1

2017 MWEA

ANNUAL

CONFERENCE

Sludge Thickening/Storage

Alternatives Analysis for a 225 MGD

Wastewater Treatment Facility

7/10/2017 HUBBELL, ROTH & CLARK, INC. | MWEA 2017 ANNUAL CONFERENCE

Page 2: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

PRESENTATION AGENDA:

≡Introduction

≡Background

≡Key Issues / Initial Scope

≡Alternatives

≡To and Fro

≡Final System

≡Lessons Learned

27/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 3: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

INTRODUCTION / BACKGROUND

≡Downriver WTF (DWTF)

≡Expansions, renovations in 1929, 1938, 1962, 1969, 1975, 1986, 1995, 1999, 2000, 2002, 2007, 2011, 2011, 2011, 2016, 2018

≡Wyandotte

3

≡Serves 13 Communities

≡Allen Park, Belleville,

Brownstown Twps., Dearborn

Heights, Ecorse, Lincoln Park,

River Rouge, Riverview,

Romulus, Southgate, Taylor, Van

Buren Twps.., Wyandotte

7/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 4: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

LOCATION

7/10/2017 4

Page 5: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

DWTF

≡40 MGD ADF

≡225 MGD Peak Flow (250+ MGD)

≡Chemical Phosphorus Removal (Ferric)

≡High Purity Oxygen Activated Sludge

≡Unique Blending Process:

≡225 MGD Headworks and Disinfection

≡150 MGD Primary

≡125 MGD Secondary

57/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 6: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

67/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 7: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

SOLID PROCESS PRIMARY SLUDGE

≡7 Primaries (1962, 1969, 1999)

≡Each Tank Has Dedicated Chopper Pump

≡Timer Control Based on Sludge Blanket Levels

≡Pump to 150,000 Gallon (ea.) Primary Sludge Storage

Tanks (then to Incineration 1962)

≡Pump to 4 Gravity Thickeners w/ Two Chopper Type

Pumps (1975)

77/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 8: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

7/10/2017 HUBBELL, ROTH & CLARK, INC. | FOOTER PLACEHOLDER 8

Page 9: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

7/10/2017 HUBBELL, ROTH & CLARK, INC. | FOOTER PLACEHOLDER 9

Page 10: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

7/10/2017 HUBBELL, ROTH & CLARK, INC. | FOOTER PLACEHOLDER 10

Page 11: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

7/10/2017 HUBBELL, ROTH & CLARK, INC. | FOOTER PLACEHOLDER 11

Page 12: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

WAS SLUDGE

≡6 Secondary’s (1972, 1986),

≡ Each with RAS Pump

≡Consistent WAS Pumping Based On MCRT, MLSS

≡Pump Directly to Gravity Thickeners

≡Co-Thicken But Maintain Separate Feed

127/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 13: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

137/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 14: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

SOLID COMPLEX

7/10/2017 14

• Thicken,

• Dewater,

• Convey to Roll-offs,

• Truck to Landfills

Page 15: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

SOLID COMPLEX EQUIPMENT

≡4 Gravity Thickeners, with 6 Plunger Pumps (1975)

≡2 Sludge Storage / Blend Tanks, with 3 Rotary Lobe

Pumps and Chopper Pumps

≡2 4,000 lbs./day Centrifuges, Individual Feed (2008)

≡4 BFPs with Loops Feed (1995)

≡Screw Conveyor (2008) Cake to Truck, Landfill

157/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 16: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

SIMPLIFIED BOX DIAGRAM

7/10/2017 HUBBELL, ROTH & CLAR, INC. | FOOTER PLACEHOLDER 16

Page 17: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

17

Page 18: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

18

Page 19: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

19

Page 20: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

HUBBELL, ROTH & CLARK, INC. | FOOTER PLACEHOLDER 20

Page 21: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

21

Page 22: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

KEY ISSUES / INITIAL SCOPE

≡Antiquated, Total Facility

Upgrade

≡Update to State of the Art

≡Simplify but Maintain

Needed Redundancy

≡Get rid of extra pumps,

storage tanks

≡Pump Sludge to Splitter Box,

Gravity Feed to Gravity

Thickeners

≡Pump to Storage / Blend

Tank

≡Attempt to Remove Grit

227/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 23: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

INITIAL PROCESS FLOW SCHEMATIC

≡Pump Primary Sludge Directly to Thickeners

≡Splitter Box Gravity Feed

237/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 24: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

SIMPLIFIED BOX DIAGRAM

7/10/2017 HUBBELL, ROTH & CLAR, INC. | FOOTER PLACEHOLDER 24

Page 25: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

SIMPLIFIED BOX DIAGRAM

7/10/2017 HUBBELL, ROTH & CLAR, INC. | FOOTER PLACEHOLDER 25

Page 26: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

THICKENING PROCESS FLOW

SCHEMATIC – SIMPLIFY!

267/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 27: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

SPLITTER BOX CONCEPT

27

Page 28: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

EVALUATIONS / WORKSHOPS

≡Considered Batch vs. Continuous Processing

≡Evaluated Splitter Box vs. Flow Meter – Control Valves Sets

≡12 Meter – Control Valve Sets

≡Four, Five and Six Sided Splitter Box

≡Fixed vs. Controlled Gates

≡Mechanical vs. Turbulence Mixing

≡Means of Grit Removal

287/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 29: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

EVALUATIONS / WORKSHOPS CONT.

≡Evaluated Sludge Pumps

≡7 Possibly Types

≡Site Visit PVP and Other Due Diligence

≡Evaluated Blend Tank Mixers

≡6 Possibly Types

≡Linear Motion Due Diligence

≡Grit Removal

≡Consider Repurpose Skimmings Building

≡Explore Equipment at WEFTEC

297/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 30: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

INITIAL PROCESS SELECTIONS

≡Mag Meter – Control Valve Sets (12) to New Gravity

Thickeners

≡Pump to Blend Tanks

≡Mix to provide consistent feed

≡Linear Motion Mixers

≡Dedicated PVPs to Centrifuges, Rotary Lobes to BFPs

307/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 31: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

But…

Why Are We “Thickening?”

…and...

Why Are We Pumping Again?

317/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 32: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

≡Centrifuge Loading:

≡2% - 4% Feed Concentration

≡4,000 lbs. /hr.

≡New and Shiny

≡BFP:

≡4% - 10% Feed Concentration

≡One-third the Centrifuge Production

≡Old and saggy

Ultimately Going With Additional Centrifuges

32

Competing Dewatering Interests

7/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 33: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

≡Convert Thickeners to Storage Tanks

≡Eliminate Blend Tanks

≡Mix to provide consistency

≡Pump Directly to Dewatering Units

33

EVALUATION / SOLUTIONS:

7/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 34: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

SIMPLIFIED BOX DIAGRAM

7/10/2017 HUBBELL, ROTH & CLAR, INC. | FOOTER PLACEHOLDER 34

Page 35: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

≡Eliminate Primary Sludge Storage Tanks and Sludge Pumps

≡Convert Gravity Thickeners to Sludge Storage

≡Pump Primary and WAS Directly to Sludge Storage Tanks

≡Eliminate Sludge Storage / Blend Tanks

≡Continue Flow Control Valve Meter Sets

≡(Eliminate elutriation water control sets)

≡Mix with Linear Motion Mixers

≡Relocate Ex Rotary Lobe to Feed BFP (problematic)

≡New PVP to Feed Centrifuges

35

ULTIMATE SOLUTION

7/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 36: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

36

Page 37: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

7/10/2017 HUBBELL, ROTH & CLARK, INC. | FOOTER PLACEHOLDER 37

Page 38: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

387/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 39: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

397/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 40: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

≡Rotary Lobe – Lobes Swelled, Rubbed Casing (Left Doors Open)

≡Vendor - “They shouldn’t swell”

≡Switched Out Lobes with Little Results

≡Vendor Witnessed Maintenance Procedures

≡Wrong Procedures

≡Staff Retrained

≡No More “Swollen Lobes”

40

LESSONS LEARNED (CONT.)

7/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 41: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

≡ Centrifuge Internals Headloss

≡6” lines, to 4’ dia. Centrifuge Feed Pipe

≡Internally, Pipe Necks Down to 2” dia.

≡Discovered When Pumps Were Dismantled For Repairs

(Oh-Shmit Moment)

41

LESSONS LEARNED (CONT.)

7/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 42: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

LESSONS LEARNED (CONT.)

42

≡Oh-Biosolids Moment

≡(Discovered When Pumps Were Dismantled For Repairs)

7/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 43: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

≡ Centrifuge Internal Headloss

≡6” lines, to 4’ dia. Centrifuge Feed Pipe

≡4” = 10 fps

≡Internally, Pipe Necks Down to 2” dia.

≡2 “ dia = 40 fps

≡Additional 25 ft. headloss (clean water)

437/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 44: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

≡Dual Disk Pump - ‘Enamored’ with PVPs (Nice Shiny

Technology)

≡Due Diligence Calls / Site Visit

≡Lease-to-Purchase for 6 Months

≡Worked Flawless at 120 gpm, Low Head

≡Once applied, severe vibrations, disk ruptures, inability

to meet design conditions (400 gpm), loss of air in

pulsation dampener chambers,

44

LESSONS LEARNED

7/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 45: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

457/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 46: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

7/10/2017 MWEA 2017 ANNUAL CONFERENCE 46

Page 47: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

477/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 48: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

WRAP-UP:

$10M Construction

Sorenson Gross (Prime)

J.F. Cavanaugh

Shaw Electric

Commerce Controls Inc.

Final Completion May 2016

487/10/2017 MWEA 2017 ANNUAL CONFERENCE

Page 49: Sludge Thickening/Storage Alternatives … 2017 MWEA ANNUAL CONFERENCE Sludge Thickening/Storage Alternatives Analysis for a 225 MGD Wastewater Treatment Facility 7/10/2017 HUBBELL,

49

Q&A???

THANK YOU!

Tim Sullivan, P.E.

If you have questions about the presentation, please contact me:

[email protected]