TPSE Requirements Specification
Product Description
TPSE Requirements Specification
Document Control
Document Information
Information
Document ID
Document Owner
Issue Date
Last Saved Date 17 July 2011
File Name document.doc
Document History
Version Issue Date Changes
0.1 Initial Document. Copied from “PD Product Descriptions Document
Oct09 v02.doc” with RACIE responsibilities added.
Document Approvals
Role Name Signature Date
1 of 31
TPSE Requirements Specification
Contents
1 Document Purpose 3
2 Product Description Composition 4
3 Product Description Quality Criteria 5
2 of 31
TPSE Requirements Specification
1 Document Purpose
The Purpose of this document is to:
Understand the detailed nature, purpose and function of the product
Identify the sources of information or supply of the product
Describe the required appearance of the product
Identify the level of quality required of the product
Enable identification of activities to develop and quality control the product
Define the people or skills required to develop and check the product
3 of 31
TPSE Requirements Specification
2 Product Description Composition
Product Description CompositionIdentifier SMS-S1.1-PD
Title TPSE Requirements Specification
Purpose This product will define ICT Environment and Infrastructure Configuration Requirements for the TPSE. The TPSE must enable the requirements of the SMS Application States to be met.
Phase: Build & Config
Composition This product will be comprised of the following:
1. Interim TPSE infrastructure and environment requirements
2. Full TPSE infrastructure and environment requirements
The product must:
Be based on the Constraints Model from Appendix D of PD (Mobilisation stage) Environment Hosting Strategy
Cover all logical environments defined in the Environment Hosting Strategy PD (Mobilisation stage).
Specify the requirements to meet the needs of all SMS activities to be performed in the TPSE including:
o Capacity, performance and reliability requirements
o Interface requirements
o Integration requirements
o Security requirements
o Disaster Recovery and Continuity Management requirements.
Consider the approach to virtualisation.
Consider the variances between technical environments at different TAFEs.
4 of 31
TPSE Requirements Specification
Product Description CompositionDerivation The product will be developed by referring to:
PD (Mobilisation stage) Environment Hosting Strategy Technical Architecture Documentation for TSM
Environment Establishment Plan
This product has relationships with the following products in this phase:Dependencies:
Peers:
Dependents:
Format and Presentation
Word 97-2003 document based on the standard template specified by the SMS PMO.
Responsibilities Responsible
Accountable Infrastructure Management Team (PV and TAFE ICT)
Consulted
Informed
Endorsed
Signatory
Quality Criteria The product will:
Conform to approved document conventions, standards and formats as specified by the PMO
Be consistent with the sources used to derive the product and
Address all areas identified in the product description.
Quality Method
Quality Tolerance
Entry Criteria:As per the Project Plan (includes dependencies).
Exit Criteria:
# KPI Precision
1. TAFE-ICT acceptance of the product 100%
2. Meets TPSE requirements 100%
5 of 31
TPSE Requirements Specification
Product Description Composition# KPI Precision
3. Number of unmitigated risks resulting from TAFE-ICT peer reviews
Zero
4. Number of issues (defects) resulting from TAFE-ICT peer reviews
Zero
5. Number of unauthorised changes made to the product
Zero
6. Effort required for re-work after the TAFE-ICT peer review process
Less than 5% of original effort
7. Number of items identified requiring remediation as a result of the PMO formal document checklist
Less than 5
8. Traceability to functional and non-functional requirements
100%
9. Coverage of functional and non-functional requirements
100%
10. Accuracy to the business requirements 100%
11. Consistent with standards, methodology and frameworks specified in the design strategy
100%
12. Integration points (inputs and outputs) defined
100%
13. Platform or environment dependencies identified
100%
14. Coverage of IT assets 100%
15. Consistency with the Business Process Design (BPD)
100%
16. Consistency with the Data Conversion Business Requirements Review
100%
17. Consistency with the Non-Functional Requirements Specification
100%
18. Consistency with the Interface Definition 100%
Product Duration: 12 days
6 of 31
TPSE Requirements Specification
Product Description Composition
Exceedance Criteria: 25% or 4 days (whichever is shorter), rounded to the nearest full day.
Quality Check skills and/or people required
Review of the product will require knowledge of technical infrastructure including operating systems, server and client hardware, databases, virtualisation and networking including TSM product requirements.
3 Product Description Quality Criteria
The purpose is clear, unambiguous, and consistent with other products The product is described to a level of detail sufficient to plan and manage its
development The composition of the product describes the contents/elements of the
product, rather than being a requirements specification Responsibility for the development of the product is clearly identified Responsibility for the development of the product is consistent with the roles
and responsibilities described in the project management team organisation and the Project Quality Plan
The quality criteria are consistent with the project quality standards, standard checklists and Acceptance Criteria
The quality criteria can be used to determine when the product is fit for purpose
The types of quality check required are able to verify whether or not the product meets its stated quality criteria
4 Key Performance Indicators
4.1 Foundation
The TAFE ICT SMS project encompasses a broad range of software development and support services. The SMS Strategies propose approaches to planning, solution design, development and implementation activities, and identify a number of deliverables (or ‘products’). To support the management of software and service quality, and also to provide measurable quality and suitability criteria to the contract negotiation, a framework of acceptability criteria and key performance indicators was developed. This document utilises the framework for such criteria for a subset of SMS deliverables and delivery processes, as illustrated below.
7 of 31
TPSE Requirements Specification
Solution• Performance Measures
Strategies
Data
Solution
Infrastructure
Application
Project KPIs
Products• Quality &
Acceptance Criteria
TPSEInterim TPSE TAFE
Services• Service
Level Agreements
PD208 Test Strategy
PD204 Conf iguration Management Strategy
PD203 Release Management Strategy
PD202 Support and Service Strategy
PD209 Design Management Strategy
PD207 Deployment StrategyPD205 Environment
Hosting Strategy
PD206 Data Management Strategy
• Sof ter KPIs• Requires Objectivity
• Service Requests• Defects & Incidents• Operational Hours• Uptime
• Responsive• Reliable• Functional
PD210 Product Description
Development
PD212 Draf t Service Specif ications Development
Figure 1 - Source and Categories for KPIsProduct KPIs are defined to assess the acceptability of this deliverable. To structure KPI definition across the project scope, products are classified by type (the kind of deliverable -- Plan, Framework, Support process, Service Specification, Agreement, Requirement, Design, Script, and Report).
The KPIs in this document are applicable to SMS Phase 1.1 only (see figure, below). KPIs are directly applicable to, and can be used as a basis for, subsequent SMS program phases.
8 of 31
TPSE Requirements Specification
Phase 1.1 Phase 1.2
Phase 2.1
Phase 3.1
Support for Upgrade activities
Support for ALL Sites
Phase 3.2
8 SitesPILOT
(PIR)
TAFE
Other Sites ...
Phase 2.2
Single Configuration State
Scope is:
• 2x QLS Sites and one PIR
• 3 remaining non-QLS sites
• Support
TPSE Infrastructure
Data
Solution
Application
Other SitesSwinburne
Holmesglen
Box Hill Institute
Other Sites ...
• TPSE inf rastructure is constant
• Applicable to TAFEs and Dual Sectors
Figure 2 - SMS Project Phases
The KPIs herein are used as a mechanism to control service provider quality and behaviour in outsourcing arrangements, driving the desired business outcomes and are defined based upon anticipated priority areas.
4.2 Outcomes
Refer to the Quality Tolerance
4.3 Services
Design Management# Service
TA
FE
ICT
TA
FE
Tec
hn
olo
gyO
ne
Plu
s+
Imp
lem
enta
tio
n
Ser
vice
s
Description Notes
1.Design services required for SMS Application State(s) Data, Live Pilot TAFE Data and all other TAFEs Data.
2.Design Management
Interface design and build to cover for interfaces as agreed for the TPSE and then for
9 of 31
TPSE Requirements Specification
ALL TAFE institutes (for all phases)
3.Design Management Planning
C C A+R
Development of the design management plan for each phase of the TPSE and each specific TAFE implementation.
4.Ongoing Design Management
C C A+R
Ongoing project management of design and development activities
5.TechnologyOne Student Management Enhancements
6.Gap Business Research Study
R+E R+E
A+R
Undertake the gap business research study for each implementation of SMS. This study will ascertain approach to fulfilling additional/modified requirements.
Relationship with Stream 1 services TBC.Governance structure defined as per PD 800 to consider this split.
7.Specify non-functional requirements
R+E R+E
A+R
Document the non-functional requirements applicable for a particular SMS implementation.
8.Scope TechnologyOne Student Managememt Product Enhancements
C+E C A+R
Scope required changes to the TechnologyOne Student Management product.
Relationship with Stream 1 services TBC. Governance structure defined as per PD 800 to consider this split.
9.Develop TechnologyOne Student Managememt Product Enhancements
I I A+R
Develop and deliver enhancements to TechnologyOne Student Management.
Relationship with Stream 1 services TBC. Governance structure defined as per PD 800 to consider this split.
10.Represent Sector enhancements required
A+R
C C Representing ongoing Sector view of TechnologyOne Student Managememt enhancements required
10 of 31
TPSE Requirements Specification
11.TechnologyOne Student Management Application Configuration
Responsibilities of TAFE ICT & TAFE depend on SMS being implemented (TPSE v TAFE)
Interface design and build to cover for interfaces as agreed for the TPSE and then for ALL TAFE institutes (for all phases)
12.Develop Business Process Descriptions
C R A+R
Develop Business Process Descriptions including defining the target business processes for the particular SMS implementation.
Relationship with Stream 1 services TBC. Governance structure defined as per PD 800 to consider this split.
13.Prototype Application Configuration
C C A+R
Relationship with Stream 1 services TBC. Governance structure defined as per PD 800 to consider this split.
14.Data Takeup and Configure TechnologyOne Student Managememt
C C A+R
Relationship with Stream 1 services TBC. Governance structure defined as per PD 800 to consider this split.
15.Interface design
C C A+R
Design of interfaces including test stubs required..(internal and external)
16.Interface development
C C A+R
Development of interfaces including test stubs required. (internal and external)
17.Report design
C C A+R
18.Report development
C C A+R
19.Systems Integration
Responsibilities of TAFE
11 of 31
TPSE Requirements Specification
ICT & TAFE depend on SMS being implemented (TPSE v TAFE)
20.Solution Architecture Development
C C A+R
Provision of a solution architecture for all environments across all phases (includes all TAFEs and TPSE). Includes security architecture.
21.Architectural Oversight
C C A+R
Architectural QA of Solution Design and Development
22.Configure Custom Software Development Environments and Tools
Configure custom software development environments and tools.
23.Custom Software Design
C+E C A+R
Development of logical and physical design documents.
24.Custom Software Development
I I A+R
Development of custom software components including unit testing and peer review activities.
25.Operational Procedure Design
R R C Accountability with TAFE ICT for TPSE implementations or with TAFE for their own SMS
26.Governance of design
27.Joint Design Authority
A+R
R R Provision of inputs and reports to the Joint Design Authority
28.Design Specific Quality Assurance Services
29.Requirements Traceability
30.Requirements Traceability Matrix creation and maintenance
I C A+R
-
31.Audit of Requirements Traceability Matrix
A+R
- C -
32.Prototype demonstrations
A+R
R I - Demonstrations of prototypes to end users.
Relationship with Stream 1 services TBC. Governance structure defined as per PD 800 to consider this split.
33.Source code quality assurance
34.Independent code reviews
I I A R+E
Third Party Endorsement (not the ISP)
35.Code walkthroughs
- - A+ -
12 of 31
TPSE Requirements Specification
R36.
Automated validation of code I I A+
RI Automated validation of
code against coding standards including adherence to mandatory development practices including configuration management and unit test coverage.
37.Application configuration quality assurance
38.Audit of application configuration
I I A+R
Review by Student Management Expert consultant of application configuration developed.
Environment Hosting Management# Service
TA
FE
ICT
TA
FE
Tec
hn
olo
gyO
ne
Plu
s+
Imp
lem
enta
tio
n
Ser
vice
s P
artn
er Description Notes
1. Environment Hosting Agreement
Note: No hosting agreement is required for PROD as it is being hosted at the TAFEs.
2. TPSE Specifications
R C+E
A+R R Provisioning of a document that details the TPSE environment specifications for the purpose of establishing an environment hosting agreement
Selection and Approval of the hosting provider will happen during contract negotiation (assumption 5, Section 2.4 (PD 205)
3. Contract Terms and Conditions
C - A+R R The provisioning of an environment hosting agreement detailing contract terms and conditions
See also Contract Management (2.3)
4. Environment Establishment Plan
5. Vendor Development / Unit Testing / System Testing
I - A+R - Provisioning of a plan for the establishment of an application development / unit test / system test environment where all application development and testing (Custom code development and configuration) will take place.
Hosted at TechnologyOne Headquarters in Queensland.
6. Interim TPSEIncluding the
E - A+R R Provisioning of a plan for the establishment
Hosted at TechnologyOne
13 of 31
TPSE Requirements Specification
following staging environments:
Validate Delivered Software
Data Conversion
Business Process
of an Interim TPSE environment where limited testing can be preformed.
Headquarters in Queensland. No performance issues are expected. Timing for the duration of the Interim TPS is subject to SMS project plans.
7. TPSEIncluding the following staging environments:
Validate Delivered Software
Data Conversion
Business Process
System Integration Testing
Acceptance Testing
Training
E - A+R R Provisioning of a plan for the establishment of an outsourced TPSE environment where all software validation, Data Conversion, Business Process, System testing (integrated Application Code (vanilla & custom), Application Configuration, Data Management, Interfaces, Integration testing and Sociability testing) will take place.
Hosted independentlySIT will be on demand.,
8. TAFE Pre Production
E A+R
E C Provisioning of a plan for the establishment of a pre production environment where the TAFE release testing can occur prior to deployment to production systems.
Hosted at TAFE. Applicable to institutes that do not opt for the TPSE Pre- Production. TAFE are to build the infrastructure according to specifications provided by Prime. Prime to also specify the risks around the specification provided.
9. TAFE Production E A+R
C - Provisioning of a plan for the establishment of the production environment (including BAU environments such as training, disaster recovery, etc)
Hosted at TAFE
Training Strategy Product ownership is to be defined.
10. Preliminary Design - Infrastructure
11. Vendor Development / Unit Testing / System Testing
12. Preliminary Design - - A+R - Provisioning of a Preliminary Design that is to be conducted prior to detailed design.
14 of 31
TPSE Requirements Specification
During Preliminary Design it is expected that any TAFE sector specific Infrastructure Designs / constraints will be considered. Designs will be in accordance with DIIRD standards.
13. Preliminary Design Review (Infrastructure / Environments)
- - A+R - Provisioning of a preliminary design review where the results of peer reviews are assessed and preliminary design documents are reviewed.
RACI will be different for each environment depending on where it is hosted
14. Preliminary Design Review Feedback (Infrastructure / Environments)
- - A+R - All feedback from the preliminary design review will be considered for inclusion or update to the existing design in line with baseline configuration and baseline requirements and preliminary design documents will be updated and circulated for acceptance.
15. Interim TPSE
16. Preliminary Design C - A R Provisioning of a Preliminary Design that is to be conducted prior to detailed design.
During Preliminary Design it is expected that any TAFE sector specific Infrastructure Designs / constraints will be considered. Designs will be in accordance with DIIRD standards.
17. Preliminary Design Review (Infrastructure / Environments)
R - A+R - Provisioning of a preliminary design review where the results of peer reviews are assessed and preliminary design documents are reviewed.
18. Preliminary Design Review Feedback (Infrastructure / Environments)
C - A R All feedback from the preliminary design review will be considered for inclusion or update to
15 of 31
TPSE Requirements Specification
the existing design in line with baseline configuration and baseline requirements and preliminary design documents will be updated and circulated for acceptance.
19. Acceptance and signoff
E I A C Signoff of the preliminary design
20. TPSE
21. Preliminary Design of TPSE including the following logical environments:
Validate Delivered Software
Data Conversion
Business Process
System Integration Testing
Acceptance Testing
Training
C - A R Provisioning of a Preliminary Design that is to be conducted prior to detailed design.
During Preliminary Design it is expected that any TAFE sector specific Infrastructure Designs / constraints will be considered. Designs will be in accordance with DIIRD standards.
22. Preliminary Design Review (Infrastructure / Environments)
R - A+R - Provisioning of a preliminary design review where the results of peer reviews are assessed and preliminary design documents are reviewed.
RACI will be different for each environment depending on where it is hosted
23. Preliminary Design Review Feedback (Infrastructure / Environments)
C - A R All feedback from the preliminary design review will be considered for inclusion or update to the existing design in line with baseline configuration and baseline requirements and preliminary design documents will be updated and circulated for acceptance.
RACI will be different for each environment depending on where it is hosted
24. Acceptance and signoff
E I A C Signoff of the preliminary design
25. TAFE Pre Production
26. Preliminary Design R R A+R C Provisioning of a Preliminary Design that is to be conducted prior to detailed design.
16 of 31
TPSE Requirements Specification
During Preliminary Design it is expected that any TAFE sector specific Infrastructure Designs / constraints will be considered. Designs will be in accordance with DIIRD standards.
27. Preliminary Design Review (Infrastructure / Environments)
R R A C Provisioning of a preliminary design review where the results of peer reviews are assessed and preliminary design documents are reviewed.
RACI will be different for each environment depending on where it is hosted
28. Preliminary Design Review Feedback (Infrastructure / Environments)
C C A+R C All feedback from the preliminary design review will be considered for inclusion or update to the existing design in line with baseline configuration and baseline requirements and preliminary design documents will be updated and circulated for acceptance.
RACI will be different for each environment depending on where it is hosted
29. Acceptance and signoff
E S I - Signoff of the preliminary design
30. TAFE Production
31. Preliminary Design R R A+R C Provisioning of a Preliminary Design that is to be conducted prior to detailed design.
During Preliminary Design it is expected that any TAFE sector specific Infrastructure Designs / constraints will be considered. Designs will be in accordance with DIIRD standards.
32. Preliminary Design Review (Infrastructure / Environments)
R R A C Provisioning of a preliminary design review where the results of peer reviews are assessed and preliminary design documents are reviewed.
RACI will be different for each environment depending on where it is hosted
33. Preliminary Design Review Feedback (Infrastructure /
C C A+R C All feedback from the preliminary design review will be
RACI will be different for each environment depending on where it
17 of 31
TPSE Requirements Specification
Environments) considered for inclusion or update to the existing design in line with baseline configuration and baseline requirements and preliminary design documents will be updated and circulated for acceptance.
is hosted
34. Acceptance and signoff
E S I - Signoff of the preliminary design
35. Detailed Design – Infrastructure Test Environments
36. Vendor Development / Unit Testing / System Testing
37. Detailed Design - - A+R - Provisioning of a Detailed Design prior to development of the infrastructure environments.
38. Detailed Design Review (Infrastructure Environments)
- - A+R - Provisioning of a detailed design review where the results of peer reviews are assessed and detailed design documents are reviewed.
RACI will be different for each environment depending on where it is hosted
39. Detailed Design Review Feedback (Infrastructure Environments)
- - A+R - All feedback from the detailed design review will be considered for inclusion or update to the existing design in line with baseline configuration and baseline requirements and detailed design documents will be updated and circulated for acceptance.
RACI will be different for each environment depending on where it is hosted
40. Interim TPSE
41. Detailed Design of the Interim TPSE, including the following logical environments:
Validate Delivered Software
Data Conversion
Business Process
C - A R Provisioning of a Detailed Design prior to development of the infrastructure environments.
42. Detailed Design R - A+R - Provisioning of a RACI will be different
18 of 31
TPSE Requirements Specification
Review (Infrastructure Environments)
detailed design review where the results of peer reviews are assessed and detailed design documents are reviewed.
for each environment depending on where it is hosted
43. Detailed Design Review Feedback (Infrastructure Environments)
C - A R All feedback from the detailed design review will be considered for inclusion or update to the existing design in line with baseline configuration and baseline requirements and detailed design documents will be updated and circulated for acceptance.
RACI will be different for each environment depending on where it is hosted
44. Acceptance and signoff
E I A C Signoff of the detailed design
45. TPSE
46. Detailed Design of the TPSE, including the following logical environments:
Validate Delivered Software
Data Conversion
Business Process
System Integration Testing
Acceptance Testing
Training
C+E
- A R Provisioning of a Detailed Design prior to development of the infrastructure environments.
Independent third party endorsement of the design across all environments to be arranged by TAFE ICT
47. Detailed Design Review (Infrastructure Environments)
R - A+R - Provisioning of a detailed design review where the results of peer reviews are assessed and detailed design documents are reviewed.
RACI will be different for each environment depending on where it is hosted
48. Detailed Design Review Feedback (Infrastructure Environments)
C - A R All feedback from the detailed design review will be considered for inclusion or update to the existing design in line with baseline configuration and baseline requirements and detailed design documents will be updated and circulated for acceptance.
RACI will be different for each environment depending on where it is hosted
49. Acceptance and E I A C Signoff of the detailed
19 of 31
TPSE Requirements Specification
signoff design 50. Detailed Design –
Infrastructure Production Environments
51. TAFE Pre Production
R C A+R C Provisioning of a detailed design and specification for the Pre Production Environment.
RACI to be resolved. Verify comments
52. TAFE Production Environment
R R A+R C Provisioning of a detailed design for the Production Environment.
RACI to be resolved. Verify comments
53. Detailed Design Review (Infrastructure Environments)
R R A C Provisioning of a detailed design review where the results of peer reviews are assessed and detailed design documents are reviewed.
RACI will be different for each environment depending on where it is hosted
54. Detailed Design Review Feedback (Infrastructure Environments)
C C A+R C All feedback from the detailed design review will be considered for inclusion or update to the existing design in line with baseline configuration and baseline requirements and detailed design documents will be updated and circulated for acceptance.
RACI will be different for each environment depending on where it is hosted
55. Acceptance and signoff
E S I - Signoff of the detailed design
56. Capacity Planning for TPSE
C I A+R R Provision of environments and infrastructure usage reports for capacity planning and sizing
57. Build
58. Infrastructure
59. Vendor Development Environment/s
- - A+R - Build of the Development Environments for the TAFE SMS Solution
Hosted at TechnologyOne Headquarters
60. Interim TPSEIncluding the following staging environments:
Validate Delivered Software
Data Conversion
Business Process
C - A R Build of the Interim TPSE environments for SMS.
Hosted at TechnologyOne Headquarters
20 of 31
TPSE Requirements Specification
61. Cut-over of environments
I - A+R C Provision of all services related to the cut-over of the solution from the interim TPSE to the TPSE.
62. TPSEIncluding the following staging environments:
Validate Delivered Software
Data Conversion
Business Process
System Integration Test
Acceptance Test
Training
E - A R Build of the TPSE Environments for SMS (as per section 3.5 of the Environment Hosting Strategy-PD 205)
Hosted independently.Independent third party endorsement of the design across all environments to be arranged by TAFE ICT
63. TAFE Pre Production
C A+R
E - Build of the TAFE Pre Production Environments for the TAFE SMS Solution
Hosted at TAFE
64. TAFE Production C A+R
E - Build of the TAFE Production Environments for the TAFE SMS Solution
Hosted at TAFE
65. Vendor Baseline Baseline Applications to be loaded
66. Hardware - - A+R C Setup and testing of all hardware in accordance with the design specifications
67. Supporting Software / Tools
- - A+R - Installation and testing of software / tools in accordance with the design specifications.
This will include: Operating
Systems Security Database
Server Software
Application Server Software
Web Server Software
Virtualisation Technologies
Monitoring Messaging
Operating systems, ICT infrastructure and known tools are defined in the Constraints Model section of the Environment Hosting Strategy (PD205). Some tools are currently under review.
68. Satellite Applications
C - A+R - All satellite applications are to be installed and tested in
"Stubs"will be used for the Library Management System,
21 of 31
TPSE Requirements Specification
accordance with the design specifications.
This will include: Finance Time Tabling Library
Management System
ID Management
Learning Management
ID Management and Learning Management Systems. TechnologyOne Financials and Celcat Timetabling full products will be used for the Finance and Time Tabling Interfaces.
69. TPSE Baseline Baseline Applications to be loaded
70. Hardware for following environments:
Validate Delivered Software
Data Conversion
Business Process
System Integration Testing
Acceptance Testing
Training
E - A R Setup and testing of all hardware in accordance with the design specifications
Independent third party endorsement of the design across all environments to be arranged by TAFE ICT
71. Supporting Software / Tools
C - A R Installation and testing of software / tools in accordance with the design specifications.
This will include: Operating
Systems Security Database
Server Software
Application Server Software
Web Server Software
Virtualisation Monitoring Messaging
Includes the provisioning all suitable upgrades, patches, bug fixes in the environment.
72. Satellite Applications
C - A R Installation and testing of satellite applications in accordance with the design specifications
This will include: Finance
Time Tabling Library
Assumption: 5 common satellite
applications will be loaded. As an option
we could possibly use "stubs".
22 of 31
TPSE Requirements Specification
Management System
ID Management
Learning Management
73. TAFE Baseline Baseline Applications to be loaded
74. Capacity Planning for TAFE
C R A+R C Provision of environments and infrastructure usage reports for capacity planning and sizing for individual TAFEs (including PILOT)
75. Hardware C A+R
E - Setup and testing of all hardware in accordance with the design specifications
76. Supporting Software / Tools
C A+R
E - Installation and testing of software / tools in accordance with the design specifications.
This will include: Operating
Systems Security Database
Server Software
Application Server Software
Web Server Software
Virtualisation Monitoring Messaging
77. Satellite Applications
C A+R
E - All satellite applications are to be installed and tested in accordance with the design specifications
This will include: Finance Time Tabling Library
Management System
ID Management
Learning Management
Assumption: all applicable satellite applications will be loaded. As an option we could possibly use "stubs".
78. Test (PD208 Test Strategy)
79. TPSE
23 of 31
TPSE Requirements Specification
Infrastructure80. Application
Environment Test (Operation & Connectivity)
C I A R Establish all Development, Testing and Pre Production Environments and ensure that the environments are fully operational at all times.
81. Database Environment (Operation & Connectivity)
C I A R Establish all Database Development, Testing and Pre Production Environments and ensure that the environments are fully operational at all times.
82. Backup, Recovery and Restoration Services Infrastructure
C I A R Provide Specifications for Backup, Recovery and Restoration Services to the SMS Project Team (e.g., UPS, Tape Drives, DRP, etc).
This is for the baseline infrastructure
83. Throttling I - A+R R Includes throttling of various components of the SMS to ensure performance
84. TAFE Infrastructure
85. Application Environment Test (Operation & Connectivity)
C+E
A+R
C+E - Establish all Development, Testing and Pre Production Environments and ensure that the environments are fully operational at all times.
86. Database Environment (Operation & Connectivity)
C+E
A+R
C+E - Establish all Database Development, Testing and Pre Production Environments and ensure that the environments are fully operational at all times.
87. Backup, Recovery and Restoration Services Infrastructure
C+E
A+R
C+E - Provide Specifications for Backup, Recovery and Restoration Services to the SMS Project Team (e.g., UPS, Tape Drives, DRP, etc).
This is for the baseline infrastructure
88. Other Infrastructure Tests
89. Web Services Environment (Operation & Connectivity)
E C A R Establish all Web Services Development, Testing and Pre Production Environments and ensure that the
C-TAFE to be consulted and involved during infrastructure tests at the TAFE sites.
24 of 31
TPSE Requirements Specification
environments are fully operational at all times.
90. Desktop Sociability Environment Establishment
E C A R Establish a Desktop Sociability Testing Environment.
91. Desktop Sociability Environment (Operation & Connectivity)
E C A R Establish a Desktop Sociability Testing Environment.
at TAFEs
92. EAI/Messaging Environment (Operation & Connectivity)
E C A R Establish all EAI/Messaging Development, Testing and Pre Production Environments and ensure that the environments are fully operational at all times.
93. Environment Availability Plan
94. Interim TPSE C I A R Provisioning for a plan which identifies when the environments will be available.
95. TPSE C I A R Provisioning for a plan which identifies when the environments will be available.
96. TAFE C A+R
C - Provisioning for a plan which identifies when the environments will be available.
97. Environment Booking Process
98. Interim TPSE C I A R Provisioning for an environment Booking Process which identifies how to book access to an environment. An availability schedule will be published for the SMS Project team on a weekly basis to ensure visibility of the environment availability. It is anticipated that an electronic booking request will be lodged and a confirmation will be sent to the requestor informing them of the outcome of the request. This notice will occur within 24 hours of the request being raised.
99. TPSE C I A R Provisioning for an environment Booking
25 of 31
TPSE Requirements Specification
Process which identifies how to book access to an environment. An availability schedule will be published for the SMS Project team on a weekly basis to ensure visibility of the environment availability. It is anticipated that an electronic booking request will be lodged and a confirmation will be sent to the requestor informing them of the outcome of the request. This notice will occur within 24 hours of the request being raised.
100.TAFE C A+R
C - Provisioning for an environment Booking Process which identifies how to book access to an environment. An availability schedule will be published for the SMS Project team on a weekly basis to ensure visibility of the environment availability. It is anticipated that an electronic booking request will be lodged and a confirmation will be sent to the requestor informing them of the outcome of the request. This notice will occur within 24 hours of the request being raised.
101.Environment Access Process
102.Interim TPSE C I A R Provision for an environment access and authorisation process which identifies the requirements for secure access (Onsite or remote) to an environment. It is anticipated that environments will be available via remote
26 of 31
TPSE Requirements Specification
access (Web Services, Secure VPN, etc)
103.TPSE C I A R Provision for an environment access and authorisation process which identifies the requirements for secure access (Onsite or remote) to an environment. It is anticipated that environments will be available via remote access (Web Services, Secure VPN, etc)
104.TAFE Pre Production (New & Legacy)
C A+R
C - Provision for an environment access and authorisation process which identifies the requirements for secure access (Onsite or remote) to an environment. It is anticipated that environments will be available via remote access (Web Services, Secure VPN, etc)
105.TAFE Production (New & Legacy)
C A+R
C - Provision for an environment access and authorisation process which identifies the requirements for secure access (Onsite or remote) to an environment. It is anticipated that environments will be available via remote access (Web Services, Secure VPN, etc)
106.Environment Management Processes (ITSM/ITIL)
107.Incident Management
I - A R Provision of an effective incident management process to restore normal SMS operation (within SLAs) in TPSE as quickly as possible and minimize the adverse impacts of business operations, thus ensuring that the best possible levels of
27 of 31
TPSE Requirements Specification
service quality and availability are maintained
108.Problem Management
I - A R Provision of processes to resolve the root-cause of any incidents related to TPSE.
109.Event Management I - A R Provision of processes to proactively monitor to detect events, analyse them and determine the appropriate control action related to TPSE.. Event Management is the basis for monitoring and control of the operational SMS.
110.Capacity and Performance Management
I - A R Provision of services to ensure current and future capacity and performance demands of SMS users are delivered in a cost-effective manner in TPSE.
111.IT Service Continuity Management
CI - A R Provision of Business Continuity Plans of each TPSETAFE by ensuring that relevant IT infrastructure and SMS services can be recovered within required and agreed business timescales.
112.Service Level Management
CI - A R Provision of processes to ensure the agreed level of service is established in TPSE (to be agreed as part of the contract) and provided for each SMS and ensure that the service delivered achieves the targets. In addition, customer satisfaction with the SMS should be monitored and proactively improved.
113.Security Management
CI - A R Provision of services in TPSE to ensure SMS security is aligned with business security requirements and ensure that information security is effectively managed in all SMS
28 of 31
TPSE Requirements Specification
activities. Information Security Management ensures that confidentiality, integrity and availability of SMS related assets, information and data is maintained
114.Knowledge Management
I - A R Provision of services to maintain relevant documentation that enables the service provider to provide a high level of Support and continually improve. The purpose of Knowledge Management is to ensure that the right support person has the right knowledge, at the right time to support the SMS.
115.Infrastructure Management
I - A R Provision of management processes to effectively manage ICT infrastructure.
116.Environment Service Level Agreements
117.Interim TPSE R I A R Provision for an Environment Service Level Agreement to ensure that any planned or unplanned outages are managed and that Environments are made available in a timely manner.
118.TPSE R I A R Provision for an Environment Service Level Agreement to ensure that any planned or unplanned outages are managed and that Environments are made available in a timely manner.
119.TAFE Pre Production (New & Legacy and interfaces)
C A+R
C - Provision for an Environment Service Level Agreement to ensure that any planned or unplanned outages are managed and that Environments are made available in a timely manner.
120.TAFE Production C A+ C - Provision for an
29 of 31
TPSE Requirements Specification
(New & Legacy) R Environment Service Level Agreement to ensure that any planned or unplanned outages are managed and that Environments are made available in a timely manner.
121.Environment Decommissioning
122.Vendor Development / Unit Testing / System Testing
- - A+R - Decommissioning of environment
123.Interim TPSEIncluding the following staging environments:
Validate Delivered Software
Data Conversion
Business Process
C I A+R Decommissioning of environment
124.TPSE Including the following staging environments:
Validate Delivered Software
Data Conversion
Business Process
System Integration Test
Acceptance Test
Training
C I A R Decommissioning of environment
125.TAFE Legacy C A+R
- C Decommissioning of environment
30 of 31