Small Scale LNGCurrent State of Play in Europe and Outlook for the
next Decade
Piet KagerNV Nederlandse Gasunie
Gate Terminal Rotterdam
Break Bulk versus Small Scale LNG
Break Bulk means extension of the classic LNG chain with an extra step
Break Bulk
Small Scale LNG means a step in the classic chain where LNG will be used as a commodity in the end users market
LNG as transport fuel
Growing interest in LNG as a fuel for transportation, because of emission targets/requirements
Tightening emission norms for trucks ships
(Source: KEMA)
Emission limits for transport by truck and ship are tightened and converging. LNG as transport fuel can meet these
requirements
Truck: Euro V has been implemented in 2009, Euro VI will come into force in 2014.
Ships: CCNR v3 will have similar emission levels in 2014
0
2
4
6
8
10
12
14
Soxg/kWh
Noxg/kWh
PMg/kWh
CO2cg/kWh
Residual Oil3,5%S Marine DieselOil, 0,5%S Gasoil, 0.1%S
LNG
Emission comparison
(Source Magalog)
Where are the Small Scale Activities Spain: All terminals have truck loading facilities to
distribute LNG to various locations since many years Norway: Two Small Scale Liquefaction Units operational
and LNG transported by Small Scale Vessel or Truck Zeebrugge: Loading of LNG currently on large jetty and
truck loading. Second jetty under construction Rotterdam: Reloading at large jetties later this year, truck
loading early next year, dedicated Small Scale jetty operational in 2015
Montoir: Truck loading summer 2013 UK: Small scale liquefaction of Biomass
Current Status of Small Scale LNG
Spain: Trucking of LNG to industrial sites Norway: Kolsness (Gasnor) and Risavika (Skangass) small scale
liquefaction for shipping and industrial use– Various Fjord Ferries – Offshore Supply Vessels – Coast Guard– Export to Sweden for industry and Ferry (Viking Grace)
between Stockholm (Sw) and Turku (F)– Fjord Line between Bergen (N) and Hirsthals (Dk) will run on
LNG shortly Netherlands:
– 85+ trucks are currently using LNG as fuel– 2 Inland ships are LNG fuelled Argonon and Green Stream
Potential market near term
Import terminalLNG productionInitial Market area, Rhine ValleyRussia – NW Europe road connection
Geographical Area’s– 1 Baltic area– 2 North Sea– 3 Rhine route, inland shipping– 4 Dutch, German and Danish
Wadden area– 5 Blue Corridor
1
2
3
4
5
Issues with Small Scale LNG
LNG Availability and composition LNG pricing
– Currently NBP +20/30%– + transportation– + storage
Infrastructure– Some existing terminals to be adjusted– More vessels/barges needed– Bunker locations to be established – Overall cost of Cryogenic equipment
Taxation– For use as a tranportation fuel the right tax incentives to be in place
Permits– Current use of LNG as inland ship fuel is by exemption rather than by
permit Standarization
– At the moment there are too many different ways of handling LNG as a truck fuel
– Also the marine sector needs to come to certain standards
Support from EU and Governments
EU support through TEN-T subsidies– TEN-T supported multi country “North European LNG
Infrastructure Project 2011/2012 – Several initiatives have applied for subsidy of TEN-T– Necessary because poor project economics due to slow volume
build up, while all investments are upfront.– 10% of relevant investment for a project in one country– 20% of relevant investment when two or more EU countries
join forces in setting up Small Scale chain Netherlands: Green Deal “Rhine and Wadden”
– Private Public cooperation to support the use of LNG as a fuel and to take away bureaucratic hurdles
Wadden
Rotterdam and Rhine
RegionalNationalInternational
Parties:• Min. I&M, EL&I and
Fin.• LNG Market Parties
via Nat LNG Platform
“Green Deal” LNG Rhine and Wadden
Goal of “Green Deal”
By 2015:50/50/500– This means by 2015 there will be operational in
the Netherlands and surrounding countries– 50 sea going vessels using LNG as a fuel– 50 inland ships which are LNG fuelled– 500 heavy duty trucks with LNG as fuel
Z
Rotterdam
Duisburg
Arnhem
Basel
Köln/Bonn
Koblenz
Karlsruhe
Strasburg
Wiesbaden
A
International Link:Central Commission for Navigation on the Rhine
LNG Break Bulk Rotterdam
The project: LNG supply through Gate terminalLoading of LNG in smaller carriers and bargesTruck loading with LNGLoading of LNG in rail cars containers under consideration
Project partners:
5/24/2013 13
The Next Decade
Very much dependent on– Overall economic situation, specially in shipping– Availability of LNG and more important its price– Availability of alternatives and its prices– Further development of SECA areas
010000002000000300000040000005000000600000070000008000000
2015 2030
Low LNGpriceMid LNGPriceHigh LNGPrice
2020
Ton
nes
/yr
Source DMA report 8000000tonnes = appr 10BCM
2015 2030