SLAC Accelerator Department
PEP-II Future Plans and
Parameters 2004-2010
John T. Seeman
PEP-II MAC Meeting
December 13, 2004
SLAC Accelerator Department
Contributors to PEP-II• SLAC• LBNL• LLNL• With help from:
– IHEP, Beijing, China– BINP, Novosibirsk, Russia– INFN, Frascati, Italy– KEK, Tsukuba, Japan– CEA, Saclay, France– IN2P3, Paris, France– Caltech– BNL– Many people from the BaBar Collaboration– Visitors from CERN, DESY, Cornell, FNAL, …
SLAC Accelerator Department
The PEP-II Team
•
August 2004
SLAC Accelerator Department
Beam Lines
SLAC Accelerator Department
PEP-II arc section
SLAC Accelerator Department
PEP-II HER RF cavities
SLAC Accelerator Department
PEP-II Interaction Region Components near BaBar
HER
LER
Collision point
BaBar
SLAC Accelerator Department
Other reviews since the last PEP-II MAC
• DOE Operations Review in June 2004
• (Next DOE Operations Review May 2005)
• PEP-II End of Run Review August 2004
SLAC Accelerator Department
Operational Improvements in FY2004
– Peak luminosity: 6.6 9.21033
– Number of bunches: 1050 1588 bunches • by-2 pattern (24 long mini-trains) with 2% ion gap
– Parasitic collision effects seen but small(<5%)– Electron Cloud (ECI) effects are small (<2%)– I current 1500 2450 mA (3 RF stations)– Icurrent 1050 1550 mA (8 RF stations)
y* of 12 11 mm
– All data now taken in trickle charge mode • Both beams: LER in November, HER in March
SLAC Accelerator Department
PEP-II Performance Measure: Peak Luminosity
SLAC Accelerator Department
Trickle injection at the B FactoriesBest shift, no trickle
PEP-II: ~5 Hz continuousKEKB: at ~5-10 min intervals
Best shift, LER only trickleNov 2003
Best shift, double trickleMar 2004
PEP-II LumiHER currentLER current
SLAC Accelerator Department
Run 1
Run 2
Run 3
Run 4
CD4
Design Performance
SLAC Accelerator Department
•
SLAC Accelerator Department
SLAC Accelerator Department
Luminosity versus Crossing Angle
• Normalized Lsp vs. e- angle
0.75
0.80
0.85
0.90
0.95
1.00
1.05
-1000 -500 0 500 1000
XP[e-] (murad)
Lsp
/ L
sp(X
P=
0)
by-4, msrd
by-4, fit
sp. by-2, msrd
sp. by-2, fit
Without parasitic crossing
Withparasitic crossing
KozaneckiSullivanCai
SLAC Accelerator Department
Beam-Beam Observed and Simulated
• Specific luminosity vs. LER bunch current
3.0
3.5
4.0
4.5
5.0
5.5
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8
LER bunch current (mA/b)
Sp
ecif
ic lu
min
osi
ty (
1E30
mA
^-2
b^
-1)
msrd (16 Mar 04)
simulated
Data: by-4 pattern exc. highestL/H ratio = 1.6
KozaneckiSullivanCaiNarskyDynamic
beta effects
Beam-beam limit effects
SLAC Accelerator Department
Response to April 2004 PEP-II MAC Questions
• Aborts per day: Down to 5 to 6 per day in July (McIntosh)• IR upgrade reduced y*: Designing for 7 mm, hope to get 8.5 mm
(Sullivan, Biagini)• IR vacuum work: Ongoing (Kurita, Langton, Pope, Sheng, Kharakh,
Metcalfe, DeBarger, Sullivan)• IR vacuum model: Some progress (Sullivan, Student, Gierman)• Q1/Q2 bellows design: Nearly designed (Kurita, Langton,
Novokhatski)• Radial ion pump: Designed (Kurita, Wright)• B1 magnet upgrade: Some studies done. No decision yet. Likely we
will make no changes. (Ecklund, Sullivan)• LER arc HOM TSP heating: Sources now known (collimators). Extra
absorber to be installed (Novokhatski, Kulikov, Langton)• “IR outgassing storms”: NEGs are heated by e+ beam (Sullivan,
Ecklund, Metcalfe)• RF engineering positions: Hired two new people. Tried to hire a third
person. He turned us down. Now most hires are frozen due to 2005 budget.
SLAC Accelerator Department
Summer 2004 PEP-II Improvements
• IR2 south forward shield wall: Backgrounds
• Add another new LER RF station: Higher current
• Add a HER RF station by splitting up a current 4 cavity station into two 2 cavity stations: Higher current
• Two new “Frascati” longitudinal kickers in LER: More stability
• New electrodes for transverse kickers: More stability
• Add fans to all HER bellows: Cool Higher Order Modes (HOMs)
• Alignment work (quadrupole rolls): Smaller vertical emittance
• New LER synchrotron light monitor: Smaller vertical emittance
• IR NEG pump HOM reduction: Better lifetime and backgrounds
• New Support Tube Chiller: Higher currents
SLAC Accelerator Department
New IR2 Shield Wall for BaBar IFR
SLAC Accelerator Department
Windings finished for ECI reduction
SLAC Accelerator Department
LER NEG Test chamber
SLAC Accelerator Department
Existing 3082 chamber
BPM
BPM
Chamber support
Cooling bar
NEG plenum
NEG heater
Quad extrusion
SLAC Accelerator Department
Chamber showninverted and plenum not shown for clarity
SiC HOM absorber
SLAC Accelerator Department
New Longitudinal Feedback Kicker Assembly
SLAC Accelerator Department
New transverse kicker electrodes
SLAC Accelerator Department
Luminosity Equation y is the beam-beam parameter (~0.065)
Ib is the bunch current (1 to 3 mA)
n is the number of bunches (~1600) y
* is the IP lattice optics function (vertical beta) (10 mm)
E is the beam energy (3.1 and 9 GeV) Luminosity (1033 cm-2 s-1)
*341017.2
y
byEInxL
SLAC Accelerator Department
Overall Parameters and Goals
Parameter Units DesignBest in collision
Future 2007 goal
I+ mA 2140 2450 4500
I- mA 750 1550 2200
Number bunches
1658 1588 1720
y* mm 15-20 11 8.5
y 0.03 0.045, 0.06 0.055-0.07
Bunch length mm 12 10-12 8.5
Luminosity x1033 3.0 9.2 23
Integrated lumi / day
pb-1 130 710 1600
Over five times design!Over three times design
Twice design
SLAC Accelerator Department
Future luminosity increase factors
Parameter Present Future Luminosity gain ratio
Hardware and work needed
LER current 2450 mA 4500 mA Two RF stations, new IR vacuum chambers
HER current 1550 mA 2200 mA 1.61 Two RF stations, new IR vacuum chambers
y* 10.5 mm 8.5 mm 1.24 HER higher tunes, RF & power supplies work
y 0.06 L 0.045 H
0.070 L 0.055 H
1.17 Tune plane, coupling, & IR work, vertical emittance
Parasitic x 3.22 mm 3.80 mm 1.08 B1 magnet change (?)
Total x 2.52
SLAC Accelerator Department
PEP-II Future Luminosity Parameters
x y x y n I x* y* Lumi x y
Units cm mm nm nm mA m m x1E33
LER now
32 10.5 33 1.55 1616 2450 103 4.0 9.21 0.053 0.065
LER 2007
28 8 47 1.80 1720 4500 115 3.8 23.0 0.065 0.070
HER now
33 10.5 60 1.30 1616 1550 139 3.7 9.21 0.052 0.043
HER 2007
28 8 66 1.60 1720 2200 136 3.6 23.0 0.063 0.055
SLAC Accelerator Department
HER Single-Bunch Synchroscan Data at 16 MV
HoltzappleFisherNovokhatski
SLAC Accelerator Department
Comparing Single-Shot and Synchroscan Data
LER e+
SLAC Accelerator Department
How to shorten the HER-LER bunch lengths
• Summer 2004 2007:– LER current: 2450 mA 4500 mA– HER current: 1550 mA 2200 mA– LER RF: 3 stations 5 stations– LER RF: 6 10 cavities– HER RF: 8 stations 10 stations– LER total RF voltage: 3.8 MV 7.7 MV– HER total RF voltage: 15.8 18.7 MV– HER Je 2.0 2.2– HER Momentum compaction: 0.0024 0.0017
• LER bunch length: 11.8 mm 8.7 mm• HER bunch length: 11.4 mm 8.4 mm
SLAC Accelerator Department
PEP-II Future Downs• Nominal plan:
– Down July-December 2005 BaBar IFR, PEP-II support tube, many PEP-II vacuum chambers
– Down Aug-Sept 2006 Last RF station LER-5 + last upgraded chambers– Down Aug-Sept 2007 maintenance and PPS– Down Aug-Sept 2008 maintenance and PPS– Down Aug-Sept 2009 maintenance and PPS
• Option 1:– Run through 2005-2006 except for three week down for PPS certification
(When: December 2005?) (+maybe PEP-II HER-10 RF Station)– Down August-December 2006 BaBar IFR and PEP-II support tube– Downs in 2007-2009 same as above
• Option 2:– Run through 2005-2006 except for three week down for PPS certification
(When: December 2005?) (+maybe PEP-II HER-10 RF Station)– Down May-September 2006 BaBar IFR and PEP-II support tube– Downs in 2007-2009 same as above
SLAC Accelerator Department
VTX Bellows Cooling Installation: Key issue in the future!
SLAC Accelerator Department
New Be bellows design
•
SiC
CoolingLangton
SLAC Accelerator Department
Expected PEP-II Delivered Integrated Luminosity
Delivered as of end of fiscal year PEP-II Projection “Delta”
FY2004 256/fb 117/fb
FY2005 387 131
FY2006 528 141
FY2007 821 293
FY2008 1156 335
FY2009 1501 345
FY2010 1847 346
Fivemonthdown
SLAC Accelerator Department
Future Maintenance Down Activities
• Install LER-5 RF station
• Install HER-10 RF station
• Remove support tube for SVT work to fix radial ion pump, add an IR BPM, new Be bellows
• Upgrade several high-power IR vacuum chambers (Q4, Q5, high power dump, Q2 bellows, LER abort window, straight section bellows …)
• HER lattice upgrade for lower momentum compaction and shorter bunches
• New RF comb filters
• New klystron linearizer
• New transverse digital feedback processors
SLAC Accelerator Department
Detailed PEP-II upgrade list
• IR2 new Q2 chamber Apr-05• Transverse digital feedback Apr-05• RF woofer link May-05• IR2 Q2 bellows Jul-05• ST Be bellows Jul-05• ST radial ion pump Jul-05• ST new BPM Jul-05• IR2 HER Q4L Jul-05• IR2 HER Q4R Jul-05• IR2 HER Q5L Jul-05• IR2 HER Q5R Jul-05• IR2 HER Q4-5 bellows Jul-05• IR2 LER Q4-5L Jul-05• IR2 LER Q4-5R Jul-05• LER Abort spoiler Jul-05• LER new high power bellows Jul-05• PEP-II tunnel network upgrade Jul-05• RF station HER 10 Aug-05• HER tune power supply upgrade Aug-05• RF comb-2 project Dec-05• RF klystron linearizer Jan-06• RF station LER 5 May-06• IR HER HOM absorbers May-06• IR LER HOM absorbers May-06• IR HER new high power dump May-06• IR New HER frangible links May-06• IR new LER frangible links May-06• IR new HER 12 m transition May-06• IR new NEG chamber upgrades May-06• New longitudinal feedback system May-06
Project Time early to install
SLAC Accelerator Department
Conclusions
• PEP-II has reached a luminosity of 9.21033/cm2/s.
• PEP-II has delivered 710 pb-1 in one day.
• PEP-II has delivered 117 fb-1 in Run 4!
• PEP-II has delivered 256 fb-1 since May 1999.
• Trickle injection in both rings all of the time.
• Near term upgrades are going well.
• Planned upgrades toward 2.31034 are on track.
• SLAC to decide on down schedule in the next few months.