AMAXII Stage Cooling System
AMAXII Stage Cooling System
AMAXAMAX™
Introduction2 Types of Air Conditioning Systems
Introduction2 Types of Air Conditioning Systems
Air conditioningAir conditioning
EvaporativeEvaporative
DirectDirect II StageII Stage
Water/Air Cooled
Condenser
Water/Air Cooled
Condenser
MechanicalMechanical
CompressorCompressor
IntroductionIntroduction
• II Stage Evaporative Cooling– Concept since 15 years– Added Indirect Stage & Cooling Tower
to Conventional Evaporative Cooling&
– Adiabatic Efficiencies increasedfrom 80% to 115% of II Stage
– Lower Temperatures / Controlled Humidity– Greater Comfort Control – Hence can now also be used for Specialized Applications
Concept Understanding Contd..
Concept Understanding Contd..
II Stage Evaporative Cooling
Stage I
– Air Stream not in direct contact with Wet Medium
Temperature Drop with no addition of Water Vapour to the Air Stream.
II Stage / Indirect-Direct Evaporative Cooling
II Stage / Indirect-Direct Evaporative Cooling
– Addition of Water Vapour to the Air Stream
&further lowering of
Temperature using rigid media
Stage II
I Stage
II Stage
COOLING
Concept Understanding Concept Understanding
Requirements for Effective use of
II Stage Cooling– Natural Temp
to have large Wet Bulb Depression
– Designing to be same as Ventilation
i.e. 25 to 40 air changes per hour below the grill.
AMAX DrawingAMAX Drawing
Secondarystream
Intermediatestream
Primarystream
ED G
H
MI
B LK
F J
C
Coo
ling
coil
fan
3
2 1
Pad
Pad
Blower
Water Tank
Cooled Air
Secondary Air
(1) Outside air
(2) Indirect Cooling air
(3) AMAX leaving air temp
(1-2) Indirect Cooling
(2-3) Direct Cooling
AMAX Drawing AMAX Drawing
A COOLING COIL
B WATER TANK
C FOOD MOUNT
D COOLING MEDIA
E A FAN
F BLOWER
G ELIMINATOR
H DUST FILTERS
I MOTOR TEF C 1440 RPM
J CANVAS
K ANGLE STAND
L CHANNEL BASE
M PUMP
DESCRIPTION
TITLE TWO STAGE RIGID MEDIA EVAPORATIVE COOLING SYSTEM AT 115 % EFF
Cooling In SummerConditions II Stage
Cooling In SummerConditions II Stage
AMBIENT FILTER INDIRECT COIL ADIABATIC SPACE
Indirect Cooling : resulting in 12.5oC drop
Direct Cooling : further 70C drop
Outlet Conditions : DB 18.50C (i.e. 30C lower than inlet WB)
40.00
21.88 18.05 20.10
64.21
20.00% 40.44% 95.71% 64.41%
64.21 51.39 51.67 58.31
DRY BULB
WET BULB
ENTHALPY
RH
20.00%
DEG C DEG C
%KJ/KG
40.00 27.40 18.52 25.00
21.88 18.05
AMAX COOLING PROCESSAMAX COOLING PROCESS
A NEW UNIQUE COOLING PROCESS
STAGE ONE: - Indirect cooling coil removes sensible heat from the primary supply air stream providing 70-75%Indirect saturation efficiency.
STAGE TWO : Direct evaporative cooler produces near adiabatic
cooling, resulting in a total two stage saturation efficiency of 110%-115%.
And hence the Comfortable, Healthy, Cooling
AREA’S OF APPLICATIONAREA’S OF APPLICATION
WB Depression 0-10 Deg
WB Depression 10-15 Deg
WB Depression 15-18 Deg
WB Depression >18 Deg
ҐҐҐҐ
ҐҐ
Wet Bulb Depression – By Region
WB Depression 22-26 Deg
ҐҐ
TEMPERATURE ATTAINABLE AT THE MOUTH OF THE BLOWER
AT
VARIOUS
INDIAN CITIES
AT
VARIOUS
INDIAN CITIES
2 STAGE EFF 115%
LOCATION DRY BULB WET BULB SUPPLY AIR
DEGREES C DEGREES C DEGREES C
AHEMDABAD 41.2 23.5 19.96
ALLAHABAD 42.2 23.5 20.695
AURANGABAD 39.3 22.9 20.44
BANGALORE 34 19.6 17.44
BHOPAL 40.5 21.7 17.94
BHUBANESHWAR 37.6 26.6 24.4
BIKANER 43.4 22.4 18.2
DEHRADUN 36.3 23.9 21.42
GORAKHPUR 40.3 26 23.14
GWALIOR 42.5 22.9 18.98
HISSAR 43.3 25.8 22.3
HYDERABAD 39.2 22.5 19.96
INDORE 40.4 20.6 17.63
JABALPUR 41.2 23.2 19.6
JAIPUR 41.4 22.6 19.78
Temperature at Mouth of the Blower
LOCATION DRY BULB 0C WET BULB 0C TEMPERATUREAT BLOWER
@ 115% EFF.JODHPUR 40.8 23 19.44JAISALMER 42.5 23.1 19.22KOTA 42.4 22.6 18.64LUCKNOW 40.8 24.8 22.4NAGPUR 42.6 23.9 21.09NEW DELHI 40.6 23.8 21.28PATNA 39.5 23.7 20.54PUNE 37.4 20.4 17.85RAIPUR 42.2 23.3 20.46RANCHI 37.7 21.8 18.62SURAT 36.9 23.9 21.3MUMBAI 34.3 23.3 21.1KOLKATTA 36.2 26.1 24.08CHENNAI 37.3 26.7 24.58
Temperature at Mouth of the Blower
SECUNDERABAD TEMP21st of every month at 3 PMSECUNDERABAD TEMP21st of every month at 3 PM
DAY & TIME AMBIENT CONDITIONS AMAX CONDITIONSMonth Day Hour DBT (°C) WBT (°C) RH (%) BLOWER WIND CHILL
Jan 21 15 27.70 19.30 45.00 18.04 20.04Feb 21 15 31.30 18.20 27.00 16.24 18.24Mar 21 15 36.20 20.80 24.00 18.49 20.49Apr 21 15 40.20 22.60 22.00 19.96 21.96May 21 15 38.40 23.30 28.00 21.04 23.04Jun 21 15 32.70 25.40 56.00 24.31 26.31Jul 21 15 32.50 23.60 48.00 22.27 24.27
Aug 21 15 29.80 23.60 60.00 22.67 24.67Sept 21 15 30.90 2380.00 56.00 22.74 24.74Oct 21 15 30.90 22.10 47.00 20.78 22.78Nov 21 15 29.90 21.50 48.00 20.24 22.24Dec 21 15 27.00 17.00 36.00 15.50 17.50
SECUNDERABAD TEMP21st of every month at 3 pmSECUNDERABAD TEMP21st of every month at 3 pm
BANGALORE TEMP21st of every month at 2 pmBANGALORE TEMP
21st of every month at 2 pmAMAX PERFORMANCE BANGLORE 15TH DAY OF EVERY MONTH AT 2 PM
15.00
17.00
19.00
21.00
23.00
25.00
27.00
29.00
31.00
33.00
35.00
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
MONTHS
TEM
PERA
TURE
C
AMB-DBT (C) AMB-WBT (C) ROOM-DBT-(4 DEG GAIN) (C) AMAX - OUTLET-DBT (C)
PUNE TEMP21st of every month at 2 pm
PUNE TEMP21st of every month at 2 pm
AMAX PERFORMANCE PUNE 15TH DAY OF EVERY MONTH AT 2 PM
15.00
20.00
25.00
30.00
35.00
40.00
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
MONTHS
TEM
PERAT
URE
C
AMB-DBT (C) AMB-WBT (C) ROOM-DBT (C) ROO
DELHI TEMPon 21st May for 24 hrs
DELHI TEMPon 21st May for 24 hrs
CHENNAI TEMP21st of every month at 3 pm
CHENNAI TEMP21st of every month at 3 pm
Chennai Average Outside Design ConditionsMonths Average DB - Deg Average WB - Average Dep - Average Amax @ 115%
Jan 30.6 22.5 8.1 21.3Feb 32.1 23.4 8.7 22.1Mar 33.6 27.0 6.6 26.0Apr 34.0 26.9 7.1 25.8May 37.3 28.1 9.2 26.7Jun 38.3 27.7 10.7 26.1Jly 36.2 27.3 8.9 25.9
Aug 35.8 26.5 9.3 25.1Sep 34.9 26.7 8.2 25.5Oct 32.0 27.0 5.0 26.2Nov 29.4 24.7 4.7 24.0Dec 28.6 22.9 5.7 22.0WB 21.5
RELIEF COOLING TEMPLATE
RELIEF COOLING TEMPLATE
RELIEF COOLING TEMPLATE
RELIEF COOLING TEMPLATE
Nomograph for the rapid calculating of direct evaporative cooling results. The two templates show the nomographic procedures for comfort cooling maintaining indoor dry - bulb 8o F below outdoor air, and for relief cooling with a 6oF differential.
In both cases comfort sensations depend heavily upon air velocities. Adapted from early ASHRAE effective Temperature nomographs for comfort determination.
RELIEF COOLING TEMPLATE
RELIEF COOLING TEMPLATE
Calculating Rough Direct Evaporative Cooling Comfort Levels.1. Select ODB and WB from local air conditioning design data.
ODB is Outdoor Dry – Bulb temperature. WB is Outdoor Wet – Bulb temperature.
2. Draw Outdoor Condition Line from ODB to WB3. Select Cooler Saturating Efficiency column. Where it Crosses Outdoor
Condition Line. Read WAE, the washed – air room – entering temperature.
4. Select washed – air Indoor temperature gain, usually 6o to 10o F, and WAE, and draw a line to WAE, exhaust temperature.
5. Locate WAIA, the washed – air Indoor average temperature, midway between WAE and WAX.
RELIEF COOLING TEMPLATE
RELIEF COOLING TEMPLATE
6. Draw horizontal line left from WAIA to find IDB, the average indoor dry – bulb temperature.
7. Select IWB (Not shown), usually 2o F above WB. It is the estimated indoor wet – bulb temperature.
8. Draw indoor Condition Line from IDB to IWB.
9. Select an estimated indoor average Air Velocity Line in grid at left, usually between 100 and 400 fpm.
10. Read indoor comfort level in Effective Temperature degrees, where Indoor Condition Line crosses indoor Air Velocity Line. Read estimated present of comfortable people at upper left.
“Wind Chill” Effect as per ASHRAE“Wind Chill” Effect as per ASHRAE
Comfort Chart Adaption to other ConditionsAside from its fixed dew point limits, the
ASHRAE Comfort Zone adjusts for faster indoor air velocities and for human acclimatization to conditions.
First, the zone expands to tolerate higher dry bulbs; its right – hand border moves to the right as circulation rates increase to about 350 fpm (1 – 8 m /s). Assuming the taller zone noted above, it allows some conventional direct evaporative cooling to achieve official comfort.
“Wind Chill” Effect as per ASHRAE“Wind Chill” Effect as per ASHRAE
Average Air Velocity Around Persons
Miles per Feet per Meters per Effective Degrees ofHour Minute Second Cooling Achieved.1 8.8 0.045 -----.5 44.0 0.224 5.0F 2.
1.0 88.0 0.447 7.0 3.92.0 176.0 0.894 9.7 5.43.0 264.0 1.34 10.3 5.75.0 440.0 2.24 11.3 6.310.0 880.0 4.47 12.6 7.0
Second, other extension areas appear on the zone right border to represent comfort felt by persons acclimated by 7 to 10 days’ exposure to moderate discomfort. After initial habituation, mere one – day per week re-exposure maintains the benefits.
Specifically, the right-side extension approximates 2o F (1.1oC) ET*, presumably additive to velocity – based extensions.
Table IV – 2 AIR MOTION AND COOLING SENSATIONS
Some of the ApplicationsContd..
Some of the ApplicationsContd..
Offices
Residences
Hospitals
Commercial Complexes
Call Centres
Hotels/Restaurants/Bars
Some of the ApplicationsContd..
Some of the ApplicationsContd..
Factories like :Garments
Pharmaceuticals
Car / Motor Cycles
Food & Gen Industries, etc.
Some of the ApplicationsContd..
Some of the ApplicationsContd..
Colleges - Libraries
Clubs
Cinema Theatres
Live Stock
Generator for extra Power Production.
Benefits of II Stage - IDDRBenefits of II Stage - IDDR
• AMAX Series– 115% Adiabatic Efficiencies
Grill Temperature upto 20o C or less in Real Conditions
– Energy Consumption ~ 50-60% of Air Conditioning
– Capital Cost less than Air-Conditioning
Benefits of II Stage - IDDRContd..
Benefits of II Stage - IDDRContd..
The Intelligent Alternative to
Air Conditioning&
The MOST EFFICIENT way to COOL
with benefits of :– Better Health, No re-cycled air
– Does not spoil the outside air-ozone depletion, etc & hence you leave a better place for your children.
Benefits of II Stage - IDDRContd..
Benefits of II Stage - IDDRContd..
– Low Power Consumption
– Low Capital cost etc.
− 100% Fresh air always - Very good for Health.
− No Re-cycled air - No chance for air- borne disease to be transferred from one person to the other in the Hall.
Benefits of II Stage - IDDRContd..
Benefits of II Stage - IDDRContd..
Indoor air quality very good
− No Ozone Depletion
♥ Leaving the children a better place to live in.
− Running Cost Very LOW.
− Can run on a lower Capacity Generator.
Benefits of II Stage - IDDRContd..
Benefits of II Stage - IDDRContd..
− Down stream items automatically Cost less like Panel Board - Cabling – Transformer Electricity deposit - etc.
Annual Maintenance Contract Cost is also cheaper.
Benefits of II Stage - IDDRBenefits of II Stage - IDDR
BY USING SMART CONDITIONING
COMFORTABLE TEMP&
CONTROLLED RH IS OBTAINED
AND HENCE CREATING A HEALTHY ENVIRONMENT FOR THE STAFF & EQPT
POWER CONSUMPTION(In Units)
POWER CONSUMPTION(In Units)
POWER COST OF II STAGE COOLING MACHINE Vs AIR CONDITIONING
Approx. Area to Cool : 4,000 Sqft.104 Ht with 70 PeopleDesign : Outside 450 C & RH 20% & Inside 25 + 20 C
AMAX II StageCooling System Air Conditioning
Machine Capacity 30,000 CFM 40 Tonne
Units per Hour 19 Units 52 Units
Units per Day (8 Hours) 152 Units 416 Units
Units per Month (30 Days) 4,560 Units 12,480 Units
Units per Year 54,720 Units 1,49,760 Units
Power Consumption
POWER CONSUMPTION(In Rs)
POWER CONSUMPTION(In Rs)
Approx. Area to Cool : 4,000 Sqft. 104 Ht with 70 PeopleDesign : Outside 450 C & RH 20% & Inside 25 + 20 C
AMAX II StageCooling System Air Conditioning
Cost Per Unit Rs. 7.00 Rs. 7.00
Cost Per Hour Rs. 133.00 Rs 364.00
Cost Per Day (8 Hours) Rs. 1,064.00 Rs. 2,912.00
Cost Per Month (30 Days) Rs. 31,920.00 Rs. 87,360.00
Cost Per Year (12 Months) Rs. 3,83,040.00 Rs. 10,48,320.00
SAVINGS PER YEAR Rs. 6,65,280.00 ---
POWER COST OF II STAGE COOLING MACHINE Vs AIR CONDITIONING
Power Consumption
CAPITAL COSTCAPITAL COST
II STAGE COOLING MACHINE Vs AIR CONDITIONING
Approx. Area to Cool : 4,000 Sqft.104 Ht with 70 PeopleDesign : Outside 450 C & RH 20% & Inside 25 + 20 C
AMAX II StageCooling System Air Conditioning
Cost of Generator Rs. 3,00,000.00 Rs. 5,35,000.00
(Approx. 35 KVA) (Approx. 100 KVA)
Annual Maintenance Contract NOT REQUIRED Rs. 48,000.00
This Excludes extra cost of TRANSFORMERS, PANEL BOARD, CABLING, etc.
Cost of Stand by Generator..
APPX DIMENTIONS OF MCAPPX DIMENTIONS OF MC
DESCRIPTION AMAX 060 AMAX 080 AMAX 100 AMAX 125 AMAX 150CUBMTS/SEC 2.8332 3.7776 4.722 5.9025 7.083
CFM 6000 8000 10000 12500 15000CMH 10260 13680 17100 21375 25650
TOTAL HP / KW OF M/C 3.5 / 2.6 4.5 / 3.5 8 / 6 10.5 / 7.9 13 / 9.8UNITS / HOUR 2.6 3.5 6 8 10
DIMENTIONS MMWIDTH 'A' 1650 1670 1974 1974 2280DEPTH 'B' 2800 2800 2900 2900 3200HEIGHT 'C' 2150 2430 2450 2890 2920EQUIV KWH 12 16 20 25 30
EQUIV A/C vs AMAX appx in Tonns 15 20 25 31.25 37.5
APPX DIMENTIONS OF MCAPPX DIMENTIONS OF MC
DESCRIPTION AMAX 200 AMAX 250 AMAX 300 AMAX 350 AMAX 400 AMAX 450CUBMTS/SEC 9.444 11.805 14.166 16.527 18.888 21.249
CFM 20000 25000 30000 35000 40000 45000CMH 34200 42750 51300 59850 68400 76950
TOTAL HP / KW OF M/C 15 / 11.25 20 / 15 25 / 18.75 26 / 19.5 31/23.25 31/23.25UNITS / HOUR 11 15 19 20 24 24UNITS / HOUR 11 15 19 14 15 16
DIMENTIONS MMWIDTH 'A' 2560 3160 3460 4100 4800 5000DEPTH 'B' 3400 3550 3700 3400 3400 3400HEIGHT 'C' 2850 3050 3150 3650 3450 3650
EQUIV KWH 40 50 60 70 80 90EQUIV A/C vs AMAX
Apex in Tonns 40 50 60 70 80 90
AMAX InnovationAMAX Innovation
– Tested for Adiabatic Eff. Upto 115%
– Successfully working in various Projects in AP, India, &USA
– Benefit of Secondary Air at 95% @500 fpm• Primary Air stream at ~115% to 120% eff
Secondary air can be utilized for other applications at no extra capital cost
AMAX InnovationContd..
AMAX InnovationContd..
• Unique & Innovative Design
• Advantages– Cooling Tower inbuilt – Secondary Air at 95%
could be used for other application
– Proven to be most efficient design for a II Stage System
450 C450 C
260 C260 C
200 C200 C
AMAX InnovationContd..
AMAX InnovationContd..
• Cost Effective & Compact
• Design
• Specifications
– 100% Folded Construction– Filtration upto 3 microns
with 99% efficiency available– Cu-Al Coil
Machines ErectedMachines Erected
Secunderabad ClubSecunderabad Club
MICO BOSCHMICO BOSCH
APSRTCAPSRTC
SMART CONDITIONINGSMART CONDITIONINGAMAX SeriesAMAX Series
Double Skin ConstructionDouble Skin Construction
AMAXAMAX Spot CoolingSpot CoolingBosch Nasik, Maharastra, IndiaBosch Nasik, Maharastra, India
AMAXAMAX Spot CoolingSpot CoolingBosch Nasik, Maharastra, IndiaBosch Nasik, Maharastra, India
AMAXAMAX IDEC DX using Chilled WaterIDEC DX using Chilled WaterWIPRO AIRCEL Data Centre, IndiaWIPRO AIRCEL Data Centre, India
AMAXAMAX IDEC DX using Chilled WaterIDEC DX using Chilled WaterWIPRO AIRCEL Data Centre, IndiaWIPRO AIRCEL Data Centre, India
AMAXAMAX Indirect OnlyIndirect OnlyResort World, Sentosa, Singapore Resort World, Sentosa, Singapore
AMAXAMAX IDEC 115% adiabatic effIDEC 115% adiabatic effNevada, USANevada, USA
USERS Contd..
USERS Contd..
SL. NO. YEAR NAME OF THE PARTY PLACE QTY CFM TOTAL CFM
1 2003 Delhi College of Engg Delhi 1 12000 12000
2 2003 Ansal Plaza Delhi 1 8000 8000
3 2003 Orient Fashion Export Delhi 1 10000 10000
4 2003 Exide Ind LTD Bawal 1 8500 8500
5 2003 Mahajan Overseas Pvt LTD Panipat 1 12000 12000
6 2004 Secunderabad Club Secunderabad 1 12500 12500
7 2004 Exide Ind LTD Bawal 1 45000 45000
8 2004 Exide Ind LTD Kolkatta 1 27000 27000
9 2004 Motor Ind LTD (MICO) Nasik 1 8000 8000
10 2004 Indus Medicare LTD Secunderabad 2 8000 16000
11 2004 SS Oral Hygenic(COLGATE) Secunderabad 2 20000 40000
12 2004 Annapurna Electronics Secunderabad 1 20000 20000
USERSContd..
USERSContd..
13 2005 Exide Ind LTD Pune 1 25000 25000
14 2005 Motor Ind LTD (MICO) Nasik 6 65000 390000
15 2005 HBD Packing (P) Ltd Noida 3 25000 75000
16 2006 Aparna Controls (P) Ltd Secunderabad 1 12500 12500
17 2006 Motor Ind LTD (MICO) Bangalore 1 25000 25000
18 2006 Biological Evans Ltd Hyderabad 2 15000 30000
19 2006 Vatika City Centre Gurgaon 1 25000 25000
20 2006 Spiral Metal ( P) Ltd Noida 1 27500 27500
21 2006 LIC of India Tanuku 2 8000 16000
22 2006 LIC of India Bhimavaram 2 8000 16000
23 2006 Motor Ind LTD (MICO) Nasik 1 45000 45000
24 2006 Allied Exports Noida 1 15000 15000
25 2007 Nagarjuna Fertilizers & Chemicals Ltd (NFCL) Secunderabad 1 40000 40000
USERSContd..
USERSContd..
26 2008Nagarjuna Fertilizers & Chemicals Ltd
NFCL Hyderabad 2 20000 40000
27 2008 Shakti Met- Dor Ltd Secunderabad. 2 18000 36000
28 2007 Euroflex Transmissions (India) Ltd Hyderabad 1 15000 15000
29 2007 Quark City Chandigadh 1 13500 13500
30 2007 Daily Bread Gourmet Foods (I) Ltd Hyderabad 1 10000 10000
31 2007 Saradamba DTS Theatre Guntur 2 20000 40000
32 2007 Vatika City Centre Gurgaon 6 22000 132000
33 2007 Motor Ind LTD (MICO) Nasik 5 65000 325000
34 2008 Sunman Jairaj Hyderabad 1 8000 8000
35 2008 CC Health Care Products Ltd Hyderabad 1 35000 35000
36 2008 APSRTC Hyderabad 1 25000 25000
37 2008 APSRTC Hyderabad 2 20000 40000
38 2008 APSRTC Hyderabad 2 15000 30000
39 2008 APSRTC Hyderabad 1 8000 8000
40 2008 MM Exports Faridabad 2 16000 32000
41 2008 SNJ Synthatics Ltd Hyderabad 1 25000 25000
USERSContd..
USERSContd..
42 2008 Vatika City Centre Gurgaon 1 27000 27000
43 2008 Vatika City Centre Gurgaon 2 13500 27000
44 2008 SNJ Synthatics Ltd Hyderabad 2 35000 70000
45 2008 Motor Ind LTD (MICO) Nasik 2 65000 130000
46 2008 Delphi TVS Diesel Systems Ltd Chennai 10 40000 400000
47 2008 Motor Ind LTD (MICO) Nasik 1 45000 45000
48 2008 YKK Industries Ltd Haryana 4 30000 120000
49 2009 Piaggo Vehicles Ltd Pune 4 40000 160000
50 2009 TC Ashok Hyderabad 1 8000 8000
51 2009 A.P. Explosives Pvt Ltd Secunderabad 1 10000 10000
52 2009 Jaju Sarees (P) Ltd Hyderabad 1 10000 10000
TOTAL CFM 27,82,500
What to do to decide on Which System to UseWhat to do to decide on Which System to Use
11.. Get tGet the temperature & RH of your he temperature & RH of your
AREA TO COOL AREA TO COOL Summer Summer –– Wise.Wise.
2.2. Decide a practical temperature that Decide a practical temperature that
you need for your application & why.you need for your application & why.
3. 3. Inform the concerned department Inform the concerned department
person etc of the same when asking person etc of the same when asking
for a design for a design –– Quotation.Quotation.
Which System to useWhich System to use
Check Total Cost of system i.e. unit cost, cabling, Check Total Cost of system i.e. unit cost, cabling,
transformers, panel board, deposit to electricity transformers, panel board, deposit to electricity
dept., generator cost, AMC etc.dept., generator cost, AMC etc.
-- Compare Running Cost of all for approx. 3 Compare Running Cost of all for approx. 3
year of running.year of running.
SMART CONDITIONINGSMART CONDITIONINGCONCLUSIONSCONCLUSIONS
1.1. The AMAX is a The AMAX is a ‘‘HealthierHealthier’’ solution solution considering we are using 100%considering we are using 100%Fresh Fresh ––CLEAN Air.CLEAN Air.
2.2. With AMAX, all Stale Air, Fumes, Odour With AMAX, all Stale Air, Fumes, Odour are are removed from the conditioned area.removed from the conditioned area.
3. 3. Humidity levels are controlled & much Humidity levels are controlled & much lower than conventional units.lower than conventional units.
SMART CONDITIONINGSMART CONDITIONINGCONCLUSIONSCONCLUSIONS
4.4. The AMAX is an The AMAX is an ‘‘EconomicalEconomical’’ solution solution considering that it consumes 24% of considering that it consumes 24% of the the power power
5.5. The AMAX is an The AMAX is an ‘‘EcologicallyEcologically’’ sound sound decision as there are no CFCdecision as there are no CFC’’s s involvedinvolved
5.5. The AMAX is a The AMAX is a ‘‘GreenGreen’’ decision as it is decision as it is ‘‘naturenature’’s own way of cooling s own way of cooling
6. 6. With AMAX Carbon Credits can be claimedWith AMAX Carbon Credits can be claimed
SMART CONDITIONINGSMART CONDITIONINGCONCLUSIONSCONCLUSIONS
ONLY 2 TYPES OF PEOPLE WILL USE ONLY 2 TYPES OF PEOPLE WILL USE THIS TYPE OF AIR CONDITIONINGTHIS TYPE OF AIR CONDITIONING
i.e. The Intelligent alternative for i.e. The Intelligent alternative for AIR CONDITIONINGAIR CONDITIONING
AMAXAMAX
1.1. Health conscious people / IndustriesHealth conscious people / Industries
2.2. Cost / Energy conscious people /IndustriesCost / Energy conscious people /Industries
CUSTOMERS CUSTOMERS
MEMBERS INMEMBERS IN
R
S
H
A
A
E
Contact Us Contact Us
ENGG CORPN147, R.P.Road, Secunderabad-500 003.
- Tele fax: 040 - 27545501, 27541113
E-Mail: [email protected]& [email protected] smartcool.co.in.
Thank You for Spending Your Precious Time...Thank You for Spending Your Precious Time...
Estd:1958
CONTACT US CONTACT US
ENGG CORPN
147, R.P.Road, Secunderabad-500 003.
- Tele fax: 040 – 27545501 / 1113 / 3559
E-Mail: [email protected]
Web Site: www smartcoolindia.co.in
Thank You for Spending Your Precious Time...Thank You for Spending Your Precious Time...
Estd:1958