Upload
alvin-hood
View
221
Download
2
Embed Size (px)
Citation preview
Slide Slide 11 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling
PETE 411 - Well DrillingPETE 411 - Well Drilling
by
Dr. M. Amani
TAMU-Petroleum EngineeringFALL, 2003
Lesson 1Lesson 1
IntroductionIntroduction
Slide Slide 22 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling
Lesson 1 - IntroductionLesson 1 - Introduction
Texts Grading Syllabus (attached and on internet) Class Objectives (attached and on internet) Schedule
Corrections to Textbook (on internet)
http://pumpjack.tamu.edu/~juvkam-wold/
MOVIE The Rotary Drilling Rig
Slide Slide 33 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling
General InformationGeneral Information
Prerequisites: PETE 320, 321, 322, 323 and 324
3 credit hours
Class Schedule:
Section 501: MWF 9:10 - 10:00
Section 502: MWF 11:30-12:20
Class Room: Rich Room 313
Slide Slide 44 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling
General InformationGeneral Information
Instructor: Dr. M. Amani
Office: Room 401 K
Office Hours: MWF 10:00 – 11:00
MW 12:30 - 2 p.m– or by
appointment
Phone: 845-6164
Slide Slide 55 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling
TextbookTextbook
Applied Drilling Engineering,
by Adam T. Bourgoyne Jr., Martin E.
Chenevert, Keith K. Millheim and F.S.
Young Jr., Society of Petroleum
Engineers, Richardson, TX, 1991.
Available from the bookstore or directly from
SPE
Slide Slide 66 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling
Basis for GradingBasis for Grading
Homework 10% Weekly Quizzes 10% Quiz A 20% Quiz B 20% Design Project 10% FINAL 30%
100%
Slide Slide 77 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling
Homework Assignment:Homework Assignment:
Read: Applied Drilling Engineering,
Ch.1, pp 1-12
HW #1, due Monday, Sept. 8 (internet)
Class Lectures are on the Internet Class Lectures are on the Internet PETE 411 – Lessons 1 & 2
http://pumpjack.tamu.edu/~amani/
Slide Slide 88 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling
PETE 411 Catalog DescriptionPETE 411 Catalog Description
The design and evaluation of well drilling systems; identification and solution of drilling problems; wellbore hydraulics; casing design; well cementing; drilling of directional and horizontal wells; wellbore surveying.
Slide Slide 99 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling
Schedule - Fall, 2002Schedule - Fall, 2002
WEEK NO. TOPICS
1. Introduction, the Rotary Drilling Process, The Rig, Drilling Equipment
2. Drilling Cost & Drilling Rate, Hole Problems, Drilling Structures
3. Drilling Bits, Drilling Hydraulics - Hydrostatics
4. Rheological Models, Pressure Losses in Laminar Flow, Slot Flow
Slide Slide 1010 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling
Schedule - cont’dSchedule - cont’d
WEEK NO. TOPICS
5. Oct. 6 & 8: no classes; SPE Fall Mtng.
Surge and Swab Pressures - cont’d
6. Pressure across Bit, Bit Nozzle Sizing, Surge and Swab Pressures
7. Lifting Capacity of Drilling Fluids,Casing Design Procedures, Burst, Collapse, Tension
Slide Slide 1111 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling
Schedule - cont’dSchedule - cont’d
WEEK NO. TOPICS
8. Casing Design, API Performance Properties, Examples, Drilling Technology - - Abnormal Pore Pressure Detection
9. Drilling Technology - Balanced and Overbalanced Drilling, Fracture Gradient Prediction, Gas Cut Mud, “dc-exponent”
Slide Slide 1212 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling
Schedule - cont’dSchedule - cont’d
WEEK NO. TOPICS
10. Well Control Methods,
Kick Detection and Procedures for
Killing Wells, Wireline Logging, MWD
11. Cements and Cementing, Primary & Secondary Cementing
Squeeze Operations
Slide Slide 1313 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling
Schedule - cont’dSchedule - cont’d
WEEK NO. TOPICS
12. Cementing Equipment, Additives, Liner Cementing, Setting Cement Plugs
13. Directional Drilling, Well Trajectory Surveying, Horizontal Drilling
Slide Slide 1414 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling
Schedule - cont’dSchedule - cont’d
WEEK NO. TOPICS
14. Torque & Drag Calculations, Coiled Tubing,
Slimhole Drilling
15. Problem Solving,
Review,
Finals
Slide Slide 1515 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling
Important DatesImportant Dates
QUIZ A - Monday, Oct. 13, 7-9 p.m.
QUIZ B - Monday, Nov. 10, 7-9 p.m QUIZ A & B: Rich 101
Design Projects Due: - Monday, Dec. 8, 5 p.m. (Rich 401K)
FINALS Rich 313
- Sec. 501: Mon., Dec. 15, 8-10 a.m. - Sec. 502: Wed., Dec. 17, 10:30-12:30
Slide Slide 1616 of 16 of 161. Introduction1. Introduction Pete 411 Well DrillingPete 411 Well Drilling
END
Lesson 1
And now, the movie...
PETE 411 - Texas A&MPETE 411 - Texas A&M