8"
AutoCAD SHX Text
EL.+16'-4" TOP OF "U" BLOCK
AutoCAD SHX Text
PRESENT ROOF CONSTRUCTION CUT & PATCH TO FIT NEW COLATIONS SHORE AS REQUIRED
AutoCAD SHX Text
PRESENT FURRED PLASTER CEILING; SHORE AS REQUIRED; PROVIDE NEW BACKING FOR SUPPORT; PATCH PLASTER
Page 3: SK-1 · 3.ceilings & ceiling supports, etc. shall be removed under asbestos abatement contract work where indicated. 4.all asbestos materials removed shall be disposed of as an acm

PROJ # DRAWN BY DATE

ADDENDUM #3 SHEET REVISED

SKETCH NUMBER

© 2016 Moody/Nolan Inc.

4415 Euclid AvenueSuite 100Cleveland, OH 44103

Phone: (216) 432-0696Fax: (216) 432-0699

SED No. 26-16-00-01-0-001-022

FOR SK-316307.01 05/24/2017

CHILDREN'S SCHOOL OF ROCHESTER -

ADDITION/RENOVATION

Rochester Joint Schools Construction Board

85 Hillside Ave, Rochester, NY 14610

ALS

SK-1 THRU SK-5

DEB1 - UPPER PLENUM REMOVALS IN CORRIDOR

TONGUE

& GROOVE

ROOF

SHEATHING

LAYER OF WOOD FRAMED

OVERBUILD ROOF FRAMING

WOOD RAFTERS

CONTAMINATED PLASTER AND LATHE

DEB3 - AUDITORIUM/GYMNASIUM/STAGE REMOVALS

SECTION THROUGH GYM ROOF EXIST STEEL

FRAMING SHOWING JOIST CONSTRUCTION

NON-AC TAR PAPER ON

METAL CEILING TILES

NON-AC ACOUSTICAL

CEILING TILES &

METAL GRID

WOOD RAFTER

METAL CEILING TILES

DEB2 - CLASSROOM REMOVALS

METAL CEILINGS IN CLASSROOMS

DEB2 - CLASSROOM REMOVALS

CEILING SPACE ABOVE METAL CEILINGS IN CLASSROOMS

NON-AC TAR PAPER ON

METAL CEILING TILES

METAL CEILING TILES

WOOD GRID FOR CEILING

TILE SUPPORT

AutoCAD SHX Text
WOOD RAFTER
AutoCAD SHX Text
PHOTOS PROVIDED FOR INFORMATION/CLARIFICATION ONLY. REFERENCE SK-1 FOR ASBESTOS ABATEMENT REQUIREMENTS.
Page 4: SK-1 · 3.ceilings & ceiling supports, etc. shall be removed under asbestos abatement contract work where indicated. 4.all asbestos materials removed shall be disposed of as an acm

PROJ # DRAWN BY DATE

ADDENDUM #3 SHEET REVISED

SKETCH NUMBER

© 2016 Moody/Nolan Inc.

4415 Euclid AvenueSuite 100Cleveland, OH 44103

Phone: (216) 432-0696Fax: (216) 432-0699

SED No. 26-16-00-01-0-001-022

FOR SK-416307.01 05/24/2017

CHILDREN'S SCHOOL OF ROCHESTER -

ADDITION/RENOVATION

Rochester Joint Schools Construction Board

85 Hillside Ave, Rochester, NY 14610

ALS

SK-1 THRU SK-5

STEEL ROOF BEAM

NON-AC TAR PAPER ON

CEILING TILES

WOOD RAFTERS

AC-ROOFING DEBRIS

TONGUE AND GROOVE ROOF SHEATHING

DEB2 - CLASSROOM REMOVALS

CEILING SPACE ABOVE METAL CEILINGS IN CLASSROOMS

WOOD FRAME

OVERBUILD

ROOF FRAMING

NON-AC TAR PAPER ON

METAL CEILING TILES

WOOD RAFTERS

DEB2 - CLASSROOM REMOVALS

CEILING SPACE ABOVE METAL CEILINGS IN CLASSROOMS

AutoCAD SHX Text
PHOTOS PROVIDED FOR INFORMATION/CLARIFICATION ONLY. REFERENCE SK-1 FOR ASBESTOS ABATEMENT REQUIREMENTS.
AutoCAD SHX Text
WOOD FRAME OVERBUILD ROOF FRAMING
Page 5: SK-1 · 3.ceilings & ceiling supports, etc. shall be removed under asbestos abatement contract work where indicated. 4.all asbestos materials removed shall be disposed of as an acm

PROJ # DRAWN BY DATE

ADDENDUM #3 SHEET REVISED

SKETCH NUMBER

© 2016 Moody/Nolan Inc.

4415 Euclid AvenueSuite 100Cleveland, OH 44103

Phone: (216) 432-0696Fax: (216) 432-0699

SED No. 26-16-00-01-0-001-022

FOR SK-516307.01 05/24/2017

CHILDREN'S SCHOOL OF ROCHESTER -

ADDITION/RENOVATION

Rochester Joint Schools Construction Board

85 Hillside Ave, Rochester, NY 14610

ALS

SK-1 THRU SK-5

DEB4 - 1972 ADDITION CLASSROOMS AND KITCHEN AREA REMOVALS

ROOM 113C

AC-ROOFING DEBRIS

NON-AC HARD CEILING BOARD

IN KITCHEN/CUSTODIAL AREA

DEB4 - 1972 ADDITION CLASSROOMS AND KITCHEN AREA REMOVALS

ROOM 113C

DEB4 - 1972 ADDITION CLASSROOMS AND KITCHEN AREA REMOVALS

ROOM 113C

AutoCAD SHX Text
PHOTOS PROVIDED FOR INFORMATION/CLARIFICATION ONLY. REFERENCE SK-1 FOR ASBESTOS ABATEMENT REQUIREMENTS.
AutoCAD SHX Text
NON-AC HARD CEILING BOARD IN KITCHEN/ CUSTODIAL AREA
AutoCAD SHX Text
AC-ROOFING DEBRIS
AutoCAD SHX Text
NON-AC HARD CEILING BOARD IN KITCHEN/CUSTODIAL AREA