Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Sl. No. PIA Name File No. StateTotal no. of beneficiaries
proposed
No. of
beneficiaries
proposed for
Year 1
No. of
beneficiaries
proposed for
Year 2
No. of
beneficiaries
proposed for
Year 3
Status as on 21.06.13
1 NIIT J-17015/4/2013 SGSY II SP Chatisgarh7900 1975 2600 3325
Desk scrutiny completed File
is under process
2 Modern
Education
Society
J-17015/2/2013 SGSY II SP Chattishgarh
7500 3500 2500 1500
Desk scrutiny completed File
is under process
3 Bhaskar
Foundation
J-17015/01/2013 SGSY II SP chhattisgarh7740 3000 4740 0
Desk scrutiny completed File
is under process
4 Barfani
Anushandan
Sansthan
J-17015/1/2009 SGSY II SP chhattisgarh
4000 2000 2000 0 Referred to NABCONS for
field appraisal on 27.5.2013
5 DB Tech Society J-17021/13/2013 SGSY II SP Jharkhand
3600 1800 1800 0 Referred to NIRD for field
appraisal on 27.5.2013
6 IL&FS J-17021/09/2013 SGSY II SP Jharkhand
7860 3930 3930 0 Referred to NIRD for field
appraisal on 27.5.2013
7 Laurus Edutech
Pvt.Ltd.
J-17021/07/2013 SGSY II SP Jharkhand
2000 1000 1000 0 Referred to NIRD for field
appraisal on 27.5.2013
8 ICA J-17021/10/2013 SGSY II SP Jharkhand
8100 1600 2500 4000 Referred to NIRD for field
appraisal on 27.5.2013
9 Career Launcher
Educate
J-17021/02/2013 SGSY II SP Jharkhand
7861 1741 3060 3060 Referred to NIRD for field
appraisal on 27.5.2013
10 NISALEASURE
LTD
J-17021/06/2013 SGSY II SP Jharkhand2000 2000 0 0
Desk scrutiny completed File
is under process
11 Mass Info Tech J-17021/08/2013 SGSY II SP Jharkhand
2000 1000 1000 0 Referred to NIRD for field
appraisal on 27.5.2013
12 Aide at Action J-17021/11/2013 SGSY II SP Jharkhand
3600 1200 1200 1200
PIA was absent in pre
screening workshop held on
22nd & 23rd May
13 India Can
Education Ltd.
J-17021/12/2013 SGSY II SP Jharkhand
7860 3925 3935 0 Referred to NIRD for field
appraisal on 27.5.2013
Status of fresh proposals for projects under ASDP
14 CAP Foundation J-17021/14/2013 SGSY II SP Jharkhand
3700 1030 2670 0 Referred to NIRD for field
appraisal on 27.5.2013
15 Busy Infotech
Pvt. Ltd.
J-17021/03/2013 SGSY II SP Jharkhand2000 1000 1000 0
Desk scrutiny completed File
is under process
16 Gramin Vikas
Trust
J-17021/05/2013 SGSY II SP Jharkhand
2000 666 667 667 Referred to NIRD for field
appraisal on 27.5.2013
17 Rashtriya
Saksharata
Mission
J-17021/04/2013 SGSY II SP Jharkhand
7800 2340 3900 1560 Referred to NIRD for field
appraisal on 27.5.2013
18 OCFIT J-17021/01/2013 SGSY II SP Jharkhand
2000 2000 0 0
To be called for pre
screening as per revised
checklist alongwith NIRD
19 Focus Skill Pro
Pvt.Ltd.
J-17021/15/2013 SGSY II SP Jharkhand
2400 1200 1200 0
To be called for pre
screening as per revised
checklist alongwith NIRD
20 Technopack J-17022/9/2013/ SGSY II SP Karnataka
6000 1800 2400 1800 Referred to NIRD for field
appraisal on 27.5.2013
21 IKYA J-17022/07/2013 SGSY II SP Karnataka
4000 800 1600 1600 Referred to NIRD for field
appraisal on 27.5.2013
22 IL&FS J-17015/6/2013 SGSY II SP Karnataka
7860 3930 3930 0 Referred to NIRD for field
appraisal on 27.5.2013
23 Wazir J-17022/04/2013 SGSY II SP Karnataka
6000 1980 1980 2040 Referred to NIRD for field
appraisal on 27.5.2013
24 Laurus Edutech
Pvt.Ltd.
J-17022/08/2013 SGSY II SP Karnataka
8000 4000 4000 0 Referred to NIRD for field
appraisal on 27.5.2013
25 DB Tech Society J-17025/3/2013 SGSY II SP Maharashtra
8320 4160 4160 0 Referred to NABCONS for
field appraisal on 27.5.2013
26 IKYA J-17025/2/2013 SGSY II SP Maharashtra
4000 800 1600 1600 Referred to NABCONS for
field appraisal on 27.5.2013
27 FCRL J-17025/1/2013 SGSY II SP Maharashtra
8000 2666 2667 2667 Referred to NABCONS for
field appraisal on 27.5.2013
28 Jai Jui Charitable
Society
J-17025/2/2011 SGSY II SP Maharashtra
4320 1440 1440 1440
PIA was absent in pre
screening workshop held on
22nd & 23rd May
29 IKYA J-17024/21/2013 SGSY II SP MP
8000 1600 3200 3200 Referred to NABCONS for
field appraisal on 27.5.2013
30 Bhaskar
Foundation
J-17024/12/2010 SGSY II SP MP4500 600 1800 2100
Desk scrutiny completed File
is under process
31 IL&FS J-17024/18/2013 SGSY II SP MP
7860 3930 3930 0 Referred to NABCONS for
field appraisal on 27.5.2013
32 ICA J-17024/06/2013 SGSY II SP MP
8100 1700 3500 2900 Referred to NABCONS for
field appraisal on 27.5.2013
33 Career Launcher
Educate
J-17024/14/2013 SGSY II SP MP
7861 1741 3060 3060 Referred to NABCONS for
field appraisal on 27.5.2013
34 Sahaj e-village
Ltd.
J-17024/02/2013 SGSY II SP MP7800 2600 2600 2600
Desk scrutiny completed File
is under process
35 Aroh
Foundation
J-17024/12/2013 SGSY II SP MP
6000 3000 3000 0 Referred to NABCONS for
field appraisal on 27.5.2013
36 Lok Bharti J-17024/03/2013 SGSY II SP MP
2000 800 1200 0
PIA was absent in pre
screening workshop held on
22nd & 23rd May
37 India Can
Education Ltd.
J-17024/04/2013 SGSY II SP MP
7860 3925 3935 0 Referred to NABCONS for
field appraisal on 27.5.2013
38 Busy Infotech
Pvt. Ltd.
J-17024/05/2013 SGSY II SP MP2000 1000 1000 0
Desk scrutiny completed File
is under process
39 CAP Foundation J-17024/10/2013 SGSY II SP MP
7220 2550 4670 0 Referred to NABCONS for
field appraisal on 27.5.2013
40 CRISP J-17024/20/2013 SGSY II SP MP
10000 3333 3333 3334 Referred to NABCONS for
field appraisal on 27.5.2013
41 Skill Pro J-17024/07/2013 SGSY II SP MP
2400 1200 1200 0 Referred to NABCONS for
field appraisal on 27.5.2013
42 Wazir J-17024/15/2013 SGSY II SP MP
6000 1980 1980 2040 Referred to NABCONS for
field appraisal on 27.5.2013
43 MPCON J-17024/16/2013 SGSY II SP MP
2000 1000 1000 0 Referred to NABCONS for
field appraisal on 27.5.2013
44 AISECT J-17024/13/2013 SGSY II SP MP7860 3930 3930 0
Desk scrutiny completed File
is under process
45 Laxmi Devi
Senani
J-17024/11/2013 SGSY II SP MP8000 2000 2700 3300
Desk scrutiny completed File
is under process
46 IACM J-17024/22/2013 SGSY II SP MP
7950 2650 2650 2650 Referred to NABCONS for
field appraisal on 27.5.2013
47 Centum Work
Skills (Barwani,
Dhar, Indore)
J-17024/8/2013 SGSY II SP MP
7800 2600 2600 2600Referred to NABCONS for
field appraisal on 27.5.2013
48 Centum Work
Skills (Dindori,
Jabalpur)
J-17024/9/2013 SGSY II SP MP
7800 2600 2600 2600 Referred to NABCONS for
field appraisal on 27.5.2013
49 PCTL J-17024/17/2013 SGSY II SP MP
5000 1300 2500 1200 Referred to NABCONS for
field appraisal on 27.5.2013
50 MGSS J-17024/19/2013 SGSY II SP MP
7800 3900 3900 0 Referred to NABCONS for
field appraisal on 27.5.2013
51 Adayana J-17046/101/2011 SGSY II
SP
Multi State2000 1000 1000 0
Desk scrutiny completed File
is under process
52 Bhaskar
Foundation
J-17032/07/2010 SGSY II SP Rajasthan
4500 900 1800 1800
Desk scrutiny completed
and PIA has not qualified.
Letter is being sent to PIA
for returning the proposal
and suggesting PIA to
submit fresh proposal to
State Govt. of Rajasthan.
53 ITFT J-17033/01/2011 SGSY II SP Sikkim
8000 2666 2667 2667 Referred to NIRD for field
appraisal on 27.5.2013
54 IKYA J-17036/16/2013 SGSY II SP UP
8000 1600 3200 3200 Referred to NABCONS for
field appraisal on 27.5.2013
55 IL&FS J-17036/5/2013 SGSY II SP UP
7860 3930 3930 0 Referred to NABCONS for
field appraisal on 27.5.2013
56 ICA J-17036/13/2011 SGSY II SP UP
8100 1700 3500 2900 Referred to NABCONS for
field appraisal on 27.5.2013
57 Career Launcher
Educate
J-17036/7/2013 SGSY II SP UP
7861 1741 3060 3060 Referred to NABCONS for
field appraisal on 27.5.2013
58 BVG India LTD J-17036/8/2013 SGSY II SP UP
8100 2700 2700 2700 Referred to NABCONS for
field appraisal on 27.5.2013
59 NISALEASURE
LTD
J-17036/9/2013 SGSY II SP UP2000 2000 0 0
Desk scrutiny completed File
is under process
60 GIDF J-17036/11/2013 SGSY II SP UP
9600 3200 3200 3200 Referred to NABCONS for
field appraisal on 27.5.2013
61 Sahaj e-village J-17036/12/2013 SGSY II SP UP7800 2600 2600 2600
Desk scrutiny completed File
is under process
62 Sitapur Sikshan
Shanshthan
J-17036/13/2013 SGSY II SP UP
7380 2460 2460 2460 Referred to NABCONS for
field appraisal on 27.5.2013
63 Orion Edutech
PVT LTD
J-17036/14/2013 SGSY II SP UP5000 2500 2500 0
Desk scrutiny completed File
is under process
64 Mass Info Tech J-17036/17/2013 SGSY II SP UP
2000 1000 1000 0 Referred to NABCONS for
field appraisal on 27.5.2013
65 Aroh
Foundation
J-17036/18/2013 SGSY II SP UP
6000 3000 3000 0 Referred to NABCONS for
field appraisal on 27.5.2013
66 OCFIT J-17036/6/2013 SGSY II SP UP7860 2620 2620 2620
Desk scrutiny completed File
is under process
67 Aryan Edutech
PVT LTD
J-17036/15/2013 SGSY II SP UP
2040 500 720 820 Referred to NABCONS for
field appraisal on 27.5.2013
68 All Services J-17036/10/2013 SGSY II SP UP
5000 2500 2500 0 Referred to NABCONS for
field appraisal on 27.5.2013
69 CTED J17036/04/2012 SGSY-II SP UP4500 1600 2000 900
Desk scrutiny completed File
is under process
403833 148639 168224 86970
SL.No.
PIA Name File No. StateDate of first receipt in ASDP
Division
Date of latest
receipt in
ASDP
Division
Proposed
Amount to be
Released in
lakhs
Status (As on
06.06.2013)Status (As on 10.06.2013) Status Location
Total
INSTALMENT CASES
1
PC Training
Institute
J-17046/92/2009-SGSY-
II (SP)
Chattishgar
h, UP, MP
and
Rajasthan
01.05.13 01.05.13 210.00
Referred to
IFD on
22.5.13
Query raised by IFD on
07.06.2013
(As on 14.06.2013)
Query letter sent on 14.06.2013 on
the following; 1. Coverage of SC/ST,
Minority and women beneficiaries
are less and not up to the mark.
2. NABCONS has certified that post
placement allowance were given to
only 1526 beneficiaries, whereas, it
has been reported that 3669
beneficiaries have been placed.
Further, it is mentioned that PPA
and salaries of corporate office are
paid in kind. This requires to be
clarified by NABCONS.
3. 76% of the beneficiaries placed
are in the range of Rs. 2500-4000,
perhaps this range may be lower
than the minimum wages fixed by
the State Govt. This requires to be
clarified by NABCONS.
4. As per the terms & conditions of
the sanction order, out of total
targets of 6000 beneficiaries, 50%
i.e. 3000 beneficiaries should be
covered from Chhattisgarh. The
number of beneficiaries trained and
PIA/TSA
2
ITFT Education
Group
J-17031/04/2009-SGSY
(SP)Chandigarh 21.03.13 07.06.13 29.82 NA
Desk Scruitiny Processed for release on
13.06.2013
IFD
3
ITFT Education
Group
J-17031/03/2009-SGSY
(SP)Punjab 21.03.13 21.03.13 131.25
Query raised
by IFD on
25.5.13 on the
following:
-IFD has taken
total target as
the basis to
state that the
placement
target not met
(not correct
since only 75%
of the total
target has to
be considered)
-Status of
UC/AR not
given in
respect of
other projects
-Third party
Evaluation not
done (This
evaluation is
not mandatory
for release of
third
installment,
Referred to IFD on
06.06.2013
(As on 14.06.2013)
Referred to IFD on 06.06.2013
(As on 21.06.2013)
No change
IFD
4
OCFITJ-17046/21/2009-SGSY-
II (SP)Multi State 10.05.13 10.05.13 279.615
Referred to
IFD on
28.5.13
Referred to IFD on
28.5.14
(As on 14.06.2013)
Referred to IFD on 28.5.15
(As on 21.06.2013)
No Change
IFD
5
EveronnSkill
Dev Ltd.J-17046/13/2010
TN, Bihar,
AP, Orissa,
Karnataka &
UP
26.12.12 20.5.13 561.96
IFD raised
query with
regard to
Complaint
from Govt. of
Orissa. Letter
sent to Govt.
of Orissa.
IFD raised query with
regard to Complaint from
Govt. of Orissa. Letter
sent to Govt. of Orissa.
PIA will submit revised
checklist within this week
for which they have given
an undertaking.
(As on 14.06.2013)
IFD raised query with regard to
complaint from Govt. of Orissa.
Letter sent to Govt. of Orissa on
8.3.13, 1.4.13, 4.6.13. Reply
awaited. PIA will submit revised
checklist within this week for which
they have given an undertaking,
which is awaited.
(As on 21.06.2013)
Reply Still Awaited from PIA &
Govt. of Rajasthan
DEO2
6
DONBOSCOJ-17046/24/2009-SGSY-
II SP
Northern
Central
India
06.5.13 06.5.13 295.00
NIRD has
mentioned in
field appraisal
report that
the PIA has
fallen short in
coverage of
female
beneficiaries,
PPS not given,
no third party
certification
given, tot
given to
trainers not
satisfactory,
no study
material
given. Letter
sent to NIRD
for seeking
clarification
from PIA in
this regard.
Reply awaited
Referred to IFD on 6.6.13 (As on 14.6.13)
Referred to IFD on 6.6.13
(As on 21.6.13)
Same as above
IFD
7
FCRL J-17046/115/2010GUJARAT,
KARNATAKA17.5.2013 17.5.2013 560.57
IFD has raised
query on
outsourcing
by PIA. Letter
sent to
NABCONS in
this regard.
Referred to IFD on 5.6.13 (As on 14.6.13)
Referred to IFD on 5.6.13
(As on 21.6.13)
Same as above
IFD
8
ILFS J-17032/9/2009 Rajasthan 14.3.13 14.3.13 558.18
Letter sent to
SIRD,
Rajasthan for
information/d
ocuments:
i)UC/AR
authenticated
by SIRD ii)
details of PPS
given to
placed
candidates.
iii) PIA's
contribution
is less and
Certificate of
CA required
iv) Short fall
in coverage of
female and
minority
v)MIS and
weblink of
PIA. Reply
awaited.
Letter sent to SIRD,
Rajasthan for
information/documents:
i)UC/AR authenticated by
SIRD ii) details of PPS
given to placed
candidates. iii) PIA's
contribution is less and
Certificate of CA required
iv) Short fall in coverage
of female and minority
v)MIS and weblink of PIA.
Reply awaited. PIA will
submit revised checklist
within this week for which
they have given un
undertaking.
(As on 14.06.2013)
Letter sent to SIRD, Rajasthan for
information/documents: i)UC/AR
authenticated by SIRD ii) details of
PPS given to placed candidates. iii)
PIA's contribution is less and
Certificate of CA required iv) Short
fall in coverage of female and
minority v)MIS and weblink of PIA.
Reply awaited. PIA will submit
revised checklist within this week
for which they have given un
undertaking.
(As on 21.06.2013)
Reply awaited from PIA & SIRD
DEO2
9
IL&FS (South,
Central and
West) SCORE-
II
J-17046/73/2010 Multi State 14.3.13 14.3.13 279.07
Referred to
IFD on
6.6.2013
Referred to IFD on 6.6.13
IFD
10
IL&FS
(Minority )j-17046/81/2010 Multi State 18.3.13 18.3.13 835.33
Referred to
IFD on
31.5.13
Referred to IFD on
31.5.13 IFD
11ILFS (Score-1)
J-17046/74/2010 SGSY-II
SPMulti State 26.3.13 26.3.13 279.09
Referred to
IFD on
6.6.2013
Referred to IFD on
6.6.2013 IFD
12
Tally WestJ-17046/51/2009-SGSY-
II (SP)Multi State 09.04.13 09.04.13 279.00
Query raised
on placement
of
beneficiaries
below
minimum
wage
standards.
Reply awaited
from PIA.
Query raised on
placement of
beneficiaries below
minimum wage
standards. Reply awaited
from PIA.
Query raised on placement of
beneficiaries below minimum wage
standards. Reply awaited from PIA.
PIA and TSA committed to furnish
before 17th of June,2013
(Status as on 21.06.2013) Reply
awaited
DEO2
13
WAWWDJ-17011/1/2008/SGSY-
SPAP 18.2.2013 18.2.2013 218.00
Letter sent to
NIRD for
reasons for i)
Delay in
implementati
on of project,
ii) Strategy
for covering
remaining
beneficairies
iii)Coverage
of minorities.
Reply
awaited.
Letter sent to NIRD for
reasons for i) Delay in
implementation of
project, ii) Strategy for
covering remaining
beneficairies iii)Coverage
of minorities. Reply
received under desk
scrutiny.
Letter sent to NIRD for reasons for
i) Delay in implementation of
project, ii) Strategy for covering
remaining beneficairies iii)Coverage
of minorities. Reply received under
desk scrutiny.
(Status as on 21.06.2013) Reply
awaited, Reminder sent to NIRD on
17.06.2013
RO-DS
14
IAP Company
Pvt. Ltd
J-17046/70/2009-SGSY-
II (SP)Multi State 1.4.13 1.4.13 279.09
Complaint
from
NABCONS.
Letter sent to
PIA for
compliance of
the
observations
made by
NABCONS.
Letter also
sent to
NABCONS in
this regard.
Reply
awaited.
Complaint from
NABCONS. Letter sent to
PIA for compliance of the
observations made by
NABCONS. Letter also
sent to NABCONS in this
regard. Reply awaited. PIA
has given an undertaking
that they would submit
reply on 10.06.13 to
NABCONS.
(As on 14.06.2013)
Complaint from NABCONS that the
PIA has still not complied with the
observations raised by them, hence
case has not been recommended
for release. Letter sent to PIA for
compliance of the observations
made by NABCONS on 26.3.13.
Letter also sent to NABCONS on
28.5.13 in this regard. Reply
awaited. PIA has given an
undertaking that they would submit
reply on 10.06.13 to NABCONS.
(As on 21.06.13)
Reply from PIA & NABCONS still
awaited.
DEO2
15
FIWE J-17046/4/2008 Multi State 09.04.2013 09.04.2013 207.39
NIRD has
raised queries
on Audit
Report of PIA
and did not
recommend
for release of
third
installment.
PIA has been
asked to
submit
documents.
Reply
awaited.
NIRD has raised queries
on Audit Report of PIA
and did not recommend
for release of third
installment. PIA has been
asked to submit
documents. Reply
awaited. PIA has given un
undertaking that they
would submit revised
checklist and documents
within this week.
(As on 14.6.13)
NIRD has raised queries on Audit
Report of PIA and did not
recommend for release of third
installment. PIA has been asked to
submit documents. Reply awaited.
PIA has given un undertaking that
they would submit revised checklist
and documents within this week,
which is awaited.
(As on 21.6.13)
Reply awaited from PIA.
DEO2
16
Ajmal
Foundation
J-17046/62/2009-SGSY-
II (SP)Multi State 09.05.2013 06.06.2013 281.23
Query
regarding
SC/ST
coevarge,
Bank
accounts and
placement
support
details were
raised during
the
workshop,
the reply is
awaited.
Query regarding SC/ST
coevarge, Bank accounts
and placement support
details were raised during
the workshop, the reply is
awaited.
PIA attended the workshop on
06.06.2013 but coulkd complete
the checklist and submitted an
undertaking regarding the queries.
File is under process to move for
IFD on 13.06.2013
IFD
17
Aroh
Foundation
J-17046/1/2009-SGSY-II
(SP)Multi State 19.03.2013 19.03.13 558.15 Desk Scruitiny
Desk Scruitiny Query letter sent on 14.06.2013.RO-
Consultan
t (P)
18
Aroh
Foundation
J-17046/46/2010-SGSY-
II (SP)Multi State 19.03.2013 19.03.13 558.15
Refered to IFD
on 06.06.2013
Refered to IFD on
06.06.2013
Refered to IFD on 06.06.2013
IFD
19
Info
International
(IEWS) (UTK)
J-17037/02/2008 SGSY-
(SP)
Uttarakhan
d 9.01.13 9.01.13 74.96
PIA has not
furnished the
details of
Source of the
funds for
completin of
the Project.
Reply awaited
from State
Government of
Uttarakhand
Reminder sent on 31.05.13
to State Govt.Response
awaited
Reminder sent on 31.05.13 to State
Govt.Response awaited
DEO2
20
ITCOTJ-17046/90/2010-SGSY-
SPMulti States 12.3.13 12.3.13 280.18
(Complain
case)
Reminder sent on 11.6.13
to IGNOU for submission
of report & response
awaited
Reminder sent on 11.6.13 to
IGNOU for submission of report &
response awaited
DEO2
21
Technopack
(Jute)
J-17046/93/2009-SGSY II
SPMulti State 08.01.2013 08.01.2013 559.32
Referred to IFD
on 6.6.2013
Referred to IFD on 6.6.2013 Referred to IFD on 6.6.2013
IFD
22
Technopak
Advisors
Pvt.Ltd (SEAM-
1)
J-17046/13/2008 SGSY-II
(SP)Seam 1Multi States 14.5.13 14.5.13 280.00
Referred to
IFD on
23.5.13
Referred to IFD on
23.5.13
Referred to IFD on 23.5.13
IFD
23
DRFJ-17020/1/2007 SGSY II
SPSouth 25.3.13 25.3.13 55.00
Reminder
sent to NIRD
for following
information/d
ocuments: i)
A detailed
statement of
fund releases
made by
MoRD and
due amount
receivable by
the PIA for
each of the
five Grameen
National
Projects.
II)Latest
UC/AR
authenticated
by NIRD iii)
Project
completion
report. Reply
awaited.
Reminder sent to NIRD
for following
information/documents:
i) A detailed statement of
fund releases made by
MoRD and due amount
receivable by the PIA for
each of the five Grameen
National Projects.
II)Latest UC/AR
authenticated by NIRD III)
Project completion
report. Reply awaited. PIA
was not present in the
workshop, hence revised
checklist has not been
filled by PIA.
(As on 14.6.13)
Reminder sent to NIRD for
following information/documents:
i) A detailed statement of fund
releases made by MoRD and due
amount receivable by the PIA for
each of the five Grameen National
Projects. Ii)Latest UC/AR
authenticated by NIRD iii) Project
completion report. Reply awaited.
PIA was not present in the
workshop, hence revised checklist
has not been filled by PIA.
(As on 21.6.13)
Reply awaited from NIRD and PIA
was not present in workshop.
DEO2
24
DRFJ-17020/3/2007 SGSY II
SPNorthern 25.3.13 25.3.13 69.36
Reminder
sent to NIRD
for following
information/d
ocuments: i)
A detailed
statement of
fund releases
made by
MoRD and
due amount
receivable by
the PIA for
each of the
five Grameen
National
Projects.
Ii)Latest
UC/AR
authenticated
by NIRD iii)
Project
completion
report. Reply
awaited.
Reminder sent to NIRD
for following
information/documents:
i) A detailed statement of
fund releases made by
MoRD and due amount
receivable by the PIA for
each of the five Grameen
National Projects.
Ii)Latest UC/AR
authenticated by NIRD iii)
Project completion
report. Reply awaited. PIA
was not present in the
workshop, hence revised
checklist has not been
filled by PIA.
(As on 14.6.13)
Reminder sent to NIRD for
following information/documents:
i) A detailed statement of fund
releases made by MoRD and due
amount receivable by the PIA for
each of the five Grameen National
Projects. Ii)Latest UC/AR
authenticated by NIRD iii) Project
completion report. Reply awaited.
PIA was not present in the
workshop, hence revised checklist
has not been filled by PIA.
(As on 21.6.13)
Reply awaited from NIRD and PIA
was not present in workshop.
DEO2
25
DRFJ-17020/2/2007 SGSY II
SPCentral 25.3.13 25.3.13 52.97
Reminder
sent to NIRD
for following
information/d
ocuments: i)
A detailed
statement of
fund releases
made by
MoRD and
due amount
receivable by
the PIA for
each of the
five Grameen
National
Projects.
Ii)Latest
UC/AR
authenticated
by NIRD iii)
Project
completion
report. Reply
awaited.
Reminder sent to NIRD
for following
information/documents:
i) A detailed statement of
fund releases made by
MoRD and due amount
receivable by the PIA for
each of the five Grameen
National Projects.
Ii)Latest UC/AR
authenticated by NIRD iii)
Project completion
report. Reply awaited. PIA
was not present in the
workshop, hence revised
checklist has not been
filled by PIA.
(As on 14.6.13)
Reminder sent to NIRD for
following information/documents:
i) A detailed statement of fund
releases made by MoRD and due
amount receivable by the PIA for
each of the five Grameen National
Projects. Ii)Latest UC/AR
authenticated by NIRD iii) Project
completion report. Reply awaited.
PIA was not present in the
workshop, hence revised checklist
has not been filled by PIA.
(As on 21.6.13)
Reply awaited from NIRD and PIA
was not present in workshop.
DEO2
26
DRFJ-17020/5/2007 SGSY II
SPWest 25.3.13 25.3.13 44.67
Reminder
sent to NIRD
for following
information/d
ocuments: i)
A detailed
statement of
fund releases
made by
MoRD and
due amount
receivable by
the PIA for
each of the
five Grameen
National
Projects.
Ii)Latest
UC/AR
authenticated
by NIRD iii)
Project
completion
report. Reply
awaited.
Reminder sent to NIRD
for following
information/documents:
i) A detailed statement of
fund releases made by
MoRD and due amount
receivable by the PIA for
each of the five Grameen
National Projects.
Ii)Latest UC/AR
authenticated by NIRD iii)
Project completion
report. Reply awaited. PIA
was not present in the
workshop, hence revised
checklist has not been
filled by PIA.
(As on 14.6.13)
Reminder sent to NIRD for
following information/documents:
i) A detailed statement of fund
releases made by MoRD and due
amount receivable by the PIA for
each of the five Grameen National
Projects. Ii)Latest UC/AR
authenticated by NIRD iii) Project
completion report. Reply awaited.
PIA was not present in the
workshop, hence revised checklist
has not been filled by PIA.
(As on 21.6.13)
Reply awaited from NIRD and PIA
was not present in workshop.
DEO2
27
DRFJ-17020/4/2007 SGSY II
SPEastern 25.3.13 25.3.13 10.17
Reminder
sent to NIRD
for following
information/d
ocuments: i)
A detailed
statement of
fund releases
made by
MoRD and
due amount
receivable by
the PIA for
each of the
five Grameen
National
Projects.
Ii)Latest
UC/AR
authenticated
by NIRD iii)
Project
completion
report. Reply
awaited.
Reminder sent to NIRD
for following
information/documents:
i) A detailed statement of
fund releases made by
MoRD and due amount
receivable by the PIA for
each of the five Grameen
National Projects.
Ii)Latest UC/AR
authenticated by NIRD iii)
Project completion
report. Reply awaited. PIA
was not present in the
workshop, hence revised
checklist has not been
filled by PIA.
(As on 14.6.13)
Reminder sent to NIRD for
following information/documents:
i) A detailed statement of fund
releases made by MoRD and due
amount receivable by the PIA for
each of the five Grameen National
Projects. Ii)Latest UC/AR
authenticated by NIRD iii) Project
completion report. Reply awaited.
PIA was not present in the
workshop, hence revised checklist
has not been filled by PIA.
(As on 21.6.13)
Reply awaited from NIRD and PIA
was not present in workshop.
DEO2
28
Tally SouthJ-17046/52/2009-SGSY-
II (SP)Multi State 13.03.2013 05.04.13 279.09
Query by IFD
on excess
payment and
UC. PIA
informed
during the
workshop.
Reply awaited
Query by IFD on excess
payment and UC. PIA
informed during the
workshop. Reply awaited
PIA and NABCONS committed to
furnish the detailed checklist before
17th June, 2013
(Status as on 21.06.2013)
The PIA furnished the checklist
directly with out the NABCONS
certifcation and recommendation.
NABCONS assured to submitt by
23.06.2013
DEO2
29
Tally NorthJ-17046/50/2009-SGSY-
II (SP)Multi State 13.03.2013 05.04.13 111.64
15% released,
Completion
Report
awaited to
release
remaining
10% of
Central Share.
15% released, Completion
Report awaited to release
remaining 10% of Central
Share.
PIA and NABCONS committed to
furnish the detailed checklist before
17th June, 2013
(Status as on 21.06.2013) Reply
awaited
DEO2
30
Tally EastJ-17046/66/2009-SGSY-
II (SP)Multi State 05.04.2013 05.04.2013 279.09
Query on PPS
and UC.
Letter sent to
NABCONS.
PIA & TSA
informed
during the
workshop.
Reply is
awaited
Query on PPS and UC.
Letter sent to NABCONS.
PIA & TSA informed
during the workshop.
Reply is awaited
PIA and NABCONS committed to
furnish the detailed checklist before
17th June, 2014
(Status as on 21.06.2013)
The PIA furnished the checklist
directly with out the NABCONS
certifcation and recommendation.
NABCONS assured to submitt by
23.06.2013
DEO2
31
Tally WestJ-17046/93/2010-SGSY-
II (SP)Multi State 05.04.2013 05.04.2013 372.12
Query on PPS
. Letter sent
to PIA & TSA
informed
during the
workshop.
Reply is
awaited
Query on PPS . Letter sent
to PIA & TSA informed
during the workshop.
Reply is awaited
PIA and NABCONS committed to
furnish the detailed checklist before
17th June, 2015
(Status as on 21.06.2013) Reply
awaited
DEO2
32
Career
Launcher
J-17046/16/2008 SGSY II
SPMulti State 28.03.2013 28.03.2013 33.00
Referred to
IFD on 6.5.13
and recieved
back on
06.06.2013
with queries
on
completion of
target with
the availabe
funds, and
State Govt
recommendat
ion for
release in
support of
their earlier
compliant.
Referred to IFD on 6.5.13
and recieved back on
06.06.2013 with queries
on completion of target
with the availabe funds,
and State Govt
recommendation for
release in support of their
earlier compliant.
Query, letter sent to State Govt and
TSA on 13.06.2013
(Status on 21.06.2013) Reminder
sent to State Govt on 17.06.2013
DEO2
33
DRDAJ-17012/07/2008-SGSY-
II SP
Arunachal
Pradesh01.05.2013 01.05.2013 222.08
Letter sent to
TSA to submit
proposal for
release of
second
installment in
checklist.
Reply
awaited.
Letter sent to TSA to
submit proposal for
release of second
installment in checklist.
Reply awaited.
TSA asked for revised checklist on
13.06.2013
(Status on 21.06.2013) Reply
awaited
DEO2
34
Tops GroupJ-17046/94/2009 SGSY II
SP
Eastern
India22.04.2013 06.06.2013 562.47
PIA attended
the workshop
on
06.06.2013
but coulkd
not complete
the checklist
due to
inavailability
of required
supporting
documents.
The PIA
Submitted an
application
for
furnishihng
the same
with in weeks
time. Reply
awaited.
PIA attended the
workshop on 06.06.2013
but coulkd not complete
the checklist due to
inavailability of required
supporting documents.
The PIA Submitted an
application for furnishihng
the same with in weeks
time. Reply awaited.
(Status as on 14.06.2013)
PIA attended the workshop on
06.06.2013 but coulkd not
complete the checklist due to
inavailability of required supporting
documents. The PIA Submitted an
application for furnishihng the
same with in weeks time. Reply
awaited. (Status as on
21.06.2013) A reminder
has issued to TSA with a copy to
PIA on 19.06.2013
DEO2
35
HIMCONJ-17019/04/2008 SGSY II
SPHP 17.2.12 18.3.13 43.87
Letter sent to
State Govt of
HP for
i)UC/AR,
Progress
Report
authenticated
by DRDA.
ii)implementa
tion plan for
training of
remaining
target. iii) PIA
has fallen
short in
coverage of
SC/ST,
minorities. Iv)
whether
placed
candidates
are getting
more than
minimum
wages. v)MIS
7 website
Letter sent to State Govt
of HP for i)UC/AR,
Progress Report
authenticated by DRDA.
ii)implementation plan for
training of remaining
target. iii) PIA has fallen
short in coverage of
SC/ST, minorities. Iv)
whether placed
candidates are getting
more than minimum
wages. v)MIS 7 website
details. vi) Certificate that
the PIA is implementing
project as per sanction
order. Reply awaited. PIA
was present in workshop
but they didnot fill the
revised checklist.
(As on 14.6.13)
Letter sent to State Govt of HP on
20.2.13 for i)UC/AR, Progress
Report authenticated by DRDA.
ii)implementation plan for training
of remaining target. iii) PIA has
fallen short in coverage of SC/ST,
minorities. Iv) whether placed
candidates are getting more than
minimum wages. v)MIS 7 website
details. vi) Certificate that the PIA is
implementing project as per
sanction order. Reply awaited. PIA
was present in workshop but they
didnot fill the revised checklist.
(As on 21.6.13)
Reminder to State Govt of HP sent
on 19.6.13. Reply awaited. Also PIA
was present in workshop but didnot
fill checklist.
deo2
36
ISAP J-17046/3/2008 Multi State 18.2.13 28.5.13 44.87
Proposed to
be referred
to IFD.
Proposed to be referred
to IFD for release on
14.6.2013
Proposed to be referred to IFD for
release on 14.6.2013
RO-
Consultan
t (P)
37
A4EJ-17046/35/2009-SGSY II
SPMulti State 26.05.2013 26.05.2013
Complaint
Case. The PIA
was handed
over new
checklist for
release of 3rd
instalment.
Howevr file
put up for
revision of
Districts and
resposne of
PIA against
the
complaint.
Complaint Case. The PIA
was handed over new
checklist for release of
3rd instalment. Howevr
file put up for revision of
Districts and resposne of
PIA against the complaint.
Complaint Case. The PIA was
handed over new checklist for
release of 3rd instalment. Howevr
file put up for revision of Districts
and resposne of PIA against the
complaint. (Status as on
21.06.2013) File under process for
revision of Districts
RO-
Consultan
t (P)
38
CentumJ-17046/84/2010-SGSY II
SPMulti State 17.12.2012 10.06.2013 558.18
Complaint
Case. File put
up for
decision.
Complaint Case. File put
up for decision.
Report asked from State Govts, TSA
on 13.06.2013. The PIA was handed
over new checklist for release of
2nd instalment.
(Status as on 21.06.2013) Reply
awaited, Reminder sent to NIRD on
15.06.2013 for revised checklist
RO-
Consultan
t (P)
39
Centum J-17046/85/2010-SGSY II
SP
Multi State 17.12.2013 10.06.2013 558.18 Complaint
Case.
Complaint Case. Report asked from State Govts, TSA
on 13.06.2013. The PIA was handed
over new checklist for release of
2nd instalment.
(Status as on 21.06.2013) Reply
awaited, Reminder sent to NIRD on
15.06.2013 for revised checklist
RO-
Consultan
t (P)
40
CentumJ-17046/79/2010-SGSY II
SPMulti State 17.12.2013 10.06.2013 558.18
Complaint
Case.
Complaint Case. Report asked from State Govts, TSA
on 13.06.2013. The PIA was handed
over new checklist for release of
2nd instalment.
(Status as on 21.06.2013) Reply
awaited, Reminder sent to NIRD on
15.06.2013 for revised checklist
RO-
Consultan
t (P)
41
Towns SchoolJ-17046/18/2008-SGSY II
SPMulti State 21.05.2013 21.05.2013 561.88
The PIA was
called on and
the new
checklist was
handed over
to the
representativ
e for
compliance.
The required
documents
are awaited.
The PIA was called on and
the new checklist was
handed over to the
representative for
compliance. The required
documents are awaited.
The PIA was called on and the new
checklist was handed over to the
representative for compliance. The
required documents are awaited.
(Status as on 21.06.2013) Reply
awaited
RO-
Consultan
t (P)
42
Career
Launcher
J-17046/18/2010 SGSY II
SPMulti State 31.03.2013 05.06.2013 744.00 ...... Desk Scruitiny
(Status as on 21.06.2013)
The PIA has submitted the details
in old check list. The revised
checklist was given to the
representative. The required
documents are awaited.
DEO2
43
CRISPJ-17024/12/2010-SGSY-
II (SP)M.P 17.02.2009 02.04.2013 561 Desk Scruitiny IFD raise quiry
File returned back to the Division
and the deficiancies were asked
from the PIA on 19.06.2013
DEO
13317.18
Total No. Amount
Referred to IFD 13 4413.31
Total
SUMMARY of INSTALLMENT CASES
Pending with TSA/State
Govt./PIA29 8345.71
Pending with ASDP Division1 558.15
TOTAL 43 13317.17
SL.No. PIA Name File No. StateDate of first receipt in ASDP
Division
Date of latest
receipt in
ASDP
Division
Proposed
Amount to be
Released in
lakhs
Status (As on
06.06.2013)Status (As on 10.06.2013) Status (As on 14.06.2013)
Status (As
on
21.06.201
3)
1ITFT Education
Group
J-17031/03/2009-SGSY
(SP)Punjab 21.03.13 21.03.13 131.25
Query raised
by IFD on
25.5.13 on the
following:
-IFD has taken
total target as
the basis to
state that the
placement
target not met
(not correct
since only 75%
of the total
target has to
be considered)
-Status of
UC/AR not
given in
respect of
other projects
-Third party
Evaluation not
done (This
evaluation is
not mandatory
for release of
third
installment,
Referred to IFD on
06.6.14Referred to IFD on 06.6.14
Referred
to IFD on
06.6.14
2 OCFITJ-17046/21/2009-SGSY-
II (SP)Multi State 10.05.13 10.05.13 279.61
Referred to
IFD on
28.5.13
Referred to IFD on
28.5.14Referred to IFD on 28.5.15
Referred
to IFD on
28.5.15
Installment Cases Pending with IFD
3Aroh
Foundation
J-17046/46/2010-SGSY-
II (SP)Multi State 19.03.2013 19.03.13 558.15
Refered to IFD
on 06.06.2013
Refered to IFD on
06.06.2013Refered to IFD on 06.06.2013
Refered to
IFD on
06.06.2013
4 DONBOSCOJ-17046/24/2009-SGSY-
II SP
Northern
Central
India
06.5.13 06.5.13 295.00
NIRD has
mentioned in
field appraisal
report that
the PIA has
fallen short in
coverage of
female
beneficiaries,
PPS not given,
no third party
certification
given, tot
given to
trainers not
satisfactory,
no study
material
given. Letter
sent to NIRD
for seeking
clarification
from PIA in
this regard.
Reply awaited
Referred to IFD on 6.6.13 Referred to IFD on 6.6.13 Referred
to IFD on
6.6.13
5 FCRL J-17046/115/2010GUJARAT,
KARNATAKA17.5.2013 17.5.2013 560.57
IFD has raised
query on
outsourcing
by PIA. Letter
sent to
NABCONS in
this regard.
Referred to IFD on 5.6.13 Referred to IFD on 5.6.13 Referred
to IFD on
5.6.13
6Technopack
(Jute )
J-17046/93/2009-SGSY II
SPMulti State 08.01.2013 08.01.2013 559.32
Referred to IFD
6.6.2013Referred to IFD 6.6.2013 Referred to IFD 6.6.2013
Referred to
IFD
6.6.2013
7Technopack
(SEAM-I)J-17046/13/2008 Multi State
14.5.13 14.5.13 280.00 Referred to
IFD on
23.5.13
Referred to IFD on
23.5.13
Referred to IFD on 23.5.13
8
IL&FS (South,
Central and
West) SCORE-
II
J-17046/73/2010 Multi State 14.3.13 14.3.13 279.07Referred to IFD
6.6.2013Referred to IFD 6.6.2013 Referred to IFD 6.6.2013
Referred to
IFD
6.6.2013
9 ILFS (Score-1)J-17046/74/2010 SGSY-II
SPMulti State 26.3.13 26.3.13 279.09
Referred to
IFD 6.6.2013Referred to IFD 6.6.2013 Referred to IFD 6.6.2013
Referred
to IFD
6.6.2013
10IL&FS
(Minority )j-17046/81/2010 Multi State 18.3.13 18.3.13 835.33
Referred to
IFD on
31.5.13
Referred to IFD on
31.5.13Referred to IFD on 31.5.13
Referred
to IFD on
31.5.13
11ITFT Education
Group
J-17031/04/2009-SGSY
(SP)Chandigarh 21.03.13 07.06.13 29.82 NA Desk Scruitiny
Processed for release on
13.06.2013
file is in IFD
with Con-2
12Ajmal
Foundation
J-17046/62/2009-SGSY-
II (SP)Multi State 09.05.2013 06.06.2013 281.23
Query
regarding
SC/ST
coevarge,
Bank
accounts and
placement
support
details were
raised during
the
workshop,
the reply is
awaited.
Query regarding SC/ST
coevarge, Bank accounts
and placement support
details were raised during
the workshop, the reply is
awaited.
PIA attended the workshop on
06.06.2013 but coulkd complete
the checklist and submitted an
undertaking regarding the queries.
File is under process to move for
IFD on 13.06.2013 File is in
IFD with
Con-2
13 ISAP J-17046/3/2008 Multi State 18.2.13 28.5.13 44.87
Proposed to
be referred to
IFD for
release on
14.6.2013
Proposed to be referred
to IFD for release on
14.6.2013
Referred to IFD for release on
19.6.2013
Referred
to IFD for
release
on
19.6.20134413.31
SL.No. PIA Name File No. StateDate of first receipt in ASDP
Division
Date of latest
receipt in
ASDP
Division
Proposed
Amount to be
Released in
lakhs
Status (As on
06.06.2013)Status (As on 10.06.2013) Status Location
Total
INSTALMENT CASES PENDING WITH TSA/STATE GOVT/PIA
1EveronnSkill
Dev Ltd.J-17046/13/2010
TN, Bihar,
AP, Orissa,
Karnataka &
UP
26.12.12 20.5.13 561.96
IFD raised
query with
regard to
Complaint
from Govt. of
Orissa. Letter
sent to Govt.
of Orissa.
IFD raised query with
regard to Complaint from
Govt. of Orissa. Letter
sent to Govt. of Orissa.
PIA will submit revised
checklist within this week
for which they have given
an undertaking.
(As on 14.06.2013)
IFD raised query with regard to
complaint from Govt. of Orissa.
Letter sent to Govt. of Orissa on
8.3.13, 1.4.13, 4.6.13. Reply
awaited. PIA will submit revised
checklist within this week for which
they have given an undertaking,
which is awaited.
DEO2
2 ILFS J-17032/9/2009 Rajasthan 14.3.13 14.3.13 558.18
Letter sent to
SIRD,
Rajasthan for
information/d
ocuments:
i)UC/AR
authenticated
by SIRD ii)
details of PPS
given to
placed
candidates.
iii) PIA's
contribution
is less and
Certificate of
CA required
iv) Short fall
in coverage of
female and
minority
v)MIS and
weblink of
PIA. Reply
awaited.
Letter sent to SIRD,
Rajasthan for
information/documents:
i)UC/AR authenticated by
SIRD ii) details of PPS
given to placed
candidates. iii) PIA's
contribution is less and
Certificate of CA required
iv) Short fall in coverage
of female and minority
v)MIS and weblink of PIA.
Reply awaited. PIA will
submit revised checklist
within this week for which
they have given un
undertaking.
(As on 14.06.2013)
Letter sent to SIRD, Rajasthan for
information/documents: i)UC/AR
authenticated by SIRD ii) details of
PPS given to placed candidates. iii)
PIA's contribution is less and
Certificate of CA required iv) Short
fall in coverage of female and
minority v)MIS and weblink of PIA.
Reply awaited. PIA will submit
revised checklist within this week
for which they have given un
undertaking.
(As on 21.06.2013)
Reply awaited from PIA & SIRD
DEO2
3IAP Company
Pvt. Ltd
J-17046/70/2009-SGSY-
II (SP)Multi State 1.4.13 1.4.13 279.09
Complaint
from
NABCONS.
Letter sent to
PIA for
compliance of
the
observations
made by
NABCONS.
Letter also
sent to
NABCONS in
this regard.
Reply
awaited.
Complaint from
NABCONS. Letter sent to
PIA for compliance of the
observations made by
NABCONS. Letter also
sent to NABCONS in this
regard. Reply awaited. PIA
has given an undertaking
that they would submit
reply on 10.06.13 to
NABCONS.
(As on 14.06.2013)
Complaint from NABCONS that the
PIA has still not complied with the
observations raised by them, hence
case has not been recommended
for release. Letter sent to PIA for
compliance of the observations
made by NABCONS on 26.3.13.
Letter also sent to NABCONS on
28.5.13 in this regard. Reply
awaited. PIA has given an
undertaking that they would submit
reply on 10.06.13 to NABCONS.
(As on 21.06.13)
Reply from PIA & NABCONS still
awaited.
DEO2
4
Info
International
(IEWS) (UTK)
J-17037/02/2008 SGSY-
(SP)
Uttarakhan
d 9.01.13 9.01.13 74.96
PIA has not
furnished the
details of
Source of the
funds for
completin of
the Project.
Reply awaited
from State
Governmemen
t of
Uttarakhand
Reminder sent on 31.05.13
to State Govt.Response
awaited
Under process US1
5 ITCOTJ-17046/90/2010-SGSY-
SPMulti States 12.3.13 12.3.13 280.18
Complaint
case
Reminder sent on 11.6.13
to IGNOU for submission
of report & response
awaited
Reply awaited DEO2
6 DRFJ-17020/1/2007 SGSY II
SPSouth 25.3.13 25.3.13 55.00
Reminder
sent to NIRD
for following
information/d
ocuments: i)
A detailed
statement of
fund releases
made by
MoRD and
due amount
receivable by
the PIA for
each of the
five Grameen
National
Projects.
Ii)Latest
UC/AR
authenticated
by NIRD iii)
Project
completion
report. Reply
awaited.
Reminder sent to NIRD
for following
information/documents:
i) A detailed statement of
fund releases made by
MoRD and due amount
receivable by the PIA for
each of the five Grameen
National Projects.
Ii)Latest UC/AR
authenticated by NIRD iii)
Project completion
report. Reply awaited. PIA
was not present in the
workshop, hence revised
checklist has not been
filled by PIA.
(As on 14.6.13)
Reminder sent to NIRD for
following information/documents:
i) A detailed statement of fund
releases made by MoRD and due
amount receivable by the PIA for
each of the five Grameen National
Projects. Ii)Latest UC/AR
authenticated by NIRD iii) Project
completion report. Reply awaited.
PIA was not present in the
workshop, hence revised checklist
has not been filled by PIA.
(As on 21.6.13)
Reply awaited from NIRD and PIA
was not present in workshop.
DEO2
7 DRFJ-17020/3/2007 SGSY II
SPNorthern 25.3.13 25.3.13 69.36
Reminder
sent to NIRD
for following
information/d
ocuments: i)
A detailed
statement of
fund releases
made by
MoRD and
due amount
receivable by
the PIA for
each of the
five Grameen
National
Projects.
Ii)Latest
UC/AR
authenticated
by NIRD iii)
Project
completion
report. Reply
awaited.
Reminder sent to NIRD
for following
information/documents:
i) A detailed statement of
fund releases made by
MoRD and due amount
receivable by the PIA for
each of the five Grameen
National Projects.
Ii)Latest UC/AR
authenticated by NIRD iii)
Project completion
report. Reply awaited. PIA
was not present in the
workshop, hence revised
checklist has not been
filled by PIA.
(As on 14.6.13)
Reminder sent to NIRD for
following information/documents:
i) A detailed statement of fund
releases made by MoRD and due
amount receivable by the PIA for
each of the five Grameen National
Projects. Ii)Latest UC/AR
authenticated by NIRD iii) Project
completion report. Reply awaited.
PIA was not present in the
workshop, hence revised checklist
has not been filled by PIA.
(As on 21.6.13)
Reply awaited from NIRD and PIA
was not present in workshop.
DEO2
8 DRFJ-17020/2/2007 SGSY II
SPCentral 25.3.13 25.3.13 52.97
Reminder
sent to NIRD
for following
information/d
ocuments: i)
A detailed
statement of
fund releases
made by
MoRD and
due amount
receivable by
the PIA for
each of the
five Grameen
National
Projects.
Ii)Latest
UC/AR
authenticated
by NIRD iii)
Project
completion
report. Reply
awaited.
Reminder sent to NIRD
for following
information/documents:
i) A detailed statement of
fund releases made by
MoRD and due amount
receivable by the PIA for
each of the five Grameen
National Projects.
Ii)Latest UC/AR
authenticated by NIRD iii)
Project completion
report. Reply awaited. PIA
was not present in the
workshop, hence revised
checklist has not been
filled by PIA.
(As on 14.6.13)
Reminder sent to NIRD for
following information/documents:
i) A detailed statement of fund
releases made by MoRD and due
amount receivable by the PIA for
each of the five Grameen National
Projects. Ii)Latest UC/AR
authenticated by NIRD iii) Project
completion report. Reply awaited.
PIA was not present in the
workshop, hence revised checklist
has not been filled by PIA.
(As on 21.6.13)
Reply awaited from NIRD and PIA
was not present in workshop.
DEO2
9 DRFJ-17020/5/2007 SGSY II
SPWest 25.3.13 25.3.13 44.67
Reminder
sent to NIRD
for following
information/d
ocuments: i)
A detailed
statement of
fund releases
made by
MoRD and
due amount
receivable by
the PIA for
each of the
five Grameen
National
Projects.
Ii)Latest
UC/AR
authenticated
by NIRD iii)
Project
completion
report. Reply
awaited.
Reminder sent to NIRD
for following
information/documents:
i) A detailed statement of
fund releases made by
MoRD and due amount
receivable by the PIA for
each of the five Grameen
National Projects.
Ii)Latest UC/AR
authenticated by NIRD iii)
Project completion
report. Reply awaited. PIA
was not present in the
workshop, hence revised
checklist has not been
filled by PIA.
(As on 14.6.13)
Reminder sent to NIRD for
following information/documents:
i) A detailed statement of fund
releases made by MoRD and due
amount receivable by the PIA for
each of the five Grameen National
Projects. Ii)Latest UC/AR
authenticated by NIRD iii) Project
completion report. Reply awaited.
PIA was not present in the
workshop, hence revised checklist
has not been filled by PIA.
(As on 21.6.13)
Reply awaited from NIRD and PIA
was not present in workshop.
DEO2
10 DRFJ-17020/4/2007 SGSY II
SPEastern 25.3.13 25.3.13 10.17
Reminder
sent to NIRD
for following
information/d
ocuments: i)
A detailed
statement of
fund releases
made by
MoRD and
due amount
receivable by
the PIA for
each of the
five Grameen
National
Projects.
Ii)Latest
UC/AR
authenticated
by NIRD iii)
Project
completion
report. Reply
awaited.
Reminder sent to NIRD
for following
information/documents:
i) A detailed statement of
fund releases made by
MoRD and due amount
receivable by the PIA for
each of the five Grameen
National Projects.
Ii)Latest UC/AR
authenticated by NIRD iii)
Project completion
report. Reply awaited. PIA
was not present in the
workshop, hence revised
checklist has not been
filled by PIA.
(As on 14.6.13)
Reminder sent to NIRD for
following information/documents:
i) A detailed statement of fund
releases made by MoRD and due
amount receivable by the PIA for
each of the five Grameen National
Projects. Ii)Latest UC/AR
authenticated by NIRD iii) Project
completion report. Reply awaited.
PIA was not present in the
workshop, hence revised checklist
has not been filled by PIA.
(As on 21.6.13)
Reply awaited from NIRD and PIA
was not present in workshop.
DEO2
11 DRDAJ-17012/07/2008-SGSY-
II SP
Arunachal
Pradesh01.05.13 01.05.13 222.08
Letter sent to
TSA to submit
proposal for
release of
second
installment in
checklist.
Reply
awaited.
Letter sent to TSA to
submit proposal for
release of second
installment in checklist.
Reply awaited.
TSA asked for revised checklist on
13.06.2013
(Status on 21.06.2013) Reply
awaited
DEO2
12 Tops GroupJ-17046/94/2009 SGSY II
SP
Eastern
India18.3.13 18.3.13 562.47
Letter sent to
NABCONS for
latest
physical and
financial
progress
report. Reply
awaited
PIA attended the
workshop on 06.06.2013
but coulkd not complete
the checklist due to
inavailability of required
supporting documents.
The PIA Submitted an
application for furnishihng
the same with in weeks
time. Reply awaited.
(Status as on 14.06.2013)
PIA attended the workshop on
06.06.2013 but coulkd not
complete the checklist due to
inavailability of required supporting
documents. The PIA Submitted an
application for furnishihng the
same with in weeks time. Reply
awaited. (Status as on
21.06.2013) A reminder
has issued to TSA with a copy to
DEO2
13
Tally South J-17046/52/2009-SGSY-
II (SP)
Multi State 13.03.2013 05.04.13 279.09 Query by IFD
on excess
payment and
UC. PIA
informed
during the
workshop.
Reply awaited
Query by IFD on excess
payment and UC. PIA
informed during the
workshop. Reply awaited
(Staus on 14.06.2013)
Query by IFD on excess payment
and UC. PIA informed during the
workshop. Reply awaited
(Status as on 21.06.2013)
The PIA furnished the checklist
directly with out the NABCONS
certifcation and recommendation.
NABCONS assured to submitt by
DEO2
14
Tally North J-17046/50/2009-SGSY-
II (SP)
Multi State 13.03.2013 05.04.13 111.64 15% released,
Completion
Report
awaited to
release
remaining
10% of
Central Share.
15% released, Completion
Report awaited to release
remaining 10% of Central
Share.
(Staus on 14.06.2013)
Query by IFD on excess payment
and UC. PIA informed during the
workshop. Reply awaited
(Status as on 21.06.2013) Reply
awaited
DEO2
15
Tally East J-17046/66/2009-SGSY-
II (SP)
Multi State 05.04.2013 05.04.2013 279.09 Query on PPS
and UC.
Letter sent to
NABCONS.
PIA & TSA
informed
during the
workshop.
Reply is
awaited
Query on PPS and UC.
Letter sent to NABCONS.
PIA & TSA informed
during the workshop.
Reply is awaited
Query on PPS and UC. Letter sent
to NABCONS. PIA & TSA informed
during the workshop. Reply is
awaited
(Status as on 21.06.2013)
The PIA furnished the checklist
directly with out the NABCONS
certifcation and recommendation.
NABCONS assured to submitt by
23.06.2013
DEO2
16
Tally East
North New
J-17046/93/2010-SGSY-
II (SP)
Multi State 05.04.2013 05.04.2013 372.12 Query on PPS
. Letter sent
to PIA & TSA
informed
during the
workshop.
Reply is
awaited
Query on PPS . Letter sent
to PIA & TSA informed
during the workshop.
Reply is awaited
Query on PPS . Letter sent to PIA &
TSA informed during the workshop.
Reply is awaited
(Status as on 21.06.2013)
The PIA furnished the checklist
directly with out the NABCONS
certifcation and recommendation.
NABCONS assured to submitt by
DEO2
17
Tally West J-17046/51/2009-SGSY-
II (SP)
Multi State 09.04.13 09.04.13 279.00 Query raised
on placement
of
beneficiaries
below
minimum
wage
standards.
Reply awaited
from PIA.
Query raised on
placement of
beneficiaries below
minimum wage
standards. Reply awaited
from PIA.
Query raised on placement of
beneficiaries below minimum wage
standards. Reply awaited from PIA.
(Status as on 21.06.2013) Reply
awaited
DEO2
18
Towns School J-17046/18/2008-SGSY II
SP
Multi State 21.05.2013 21.05.2013 561.88 The PIA was
called on and
the new
checklist was
handed over
to the
representativ
e for
compliance.
The required
documents
are awaited.
The PIA was called on and
the new checklist was
handed over to the
representative for
compliance. The required
documents are awaited.
The PIA was called on and the new
checklist was handed over to the
representative for compliance. The
required documents are awaited.
(Status as on 21.06.2013) Reply
awaited
DEO2
19 A4EJ-17046/35/2009-SGSY II
SPMulti State 26.05.2013 26.05.2013
Complaint
Case. The PIA
was handed
over new
checklist for
release of 3rd
instalment.
Howevr file
put up for
revision of
Districts and
resposne of
PIA against
the
complaint.
Complaint Case. The PIA
was handed over new
checklist for release of
3rd instalment. Howevr
file put up for revision of
Districts and resposne of
PIA against the complaint.
Complaint Case. The PIA was
handed over new checklist for
release of 3rd instalment. Howevr
file put up for revision of Districts
and resposne of PIA against the
complaint.
(Status as on 21.06.2013) File
under process for revision of
Districts
RO-
Consultan
t (P)
20 FIWE J-17046/4/2008 Multi State 09.04.13 09.4.13 207.39
NIRD has
raised queries
on Audit
Report of PIA
and did not
recommend
for release of
third
installment.
PIA has been
asked to
submit
documents.
Reply
awaited.
NIRD has raised queries
on Audit Report of PIA
and did not recommend
for release of third
installment. PIA has been
asked to submit
documents. Reply
awaited. PIA has given un
undertaking that they
would submit revised
checklist and documents
within this week.
(As on 14.6.13)
NIRD has raised queries on Audit
Report of PIA and did not
recommend for release of third
installment. PIA has been asked to
submit documents. Reply awaited.
PIA has given un undertaking that
they would submit revised checklist
and documents within this week,
which is awaited.
(As on 21.6.13)
Reply awaited from PIA.
deo2
21 HIMCONJ-17019/04/2008 SGSY II
SPHP 17.2.12 18.3.13 43.87
Letter sent to
State Govt of
HP for
i)UC/AR,
Progress
Report
authenticated
by DRDA.
ii)implementa
tion plan for
training of
remaining
target. iii) PIA
has fallen
short in
coverage of
SC/ST,
minorities. Iv)
whether
placed
candidates
are getting
more than
minimum
wages. v)MIS
& website
Letter sent to State Govt
of HP for i)UC/AR,
Progress Report
authenticated by DRDA.
ii)implementation plan for
training of remaining
target. iii) PIA has fallen
short in coverage of
SC/ST, minorities. Iv)
whether placed
candidates are getting
more than minimum
wages. v)MIS & website
details. vi) Certificate that
the PIA is implementing
project as per sanction
order. Reply awaited. PIA
was present in workshop
but they didnot fill the
revised checklist.
(As on 14.6.13)
Letter sent to State Govt of HP on
20.2.13 for i)UC/AR, Progress
Report authenticated by DRDA.
ii)implementation plan for training
of remaining target. iii) PIA has
fallen short in coverage of SC/ST,
minorities. Iv) whether placed
candidates are getting more than
minimum wages. v)MIS 7 website
details. vi) Certificate that the PIA is
implementing project as per
sanction order. Reply awaited. PIA
was present in workshop but they
didnot fill the revised checklist.
(As on 21.6.13)
Reminder to State Govt of HP sent
on 19.6.13. Reply awaited. Also PIA
was present in workshop but didnot
fill checklist.
deo2
22PC Training
Institute
J-17046/92/2009-SGSY-
II (SP)
Chattishgar
h, UP, MP
and
Rajasthan
01.05.13 01.05.13 210.00
Referred to
IFD on
22.5.13
Query raised by IFD on
07.06.2013
(Status as on 14.06.2013 )
Query letter sent on 14.06.2013 on
the following; 1. Coverage of SC/ST,
Minority and women beneficiaries
are less and not up to the mark.
2. NABCONS has certified that post
placement allowance were given to
only 1526 beneficiaries, whereas, it
has been reported that 3669
beneficiaries have been placed.
Further, it is mentioned that PPA
and salaries of corporate office are
paid in kind. This requires to be
clarified by NABCONS.
3. 76% of the beneficiaries placed
are in the range of Rs. 2500-4000,
perhaps this range may be lower
than the minimum wages fixed by
the State Govt. This requires to be
clarified by NABCONS.
4. As per the terms & conditions of
the sanction order, out of total
targets of 6000 beneficiaries, 50%
i.e. 3000 beneficiaries should be
covered from Chhattisgarh. The
DEO2
23
Centum J-17046/84/2010-SGSY II
SP
Multi State 17.12.2012 10.06.2013 558.18 Desk Scruitiny Report asked from State
Govts, TSA on
13.06.2013. The PIA was
handed over new
checklist for release of
2nd instalment.
(Status as on 21.06.2013) Reply
awaited, Reminder sent to NIRD on
15.06.2013 for revised checklist
DEO2
24
Centum J-17046/85/2010-SGSY II
SP
Multi State 17.12.2013 10.06.2013 558.18 Desk Scruitiny Report asked from State
Govts, TSA on
13.06.2013. The PIA was
handed over new
checklist for release of
2nd instalment.
(Status as on 21.06.2013) Reply
awaited, Reminder sent to NIRD on
15.06.2013 for revised checklis
DEO2
25 Centum J-17046/79/2010-SGSY II
SP
Multi State 17.12.2012 10.06.2013 558.18 Complaint
Case. File put
up for
decision.
Complaint Case. File put
up for decision.
Report asked from State Govts, TSA
on 13.06.2013. The PIA was handed
over new checklist for release of
2nd instalment.
(Status as on 21.06.2013) Reply
awaited, Reminder sent to NIRD on
RO-
Consultan
t (P)
26 WAWWDJ-17011/1/2008/SGSY-
SPAP 18.2.2013 18.2.13 218 Desk Scruitiny
Letter sent to NIRD for
reasons for i) Delay in
implementation of
project, ii) Strategy for
covering remaining
beneficairies iii)Coverage
of minorities. Reply
received under desk
scrutiny.
(As on 14.06.2013) Letter sent to
NIRD for reasons for i) Delay in
implementation of project, ii)
Strategy for covering remaining
beneficairies iii)Coverage of
minorities. Reply received under
desk scrutiny. (Status as
on 21.06.2013) Reply awaited,
Reminder sent to NIRD on
17.06.2013
DEO2
27Career
Launcher
J-17046/16/2008 SGSY II
SPMulti State 28.03.2013 28.03.2013 33.00 Desk Scruitiny
Referred to IFD on 6.5.13
and recieved back on
06.06.2013 with queries
on completion of target
with the availabe funds,
and State Govt
recommendation for
release in support of their
earlier compliant.
Referred to IFD on 6.5.13 and
recieved back on 06.06.2013 with
queries on completion of target
with the availabe funds, and State
Govt recommendation for release
in support of their earlier
compliant. Reminder sent to State
Govt on 17.06.2013
DEO2
28Career
Launcher
J-17046/18/2010 SGSY II
SPMulti State 31.03.2013 05.06.2013 744.00 ...... Desk Scruitiny
The PIA has submitted the details
in old check list. The revised
checklist was given to the
representative. The required
documents are awaited.
DEO2
29 CRISPJ-17024/12/2010-SGSY-
II (SP)M.P 17.02.2009 02.04.2013 561 Desk Scruitiny IFD raise quiry
File returned back to the Division
and the deficiancies were asked
from the PIA on 19.06.2013
DEO
Total 8345.71
SL.No PIA Name File No. StateDate of first receipt in ASDP
Division
Date of latest
receipt in
ASDP
Division
Proposed
Amount to be
Released in
lakhs
Status (As on
06.06.2013)Status (As on 10.06.2013) Status Location
INSTALMENT CASES PENDING IN ASDP DIVISION
1Aroh
Foundation
J-17046/1/2010-SGSY-II
(SP)Multi State 19.03.2013 19.03.13 558.15 Desk Scruitiny Desk Scruitiny
Query (Status as on 21.06.2013)
Reply awaitedDEO
TOTAL 558.15
Sl. No. PIA Name File No. State Modification Sought Status
1
Dyan Deep
Jankalyan
Foundation
J-17025/17/2008 Maharashtra Revision of per beneficiary cost
Letter sent to
PD DRDA on
3.5.13 for UC &
AR duly
authenticated
by DRDA.
2Shobit
Universityj-17046/28/2009 UP Revison of Trades
Query. File
under process
for inclusion of
new trade.
Sl. No. PIA Name File No. State Status
1 L & T J-17060/4/2008 SGSY II SP
UP, Bihar,
Chhattisgarh,
Jharkhand,
MP
Letter sent to KRIBHCO for
information/documents. Reply
awaited
2 ITFT J-17037/2/2009/SGSY-II(SP) Uttarakhand Query ( File is under process)
3 ITFT j-17018/2/2008.SGSY-II(SP) Haryana Desk Scrutiny
4 IL&FS J-17046/04/2009-SGSY-II(SP) Multi state Desk Scrutiny
5 Jagruti Foundation J-17011/7/2007-SGSY-SP Multi state Query(File is under process)
Modification Cases as on 21.06.2013
Closure Cases as on 21.06.2013
6 SSCI J-17046/2/2008SGSY-II(SP) Multi state
Letter dated 26.12.2011,
24.08.2012 and second reminder
dated 13.06.2013 sent to the
IGNOU and copy to the PIA for
submitting the documetns for
closure. But, the
information/documents are stll
awaited.