Office of Electricity Delivery & Energy ReliabilityU.S. Department of Energy – 1000 Independence Ave., SW Washington, DC 20585
SMART ULSS FORUM“Electricity”
March , 2008
Patricia HoffmanPrincipal Deputy Assistant Secretary
Office of Electricity Delivery and Energy ReliabilityUS Department of Energy
The Electric Grid is a Complex System with Unique Characteristics
Physically § Never holistically designed, grid developed
incrementally in response to local load growth Today, there are:
§ 30,000 Transmission paths; over 180,000 miles of transmission line
§ 14,000 Transmission substations
§ Distribution grid connects these substations with over 100 million loads, i.e. residential, industrial, and commercial customers
§ Diverse industry w/o a common voice
§ 3,170 traditional electric utilities
§ 239 investor-owned, 2,009 publicly owned, 912 consumer-owned rural cooperatives, and 10 Federal electric utilities
Technically§ Electricity flows within three major interconnections
along paths of lowest impedance (at the speed of light); yet the grid is operated in a decentralized manner by over 140 control areas
§ Demand is uncontrolled; electricity is the ultimate “just-in-time” production process
Uniqueness§ Two things make electricity unique:
1. Lack of flow control
2. Lack of large-scale energy storage
§ Change either of these and the grid delivery system will be transformed
Electric Power Infrastructure
− State Sited
Communications Integration
Plug-in Hybrids
Password GuessingSelf-Replicating Code
Password CrackingExploiting Known Vulnerabilities
Disabling Audits
BurglariesHijacking Sessions
Sweepers
Sniffers
DistributedAttack Tools
Denial of Service
GUI
Packet Spoofing
Network Management Diagnostics
Automated Probes/Scans
WWW Attacks
“Stealth”/AdvancedScanning Techniques
1980 1985 1990 1995 2000 2005 2010
Intr
ud
er K
no
wle
dg
e
High
Low
Back Doors
Zombies
BOTS
Morphing
Malicious Code
Attack Sophistication
Current SCADA/PCSZone of Defense
Current cyber security initiatives for SCADA/PCS place industry defenses circa 1994, and thus empowers attackers with high-impact (easy) vectors
Attacker sophistication has decreased due to proliferation of Easy-to-Use (automated) attack tools
War Dialing
Cyber Threat Trends
Courtesy of Idaho National Laboratory
Resiliency/N-X Contingency
Isolation of critical services-MUST RUN
Backup, Diversity and Redundancy
Recovery
Visualization and ControlsTransmission Reliability
Industry Approach to Phasor Technology Research and Applications:
§Visualization
§State Estimation
§Mode Monitoring
§Alarming
§Real Time Controls
GOAL
INFRASTRUCTUREDEVELOPMENT
FORENSIC ANALYSIS/
BASELINING APPLICATIONSINDUSTRYADOPTION
PROBLEM IDENTIFICATION
VISUALIZATIONFOR WIDE-AREA
SITUATIONALAWARENESS
• 1996 Western Interconnection Blackouts
• 2003 Northeast Blackout
§ TVA Super PDC
§ IEEE 37.118
§ NIST SynchroLab
• Real Time Dynamics Monitoring System
• CAISO Operating Engineers Workstation
• BaseliningStatic Angles in East
• Small Signal Stability Monitoring
§ Intelligent Alarming
§ State Estimation
§ Adaptive Islanding
§ EIPP ->NASPI
§ WECC WAMTF
§ Research Roadmap
Cleveland
Phasor Measurements, Real Time Wide-Area Situational Awareness, Visualization, Infrastructure Monitoring, Alarming, and Control
Reliability Metrics and Compliance Monitoring Tools
Common Wide-Area, Real Time Monitoring Platform –Standards Compliance, Key Metrics for Reliability Intelligent Alarms, Reports, and Event Analysis Situation Awareness Visualization Dashboards for NERC, DOE, and FERC
GOAL
INFRASTRUCTUREDESIGN
WIDE-AREAMONITORING
FORENSICANALYSIS
COMPLIANCEMONITORING
PROBLEM IDENTIFICATION
VISUAL-IZATION
• 1999 Low Frequency Events on Eastern Interconnection
• Declining System Performance
• Frequency Excursions
§Wide-areavisualizationinfrastructure
• Relationaltime-seriesdatabase
§ Wide-areareal timeACE-Frequencymonitoring tool
• Suppliersperformance forAGC andfrequencyresponse
§ Interchange Error (AIE) Monitoring
• Wide-area Inadvertent Monitoring
§ Performancestandardsresearch,validation, fieldtrials
• Resourcesadequacy load-generationanalysis andassessment
§ CPS-BAALmonitoring andanalysis
• Research forsituationalawareness forresourceadequacy
Visualization, Compliance, Monitoring, Infrastructure, Real Time Wide-Area Standards Compliance and Situational Awareness
Layer 3 – Wide-Area Real Time Monitoring Applications – Risk, Probabilistic Based
Real-TimeACE-Frequency,CPS-BAAL, AIE
Monitoring
Real-TimeSuppliers
PerformanceFor AGC and FR
Voltage SecurityMonitoring and
Assessment
Real TimeDynamicsMonitoring
System (RTDMS)
RESEARCH FORFUTURE
SITUATIONALAWARENESS
APPLICATIONS
Layer 1 – Relational Memory Based Database with Time Series Capability
Layer 1 - Data Communications .NET, COM+, OPC, Web Based and Data Conversion (API)
Layer 4 – Wide-Area Visualization SolutionsGeo-Graphic Multi-View Multi-Layer RESEARCH FOR HIGH LEVEL VISUAL SOLUTIONSDashboards
Long Term Archiving DatabaseWith PI -Type Tagging
Characteristics for HistoricalData Analysis and Assessment
Layer 2 – Common Archiving, Event, Alarms and Logging Monitoring Services
Real Time Intelligent Alarm,Event and Disturbance Processor
and Services
Real Time Data Quality andPerformance Metrics
Reporting and Notification
Layer 3 – Wide-Area Real Time Monitoring Applications – Risk, Probabilistic Based
Real-TimeACE-Frequency,CPS-BAAL, AIE
Monitoring
Real-TimeSuppliers
PerformanceFor AGC and FR
Voltage SecurityMonitoring and
Assessment
Real TimeDynamicsMonitoring
System (RTDMS)
RESEARCH FORFUTURE
SITUATIONALAWARENESS
APPLICATIONS
Layer 1 – Relational Memory Based Database with Time Series Capability
Layer 1 - Data Communications .NET, COM+, OPC, Web Based and Data Conversion (API)
Layer 4 – Wide-Area Visualization SolutionsGeo-Graphic Multi-View Multi-Layer RESEARCH FOR HIGH LEVEL VISUAL SOLUTIONSDashboards
Layer 4 – Wide-Area Visualization SolutionsGeo-Graphic Multi-View Multi-Layer RESEARCH FOR HIGH LEVEL VISUAL SOLUTIONSDashboards
Long Term Archiving DatabaseWith PI -Type Tagging
Characteristics for HistoricalData Analysis and Assessment
Layer 2 – Common Archiving, Event, Alarms and Logging Monitoring Services
Real Time Intelligent Alarm,Event and Disturbance Processor
and Services
Real Time Data Quality andPerformance Metrics
Reporting and Notification
Jan
2001
Apr
200
1
Jul 2
001
Oct
200
1
Jan
2002
Apr
200
2
Jul 2
002
Oct
200
2
Jan
2003
Apr
200
3
Jul 2
003
Oct
200
3
Jan
2004
Apr
200
4
Jul 2
004
Oct
200
4
Jan
2005
Apr
200
5
Jul 2
005
Oct
200
5
Jan
2006
Apr
200
6
Jul 2
006
Oct
200
6
Jan
2007
0 - 11 - 22 - 33 - 44 - 55 - 66 - 77 - 88 - 99 - 1010 - 1111 - 1212 - 1313 - 1414 - 1515 - 1616 - 1717 - 1818 - 1919 - 2020 - 2121 - 2222 - 2323 - 24
COUNT OF FREQUENCY DISTURBANCES > 28 mHz BY MONTH, BY HOUR OF DAY
0-4 4-8 8-12 12-16 16-20 20-24 24-28 28-32
Count of Events by Month
-400
-200
0
200
400
600
800
1000
1200
Jan-
02F
eb-0
2M
ar-0
2A
pr-0
2M
ay-0
2Ju
n-02
Jul-0
2A
ug-0
2S
ep-0
2O
ct-0
2N
ov-0
2D
ec-0
2Ja
n-03
Feb
-03
Mar
-03
Apr
-03
May
-03
Jun-
03Ju
l-03
Aug
-03
Sep
-03
Oct
-03
Nov
-03
Dec
-03
Jan-
04F
eb-0
4M
ar-0
4A
pr-0
4M
ay-0
4Ju
n-04
Jul-0
4A
ug-0
4S
ep-0
4O
ct-0
4N
ov-0
4D
ec-0
4Ja
n-05
Feb
-05
Mar
-05
Apr
-05
May
-05
Jun-
05Ju
l-05
Aug
-05
Sep
-05
Oct
-05
Nov
-05
Dec
-05
Jan-
06F
eb-0
6M
ar-0
6A
pr-0
6M
ay-0
6Ju
n-06
Jul-0
6A
ug-0
6S
ep-0
6O
ct-0
6N
ov-0
6D
ec-0
6Ja
n-07
Feb
-07
Eve
nt
Cou
nt
(Po
siti
ve >
0.0
50 H
z, N
egat
ive
< -
0.05
0 H
z)
High Low Total
Characteristics (Now and Future)
§ Interoperability§ Flexible (generation diversity,
disruptive technologies)§ Reliable: N-X contingency (X=1, 2,
etc)§ Eco-centric (Impact)§ Provider of Last Resort?§ Human behavior (hybrids, demand
response)