12
SMART CITY: HUBBALLI- DHARWAD

SMART CITY: HUBBALLI- DHARWAD › download › Smart... · 1 Solid Waste Management –Litter Free Zones 0.54 Prepared Prepared Under Process ... KSPCB 35 Intelligent Transport Management

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SMART CITY: HUBBALLI- DHARWAD › download › Smart... · 1 Solid Waste Management –Litter Free Zones 0.54 Prepared Prepared Under Process ... KSPCB 35 Intelligent Transport Management

SMART CITY: HUBBALLI- DHARWAD

Page 2: SMART CITY: HUBBALLI- DHARWAD › download › Smart... · 1 Solid Waste Management –Litter Free Zones 0.54 Prepared Prepared Under Process ... KSPCB 35 Intelligent Transport Management

Major Junctions of ABD

Area Profile (ABD)

Project Overview

Financial Plan

• Total 37 Projects

• ABD - 26 Projects (1410

Cr.)

• PAN City - 11 Projects (

252 Cr.)

Page 3: SMART CITY: HUBBALLI- DHARWAD › download › Smart... · 1 Solid Waste Management –Litter Free Zones 0.54 Prepared Prepared Under Process ... KSPCB 35 Intelligent Transport Management

FUND ALLOCATION (PROJECT WISE)

Sl. Name of the project

Fund Allocation (in Cr.)

Project TypeEstimated Cost

(Total)SCM PPP

GoI/Go

K

1 Solid Waste Management – Litter Free Zones 0.54 0.24 -- 0.3 ABD

2 Electric Crematorium -- -- -- -- ABD

3 IPT Connectivity (PBS) 4.75 4.75 -- -- ABD

4 e-Toilets 0.96 0.96 -- -- ABD

5 Rain water harvesting 2 1 -- 1 ABD

6 Storm Water Drains 5 2.5 -- 2.5 ABD

7 LED street Lighting 6.86 6.2 -- 0.66 PAN City

8 Roof top Solar 128.76 12.9 77.3 38.6 ABD

9 Multi Level Car Parking 66.1 59.5 6.6 -- ABD

10 Renovation of Core city market area 114.78 114.8 -- -- ABD

Page 4: SMART CITY: HUBBALLI- DHARWAD › download › Smart... · 1 Solid Waste Management –Litter Free Zones 0.54 Prepared Prepared Under Process ... KSPCB 35 Intelligent Transport Management

FUND ALLOCATION (PROJECT WISE) .. Contd.

Sl. Name of the project

Fund Allocation (in Cr.)

Project TypeEstimated Cost

(Total)SCM PPP

GoI/Go

K

11 Smart IT-Solid Waste Management System 31 31 -- -- PAN City

12 Wi-fi Corridor

130

-- --

130.1

PAN City

13 Integrated Command and Control Centre -- -- PAN City

14 Cashless and Paperless office at HDMC -- -- PAN City

15 Smart Property taxes management system -- -- PAN City

16Smart Public Advertisement Management System

-- -- PAN City

17 Smart Public Works Management System -- -- PAN City

18 People Empowerment Platform/One stop Solution 84 50.4 -- 33.6 PAN City

19 Street Scape Redesign, footpath improvement, underground ducting 83 83 -- -- ABD

20 Junction Improvement 21.75 21.75 -- -- ABD

21 Underground Drainage System 18.64 9.3 -- 9.3 ABD

22 Underground Ducting of electrical /data with Electrical Smart Metering 190 190 -- -- ABD

23a Nehru Stadium

89.65 89.65

-- -- ABD

23b Nalla Renovation & Green Corridor -- -- ABD

23c MG Park -- -- ABD

23d Tolankere -- -- ABD

Page 5: SMART CITY: HUBBALLI- DHARWAD › download › Smart... · 1 Solid Waste Management –Litter Free Zones 0.54 Prepared Prepared Under Process ... KSPCB 35 Intelligent Transport Management

FUND ALLOCATION (PROJECT WISE) .. Contd.

Sl. Name of the project

Fund Allocation (in Cr.)

Project TypeEstimated Cost

(Total)SCM PPP

GoI/Go

K

24 Green Corridor 10 -- -- 10 ABD

25 Supermarket at Dharwad N/A N/A ABD

26Affordable Housing

103.32 41.3 -- 62 ABD

27 Railway Station Redevelopment 54.45 -- 54.5 -- ABD

28 Smart Parking and Payment System -- -- -- -- ABD

29 Smart Poles -- -- -- -- ABD

30 SPV Website -- -- -- PAN City

31 NMT Zones 4 4 -- -- ABD

32 Industrial Development 99.32 -- -- 99.32 ABD

33 Upgradation of SME 72.27 -- -- -- ABD

34 Ropeway to Hillock -- -- -- -- ABD

35 Intelligent Transport Management System -- -- -- -- PAN City

36 24x7 Water Supply 24.39 24.39 ABD

37 Transport Terminal Hub 316.49 284.8 31.6 ABD

Page 6: SMART CITY: HUBBALLI- DHARWAD › download › Smart... · 1 Solid Waste Management –Litter Free Zones 0.54 Prepared Prepared Under Process ... KSPCB 35 Intelligent Transport Management

PROJECT STATUS AS ON 31ST OCT 2017

Sl. Name of the project

FR DPR RFP

Estimated Cost

(Total)

Submitted

(Yes/No)

Submitted

(Yes/No)

Submitted

(Yes/No)

SMALL SCALE PROJECTS (To be Approved in SPV level as per recent G.O. No.) – below 5 Cr.

1 Solid Waste Management – Litter Free Zones 0.54 Prepared Prepared Under Process

2 Electric Crematorium 1.8 Prepared Prepared Under Process

3 IPT Connectivity (PBS) 4.75 Prepared Prepared Under Process

4 e-Toilets 0.96 Prepared Prepared Under Process

5 Rain water harvesting 2 Prepared Prepared Under Process

6 Storm Water Drains 5 Prepared Under Process Under Process

PROJECTS CLEARED BY TECH. COMMITTEE, AWAITING IDD APPROVAL (DUE TO PPP PROJECT)

7 LED street Lighting 6.86 As per instructions provided in KUIDFC

tech. committee meeting, FR & DPR not

required for these projects

Yes

8 Roof top Solar 128.76 Yes

PROJECTS AWAITING TECH. COMMITTEE(KUIDFC) APPROVAL

9 Multi Level Car Parking 66.1 Prepared Under Process Under Process

10 Renovation of Core city market area 114.78 Prepared Under Process Under Process

ICT PROJECTS

11 Smart IT-Solid Waste Management System 31

As per instructions

provided in KUIDFC

tech. committee

meeting, FR not

required for these

projects

Draft DPR

Prepared and

Submitted to

KUIDFC

Technical

Committee for

Scrutiny

Under Process

12 Wi-fi Corridor

130

Under Process

13 Integrated Command and Control Centre Under Process

14 Cashless and Paperless office at HDMC Under Process

15 Smart Property taxes management system Under Process

16Smart Public Advertisement Management System

Under Process

17 Smart Public Works Management System Under Process

18 People Empowerment Platform/One stop Solution 84 Under Process

Page 7: SMART CITY: HUBBALLI- DHARWAD › download › Smart... · 1 Solid Waste Management –Litter Free Zones 0.54 Prepared Prepared Under Process ... KSPCB 35 Intelligent Transport Management

PROJECT STATUS (…Contd.)

Sl. Name of the project

FR DPR RFP

Estimated Cost

(Total)

Submitted

(Yes/No)

Submitted

(Yes/No)

Submitted

(Yes/No)

TECHNICAL SCRUTINY IS DONE BY KUIDFC FOR THE FOLLOWING PROJECTS ON 27 SEPT,2017

19Street Scape Redesign, footpath improvement, underground

ducting83 Prepared Under Process Under Process

20 Junction Improvement 21.75 Prepared Under Process Under Process

21 Underground Drainage System 18.64 Prepared Under Process Under Process

22Underground Ducting of electrical /data with Electrical Smart

Metering190 Prepared Under Process Under Process

23a Nehru Stadium

89.65

Prepared Under Process Under Process

23b Nalla Renovation & Green Corridor Prepared Under Process Under Process

23c MG Park Prepared Under Process Under Process

23d Tolankere Prepared Under Process Under Process

24 Green Corridor 10 Prepared Under Process Under Process

25 Supermarket at Dharwad 212 Prepared Under Process Under Process

Page 8: SMART CITY: HUBBALLI- DHARWAD › download › Smart... · 1 Solid Waste Management –Litter Free Zones 0.54 Prepared Prepared Under Process ... KSPCB 35 Intelligent Transport Management

PROJECT STATUS (…Contd.)

Sl. Name of the project

Fund Allocation

(in Cr.)FR DPR RFP

Estimated Cost

(Total)

Submitted

(Yes/No)

Submitted

(Yes/No)

Submitted

(Yes/No)

OTHER PPP PROJECTS

26Affordable Housing

103.32 Prepared Under Process Under Process

27 Railway Station Redevelopment 54.45 Under Process Under Process Under Process

28 Smart Parking and Payment System Under Process FR Not reqdDraft DPR

PreparedUnder Process

29 Smart Poles Under Process FR Not reqdDraft DPR

PreparedUnder Process

OTHER PROJECTS

30 SPV Website -- Project Complete. Website launched on 7th Oct 2017

31 NMT Zones 4 Prepared Under Process Under Process

32 Industrial Development 99.32Under Process

33 Upgradation of SME 72.27

34 Ropeway to Hillock --Survey under process with NOC from Forest Dept &

KSPCB

35 Intelligent Transport Management System -- Being implemented by BRTS project

36 24x7 Water Supply 24.39 Being implemented by Water Project ILFS Company

37 Transport Terminal Hub 316.49 Being implemented by DULT, Discussion in progress

Page 9: SMART CITY: HUBBALLI- DHARWAD › download › Smart... · 1 Solid Waste Management –Litter Free Zones 0.54 Prepared Prepared Under Process ... KSPCB 35 Intelligent Transport Management

PROJECTS

TO BE

TENDERED

SOON

1

2

3

4

5

6

• Locations: HDMC buildings

Components: Storage Pits, Storage Tanks, Recharge

Trenches, Percolation Tanks, Recharging of Bore Wells &

Dug Wells

RAIN WATER

HARVESTING(by 3rd Week of Nov)

E-TOILET(by 3rd Week of Nov)

• Locations: Akshay Park Bus Stop, MG Park, CBT.

Tolankere, HDMC office

• Components: Automatic payment & Cleaning,

Remote Monitoring, Sensor enabled interior

ELECTRICAL

CREMATORIUM(by 3rd Week of Nov)

• Locations: Harischandraghat

• Components: AWL Cremator,

Combustion Air Supply, Wet

Scrubber, Stack, Control Panel

LITTER FREE

ZONE(by 3rd Week of Nov)

• Locations: Major Junctions (54 Nos), All Bus Stops

(170 Nos), HDMC market area, Dharwad market area

• Components: RFID Tagged Bins, Mobile App, Sign

Boards

PUBLIC BIKE

SHARING(by 3rd Week of Nov)

• 30 Docking Stations

ICT PACKAGE

1. ICCC

2. E-GOV(DPR by 1st Week of Nov

Need Govt. Approval)

• Locations: ICCC at Hosur Junction

• Proposed ICONIC Building to cater ICCC control room

• Components ICCC: Smart SWM, Transport, Public Safety,

Utilities management, traffic management • Components E-GOV: Cashless &

Paperless office, Smart property taxes

management system, Smart Public

works management system, Smart

advertisement management system

Page 10: SMART CITY: HUBBALLI- DHARWAD › download › Smart... · 1 Solid Waste Management –Litter Free Zones 0.54 Prepared Prepared Under Process ... KSPCB 35 Intelligent Transport Management

CITIZEN ENGAGEMENT ON SMART CITY PROJECTS

• Date: 7 Oct 2017

• Venue: Kannada Bhavan, Hubli

• Smart City Website was launched by Hn. Dist. Minister Shri

Vinay Kulkarni , GoK

• Citizen Engagement Brochure was released

• Key Experts from PMC explained the projects to the citizen

• Questions and Suggestions were taken and being

considered in applicable projects

Citizen Engagement Brochure

Citizen Engagement Workshop

Social Media Links Are created:

http://www.facebook.com/hubballidharwa

dsmartcityltd

http://twitter.com/hdsmartcity

http://www.Instagram.com/hubballidharw

adsmartcity/

http://hubballidharwadsmartcity.com/

Release of Brochure

Page 11: SMART CITY: HUBBALLI- DHARWAD › download › Smart... · 1 Solid Waste Management –Litter Free Zones 0.54 Prepared Prepared Under Process ... KSPCB 35 Intelligent Transport Management

MAJOR SMART CITY PROJECT DIAGRAMS

Janta Bazar

MG Market

MLCP

Smart Poles

Smart Solid Waste Management

Page 12: SMART CITY: HUBBALLI- DHARWAD › download › Smart... · 1 Solid Waste Management –Litter Free Zones 0.54 Prepared Prepared Under Process ... KSPCB 35 Intelligent Transport Management

MAJOR SMART CITY PROJECT DIAGRAMS

Nehru Stadium

Tolankere