Social Monitoring Report This report has been submitted to ADB by the Shandong Provincial Government Project Management Office and is made publicly available in accordance with ADB’s public communications policy (2005). It does not necessarily reflect the views of ADB. Project Number: 36505 January 2011 PRC: Shandong Hai River Basin Pollution Control Project Prepared by Shandong Construction Development Research Institute Shandong Province, PRC For Shandong Provincial Project Management Office

SMR: PRC: Shandong Hai River Basin Pollution Control Project · Village of Dudian Community and Shaotouhanqian Village of Shangji Town, Bincheng District, 65.6 mu in total. It involves

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • Social Monitoring Report

    This report has been submitted to ADB by the Shandong Provincial Government Project Management Office and is made publicly available in accordance with ADB’s public communications policy (2005). It does not necessarily reflect the views of ADB.

    Project Number: 36505 January 2011

    PRC: Shandong Hai River Basin Pollution Control Project

    Prepared by Shandong Construction Development Research Institute

    Shandong Province, PRC

    For Shandong Provincial Project Management Office

  • ------------------------------------------------------------------------------------------------------------------------------------------ Shandong Institute of Construction and Development Address:No.17 Sanlizhuang Jingliu road Jinan Shandong Province China TEL:0086-531-83180940 Fax:0086-531-83180915 E-mail:[email protected]

    ADB Loan Shandong Haihe River Basin Pollution Control Project

    Completion Report of Resettlement

    (Report No. 5)

    January, 2011

    Shandong Construction Development Research Institute

  • CONTENTS

    FOREWORD .................................................................................................................................................. 1

    1. MONITORING AND ASSESSMENT OVERVIEW ...................................................................... 3

    1.1 PURPOSE OF MONITORING AND ASSESSMENT ............................................................................... 3

    1.2 CONTENTS AND METHODS OF MONITORING AND ASSESSMENT .................................................... 3

    1.3 BASIC CONTENTS AND IMPORTANT CONTENTS OF MONITORING AND ASSESSMENT ...................... 4

    1.3.1 Basic contents .......................................................................................................................... 4 1.3.2 Important contents................................................................................................................... 7

    1.4 ORGANIZATION AND IMPLEMENTATION OF MONITOR AND ASSESSMENT ...................................... 8

    2. IMPLEMENTATION PROGRESS OF RESETTLEMENT MONITOR AND ASSESSMENT . 9

    2.1 PROJECT PROGRESS AND PERMANENT LAND REQUISITION ........................................................... 9

    2.1.1 Binzhou No. 2 Wastewater Treatment Plant and Effluent Re-use Project................................ 9 2.1.2 Shanghe Wastewater Treatment Plant Project ....................................................................... 10 2.1.3 Gaotang Wastewater Treatment Plant Phase 2 and Reclaimed Water Utilization Project .... 11 2.1.4 Linqing Municipal Wastes Treatment Plant Project .............................................................. 12 2.1.5 Linyi County Waste Treatment Plant Project ......................................................................... 13 2.1.6 Zouping County Waste Treatment Plant Project .................................................................... 14 2.1.7 Linqing City Sewage Treatment Project ................................................................................ 14

    2.2 TEMPORARY LAND USE .............................................................................................................. 15

    2.2.1 Projects under construction and completed .......................................................................... 16 2.2.2 Projects with no temporary land use ..................................................................................... 16

    2.3 LAND REQUISITION COMPENSATION RATES ................................................................................ 16

    3. MONITOR AND ASSESSMENT OF LAND REQUISITION AND COMPENSATION PROGRESS .......................................................................................................................................... 19

    4. MONITORING AND EVALUATION OF THE IMPLEMENTATION AND USE OF FUNDS 25

    4.1MONITORING OF THE IMPLEMENTATION AND APPLICATION OF FUNDS ........................................ 25

    4.1.1 Monitor implement and use of funds of Binzhou City the second sewage treatment plant and water reuse project ......................................................................................................................... 25 4.1.2 Monitor implement and use of funds of Gaotang Sewage Treatment Plant Phase II and water reuse project ................................................................................................................................... 25 4.1.3 Monitor implement and use of funds of Shanghe Sewage Treatment Plant Project .............. 26 4.1.4 Monitor implement and use of funds of Linqing City garbage disposal plant project .......... 26 4.1.5 Monitor implement and use of funds of Linyi County Waste Treatment Plant Project .......... 27 4.1.6 Monitor implement and use of funds of Zouping County Waste Treatment Plant Project ..... 27 4.1.7 Monitor implement and use of funds of Linqing City Sewage Treatment Project .................. 27

  • 4.2 ASSESSMENT IMPLEMENT AND USE OF FUNDS ............................................................................ 28

    5. MONITORING AND EVALUATION PRODUCTION AND LIVING CONDITIONS OF TYPICAL VILLAGES ......................................................................................................................... 29

    5.1 MONITORING PRODUCTION AND RESETTLEMENT OF AFFECTED VILLAGERS .............................. 29

    5.2 THE SITUATION OF VULNERABLE GROUPS IN AFFECTED VILLAGERS .......................................... 29

    5.3 COMPENSATION PAYMENTS ........................................................................................................ 29

    5.4 ASSESSMENT OF THE AFFECTED VILLAGERS’ LIVING STANDARDS .............................................. 29

    5.5 MONITOR STATISTICS OF THE TYPICAL OF AFFECTED HOUSEHOLDS ........................................... 30

    5.5.1 The basic situation of the typical immigrant household ........................................................ 30 5.5.2 Assessment of the level of affected villagers’ income and expenditure .................................. 31 5.5.3 Livelihood restoration ........................................................................................................... 38

    6. MONITORING AND EVALUATION ON PUBLIC PARTICIPATION ..................................... 41

    6.1 MONITORING THE SITUATIONG OF PUBLIC PARTICIPATION ......................................................... 41

    6.2 ASSESSMENT ON PUBLIC PARTICIPATION ................................................................................... 42

    7. MONITORING AND EVALUATION ON IOM OPERATION AND EFFICIENCY ................ 49

    8. CONCLUSIONS AND RECOMMENDATIONS .......................................................................... 50

    8.1 CONCLUSIONS ............................................................................................................................ 50

    8.2 ASSESSMENT .............................................................................................................................. 51

  • 1

    Foreword

    In comparing the "Resettlement Action Plan", the land acquisition

    relocation and resettlement of each sub-projects of Asian Development

    Bank loaned for Shandong Haihe River Basin pollution control projects

    has been completed. The "resettlement completion report" of each

    sub-project has been submitted to ADB in September 2009. According to

    ADB's medium-term inspection team of the project (2009.05.18-27)

    "Memorandum" requirements, two years external monitoring still be

    needed after the projects completed.Shandong Institute of Construction

    Development as the independent external monitoring and evaluation

    agency hired by each sub-project, will continue tracking and monitoring

    affected people by the project and typical household. And worked out the

    "Resettlement External Monitor and assessment Report on ADB Loan

    Project: Shandong Haihe Basin Pollution Control Project" for Asian

    Development Bank, Shandong Project Office and relevant project units.

    From Octorber 15th to December 15th, 2010, based on resettlement

    baseline census and Report No. 1-4, the Resettlement External Monitor

    Group of Shandong Institute of Construction Development (hereinafter

    referred to as Monitor Group) carried out project resettlement monitor for

    the above mentioned 7 sub-projects respectively, and, as requested by the

    ADB policy guidance and memorandum of supervision group(Oct., 25th

  • 2

    to 29th), prepared the Completion and Assessment Report of Haihe Basin

    Pollution Project Financed by ADB loan.

    Thanks for the support of all the sub-project units.

    Shandong Institute of Construction and Development

    Resettlement External Monitoring and Assessment Group

    January, 2011

  • 3

    1. Monitoring and assessment Overview

    According to ADB policies, all resettlement of ADB loan projects

    should be regularly monitored by the resettlement external monitoring

    and assessment group during project implementation. And two years

    tracking and monitoring after the Resettlement Completion Report will

    be needed. The Shandong Institute of Construction Development

    Resettlement External Monitoring and Assessment Group constituted

    the implementation plan including monitoring and assessment purpose,

    method and contents, and implemented them in actual operation.

    1.1 Purpose of monitoring and assessment

    External monitoring and assessment are activities implemented by

    a third- party independent from project owners and immigration

    implementation agency. It is to provide objective and fair evaluation of

    the resettlement by carrying out field tracking investigation, periodic

    monitoring, and collecting related data and information, so as to locate

    existing or potential problems, put forward rational proposals, report

    the evaluation results and related proposals to ADB, PPMO, project

    owners and related authorities as an important basis of ADB loan

    project examination, in order to improve the implementation of

    resettlement.

    1.2 Contents and methods of monitoring and assessment

    Methods of sociological documentation, typical survey, direct visit,

    discussion and field survey were used in the work of resettlement

    investigation and monitoring/assessment.

    1) Land requisition progress;

  • 4

    2) Resettlement progress;

    3) Fund provision and use;

    4) Immigrant production and living arrangement and livelihood

    restoration;

    5) Public participation;

    6) Resettlement organs operation and efficiency.

    7) Operation and efficientcy of resettlement organs

    1.3 Basic contents and important contents of monitoring and

    assessment

    This annual monitoring is based on that of 2010 (Monitoring Report

    No. 4). The "Resettlement Completion Report" of seven sub-projects has

    been submitted to the Asian Development Bank respectively by the end

    of September 2009, according to ADB's relevant requirements. This

    monitoring and assessment focused on livelihood restoration of affected

    households, besides resettlement and compensation. As the completion

    report, there are general assessments in it.

    1.3.1 Basic contents According to the requirements of ADB project starting group, all the

    sub-project units made revision on RAP in 2007.

    According to investigations, among the seven sub-projects involving

    permanent land requisition and temporary land occupation:

    (1)The permanent land requisition for Linqing Comprehensive

    Wastewater Treatment Plant Project involves scrapped workshop

    buildings of Linqing Yinhe Paper Mill. The workshop buildings were in

    leasing status before land requisition, and the leasing has been expired,

    with no impacts on the land requisition.

    The "Resettlement Completion Report" was submitted to the Asian

  • 5

    Development Bank by project owner in September 2009.

    (2) Linqing Municipal Wastes Treatment Project involves a kiln that

    has been closed on expiration according to related state policies. Most

    labors of the kiln are seasonal workers from outside, and have left for

    other livelihoods after getting the compensations.The kiln owner is a

    contractor from Hebei Province and has been compensated according to

    the resettlement plan.

    The "Resettlement Completion Report" was submitted to the Asian

    Development Bank by project owner in September 2009.

    (3)Liny Municipal Wastes Treatment Project also involves a kiln that

    has been closed on expiration according to related state policies.

    Belonging to the county industrial company, the kiln had 13 regular

    employees and 33 seasonal labors. According to the resettlement plan,

    after closing the kiln, each seasonal labor is paid with additional two

    months wages for making other livelihood. All regular workers are

    re-arranged by the county industrial company. As we know in follow-up

    investigations, these workers have been re-arranged in three different

    ways: One, 8 regular workers close to the age of retirement were paid by

    the industrial company with endowment insurance fee and living

    allowance, including 96,000 yuan for endowment insurance fee and

    240,000 yuan for living allowance, totaling 336,000 yuan. Two, for the

    other 5 regular workers, the industrial company entered a resettlement

    agreement with No. 1 Brick Kiln, so that the company will bear the

    endowment insurance fee of 300,000 yuan and the resettlement

    compensation of 100,000 yuan, totaling 400,000 yuan. Three, 33 seasonal

    labors were paid with two months wages and left for other jobs. This

    payment sums 52,800 yuan. This follow-up monitor found no change in

    the above aspects.

    The "Resettlement Completion Report" was submitted to the Asian

  • 6

    Development Bank by project owner in September 2009.

    (4)The land for Zouping Municipal Wastes Treatment Project is

    allocated as a whole from a state owned farm, involving 25 workers. The

    farm had stopped operation before the land requisition. According to

    resettlement plan, in the project construction period, a living subsidy of

    180 yuan per person per month will be paid by Zouping Municipal

    Administration Bureau (baseline census found that, the municipal

    administration bureau increased the living subsidy from 180 yuan to 240

    yuan after taking over the farm); As designed in the "Resettlement Plan",

    after completion of the municipal waste treatment plant, the 25 regular

    workers will be employed by the waste treatment plant after training. The

    follow-up monitoring in 2009 found that, the above mentioned persons

    were arranged for retirement, long term leave and work after training.

    Among the affected 25 persons: (1) 6 persons were retired; (2) 13 persons

    were on leave (retaining their position with salary suspended); (3) 6

    persons had jobs after training (for details refer to the attached table 1).

    The original five farmers who rent land signed an agreement on the

    land change in June 2007.

    The "Resettlement Completion Report" was submitted to the Asian

    Development Bank by project owner in September 2009.

    (5)Binzhou No. 2 Wastewater Treatment Plant and Effluent Re-use

    Project made a requisition of land of two villages, namely, Lixiaohai

    Village of Dudian Community and Shaotouhanqian Village of Shangji

    Town, Bincheng District, 65.6 mu in total. It involves 62.2 mu in

    Lixiaohai Village with 24 affected households and 3.4 mu in

    Shaotouhanqian Village with 3 affected households. We selected

    Lixiaohai Village as the typical village for resettlement monitoring and

    assessment.

    The "Resettlement Completion Report" was submitted to the Asian

  • 7

    Development Bank by project owner in September 2009.

    (6)Shanghe County Urban Wastewater Treatment Plant took land of

    65 mu, including 41 mu of Tongjiadaokou Village of Shanghe Town with

    48 affected households and 24 mu of Zhanglaozhuang Village of

    Zhangfang Township with 7 affected households. We chose

    Tongjiadaokou Village as the typical village for resettlement monitoring

    and assessment.

    In addition, the project established two pumping stations with 2

    acres of land acquisition which is urban state-owned land. So the land and

    items on the ground acquisition are not involved.

    The "Resettlement Completion Report" was submitted to the Asian

    Development Bank by project owner in September 2009.

    (7)Gaotang County Urban Wastewater Treatment Plant Phase II

    Project and Reclaimed Water Utilization Project took the farm land of

    57.63 mu from teams 1, 2 and 3 of Xipu Village of Huixin Town as

    permanent land requisition, with 19 affected households. We chose the

    village as the typical village for resettlement monitoring and assessment.

    The "Resettlement Completion Report" was submitted to the Asian

    Development Bank by project owner in September 2009.

    1.3.2 Important contents We took Lixiaohai Village of Binzhou, Tongjiadaokou Village of

    Shanghe and Xipu Village of Gaotang as keypoints for monitoring,

    because the three villages are very typical:

    First, the affected population is relatively high in the three villages

    (79 persons affected by Binzhou Project, 222 by Shanghe Project and 79

    by Gaotang Project), representing the actual economic conditions of the

    project affecting area in different aspects.

    Secondly, most of the APs in the three villages are half farmers and

  • 8

    half industrial employees, showing certain comparability.

    According to the general sampling principle in social survey and our

    experience, we selected Lixiaohai Village of Dudian Community of

    Binzhou, Tongjiadaokou Village of Shanghe Town of Shanghe County

    and Xipu Village of Gaotang County as typical villages for resettlement

    monitoring and assessment, and selected Li Yanzhen, Li Pinggui and Li

    Dongling of Lixiaohai Village, Bian Faxiang, Wang Kede, Wang Shizhu

    and Wang Shizhen of Tongjiadaokou Village of Shanghe, and Zhang

    Jixiang, Zhao Chuantao and Zhao Chuanshen of Xipu Village of Gaotang

    (names of household heads) as typical households for follow-up

    monitoring and assessment (10 households in total). Continuous

    follow-up has been carried out to the above mentioned 10 typical

    households.

    1.4 Organization and implementation of monitor and

    assessment

    Resettlement External Monitor Group of Shandong Construction

    Development Research Institute (hereinafter referred to as Monitor Group)

    carried out resettlement monitoring to the above mentioned subprojects

    and follow-up survey to the typical households from Oct. 1st to December

    15th, 2010.

    In the report, the personal information on APs are provided by the

    villagers themselves and the specific compensation amounts are

    confirmed against the compensation distribution sheets with respective

    personal signatures. Detailed data and information on land requisition

    progress, project progress, fund settlement and use, resettlement progress

    and immigration institution operation were obtained from project units

    and concerned authorities of district/town governments.

  • 9

    2. Implementation progress of resettlement monitor and assessment

    2.1 Project progress and permanent land requisition

    2.1.1 Binzhou No. 2 Wastewater Treatment Plant and

    Effluent Re-use Project Binzhou Sub-project finished the permanent land requisition of 65.6

    mu (including 62.2 mu from Binzhou Economic Development Zone

    Dudian Community Lixiaohai Village and 3.4 mu from Bincheng District

    Shangji Town Shaogou hanqian Village), with all compensation settled.

    The civil work was commenced on June 25, 2007. The completion

    ceremony took place on October 18, 2008.

    Fig. 1. Completed Binzhou No. 2 Wastewater Treatment Plant and

    Effluent Re-use Project

  • 10

    Fig. 2.Factory of Binzhou No. 2 Wastewater Treatment Plant

    2.1.2 Shanghe Wastewater Treatment Plant Project Shanghe Subproject finished the permanent land requisition of 65

    mu (including 41 mu from Shanghe Town Tongjiadaokou Village, 24 mu

    from Zhangfang Township Zhanglaozhuang Village and 2 mu of

    collective ditch land), with all compensation settled. Two pump stations

    took land of 2 mu which is the state-owned land. The civil work was

    commenced in November 2007 and completed in October 2008.

    Fig. 3. Completed Shanghe Wastewater Treatment Plant

  • 11

    Fig. 4.Factory of Shanghe Wastewater Treatment Plant

    2.1.3 Gaotang Wastewater Treatment Plant Phase 2 and

    Reclaimed Water Utilization Project Gaotang Sub-project finished the permanent land requisition of

    81.54 mu (Xipu Village) with all compensation settled. The civil work

    was commenced in August 2007, completed in September 2008 and

    passed through the acceptance check of provincial environmental

    protection department in August 2009. The recycled water construction

    parts and equipment tender has been completed by the monitoring day

    and is expected to be operational in June 2010. The water quality of

    Phase II project has reached the national level B emission standards.

  • 12

    Fig.5. Gaotang Wastewater Treatment Plant Phase II Project

    Fig.6. Operation of Phase II Project

    2.1.4 Linqing Municipal Wastes Treatment Plant Project The land for Linqing Municipal Wastes Treatment Plant Project is

    used to be a kiln of Xianfeng Community. The kiln was closed by policy.

    The land is state owned. Land certificate has been obtained. The project

    was commenced in September 2007 and completed with civil work by the

    end of 2008. The project started running in April, 2009.

  • 13

    Fig.7. Linqing Municipal solid waste Co., Ltd.

    Fig.8. landfill area protection

    2.1.5 Linyi County Waste Treatment Plant Project The project covers an area of 306 acres, has completed land

    acquisition in June 2005 and start on March 21, 2008. According to the

    confirmation with the project, as of the date of this report has been

    completed, the total project amount of 98%, civil engineering,

    anti-seepage project has been completed. The project started test run in

    Jun., 2010.

    Fig.9. Linyi Kangmin waste treatment Co., Ltd. completed

  • 14

    2.1.6 Zouping County Waste Treatment Plant Project The land for Zouping Wastes Treatment Plant is state owned with

    compensation. A land transfer fee of 5.477 million yuan was paid to

    Zouping County Financial Bureau on July 27, 2007, and land certificate

    obtained. The project was commenced in July 2007, completed with civil

    work in October 2008 and is operational now.

    Fig.10. Zouping Waste Treatment Plant Co., Ltd. completed

    Fig.11.Part of Zouping Waste Treatment Plant

    2.1.7 Linqing City Sewage Treatment Project Linqing City Wastewater Treatment Project took the state-owned

    transfer land, and obtained the land use prmits on December 25, 2006.

    The bid opening of construction took place on August 20, 2009. The

    project started constrctuon in October 2009. The project was completed in

  • 15

    in Oct., 2010.

    Fig.11.One part of seawage treatment plant in construction

    Fig.12. Part of construction site

    2.2 Temporary land use

    Temporary land use mainly involves the spaces for sewage pipe line,

    temporary construction facilities and materials storage. Three types of

    temporary covers area of sub-project: ① projects have started

    construction and completion; ②projects do not have temporary land; ③

    projects not yet started:

  • 16

    2.2.1 Projects under construction and completed According to investigation, up to January 2010, the land-taking

    works of Binzhou Project, Gaotang Project and Shanghe Project have

    been completed mostly.

    2.2.2 Projects with no temporary land use Linqing Municipal Wastes Treatment Plant Project, Linyi County

    Wastes Treatment Plant and Zouping County Wastes Treatment Plant

    Project involve no temporary land use.

    For details of temporary land occupation, refer to the following

    table:

    Temporary land use of subprojects

    Project Unit RP (mu or m2)

    Up to report (mu or m2) Remarks

    Binzhou No. 2 Wastewater Treatment Plant 309 mu 206235 m

    2 completed

    Shanghe Wastewater Treatment Plant

    The edge of the narrow city roads

    with: 103 mu 70323 ㎡ completed

    Gaotang Wastewater Treatment Plant 87 mu

    Sewage pipe: 54540 M,

    effluent pipe: 5480 M

    Completed

    Linqing Municipal Wastes Treatment Plant 0 0

    No temporary land use

    Linyi County Waste Treatment Plant Project 0 0

    No temporary land use

    Zouping County Waste Treatment Plant 0 0

    No temporary land use

    Linqing City Sewage Treatment 59970 m

    2 0 Finished

    2.3 Land requisition compensation rates

    Standard of compensation for carrying out project monitoring

    process, we paid special attention to the "Resettlement Action Plan" to do

    set standards of compensation and the actual compensation standard

    monitoring, by comparison, in the land requisition compensation process

    has improved the standard of compensation for individual sub-projects

  • 17

    (such as sub-Gaotang project), there is no compensation for a lower

    standard. Overview of the project land requisition compensation

    standards for comparison in the table below:

  • 18

    Comparison of compensation rates for land requisition

    Unit Contents RP rates Up to date of report Remarks

    Number of mu Rate Number of mu Rate

    Gaotang Wastewater Treatment Plant

    Permanent land requisition 92.4 mu

    22400 yuan/mu 81.54 mu 25300 yuan/mu

    Obtained relevant certificate

    Temporary land occupation 0 0 0 0

    The edge of a narrow band for the urban road

    Binzhou Wastewater Treatment Plant

    Permanent land requisition 65.6 mu

    25600 yuan/mu 6506 mu 25600 yuan/mu

    Obtained relevant certificate

    Temporary land occupation 309 mu 35 yuan/ m

    2 206235m2 0 Dev. Zone Const. Bureau bears the costs

    Shanghe Wastewater Treatment Plant

    Permanent land requisition 65 mu

    25200 yuan/mu 65 mu 25200 yuan/mu

    Obtained relevant certificate

    Temporary land occupation

    19 mu 500 yuan/mu 19 mu 500 yuan/mu Government bears the

    costs 70323 m2 35 yuan/ m2 45714 m2 35 yuan/ m2

    72 mu 400 yuan/mu

    Zouping Waste Treatment Plant

    Permanent land requisition 627 0 627 0 Government funding

    Temporary land occupation N/A N/A N/A N/A

    Linqing Waste Treatment Plant

    Permanent land requisition 280 mu

    40000 yuan/mu 280 mu 40000 yuan/mu

    Obtained relevant certificate

    Temporary land occupation N/A N/A N/A N/A

    Linyi Waste Treatment Plant

    Permanent land requisition 306 mu

    40000 yuan/mu 306 mu 64000 yuan/mu

    Obtained relevant certificate

    Temporary land occupation N/A N/A N/A N/A

    Linqing Wastewater Treatment Plant

    Permanent land requisition 79.1 mu

    11000 yuan/mu 39.92 mu 90000 yuan/mu

    Obtained relevant certificate

    Temporary land occupation 59970 m

    2 35 yuan/ m2 N/A N/A

  • 19

    3. Monitor and assessment of Land Requisition and Compensation Progress

    All the sub-projects organized land requisition and house demolition

    and made compensation based on their own situation. Although there are

    defferences between the actual time and RAP, the work was done before

    the construction time. No sub-project was impacted by land requisition

    and resettlement.

    For the resettlement and implementation of the 7 subprojects, refer

    to the following table:

    Schedule of resettlement and implementation

    Unit Activities Responsible organ RAP Schedule Implementation

    date

    Gaotang

    WWTP

    Distribute the resettlement information booklets (containing compensation rates) to all APs

    and collect modification opinions

    PPMO, project implementation

    organs April 15, 2005 Completed March 13, 2005

    Preliminary review of land use for construction

    Project construction

    unit, land and resources authorities

    May Completed May 2005

    Local government establishes project resettlement organ County PMO April / July

    Completed April 2005

    Provide resettlement training to local government officials

    PPMO, County PMO

    September - November

    Approval of resettlement plan and management appraisal

    meeting (MRM) ADB December Completed December 2005

    Process land use formalities County PMO, construction unit December - January Completed April 2007

    Consultation about formulation of detailed resettlement plan

    County PMO, construction unit April - September

    Completed May 2005

    Determine detailed restoration proposal of affected units

    County PMO, construction unit October - December

    Completed July 2005

    Conclude compensation agreement with affected unit

    County PMO, construction unit October

    Completed January 2007

    Land readjustment

    Village committee, township

    government, county

    agriculture bureau

    November

  • 20

    Unit Activities Responsible organ RAP Schedule Implementation

    date Land requisition and

    resettlement process start County PMO October 2005 - January 2006

    Carry out detailed measurement survey (DMS) and affected

    assets registration; publicize the resettlement plan updated

    according to detailed survey results

    PMO, environmental

    protection bureau

    October - December 2005

    Based on detailed measurement survey, submit updated report on

    resettlement impacts and cost changes to ADB

    PMO January 2006 Completed March 2007

    Binzhou

    WWTP

    Distribute the resettlement information booklets (containing compensation rates) to all APs

    and collect modification opinions

    PPMO, project implementation

    organs August 2006 Completed August 2006

    Preliminary review of land use

    Project construction

    unit, land and resources authorities

    August Completed September 2005

    Local government establishes project resettlement organ

    Development zone PMO August

    Completed August 2006

    Provide resettlement training to local government officials

    PPMO, City PMO September

    Completed September 2006

    ADB's approval of resettlement plan and management appraisal

    meeting (MRM) ADB September Completed September 2006

    Process land use formalities PMO, construction unit September Completed2006.9

    Consultation about formulation of detailed resettlement plan PMO August-September

    Completed 2006.9

    Determine detailed restoration proposal of affected units PMO August-December Completed2006.12

    Conclude compensation agreement with affected unit PMO 10 月 Completed2006.11

    Land requisition and resettlement process start PMO

    October 06 - January 07 Completed2007.1

    Carry out detailed measurement survey (DMS) and affected

    assets registration; publicize the resettlement plan updated

    according to detailed survey results

    PMO November 2006 Completed2006.11

    Based on detailed measurement survey, submit updated report on

    resettlement impacts and cost changes to ADB

    PMO December 2006 Completed2006.12

    Shanghe

    Distribute the resettlement information booklets (containing compensation rates) to all APs

    and collect modification opinions

    PPMO, project implementation

    organs April 15, 2005 2005.4.15

  • 21

    Unit Activities Responsible organ RAP Schedule Implementation

    date

    WWTP

    Preliminary review of land use

    Project construction

    unit, land and resources authorities

    May 2007.9

    Local government establishes project resettlement organ

    Shanghe County PMO April / July 2005.4

    Provide resettlement training to local government officials

    PPMO, County PMO July-September 2005.7

    ADB's approval of resettlement plan and management appraisal

    meeting (MRM) ADB August

    Process land use formalities PMO, construction unit September 2007.6

    Consultation about formulation of detailed resettlement plan

    County PMO, construction

    bureau April - September

    Determine restoration plan of affected units

    County PMO, construction

    bureau October - December

    Conclude compensation agreement with affected unit County PMO March 2007 2007.3

    Land requisition and resettlement process start County PMO March - May 2007 2007.9

    Carry out detailed measurement survey (DMS) and affected

    assets registration; publicize the resettlement plan updated

    according to detailed survey results

    County PMO May 2007 2007.3

    Farm land readjustment June 2007 2007.7 Based on DMS, submit updated report on resettlement impacts

    and cost changes to ADB County PMO August 2007 2007.8

    Zouping

    SWTP

    Distribute RIB (containing compensation rates) to all APs

    and collect modification opinions

    PPMO, project implementation

    organs April 15, 2005 Completed 2005.4

    Preliminary review of construction land use

    Project construction

    unit, land and resources authorities

    May Completed 2005.5

    Local government establishes project resettlement organ County PMO April / July

    Completed 2005.3

    Provide resettlement training to local government officials

    PPMO, County PMO July-September

    Completed 2005.7

    ADB's approval of RP and management review meeting

    (MRM) ADB August Completed 2005.8

    Obtain land utilization certificate

    County PMO, construction unit September

    Completed 2005.8

    Consultations for making detailed RP

    County PMO, construction unit April - September

    Completed 2005.6

  • 22

    Unit Activities Responsible organ RAP Schedule Implementation

    date

    Determine restoration plan of affected units

    County PMO, construction unit July-December

    Hand-over as a whole, without

    restoration Conclude resettlement agreement with APs

    County PMO, construction unit October

    Completed 2005.10

    Land requisition and resettlement process start County PMO

    October 2005 to January 2006

    No AP, no demolition

    Carry out DMS and affected assets registration; publicize RP

    updated according to DMS results

    PMO November-December 2006 Completed

    2006.11

    Based on DMS, submit updated report on resettlement impacts

    and cost changes to ADB PMO March 2007 Completed 2007.3

    Linqing

    SWTP

    Distribute the draft of RP (containing compensation right)

    to all APs and collect modification opinions

    PPMO, IA April 15, 2005 Completed,

    discussed by 20 persons

    Preliminary review of construction land use

    Project construction

    unit, land and resources authorities

    May Completed 2005.5

    Local government establishes project resettlement organ City PMO April / July 已设立

    Provide resettlement training to local government officials

    PPMO, City PMO July-September

    Completed

    ADB's approval of RP and management review meeting

    (MRM) ADB September Completed

    Obtain land utilization certificate

    City PMO, construction

    unit September Obtained

    Consultations for preparing detailed RP

    City PMO, construction

    unit April - September

    Completed

    Determine arrangement of affected casual workers

    City PMO, construction

    unit October - December Completed

    Conclude resettlement agreement with APs

    City PMO, construction

    unit October Concluded

    Land requisition and resettlement process start City PMO February-May 2006

    Completed

    Carry out DMS and affected assets registration; publicize RP

    updated according to DMS results

    PMO January 2006 Completed

    Based on DMS, submit updated report on resettlement impacts

    and cost changes to ADB PMO January 2006

    Distribute RIB (containing compensation rates) to all APs

    and collect modification PPMO, IA April 15, 2005 Completed

  • 23

    Unit Activities Responsible organ RAP Schedule Implementation

    date opinions

    Linyi

    SWTP

    Preliminary review of construction land use

    Project construction

    unit, land and resources authorities

    May Completed

    Local government establishes project resettlement organ County PMO April / July Completed

    Provide resettlement training to local government officials

    PPMO, County PMO July-September Completed

    ADB's approval of RP and management review meeting

    (MRM) ADB August Completed

    Obtain land utilization certificate

    County PMO, construction unit September Completed

    Consultations for preparing detailed RP

    County PMO, construction unit April - September Completed

    Determine restoration plan of affected units

    County PMO, construction unit July-December Completed

    Conclude resettlement agreement with APs

    County PMO, construction unit October Completed

    Land requisition and resettlement process start County PMO February-May 2007 Completed

    Carry out DMS and affected assets registration; publicize RP

    updated according to DMS results

    PMO January 2007 Completed

    Based on DMS, submit updated report on resettlement impacts

    and cost changes to ADB PMO January 2007 Completed

    Distribute RIB (containing compensation rates) to all APs

    and collect modification opinions

    PPMO, project implementation

    organs April 15, 2005 Completed 2005.4

    Linqing

    WWTP

    Preliminary review of construction land use

    Project construction

    unit, land and resources authorities

    May Completed 2005.5

    Local government establishes project resettlement organ City PMO April / July

    Completed 2005.5

    Provide resettlement training to

    local government officials PPMO, City

    PMO July-September Completed2005.8

    ADB's approval of RP and management review meeting

    (MRM) ADB October Completed 2005.4

    Obtain land utilization certificate

    City PMO, construction unit September

    Completed 2006.9

    Consultations for preparing detailed RP

    City PMO, construction unit April - September

    Completed 2004.6

    Determine restoration plan of affected units

    City PMO, construction unit October - December

    Conclude compensation City PMO, October Completed

  • 24

    Unit Activities Responsible organ RAP Schedule Implementation

    date agreement with affected unit construction unit 2006.8

    Land clearing starts City PMO January-June 2006 Completed2006.3 Carry out DMS and affected

    assets registration; publicize RP updated according to DMS

    results

    PMO, environmental

    protection bureau

    January 2006

    Based on DMS, submit updated report on resettlement impacts

    and cost changes to ADB PMO January 2006 Completed 2007.5

  • 25

    4. Monitoring and evaluation of the implementation and use of funds

    4.1Monitoring of the implementation and application of

    funds

    4.1.1 Monitor implement and use of funds of Binzhou City

    the second sewage treatment plant and water reuse project According to the survey, as of the date of this report (by the end of

    January 2010), the second sewage treatment plant of Binzhou City and

    water reuse project have spended resettlement costs a total of RMB

    3,953,020 yuan, including compensation for Binzhou Economic

    Development Zone Du store neighborhood offices Li Xiaohai Village

    land compensation and resettlement of population count 1,592,320 yuan,

    young crops compensation fee of 140,400 yuan, total 1,732,720 yuan;

    compensation Binzhou City Bincheng zone Shangji Town

    Shaotouhanqian village land compensation and population resettlement

    total 87,040 yuan and young crops compensation fee of 8,840 yuan,

    totaling 95,880 yuan.

    4.1.2 Monitor implement and use of funds of Gaotang

    Sewage Treatment Plant Phase II and water reuse project According to the survey, as of the date of this report (by the end of

    January 2010), the second sewage treatment plant of Gaotang and water

    reuse project have spended resettlement costs a total of RMB 2,186,962

    yuan, mainly permanent land requisition, seedlings fees, Population

    emplacement and ground attachments compensation and release in

  • 26

    project-affected xipu village (Gao Tang Xi Pu limited liability company)

    Villagers hands.

    4.1.3 Monitor implement and use of funds of Shanghe

    Sewage Treatment Plant Project According to the survey, as of the date of this report (by the end of

    January 2010), Shang River Sewage Treatment Plant Project have total

    spended the resettlement cost of RMB 4,542,200 yuan, including land

    compensation fee 1,638,000 yuan, compensation for young crops: 9 acres

    of cotton total 5,400 yuan (the rest of the land has not continued farming,

    because of the stop down notice since 2007), a total compensation of

    1,643,400 yuan.

    According to investigation and verification, Shang River Sewage

    Treatment Plant project land compensation and young crops

    compensation standard was in accouding with the compensation standard

    in "Resettlement Action Plan".

    4.1.4 Monitor implement and use of funds of Linqing City

    garbage disposal plant project According to the survey, as of the date of this report (by the end of

    January 2010), Linqing municipal solid waste plant costs the resettlement

    cost of RMB 13,271,800 yuan, of which according to a certificate of

    Linqing State-owned assets, Linqing municipal government allocate280

    acres land to Linqing Environmental Management Division as an

    investment, valuation of 40,000 yuan per mu, land worth 11,200,000 yuan,

    resettlement compensation, relocation and temporary relocation costs

    173.3 thousand yuan.

  • 27

    4.1.5 Monitor implement and use of funds of Linyi County

    Waste Treatment Plant Project According to the survey, as of the date of this report (by the end of

    January 2010), Linyi county solid waste plant costs the resettlement

    costs of RMB 22,481,200 yuan, including One project permanent covers

    land of 12.24 million yuan, relocation compensation for 840,000 yuan,

    222,000 yuan of ground compensation.

    4.1.6 Monitor implement and use of funds of Zouping

    County Waste Treatment Plant Project According to the survey, due to that state-owned land acquisition of

    the project, without compensation, therefore, a permanent land

    compensation funds does not require. The ground attachments 1800 trees

    belonged to state-owned assets on permanent land acquisition, therefore,

    without compensation. The owners of the 1835 cut trees have got 9175

    yuan of compensation. The project did not cover temporary land, so it did

    not happen the temporary area of compensation.

    4.1.7 Monitor implement and use of funds of Linqing City

    Sewage Treatment Project According to "Project Resettlement completion report", as of the

    date of this report (by the end of January 2010), Linqing municipal

    sewage treatment projects have been in accordance with the procedure to

    release land costs (39.92 mu×9 yuan / mu = 359.28 million yuan) and

    demolition compensation payments (2.629 million yuan) to the affected

    unit account.

  • 28

    4.2 Assessment implement and use of funds

    From the implementation of the project plan and the availability of

    funds, we can see:

    First, the permanent land acquisition costs and related compensation

    costs have been fully in place before the commencement of the project,

    which meet the needs of the progress of the project construction.

    Second, compared with the resettlement plan, the compensation

    standards is not reduced, and promptly distributed to the villages, so as

    to ensure the interests of the affected villages be compensated.

  • 29

    5. Monitoring and evaluation production and living conditions of typical villages

    5.1 Monitoring production and resettlement of affected

    villagers

    Affected villagers basically in a semi-agricultural and semi-industrial

    living conditions, so, after receiving compensation and resettlement does

    not require special production.

    5.2 The situation of vulnerable groups in affected villagers

    According to our survey, we found that in all sub-projects the

    affected villagers did not exist vulnerable groups (in Shang River Project

    "Resettlement Action Plan" referred to two vulnerable groups, concerned

    of women's labor force).

    5.3 Compensation payments

    In all sub-projects, the land compensation and ground attachments

    compensation payments, young crops compensation payments have been

    distributed to villagers.

    5.4 Assessment of the affected villagers’ living standards

    Because the project-affected villagers no one is entirely dependent

    on agriculture as the main source of income before land acquisition, and

    basically semi-agricultural and semi-industrial state, the main source of

    income rely on the income of part-time jobs. We understand that affected

  • 30

    illagers living standard is not adversely affected. The details are listed in

    comparasion table.

    5.5 Monitor statistics of the typical of affected households

    As all project-affected villagers little practical impacted by the

    project (per capita reduction of land about 0.1 acres), in accordance with

    the general social survey sample principles and our practices experience,

    we have chosen Xiaohai Village Dian Department Binzhou Du Li,

    Tongjia Daokou village shanghe Shanghe Town Shanghe County and

    xipucun village Gaotang as resettlement monitoring and evaluation

    typical village and choice Li-Yanzhen, Li Pinggui, Li Dongling Li

    Xiaohai village Binzhou, Bian Fa-xiang, Wang Kede, Wang Shizhen

    Tongjia Daokou village Shanghe and Zhang Jin-xiang, Zhao Chuantao,

    Zhao Chuanshen Gaotang Xipu village(The above-headed name) as

    tracking monitoring and evaluation typical household (total 10).

    In order to ensure the accuracy of tracking and monitoring, we used

    the basement survey form used in the investigation, the affected

    households’ agricultural income and non-agricultural incomes were

    investigated, and then consolidated into income statistics, on the family

    spending has also done a detailed survey and analyzed for a specific

    revenue and expenditure changes.

    5.5.1 The basic situation of the typical immigrant household As previously reported, in the above-mentioned three typical

    households no one is entirely dependent on agriculture as the main

    economic resource and basically semi-agricultural and semi-industrial

    state, the main source of income for the family relies mainly on the

    income of part-time jobs.

  • 31

    For example, Binzhou Li Xiaohai village affected villagers mainly

    relied on Economic the labor market, day-work income can be RMB

    40-50 yuan.

    Shang river Tong Daokou village affected villagers are based on the

    construction market, including long-term worker in construction team and

    temporary laborer.

    Gaotang Xipu villagers affected villagers mainly worked in Quan

    Lin Zhiye Company, and farm is essentially done by women.

    5.5.2 Assessment of the level of affected villagers’ income

    and expenditure The details are shown in the subtracking table of baselin, 2008 and

    2010:

  • 32

    Tracking and monitoring the income of a typical household

    No.

    Project unit

    Villagers

    committee

    Name

    Population Family income 10,000 yuan Land occupation Agricultural income Noe-agricultural

    income Total Remarks

    Baseline

    Follow-up

    in 2010

    Fefore land

    requisition

    (mu)

    After land

    requisition

    (mu)

    Baseline

    Follow-up

    in 2008

    Follow-up

    in 2010

    Baseline

    Follow-up

    in 2008

    Follow-up

    in 2010

    Baseline

    Follow-up

    in 2008

    Follow-up

    in 2010

    1 Shanghe waste

    Water

    Treatment

    Plant

    Tongdaok

    ou Village

    Wang

    Kede 6

    3 5.6 4 8000

    5400 6500 0

    25000 35000 8000 30400 41500 Resons for the

    increase or

    decrease of

    income:

    1 、 The APs

    have spare

    time to work

    in other

    industry

    2Members of

    the affected

    families

    changed

    2 Wang Shizhe

    n

    5

    5

    7.2 5.1 7200

    8000 8700

    10000

    42000 60000 17200 50000 68700

    3 Wang Shigui

    4 6

    5.6 5.1 5600 7500 8200

    5000 30000 50000 10600 37500 58200

    4 Bian Pengsh

    an

    7

    6

    6.5 9.5 7500

    14500 11000

    10000

    25000 30000 17500 39500 41000

    5 Gaotang waste

    Water

    Treatment

    Xipu

    village

    Zhao

    Chuant

    ao

    5

    5

    6.5 4 5200

    7000 5000

    9600

    28000 40000 14800 35000 45000

    6 Zhang 5 5 6.5 4 8450 7100 7500 0 32600 40000 8450 39700 47500

  • 33

    Plant

    (Phase II)

    Jinxian

    g

    7 Zhao Chuans

    hen

    2

    2

    4.8 2.4 6240

    2850 3000

    0

    9600 10000 6240 12450 13000

    8 Binzhou No. 2

    waste

    Water

    Treatment

    Plant

    Lixiaohai

    Village

    Li

    Dongli

    ng

    3

    3

    7 6 700

    7400 6000

    19000

    12400 31000 19700 19800 37000

    9 Li Yanzhe

    n

    3

    5

    11 4 16000

    23200 6000

    15000

    9900 45000 31000 38300 51000

    10 Li Pinggui

    4 5

    7 5 700 7900 6500

    10000 5700 45000 10700 13600 51500

    合 计 44 45 65.7 49.1 65590 90850 68400 78600 220200 386000 144190 311050 454400

    备注 1、 Average land area reduced 0.37mu 2、 The non-agricultural income is far more than agricultural income

    3、The income of APs increase year by year, so the land requisition did not affect the APs’ income

  • 34

    Follow-up survey of expenditure of typical households

    No.

    Project unit

    Villagers

    committee

    Name Population Family expenditure (yuan) Produciton Education Medical care Food, fuel, water and

    electricity, communication

    Clothes, electric appliance Total

    Rema

    rks Basel

    ine

    Follo

    w-up

    in

    2010

    Baseli

    ne

    Follo

    w-up

    in

    2008

    Follo

    w-up

    in

    2010

    Basel

    ine

    Follo

    w-up

    in

    2008

    Follo

    w-up

    in

    2010

    Basel

    ine

    Follo

    w-up

    in

    2008

    Follo

    w-up

    in

    2010

    Basel

    ine

    Follo

    w-up

    in

    2008

    Follo

    w-up

    in

    2010

    Basel

    ine

    Follo

    w-up

    in

    2008

    Follo

    w-up

    in

    2010

    Basel

    ine

    Follo

    w-up

    in

    2008

    Follo

    w-up

    in

    2010

    1 Shang

    he

    waste

    Water

    Treat

    ment

    Plant

    Tongdao

    kou

    Village Wang

    Kede

    6 3 Calcul

    ated at

    the

    end of

    2008

    1860 2100 5000 500 0 1000 300 200 6500 5400 6600 0 0 2000 125

    00

    8060 1090

    0

    1、

    CPI

    incre

    ase

    by

    5.9%

    in

    2008

    2、

    CPI

    incre

    ase

    by

    5.1%

    in

    2010

    2

    Wang

    Shi

    zhen

    5 5 Calcul

    ated at

    the

    end of

    2008

    2200 2700 1000 0 1000 1000 200 400 7600 4650 8500 0 0 1000 850

    0

    7550 1360

    0

    3

    Wang

    Shigui

    4 6 Calcul

    ated at

    the

    end of

    2008

    2200 2500 0 0 0 1000 200 1000 6500 4500 8700 0 0 2000 750

    0

    6900 1420

    0

    4 Bian

    Peng

    shan

    7 6 Calcul

    ated at

    the

    2880 3000 1000 0 1000 1500 300 400 9500 5700 8900 0 2100 2000 120

    00

    8880 1530

    0

  • 35

    end of

    2008

    5 Gaota

    ng

    waste

    Water

    Treat

    ment

    Plant

    (Phase

    II)

    Xipu

    village

    Zhao

    Chuan

    tao

    5 5 800 1520 1850 1020 700 2000 300 70 250 4564 4060 4950 0 180 4000 668

    4

    6530 1305

    0

    6 Zhang

    Jin

    xiang

    5 5 900 1630 2080 300 350 400 100 80 220 2764 4240 4050 0 200 6000 406

    4

    6500 1275

    0

    7 Zhao

    Chuan

    shen

    2 2 700 1080 1230 0 0 0 200 20 300 1884 2070 3100 0 100 4000 278

    4

    3270 8630

    8 Binzh

    ou

    No. 2

    waste

    Water

    Treat

    ment

    Plant

    Lixiaohai

    Village

    Li

    Dong

    ling

    3 3 10000 1670 0 2000 1000 300 1200 900 500 6100 2800 9100 0 2000 13000 193

    00

    8370 2290

    0

    9

    Li Yan

    zhen

    3 5 14000 1670 0 0 500 200 1000 900 1000 5700 3530 9800 0 1500 7000 207

    00

    6430 1800

    0

  • 36

    Comparative table of the baseline and follow-up survey of a typical household economic situation No Location

    Name Total income (yuan) Total expenditure(yuan)

    Remarks Baselin survey in 2006

    Follow-up survery in

    2008

    Follow-up survery in

    2010

    Difference 2008:2006

    Difference 2010:2006

    Baselin survey in 2006

    Follow-up survery in

    2008

    Follow-up survery in

    2010

    Difference 2008:2006

    Difference 2010:2006

    1 Shanhe Wang Kede 8000 30400 41500 +22400 +33500 12500 8060 10900 -4440 -1600 Resons for the increase or decrease of income:

    1、The APs have spare

    time to work in other industry 2Members of the affected

    families changed

    2 Wang

    Shizhen 17200

    50000 68700 +32800 +51500 9600

    7550 13600 -2050 +4000

    3 Wangshizhu 10600 37500 58200 +26900 +47600 7500 6900 14200 -600 +4600

    4 Bian

    Pengshan 17500

    39500 41000 +22000 +23500 12000

    8880 15300 -3120 +3300

    5 Gaotang Zhao

    Chuantao 14800

    35000 45000 +20200 +30200 6684 6530 13050 -154 +6366

    6 Zhang

    Jinxiang 8450

    39700 47500 +31250 +39050 4064 6500 12750 +2436 +8686

    7 Zhao

    Chuanshen 6240

    12450 13000 +6210 +6760 2784 3270 8630 +486 +5846

    8 Binzhou Li Dongling 19700 19800 37000 +100 +17300 9300 8370 22900 -930 +13600

    9 Li Yanzhen 31000 38300 51000 +7300 +20000 6700 6430 18000 -270 +11300

    10 Li Pinggui 10700 13600 51500 +2900 +40800 8900 7770 22000 -1130 +13100

    Total 144190 316250 454400 172060 310210 80032 70260 151330 -9772 69198 Increasing rate +119% +215% -12.2% +86..5%

    Remarks 1、CPI increase by 5.9% in 2008 2、CPI increase by 5.1% in 2010

  • 37

    Compared with 2006, the income increased by 119% and 215% in

    2008 and 2010. The expenditure decreased by 12.2% in 2008 and

    increased by 85.5% in 2010.

    CPI increase by 5.9% and 5.1%in 2008 and in 2010.

    A typical household Wang Kezhen of the land survey in 2007, the

    basement before the 7.2 acres of land, of which the individual contracting

    of collective land 1.6 acres, has been in the second half of 2007 to adjust

    land to recover, so the land prior to the actual 5.6 acres of farmland, this

    survey to be corrected. The population changed (Birth and death) in some

    families.

    The main reason for changing in income and expenditure has been

    written in the former reports.

    From the big side, the increase in income is mainly because of the

    affected villagers have more the time to do business or labor with the

    arable land reduced. With the increasing in the number of migrant

    workers, the household monthly incomes rise, thereby household income

    increase.

    The villagers dependent on land as the main resource of life, way of

    life and the concept of survival fundamental changes and no longer rely

    on farming as the sole source of livelihood.

    The number of land acquisition is not much and the affected

    villagers would have little impact.

    Expenditure is more than CPI. it mainly dues to building newly

    houses, children, marriage or a patient at home, purchase a new home

    appliance, furniture and other household items. For example, Shang River

    Project Tong Daokou village the affected households Bian Pengshan’

    were because a patient at home for two consecutive years with two

    elderly people died. Wang Shizhu’ built newly house, Wang Shizhu’

    added a new appliances, Thus resulting in increased expenditure.

  • 38

    At the same time, due to price rises, some families also increased

    spending.

    A typical household Wang Kede’ spending decrease due to

    government fees and education costs were reduced. These parts of the

    students become migrant workers, which become a factor of household

    income increase.

    5.5.3 Livelihood restoration In the development of "Resettlement Scheme", the subprojects

    would put the livelihood restoration as a focus program In addition to the

    relevant "re-adjustment of land", "cash compensation", "Education and

    skills training", the subprojects referred to "During the project

    construction period, the affected villagers can go to projects to participate

    in the work of some non-skilled, at the same time, for the construction

    team provide food, vegetables and other services, which can increase the

    income of the affected farmers. "We have also made tracking and

    monitoring. As follows:

    1. Labor resettlement measures of Binzhou sub-project:

    In the implementation process, the affected villagers were provided a

    temporary workforce of approximately 90 jobs, mainly engaged in

    unskilled work. After sewage plant completed, the affected people will be

    recruited two long-term workers, engaged in waste water treatment plants

    greening, cleaning and security work.

    2. Labor resettlement measures of Gaotang sub-project:

    To help affected families by the project to create a self-reliant and

    self-development environment as far as possible to restore or improve the

    living standards, county project office arranged for the affected people to

    participate in technical and skills training, specifically including the

    strengthening of training in agricultural technology, combined with

    agricultural structural adjustment implementation of the project, invited

  • 39

    experts with experience farming and breeding industry training,

    organizing the agricultural sector with the relevant professional and

    technical personnel to the scene to guide the improvement of agricultural

    technology, greenhouse vegetable cultivation techniques and poultry,

    livestock breeding technologies.

    In addition to the promised training in the implementation process,

    sludge sinotrans will be contracted to the affected villages, thus

    increasing the income of the affected villages.

    3. Labor resettlement measures of Shanghe sub-project:

    According to the project unit's internal monitoring reports, we know

    that "Project Unit provided opportunities for villagers to participate in

    project construction and the villagers got the direct benefits from the

    project construction. Job opportunities the villagers afforing were goven

    to affected villagers, so that the affected villagers got the direct benefits

    of the project construction. Meanwhile, in the construction process, the

    part of the transportation, food service, etc. also goven to the villagers, so

    they raise the level of income. "

    Learned through the investigation, Shang River Project Office

    respectively in March 29, 2008 and May 9 at Xushang offices have

    organized with 58 (first 26, second 32) to participate in skills training,

    training content are transportation, construction and other

    non-agricultural re-employment basic skills and technical training and

    intensive vegetable production technology, agricultural processing and

    technical training.

    5.6 Assessment

    The land requisition and resettlement of ADB loan projct has been

    finished. The project owners made land requisition, seedling and

    above-gound attachments compensation according to RAP. The living

    standards of APs are not decreased due to land requisition. The project

  • 40

    owners keep eyes on living restoration during land requisition. Besides

    normal compensation, they also hired temporary workers and other ways

    to increase APs’ income.

  • 41

    6. Monitoring and evaluation on public

    participation

    6.1 Monitoring the situationg of public participation

    According to the survey, during the process of the sub-project

    implementation using of Asian Development Bank loans Shandong Haihe

    River Basin pollution control, the attention to immigration (the affected

    people) participation and consultation, on immigration and the affected

    villagers a wide range of public mobilization. Embodied in the following

    aspects:

    The first aspect: the affected villagers

    1 / Affected villagers investigated were basic understanding of the

    contents of the project.

    2 / Affected villagers investigated were basic understanding of the

    project's relevant policies, regulations, compensation standards,

    resettlement programs.

    3 / Affected villagers investigated were basic understanding that

    when they are doubt and dissatisfaction in the relevant policies,

    regulations, compensation standards and so, it is necessary through the

    village to the town and district government departments to concern

    consult or complaint.

    The second aspect: the implementation of various subprojects

    1 / Convened the forum participated in by the affected villagers,

    village cadres, vulnerable groups (women) representatives, focus on

    intrucduct the progress of works and seek and carefully listen to their

    views and suggestions.

    2 / Organized a working group with the village committee in-depth

  • 42

    to the affected villages to talk the policies, regulations, compensation

    standards, resettlement programs.

    3 / During the process of resettlement and land acquisition of all

    subprojects, the municipal / county leaders (Mayor / vice mayor,

    Construction Committee Officer in charge of Deputy) were as the leader

    of resettlement leading group, chaired the resettlement meeting to discuss

    and consultation issues existing in construction and reply, explain and

    resolve on the practical problems raised by the village cadres.

    4 / Shanghe County sewage treatment project Office prepared and

    produced contact cards in order to more widely listene to the project

    resettlement aspects of feedback.

    6.2 Assessment on Public Participation

    Through visiting to a typical household, we found that all the

    villagers surveyed have a basic understanding of this project scope,

    compensation standards and relevant policies and regulations, etc., and

    were satisfactory with the compensation standard, compensation program

    and resettlement program.

    Up to the end of Dec., 2010, there are not appearing affected

    households/ persons dissatisfy or appeal for compensation standards,

    compensation package.

    This shows that sub-projects has done a great deal of fruitful work

    on public participation, meet the requirements and the basic desire of

    affected villagers, basically achieved its expected goals, which made

    migration, resettlement, the approach of compensation implementation,

    the implementation of scheme carring out normally.

  • 43

    List of Public Participation unit location date person Theme Content and problems Questions and answers

    Gaoting County Sewage Treatment Plant

    Gaotang sewage treatment plant on the third floor conference

    room

    2004.5

    Farmers, village leaders, local government

    officials

    For a feasibility study, we did the project compared

    and on-site survey

    We convened With the local government and the relevant departments to introduce the

    main technical standards, meaning

    Gaotang sewage treatment plant on the third floor conference

    room

    2004.8

    the affected farmers, county and

    township government

    officials

    the socio-economic adjustmentduring resettlement plans

    prepared

    Support the project and assist in the investigation, the

    village farmers support the project

    Gaotang sewage treatment plant on the

    second floor conference room

    2005.3County officials,

    the affected companies

    Survey on the preparation of resettlement plans

    The meaning, the advantages and disadvantages of different method of compensation / land

    adjustment were discussed

    Gaotang sewage treatment plant on the

    second floor conference room

    2005.5

    Project implementation

    agencies / departments concerned

    Information Disclosure and comments

    Generally agreed resettlement plan and compensation

    standards (draft)

    Gaotang sewage treatment plant on the

    second floor conference room

    2005.7 project officer

    Resettlement planning and implementation and signing the Resettlement

    report

    signing the resettlement plans

    Bingzhou County Sewage Treatment Plant

    Development Project Office 2006.7

    District Project Officer, Dudian

    officers, Li Xiaohai Village, the

    committee and village

    representatives of

    Views of the project site adjustion

    Specific location and adjustment reasons of the

    project adjusted

    The project site is transferred from road east to road wes,

    reduced the affected populations and benefit of land

    utilization.

  • 44

    unit location date person Theme Content and problems Questions and answers Shaotou Hanqian

    village

    Development Project Office 2006.10

    District Project Officer, Li Xiaohai

    Village, the committee and

    village representatives of Shaotou Hanqian

    village

    Compensation protocol negotiation

    Compensation standard and compensation methods

    Calculating according to national standards, the compensation method t decided by he village

    committee

    Li Xiaohai Village Committee 2006.11

    District Project Officer, Li Xiaohai

    Village, the committee and

    village representatives of Shaotou Hanqian

    village

    Determine compensation method

    Release time of compensation

    After signing the agreement, payed in December 2006

    Li Xiaohai Village Committee 2006.12

    District Project Officer, Li Xiaohai

    Village, the committee and

    village representatives of Shaotou Hanqian

    village

    Clean ground fixtures Clean-up manner and timing of the ground attachments

    Accordance with the relevant provisions of the development zone, the compensation is in

    place, there are village organizations to clean up

    during the period 7.

    Li Xiaohai Village Committee 2007.3

    District Project Officer, Li Xiaohai

    Village, the committee and

    village representatives of Shaotou Hanqian

    impact on environment after sewage treatment

    plant under construction

    During the construction of sewage treatment plant, and

    whether or had impact of noise and wastewater

    emissions

    During construction of sewage treatment plant, construction

    projects related strictly abide the state regulations,

    develop plans and take measures to strictly control the noise, dust and other domestic

  • 45

    unit location date person Theme Content and problems Questions and answers village wastewater

    Shanghe County Sewage Treatment Plant

    Tong Daokou village 2004.5 Village cadres, villagers, a total 20 Comparison program for

    a feasibility study Describes the main technical

    standards, meaning

    When Program choicing, trying to occupy fewer

    cultivated land and farmland

    Zhang Laozhuang village 2005.3

    Village cadres, villagers, a total

    150

    Survey on Readiness of resettlement plans

    discussing the meaning, advantages and disadvantages of the different compensation

    and land adjust ways

    In the information manual, prepared a summary report on resettlement, social issues to

    widely distribute

    Zhang Laozhuang village 2007.1

    Township, 12village

    representatives

    Amendment "Resettlement Plan"

    held discussions with township, village

    representatives about the situation of affected staff

    Tong Daokou village 2007.5 10 villagers Discussion we must pay close attention to start the construction Tendering

    Zouping Sewage Treatment Plant

    Urban Management Board Meeting Room

    2003.8.16 732 farm workers

    The basic situation of project and the next steps

    related personnel placement briefings

    After land acquisition, the works on farm how to place?

    After completed Zouping County Domestic Waste

    Treatment Plant, the farm permanent staff is 25 people

    and trained to enter the dump, the other five farmer will lease

    their land exchange.

    Daixi Villa 2004.12.15

    Asian Development Bank officials, county leaders,

    representatives of the masses

    The first public participation in forum on

    environmental impact

    After the Project completion, the county town living

    conditions how to improve?

    After completed Zouping County Domestic Waste

    Treatment Plant, this plant can consume garbage 400 tons and

    guarantee Zouping County 15-year, while the project adopts the most advanced

    sanitary landfill technology, so that minimize the pollution

    risk.

    Daixi Villa 2005.4.20 Asian Development

    Bank officials, The second public

    participation in forum on Project construction had any

    effect onthe surroundind Zouping County Domestic

    Waste Treatment Plant carried

  • 46

    unit location date person Theme Content and problems Questions and answers county leaders,

    representatives of the masses

    environmental impact residents? out in strict according with state regulations and avoid all

    kinds of impact to the surrounding residents.

    Project site 2006.8 732 staff

    representatives and villagers

    The basic situation of project

    Working in the garbage disposal plant, if there are any

    harmful pollution?

    In waste disposal plant the employees were strictly

    according with the provisions of labor induction and all

    kinds of protective measures was in place according with

    regulations.

    Linqing Sewage Treatment Plant

    Municipal Meeting Room 2004.5

    City functional departments and representatives of Guan Xin village

    Relocation and resettlement

    compensation and land acquisition

    Strongly supports the construction of new landfills, the request for compensation

    in place in time.

    Ensure compensation in place and timely

    Shicheng district 2004.7.16

    Municipal functions departments and the

    brick factory workers

    Carried out a questionnaire on the

    residents

    Unanimously supported the construction of garbage dumps, in line with the principle of what one is

    willing to pay for municipal solid waste fees

    As soon as possible to improve sanitation standards

    Project site 2004.11.10

    Municipal functions departments and the

    brick factory workers

    Announcement compensation standard

    Agreed compensation standard to get funding as

    soon as possible

    No comment immediately implementation

    Gaotang Quanlin Hotel

    2004.12.16

    City functional departments and

    project in-sitesrepresentativ

    es

    Ideas and suggestions on theproject Strong support, no comments

    Zouping daixi Hotel 2005.4.20

    City functional departments and

    project

    Public participation in the forum Strong support, no comments

  • 47

    unit location date person Theme Content and problems Questions and answers in-sitesrepresentativ

    es

    municipal government 2005.1

    City functional departments and

    project in-sitesrepresentativ

    es

    The establishment of City Project Office

    Set up an office telephone, the complainant Tel:

    06,352,511,626

    Linyi

    Sewage Treatment Plant

    Linyi project office 2007.10.18

    project officers, project affected persons and the

    surrounding masses, a total of

    17

    Learn more about the public attitude towards

    the project

    The villagers had mainly in the surrounding villages after the completion of the project

    some concerns about environmental issues, feared that contamination will affect

    the normal life and production.

    Project Office made clear attitude, after the project

    completed, it will operate in strict accordance with waste

    disposal process to meticulous disinfection, kill flies, dust,

    and other work to ensure less interfere around people.

  • 48

    unit location date person Theme Content and problems Questions and answers

    Linqing Sewage Treatment Plant

    Linqing 2006.8

    leaders of Linqing Municipal People's Government, Linyi City Development Planning Bureau,

    Linqing Municipal Environmental

    Protection Bureau, Linqing Municipal

    Authority, the design units and 40

    representatives from various

    participants, a total of 65.

    Understand the affected villagers’ ideas and

    requirements, collection advice and

    recommendations.

    1, The construction started as soon as possible and put into

    operation to benefit local people.

    2, we must carefully select the sewage pipe network

    construction units and supervision units, and

    strengthen on-site management. The project

    must take seriously measures to abate various pollutions. 3, we must carefully select

    the pipe material, thoroughly to prevent counterfeiting

    4, before construction, the project informed the shops

    in advance 5, it is recommended

    sub-construction, try to shorten the construction time.

    6, After completed pipe laying, the road must be

    recoveried as soon as possible

    Before the pipe network construction, notice the

    detailed implementation plan, including project overview,

    construction plans, construction units, supervision units. Reducing the impact on affected shops by engineering and environmental protection

    measures, complaints and suggestions were bulit. During construction, the construction is strictly according with the

    construction program and strengthen on-site

    managementand minimize the impact on shop.

  • 49

    7. Monitoring and evaluation on IOM

    operation and efficiency

    According to the survey, in accordance with ADB's relevant

    requirements and "Resettlement Action Plan" arrangement, under the

    guidance and supervision of PMO in Shandong Province, all of seven

    subprojects set up the resettlement agency, which was component by the

    relevant government departments , Planning Bureau, Construction Bureau,

    Land Bureau, Finance Bureau, the Home and Social Security Bureau, the

    project office, the project is located office / township government and the

    administrative villages affected by the project. Land requisition was

    implied by the Land and Resources Branch of the specific and the

    implementation and resettlement team monitored.

    Seeing from the resettlement agencies, we knew that the setting is

    reasonable and responsibilities are clear.

    Seeing from the staffing of placement agency, we knew that the

    personnel’s engaged in the work culture was high-quality, in addition to

    the village committee members, most of the staff have a college degree or

    above and have some work experience, who can be able to meet the the

    actual job requirements.

    Since the resettlement organizations to be set up, everything is

    running normally, higher efficiency, in the land acquisition, compensation,

    resettlement, personnel training, public participation, financial

    management, etc. played an important role.

  • 50

    8. Conclusions and Recommendations

    8.1 Conclusions

    (1) Each project is clearly responsibilities, operate better-performing,

    can seriously fulfill their respective responsibilities and tasks.

    (2) Permanent land requisition imply the relevant policies

    of"Resettlement Action Plan", the procedures of land requisition

    compensation were legal, norms, methods correctly; embodiment of

    justice, fairness and openness; compensation funds in place was in time,

    to meet the capital requirements of land acquisition and resettlement.

    (3) As of January 2010, the permanent land requisition of all

    sub-projects has been fully completed, compensation has been paid;

    affected villagers in general satisfied, psychological relatively stable,

    family life has not been affected by land acquisition. Subproject units

    have submitted"Resettlement Completion Report." to the Asian

    Development Bank in September 2009.

    (4) The completion of sub-project temporary covers an area

    compensation and rehabilitation was although not the same, but through

    on-site survey, the temporary use of land pipeline network in sub-projects

    was compensaed and recoveried in accordance with the relevant design in

    "Resettlement Plan".

    (5) Affected villagers knew the channel of appeal when their rights

    have been violated, a channel for complaints and appeals were smooth,

    and project units set up a complaints hotline and released the numbers,

    designated personnel to answer the call of the relevant.

    (6) The end of this reporting period, all sub-projects have not

    occurred complaints because of land acquisition relocation and

    compensation.

  • 51

    8.2 Assessment

    During implementation, the resettlement organ actively carried out

    public participation, consulting compensation standard, coordinating

    works and monitoring the payment of compensation fees. All the

    sub-project units finished their resettlement work, which apply with the

    requirements of ADB.