    SMS in Practice- Information Gathering and RiskManagementSMS Seminar & WorkshopOctober 25/26 2007Tokyo, Japan

    Michael Mugridge, BCommManager, Quality ServicesAir [email protected]

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    2/65

    2

    Background: Air Canada Legacy Systems

    British Airways Safety Information System(BASIS): only used by Flight Operations, Flight

    Safety SurPass Audit Software:

    only used by Maintenance

    Parklane Injury system only used for reporting of personal injuries

    for claims purposes

    Discrete systems which did not communicate

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    3/65

    3

    Decision made by the Executive toconsolidate:

    Document Control; Audits; Safety Reporting; and

    into a single Information Managementtool

    Background: Air Canada Legacy Systems

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    4/65

    4

    Benefits of Integration

    help meet Transport Canada SMS andIOSA requirements

    one taxonomy model

    one risk model

    efficiencies with respect to operations andmaintenance of a single it system

    standardization of functionality across the

    business units easier Corporate reporting

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    5/65

    5

    The Software Solution:

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    6/65

    6

    EtQ Reliance Web-based, enterprise system for Quality

    Management.

    Flexible Workflow Engine, it allows: workflows

    forms fields,

    reports

    to be configured without programming. In other words build your system

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    7/65

    7

    Reliance Notifications E-mail notifications can be used to:

    Notify users that they have a task to perform e.g.

    > Approve a document> Complete an audit checklist> Do a risk assessment

    Notify users when they are late

    Provides hyperlink directly to document.

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    8/65

    8

    Three Principle Modules Implementation

    at Air Canada

    small grouptrials

    Safety Reporting

    ImplementedAudit and

    Corrective/Preventive Action

    ImplementedDocument Management

    and Control

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    9/65

    Document Control

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    10/65

    10

    Document Management and Control For company policy and procedure documents

    Provides control over source documents (e.g.Microsoft Word)

    Automates: creation of draft copy;

    review and comment; approval (includes Transport Canada approval);

    etc.

    Provides a central repository for current; and archived documents

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    11/65

    11

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    12/65

    12

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    13/65

    13

    Document Control FeaturesApproved documents areseparated from Drafts

    (Pending)

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    14/65

    14

    Document Control Features (contd)

    Draft (Pending) documents travel through a

    workflow for all value-added work: review and comment, approvals; translation;

    printing, distribution, uploading; etc

    Draft

    Review &

    Comment

    Internal

    Approval Approved

    Regulatory

    Approval

    PENDING

    APPROVED

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    15/65

    15

    Document Control Features (contd)

    Approved

    ARCHIVED OBSOLETE

    [automatic]

    Manual Archive

    Superseded documents are automaticallyarchived

    Obsolete documents may be manually archived

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    16/65

    16

    Document Control Features (contd)Reliance can monitor a documents date and

    warn (via e-mail) of potentially outdated

    content

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    17/65

    17

    Reliance screen

    E-mail

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    18/65

    Audit and Corrective & Preventive Action

    (CAPA)

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    19/65

    19

    Question Bank (question profiles) Each audit question only exists once.

    If question is revised, all checklists using that

    question are updated. Questions are revision controlled

    Old versions are archived.

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    20/65

    20

    Audit Templates Checklist templates points to questions in

    question bank

    Audit template point to checklists

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    21/65

    21

    Question Bank

    Audit Templates

    Audit type 1

    Audit type 2 QuestionQuestionQuestion

    Checklist 3

    Question

    QuestionQuestionChecklist 2

    QuestionQuestionQuestion

    Checklist 1

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    22/65

    22

    Audit Records Creating an audit of a certain type

    copies the template contents intorecords.

    Templates remain untouched.

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    23/65

    23

    Audit Document (Record)

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    24/65

    24

    Checklist Document (Record)

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    25/65

    25

    Question Document (Record)

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    26/65

    26

    Audit Record Workflows

    Lead auditor can manage the audit record and assignchecklists to individual auditors for completion

    Draft Scheduled In Progress Accomplished Closed

    Audit Record

    Draft Assigned Completed

    Checklist Document

    Draft Completed

    Question Document

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    27/65

    27

    Audit Corrective Action

    LinksCAPA are automatically linked to the Audit Report

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    28/65

    28

    Audit Corrective Action

    Links Audit question contains link to CAPA

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    29/65

    29

    CAPA Document Workflow

    DraftCorrective

    Action Plan

    CAP

    Approval

    ImplementationVerification &

    Effectiveness *Completed

    Auditor

    Auditee

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    30/65

    30

    Fields - Draft

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    31/65

    31

    Fields Draft (contd)

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    32/65

    32

    Root Cause Analysis

    Uses HFACS model which will be covered inthe Safety Module

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    33/65

    33

    Fields - Corrective Action Plan

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    34/65

    34

    Fields - Implementation

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    35/65

    35

    Fields Verification and Validation

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    36/65

    36

    Output Reports Audit

    WebFocus: Web-based reporting tool

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    37/65

    37

    Sample Report

    Pdf but can be other format

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    38/65

    Safety Reporting

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    39/65

    39

    Safety Reporting

    Provides a single, platform for reporting safetyevents and hazards / concerns

    Used by several different Branches andBusiness Units

    Uses intuitive Risk Assessment Model (IRAM)

    and root cause analysis/causal factors model(HFACS)

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    40/65

    40

    Occurrence Form

    Contains approximately 200 fields

    Shows / hides sections/fields depending on

    user entries e.g. Disruptive passenger

    Environment

    Injury Turbulence

    Equipment damage

    Fuel dump

    O W kfl

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    41/65

    41

    Occurrence Workflow

    Draft Investigate

    Review

    WithManagement

    Finalize

    Report Finished

    Risk

    Assessment

    Low risk

    High risk

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    42/65

    42

    Phase - Draft

    Employee checks box to determine type of report

    Ph D ft G l S ti

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    43/65

    43

    Phase Draft: General Sections

    Ph D ft G l S ti

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    44/65

    44

    Phase - Draft: General Sections

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    45/65

    45

    Phase - Draft: Context Specific Sections

    plus context specific sections

    Occurrence Workflow

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    46/65

    46

    Occurrence Workflow

    Draft Investigate

    Review

    WithManagement

    Finalize

    Report Finished

    Risk

    Assessment

    Low risk

    High risk

    Risk

    Assessment

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    47/65

    47

    Risk Assessment

    Air Canada has developed an intuitive RiskAssessment Matrix

    Provides guidance words to front-line staff tomake quick assessments without statistics

    User chooses:

    Probability of occurrence Severity of outcome

    The matrix provides a direction letter AD

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    48/65

    48

    Guidance Words

    Exist for the following possible incidentoutcomes:

    Injury Illness

    Aircraft damage

    Equipment / facility damage

    Safety of flight

    Environmental

    Regulatory

    Security

    Sample Guidance Words for Severity for

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    49/65

    49

    Sample Guidance Words for Severity forSafety of Flight

    Low; activation of a safety system or safety procedure with correct crew response an avoidance maneuver that is deemed not to have been required loss of single primary system with redundant system available. smoke, smell, or fire/spark that was brief, identifiable, and extinguished

    Medium; activation of a safety system or safety procedure followed by an incorrect crew

    response, which however did not result in an increased safety threat an avoidance maneuver that is deemed to have been required loss of multiple primary systems with redundant systems available an un-commanded flight control input that is easily counter controlled.

    smoke, smell, or fire that was prolonged and identifiable, but contained orextinguished. High;

    activation of a safety system or safety procedure with incorrect response whichdid result in an increased safety threat

    an avoidance maneuver that is deemed to have been aggressive or prolonged loss of a primary system with no redundant system available

    an un-commanded flight control input that is difficult to counter control smoke, smell, or fire that was prolonged and not identifiable, or not contained,

    or not extinguishable. Critical;

    hull loss

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    50/65

    50

    Risk Assessment The Challenge

    How to make all the guidance wordsavailable via the software?

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    51/65

    51

    Phases Risk Assessment

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    52/65

    52

    Selecting the Appropriate Severity

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    53/65

    53

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    54/65

    54

    Phases Risk Assessment

    The overall risk for an incident is the highestrisk for any one outcome

    The employee is also provided with direction

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    55/65

    55

    Risk Assessment - Example

    Occurrence Workflow

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    56/65

    56

    Draft Investigate

    Review

    WithManagement

    Finalize

    Report Finished

    Risk

    Assessment

    Low risk

    High risk

    Investigate

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    57/65

    57

    Phases Investigation and Recommendation

    Investigate: Supervisor or trained investigatorperforms investigation: Executive Summary of Occurrence Factual Information of Occurrence Analysis of Occurrence Findings

    Recommendations (Corrective and PreventativeActions)

    Categorizes the incident various ways HFACS

    Immediate Effect Incident Category

    I id t R t

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    58/65

    58

    Incident Report

    I ti ti D t il

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    59/65

    59

    Investigation Details

    Occurrence Causal Factors is the HFACS field

    Human Factors Accident ClassificationS t (HFACS) I l t ti

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    60/65

    60

    System (HFACS) Implementation

    User can choose asmany as needed

    Human Factors Accident ClassificationSystem (HFACS) Implementation

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    61/65

    61

    System (HFACS) Implementation

    Entire tree structure is captured to facilitate roll-up analysis

    Occurrence Workflow

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    62/65

    62

    Draft Investigate

    Review

    WithManagement

    Finalize

    Report Finished

    Risk

    Assessment

    Low risk

    High risk

    Review

    WithManagement

    Finalize

    Report

    Review and Finalize Phases

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    63/65

    63

    Review and Finalize Phases

    Review Review with responsible management to agree with

    Corrective Actions Finalize Report

    Investigator:

    > creates Corrective Action documents (same as

    Audit module)> Finishes report.

    Output Reports WebFocus

  • 8/3/2019 SMS 25 6 Mugridge AirCanada

    64/65

    64

    Output Reports - WebFocus

    Reports for Safety (accident, incident, concern)are being developed.