DAFTAR HARGA UPAH DAN BAHAN NO URAIAN SATUAN KET. 1 2 3 4 5 A. UPAH PEKERJA HARIAN 1 Pekerja OH 45,000.00 2 Tukang Batu OH 60,000.00 3 Tukang Kayu OH 60,000.00 3 Kepala Tukang OH 75,000.00 4 Mandor OH 70,000.00 B. HARGA BAHAN 1 Tanah urug 49,000.00 2 Pasir urug 110,000.00 3 Pasir pasang (beton) 110,000.00 4 Kerikil (beton) 110,000.00 5 Pasir pasang (beton) kg 78.57 6 Kerikil (beton) Kg 81.48 7 BatuKali/batu belah (15/20) cm 180,000.00 8 Batu bata Bh 600.00 9 Semen Portland @ 40 Kg kg 1,075.00 10 Semen warna Kg 2,125.00 11 Keramik dinding 20 x 25 cm Bh 3,000.00 12 Keramik lantai 20 x 20 cm anti slip Bh 2,900.00 13 Keramik 30 x 30 cm Bh 4,000.00 14 Keramik lantai 40 x 40 cm Bh 9,500.00 15 Keramik lantai 40 x 40 cm kulit jeruk Bh 10,000.00 16 Bonbon keramik setelah dipasang Bh 15,000.00 17 Besi beton polos kg 13,000.00 18 Besi beton ulir kg 15,000.00 19 Besi Strip kg 19,000.00 18 Kawat beton kg 19,000.00 19 Paku kg 16,000.00 20 Paku seng kg 16,000.00 21 Paku Scrup kg 16,000.00 22 Seng Genteng Metal 0.30 42,000.00 23 Rabung Genteng Metal 21,200.00 24 Kayu Seumantok/Damar laut ( Kelas I) 4,700,000.00 25 Kayu rangka atap klas II (sejenis semb 3,500,000.00 26 Kayu rangka plafond (sejenis sembarang 2,900,000.00 27 Kayu bekisting Kelas III 3,100,000.00 Papan Kayu (Kelas II) 3,500,000.00 28 Kayu Dolken Ø 8 - 10 cm Btg 10,000.00 Kaso-Kaso 1,800,000.00 29 Lem kayu Bh 15,000.00 29 Plywood Tebal 4 mm Lbr 70,000.00 30 Tripleks Tebal 4 mm Lbr 76,000.00 31 Gypsum Board 9 mm Lbr 39,000.00 32 Calsi Board 6 mm Lbr 42,000.00 33 List Kayu Profil 3,900.00 List Profil Gypsum 12,000.00 Tepung Gypsum kg 15,000.00 34 Kaca 5 mm 99,000.00 35 Cat meni kayu/besi kg 23,000.00 36 Cat minyak kg 42,000.00 37 Cat Dasar kg 17,000.00 38 Cat Tembok kg 17,000.00 38 Dempul/Plamir kg 19,000.00 39 Minyak bekisting ltr 10,000.00 40 Kertas amplas Lbr 2,000.00 41 Kloset duduk Bh 1,400,000.00 42 Kloset jongkok Bh 129,000.00 43 Wastafel Bh 549,000.00 HARGA (Rp) m 3 m 3 m 3 m 3 m 3 m 2 m 1 m 3 m 3 m 3 m 3 m 3 m 3 m 1 m 1 m 2

SNI 2008

Embed Size (px)

DESCRIPTION

daftar SNI pekerjaan konstruksi 2008

Citation preview

UpahDAFTAR HARGA UPAH DAN BAHANNOURAIANSATUANHARGA (Rp)KET.12345A. UPAH PEKERJA HARIAN1PekerjaOH45,000.002Tukang BatuOH60,000.003Tukang KayuOH60,000.003Kepala TukangOH75,000.004MandorOH70,000.00B. HARGA BAHAN1Tanah urugm349,000.002Pasir urugm3110,000.003Pasir pasang (beton)m3110,000.004Kerikil (beton)m3110,000.005Pasir pasang (beton)kg78.576Kerikil (beton)Kg81.487BatuKali/batu belah (15/20) cmm3180,000.008Batu bataBh600.009Semen Portland @ 40 Kgkg1,075.0010Semen warnaKg2,125.0011Keramik dinding 20 x 25 cmBh3,000.0012Keramik lantai 20 x 20 cm anti slipBh2,900.0013Keramik 30 x 30 cmBh4,000.0014Keramik lantai 40 x 40 cmBh9,500.0015Keramik lantai 40 x 40 cm kulit jerukBh10,000.0016Bonbon keramik setelah dipasangBh15,000.0017Besi beton poloskg13,000.0018Besi beton ulirkg15,000.0019Besi Stripkg19,000.0018Kawat betonkg19,000.0019Pakukg16,000.0020Paku sengkg16,000.0021Paku Scrupkg16,000.0022Seng Genteng Metal 0.30m242,000.0023Rabung Genteng Metalm121,200.0024Kayu Seumantok/Damar laut ( Kelas I)m34,700,000.0025Kayu rangka atap klas II (sejenis sembarang keras)m33,500,000.0026Kayu rangka plafond (sejenis sembarang keras)m32,900,000.0027Kayu bekisting Kelas IIIm33,100,000.00Papan Kayu (Kelas II)m33,500,000.0028Kayu Dolken 8 - 10 cmBtg10,000.00Kaso-Kasom31,800,000.0029Lem kayuBh15,000.0029Plywood Tebal 4 mmLbr70,000.0030Tripleks Tebal 4 mmLbr76,000.0031Gypsum Board 9 mmLbr39,000.0032Calsi Board 6 mmLbr42,000.0033List Kayu Profilm13,900.00List Profil Gypsumm112,000.00Tepung Gypsumkg15,000.0034Kaca 5 mmm299,000.0035Cat meni kayu/besikg23,000.0036Cat minyakkg42,000.0037Cat Dasarkg17,000.0038Cat Tembokkg17,000.0038Dempul/Plamirkg19,000.0039Minyak bekistingltr10,000.0040Kertas amplasLbr2,000.0041Kloset dudukBh1,400,000.0042Kloset jongkokBh129,000.0043WastafelBh549,000.0044UrinoirBh1,000,000.0045Bak cuci stainles steelBh658,000.0046Water drain + asesoriesSet300,000.0047Kran 1/2"Bh16,000.0048Floor drainBh21,000.0049Seal tapeBh4,000.0050IjukKg5,000.0050Airltr25.00

AnalisaDAFTAR ANALISAANALISAURAIANKOEF.SAT.HARGA SATUAN (Rp.)JUMLAH HARGA (Rp.)123456=(3x5)I.PEKERJAAN TANAHSNI. 2835:2008-6.1Menggali 1 m3 tanah biasa sedalam 1 meterPekerja0.750OH45,000.0033,750.00Mandor0.025OH70,000.001,750.00Jumlah35,500.00Dibulatkan35,500.00SNI. 2835:2008-6.2Menggali 1 m3 tanah biasa sedalam 2 meterPekerja0.900OH45,000.0040,500.00Mandor0.045OH70,000.003,150.00Jumlah43,650.00Dibulatkan43,600.00SNI. 2835:2008-6.3Menggali 1 m3 tanah biasa sedalam 3 meterPekerja1.050OH45,000.0047,250.00Mandor0.067OH70,000.004,690.00Jumlah51,940.00Dibulatkan51,900.00SNI. 2835:2008 6.7Mengerjakan 1 m2 stripping tebing setinggi 1 meterPekerja0.050OH45,000.002,250.00Mandor0.005OH70,000.00350.00Jumlah2,600.00Dibulatkan2,600.00SNI. 2835:2008 6.11Mengurug 1 m3 pasir urugPasir Urug1.200m3110,000.00132,000.00Pekerja0.300OH45,000.0013,500.00Mandor0.010OH70,000.00700.00Jumlah146,200.00Dibulatkan146,200.00SNI. 2835:2008 6.14Memasang 1 m2 lapisan ijuk tebal 10 cm , untuk bidang resapan.Ijuk6.000m35,000.0030,000.00Pekerja0.300OH45,000.0013,500.00Mandor0.010OH70,000.00700.00Jumlah44,200.00Dibulatkan44,200.00IIPEKERJAAN PONDASISNI. 2836:2008 6.1Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PPBatu Belah 15 cm /20 cm1.200m3180,000.00216,000.00Semen Portland202.000kg1,075.00217,150.00Pasir Pasang0.485m3110,000.0053,350.00Pekerja1.500OH45,000.0067,500.00Tukang Batu0.750OH60,000.0045,000.00Kepala Tukang0.075OH75,000.005,625.00Mandor0.075OH70,000.005,250.00Jumlah609,875.00Dibulatkan609,800.00SNI. 2836:2008 6.2Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PPBatu Belah 15 cm /20 cm1.200m3180,000.00216,000.00Semen Portland163.000kg1,075.00175,225.00Pasir Pasang0.520m3110,000.0057,200.00Pekerja1.500OH45,000.0067,500.00Tukang Batu0.750OH60,000.0045,000.00Kepala Tukang0.075OH75,000.005,625.00Mandor0.075OH70,000.005,250.00Jumlah571,800.00Dibulatkan571,800.00SNI. 2836:2008 6.3Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PPBatu Belah 15 cm /20 cm1.200m3180,000.00216,000.00Semen Portland136.000kg1,075.00146,200.00Pasir Pasang0.544m3110,000.0059,840.00Pekerja1.500OH45,000.0067,500.00Tukang Batu0.750OH60,000.0045,000.00Kepala Tukang0.075OH75,000.005,625.00Mandor0.075OH70,000.005,250.00Jumlah545,415.00Dibulatkan545,400.00SNI. 2836:2008 6.4Memasang 1 m3 pondasi batu belah, campuran 1 PC : 6 PPBatu Belah 15 cm /20 cm1.200m3180,000.00216,000.00Semen Portland117.000kg1,075.00125,775.00Pasir Pasang0.561m3110,000.0061,710.00Pekerja1.500OH45,000.0067,500.00Tukang Batu0.750OH60,000.0045,000.00Kepala Tukang0.075OH75,000.005,625.00Mandor0.075OH70,000.005,250.00Jumlah185,085.00Dibulatkan185,000.00SNI. 2836:2008 6.5Memasang 1 m3 pondasi batu belah, campuran 1 PC : 8 PPBatu Belah 15 cm /20 cm1.200m3180,000.00216,000.00Semen Portland91.000kg1,075.0097,825.00Pasir Pasang0.584m3110,000.0064,240.00Pekerja1.500OH45,000.0067,500.00Tukang Batu0.750OH60,000.0045,000.00Kepala Tukang0.075OH75,000.005,625.00Mandor0.075OH70,000.005,250.00Jumlah187,615.00Dibulatkan187,600.00SNI.2836:2008 6.9Memasang 1 m3 batu kosong (anstamping)Batu Belah 15 cm /20 cm1.200m3180,000.00216,000.00Pasir Urug0.432m3110,000.0047,520.00Pekerja0.780OH45,000.0035,100.00Tukang Batu0.390OH60,000.0023,400.00Kepala Tukang0.039OH75,000.002,925.00Mandor0.039OH70,000.002,730.00Jumlah327,675.00Dibulatkan327,600.00SNI.2836:2008 6.10Memasang 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40 % Batu BelahBatu Belah 15 cm/20 cm0.480m3180,000.0086,400.00Semen Portland194.000kg1,075.00208,550.00Pasir Beton0.312m3110,000.0034,320.00Kerikil0.468m3110,000.0051,480.00Besi Beton126.000kg13,000.001,638,000.00Kawat Beton1.800kg19,000.0034,200.00Pekerja3.400OH45,000.00153,000.00Tukang Batu0.850OH60,000.0051,000.00Kepala Tukang0.085OH75,000.006,375.00Mandor0.170OH70,000.0011,900.00Jumlah2,275,225.00Dibulatkan2,275,200.00SNI.2836:2008 6.11Memasang 1 m3 pondasi sumuran, diameter 100 cmBatu Belah 15 cm/20 cm0.450m3180,000.0081,000.00Semen Portland194.000kg1,075.00208,550.00Pasir Beton0.312m3110,000.0034,320.00Kerikil0.468m3110,000.0051,480.00Pekerja2.400OH45,000.00108,000.00Tukang Batu0.800OH60,000.0048,000.00Kepala Tukang0.080OH75,000.006,000.00Mandor0.119OH70,000.008,330.00Jumlah545,680.00Dibulatkan545,600.00IIIPEKERJAAN PLESTERANSNI. 2837:2008 6.1Membuat 1 m2 plesteran 1 PC : 1 PP, tebal 15 mmSemen Portland15.504kg1,075.0016,666.80Pasir Pasang0.016m3110,000.001,760.00Pekerja0.300OH45,000.0013,500.00Tukang Batu0.150OH60,000.009,000.00Kepala Tukang0.015OH75,000.001,125.00Mandor0.015OH70,000.001,050.00Jumlah43,101.80Dibulatkan43,100.00SNI. 2837:2008 6.2Membuat 1 m2 plesteran 1 PC : 2 PP, tebal 15 mmSemen Portland10.224kg1,075.0010,990.80Pasir Pasang0.020m3110,000.002,200.00Pekerja0.300OH45,000.0013,500.00Tukang Batu0.150OH60,000.009,000.00Kepala Tukang0.015OH75,000.001,125.00Mandor0.015OH70,000.001,050.00Jumlah37,865.80Dibulatkan37,800.00SNI. 2837:2008 6.3Membuat 1 m2 plesteran 1 PC : 3 PP, tebal 15 mmSemen Portland7.776kg1,075.008,359.20Pasir Pasang0.023m3110,000.002,530.00Pekerja0.300OH45,000.0013,500.00Tukang Batu0.150OH60,000.009,000.00Kepala Tukang0.015OH75,000.001,125.00Mandor0.015OH70,000.001,050.00Jumlah35,564.20Dibulatkan35,500.00SNI. 2837:2008 6.4Membuat 1 m2 plesteran 1 PC : 4 PP, tebal 15 mmSemen Portland6.240kg1,075.006,708.00Pasir Pasang0.024m3110,000.002,640.00Pekerja0.300OH45,000.0013,500.00Tukang Batu0.150OH60,000.009,000.00Kepala Tukang0.015OH75,000.001,125.00Mandor0.015OH70,000.001,050.00Jumlah34,023.00Dibulatkan34,000.00SNI. 2837:2008 6.27Membuat 1 m2 acianSemen Portland3.250kg1,075.003,493.75Pekerja0.200OH45,000.009,000.00Tukang Batu0.100OH60,000.006,000.00Kepala Tukang0.010OH75,000.00750.00Mandor0.010OH70,000.00700.00Jumlah19,943.75Dibulatkan19,900.00IVPEKERJAAN LANGIT-LANGITSNI. 2839:2008 6.7Memasang 1 m2 langit-langit gypsum board ukuran (1200x2400x9) mm,Gypsum Board0.364kg39,000.0014,196.00Paku Skrup0.110m316,000.001,760.00Pekerja0.100OH45,000.004,500.00Tukang Kayu0.050OH60,000.003,000.00Kepala Tukang0.005OH75,000.00375.00Mandor0.005OH70,000.00350.00Jumlah8,225.00Dibulatkan8,200.00SNI. 2839:2008 6.8Memasang 1 m list plafond gysum profilList gypsum profil1.050m'12,000.0012,600.00Tepung Gypsum0.150kg15,000.002,250.00Pekerja0.060OH45,000.002,700.00Tukang Kayu0.060OH60,000.003,600.00Kepala Tukang0.006OH75,000.00450.00Mandor0.003OH70,000.00210.00Jumlah21,810.00Dibulatkan21,800.00SNI. 2839:2008 6.10Memasang 1 m list langit-langit kayu profilList Kayu Profil1.050m'3,900.004,095.00Paku0.010kg16,000.00160.00Pekerja0.050OH45,000.002,250.00Tukang Kayu0.050OH60,000.003,000.00Kepala Tukang0.005OH75,000.00375.00Mandor0.003OH70,000.00210.00Jumlah10,090.00Dibulatkan10,000.00VPEKERJAAN KAYUSNI. 3434:2008 6.1Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas IBalok Kayu1.100m34,700,000.005,170,000.00Paku 10 cm1.250kg16,000.0020,000.00Lem Kayu1.000kg15,000.0015,000.00Pekerja7.000OH45,000.00315,000.00Tukang Kayu21.000OH60,000.001,260,000.00Kepala Tukang2.100OH75,000.00157,500.00Mandor0.350OH70,000.0024,500.00Jumlah6,962,000.00Dibulatkan6,962,000.00SNI. 3434:2008 6.2Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau kelas IIIBalok Kayu1.200m33,500,000.004,200,000.00Paku 10 cm1.250kg16,000.0020,000.00Lem Kayu1.000kg15,000.0015,000.00Pekerja6.000OH45,000.00270,000.00Tukang Kayu18.000OH60,000.001,080,000.00Kepala Tukang1.800OH75,000.00135,000.00Mandor0.300OH70,000.0021,000.000.5Jumlah5,741,000.00Dibulatkan5,741,000.00SNI. 3434:2008 6.5Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I atau IIPapan Kayu0.040m33,500,000.00140,000.00Lem Kayu0.500kg15,000.007,500.00Pekerja1.000OH45,000.0045,000.00Tukang Kayu3.000OH60,000.00180,000.00Kepala Tukang0.300OH75,000.0022,500.00Mandor0.050OH70,000.003,500.00Jumlah398,500.00Dibulatkan398,500.00SNI. 3434:2008 6.6Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I atau IIPapan Kayu0.024m33,500,000.0084,000.00Lem Kayu0.300kg15,000.004,500.00Pekerja0.800OH45,000.0036,000.00Tukang Kayu2.400OH60,000.00144,000.00Kepala Tukang0.240OH75,000.0018,000.00Mandor0.040OH70,000.002,800.00Jumlah289,300.00Dibulatkan289,300.00SNI. 3434:2008 6.7Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I atau IIPapan Kayu0.064m33,500,000.00224,000.00Lem Kayu0.500kg15,000.007,500.00Pekerja1.000OH45,000.0045,000.00Tukang Kayu3.000OH60,000.00180,000.00Kepala Tukang0.300OH75,000.0022,500.00Mandor0.050OH70,000.003,500.00Jumlah482,500.00Dibulatkan482,500.00SNI. 3434:2008 6.8Membuat dan memasang 1 m2 pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kelas II (lebar sampai 90 cm)Papan Kayu0.025m33,500,000.0087,500.00Paku 1 cm- 2,5 cm0.030kg16,000.00480.00Lem Kayu0.030kg15,000.00450.00Plywood tebal 4 mm Ukuran (90 x 220 ) cm1.000Lbr70,000.0070,000.00Pekerja0.700OH45,000.0031,500.00Tukang Kayu2.100OH60,000.00126,000.00Kepala Tukang0.210OH75,000.0015,750.00Mandor0.035OH70,000.002,450.00Jumlah246,150.00Dibulatkan246,100.00SNI. 3434:2008 6.13Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 mBalok kayu1.100m34,700,000.005,170,000.00Besi strip tebal 5 mm15.000kg19,000.00285,000.00Paku 12 cm5.600kg16,000.0089,600.00Pekerja4.000OH45,000.00180,000.00Tukang Kayu12.000OH60,000.00720,000.00Kepala Tukang1.200OH75,000.0090,000.00Mandor0.200OH70,000.0014,000.00Jumlah6,548,600.00Dibulatkan6,548,600.00SNI. 3434:2008 6.19Memasang 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau IIIKaso-kaso (5 x 7 ) cm0.015m31,800,000.0027,000.00Paku 7 cm -10 cm0.200kg16,000.003,200.00Pekerja0.150OH45,000.006,750.00Tukang Kayu0.300OH60,000.0018,000.00Kepala Tukang0.030OH75,000.002,250.00Mandor0.075OH70,000.005,250.00Jumlah62,450.00Dibulatkan62,400.00SNI. 3434:2008 6.20Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau IIIKaso-kaso (5 x 7 ) cm0.016m31,800,000.0029,340.00Paku 7 cm -10 cm0.250kg16,000.004,000.00Pekerja0.200OH45,000.009,000.00Tukang Kayu0.300OH60,000.0018,000.00Kepala Tukang0.030OH75,000.002,250.00Mandor0.010OH70,000.00700.00Jumlah63,290.00Dibulatkan63,200.00SNI. 3434:2008 6.21Memasang 1 m1 lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas IIPapan kayu0.0108m33,500,000.0037,800.00Paku 5 cm dan 7 cm0.100kg16,000.001,600.00Pekerja0.100OH45,000.004,500.00Tukang Kayu0.200OH60,000.0012,000.00Kepala Tukang0.020OH75,000.001,500.00Mandor0.005OH70,000.00350.00Jumlah57,750.00Dibulatkan57,700.00SNI. 3434:2008 6.21Memasang 1 m1 lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas IIPapan kayu0.011m33,500,000.0038,500.00Paku 5 cm dan 7 cm0.050kg16,000.00800.00Pekerja0.100OH45,000.004,500.00Tukang Kayu0.200OH60,000.0012,000.00Kepala Tukang0.020OH75,000.001,500.00Mandor0.005OH70,000.00350.00Jumlah57,650.00Dibulatkan57,600.00VIPEKERJAAN DINDINGSNI. 6897:2008 6.1Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22 ) cm tebal 1 bata, campuran spesi 1 PC : 2 PPBata Merah140.000Buah600.0084,000.00PC43.500kg1,075.0046,762.50PP0.080m3110,000.008,800.00Pekerja0.600OH45,000.0027,000.00Tukang Kayu0.200OH60,000.0012,000.00Kepala Tukang0.020OH75,000.001,500.00Mandor0.030OH70,000.002,100.00Jumlah182,162.50Dibulatkan182,100.00SNI. 6897:2008 6.2Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22 ) cm tebal 1 bata, campuran spesi 1 PC : 3 PPBata Merah140.000Buah600.0084,000.00PC32.950kg1,075.0035,421.25PP0.091m3110,000.0010,010.00Pekerja0.600OH45,000.0027,000.00Tukang Kayu0.200OH60,000.0012,000.00Kepala Tukang0.020OH75,000.001,500.00Mandor0.030OH70,000.002,100.00Jumlah172,031.25Dibulatkan172,000.00SNI. 6897:2008 6.3Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22 ) cm tebal 1 bata, campuran spesi 1 PC : 4 PPBata Merah140.000Buah600.0084,000.00PC26.550kg1,075.0028,541.25PP0.093m3110,000.0010,230.00Pekerja0.600OH45,000.0027,000.00Tukang Kayu0.200OH60,000.0012,000.00Kepala Tukang0.020OH75,000.001,500.00Mandor0.030OH70,000.002,100.00Jumlah165,371.25Dibulatkan165,300.00SNI. 6897:2008 6.7Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22 ) cm tebal 1/2 bata, campuran spesi 1 PC : 2 PPBata Merah70.000Buah600.0042,000.00PC18.950kg1,075.0020,371.25PP0.038m3110,000.004,180.00Pekerja0.300OH45,000.0013,500.00Tukang Kayu0.100OH60,000.006,000.00Kepala Tukang0.010OH75,000.00750.00Mandor0.015OH70,000.001,050.00Jumlah87,851.25Dibulatkan87,800.00SNI. 6897:2008 6.8Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22 ) cm tebal 1/2 bata, campuran spesi 1 PC : 3 PPBata Merah70.000Buah600.0042,000.00PC14.370kg1,075.0015,447.75PP0.040m3110,000.004,400.00Pekerja0.300OH45,000.0013,500.00Tukang Kayu0.100OH60,000.006,000.00Kepala Tukang0.010OH75,000.00750.00Mandor0.015OH70,000.001,050.00Jumlah83,147.75Dibulatkan83,100.00SNI. 6897:2008 6.9Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22 ) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PPBata Merah70.000Buah600.0042,000.00PP11.500kg1,075.0012,362.50PC0.043m3110,000.004,730.00Pekerja0.300OH45,000.0013,500.00Tukang Kayu0.100OH60,000.006,000.00Kepala Tukang0.010OH75,000.00750.00Mandor0.015OH70,000.001,050.00Jumlah80,392.50Dibulatkan80,300.00VIIPEKERJAAN BESI DAN ALUMINIUMSNI. 7393:2008 6.1Memasang 1 kg besi profilBesi Profil1.150kgPekerja0.060OH45,000.002,700.00Tukang Las Konstruksi0.060OH60,000.003,600.00Kepala Tukang0.006OH75,000.00Mandor0.003OH70,000.00Jumlah6,300.00Dibulatkan6,300.00SNI. 7393:2008 6.2Memasang 1 kg rangka kuda-kuda baja IWFBesi baja IWF1.150kgPekerja0.060OH45,000.002,700.00Tukang Las Konstruksi0.060OH60,000.003,600.00Kepala Tukang0.006OH75,000.00Mandor0.003OH70,000.00Jumlah6,300.00Dibulatkan6,300.00SNI. 7393:2008 6.11Memasang 1 m kusen pintu aluminiumProfil alluminium1.100mskrup Fixer2.000BuahSealant0.060TubePekerja0.043OH45,000.001,935.00Tukang Kayu0.043OH60,000.002,580.00Kepala Tukang0.0043OH75,000.00Mandor0.0021OH70,000.00Jumlah4,515.00Dibulatkan4,500.00VIIPEKERJAAN BETONSNI. 7394:2008 6.1Membuat 1 m3 beton mutu fc = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87Semen Portland247.000kg1,075.00265,525.00Pasir beton869.000kg78.5768,278.57Kerikil (maksimum 30 mm)999.000kg81.4881,400.00Air215.000kg25.005,375.00Pekerja1.650OH45,000.0074,250.00Tukang batu0.275OH60,000.0016,500.00Kepala Tukang0.028OH75,000.002,100.00Mandor0.083OH70,000.005,810.00Jumlah519,238.57Dibulatkan519,200.00SNI. 7394:2008 6.2Membuat 1 m3 beton mutu fc = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78Semen Portland276.000kg1,075.00296,700.00Pasir beton828.000kg78.5765,057.14Kerikil (maksimum 30 mm)1,012.000kg81.4882,459.26Air215.000kg25.005,375.00Pekerja1.650OH45,000.0074,250.00Tukang batu0.275OH60,000.0016,500.00Kepala Tukang0.028OH75,000.002,100.00Mandor0.083OH70,000.005,810.00Jumlah548,251.40Dibulatkan548,200.00SNI. 7394:2008 6.3Membuat 1 m3 beton mutu fc = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72Semen Portland299.000kg1,075.00321,425.00Pasir beton799.000kg78.5762,778.57Kerikil (maksimum 30 mm)1,017.000kg81.4882,866.67Air215.000kg25.005,375.00Pekerja1.650OH45,000.0074,250.00Tukang batu0.275OH60,000.0016,500.00Kepala Tukang0.028OH75,000.002,100.00Mandor0.083OH70,000.005,810.00Jumlah571,105.24Dibulatkan571,100.00SNI. 7394:2008 6.4Membuat 1 m3 lantai kerja beton mutu fc = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87Semen Portland230.000kg1,075.00247,250.00Pasir beton893.000kg78.5770,164.29Kerikil (maksimum 30 mm)1,027.000kg81.4883,681.48Air200.000kg25.005,000.00Pekerja1.200OH45,000.0054,000.00Tukang batu0.200OH60,000.0012,000.00Kepala Tukang0.020OH75,000.001,500.00Mandor0.060OH70,000.004,200.00Jumlah477,795.77Dibulatkan477,700.00SNI. 7394:2008 6.5Membuat 1 m3 beton mutu fc = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66Semen Portland326.000kg1,075.00350,450.00Pasir beton760.000kg78.5759,714.29Kerikil (maksimum 30 mm)1,029.000kg81.4883,844.44Air215.000kg25.005,375.00Pekerja1.650OH45,000.0074,250.00Tukang batu0.275OH60,000.0016,500.00Kepala Tukang0.028OH75,000.002,100.00Mandor0.083OH70,000.005,810.00Jumlah598,043.73Dibulatkan598,000.00SNI. 7394:2008 6.6Membuat 1 m3 beton mutu fc = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61Semen Portland352.000kg1,075.00378,400.00Pasir beton731.000kg78.5757,435.71Kerikil (maksimum 30 mm)1,031.000kg81.4884,007.41Air215.000kg25.005,375.00Pekerja1.650OH45,000.0074,250.00Tukang batu0.275OH60,000.0016,500.00Kepala Tukang0.028OH75,000.002,100.00Mandor0.083OH70,000.005,810.00Jumlah623,878.12Dibulatkan623,800.00SNI. 7394:2008 6.7Membuat 1 m3 beton mutu fc = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58Semen Portland371.000kg1,075.00398,825.00Pasir beton698.000kg78.5754,842.86Kerikil (maksimum 30 mm)1,047.000kg81.4885,311.11Air215.000kg25.005,375.00Pekerja1.650OH45,000.0074,250.00Tukang batu0.275OH60,000.0016,500.00Kepala Tukang0.028OH75,000.002,100.00Mandor0.083OH70,000.005,810.00Jumlah643,013.97Dibulatkan643,000.00SNI. 7394:2008 6.8Membuat 1 m3 beton mutu fc = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56Semen Portland384.000kg1,075.00412,800.00Pasir beton692.000kg78.5754,371.43Kerikil (maksimum 30 mm)1,039.000kg81.4884,659.26Air215.000kg25.005,375.00Pekerja1.650OH45,000.0074,250.00Tukang batu0.275OH60,000.0016,500.00Kepala Tukang0.028OH75,000.002,100.00Mandor0.083OH70,000.005,810.00Jumlah655,865.69Dibulatkan655,800.00SNI. 7394:2008 6.9Membuat 1 m3 beton mutu fc = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53Semen Portland406.000kg1,075.00436,450.00Pasir beton684.000kg78.5753,742.86Kerikil (maksimum 30 mm)1,026.000kg81.4883,600.00Air215.000kg25.005,375.00Pekerja1.650OH45,000.0074,250.00Tukang batu0.275OH60,000.0016,500.00Kepala Tukang0.028OH75,000.002,100.00Mandor0.083OH70,000.005,810.00Jumlah677,827.86Dibulatkan677,800.00SNI. 7394:2008 6.10Membuat 1 m3 beton mutu fc = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52Semen Portland413.000kg1,075.00443,975.00Pasir beton681.000kg78.5753,507.14Kerikil (maksimum 30 mm)1,021.000kg81.4883,192.59Air215.000kg25.005,375.00Pekerja1.650OH45,000.0074,250.00Tukang batu0.275OH60,000.0016,500.00Kepala Tukang0.028OH75,000.002,100.00Mandor0.083OH70,000.005,810.00Jumlah684,709.74Dibulatkan684,700.00SNI. 7394:2008 6.11Membuat 1 m3 beton mutu fc = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49Semen Portland439.000kg1,075.00471,925.00Pasir beton670.000kg78.5752,642.86Kerikil (maksimum 30 mm)1,006.000kg81.4881,970.37Air215.000kg25.005,375.00Pekerja2.100OH45,000.0094,500.00Tukang batu0.350OH60,000.0021,000.00Kepala Tukang0.035OH75,000.002,625.00Mandor0.105OH70,000.007,350.00Jumlah737,388.23Dibulatkan737,300.00SNI. 7394:2008 6.17.aPembesian 10 kg dengan besi polos atau besi ulirBesi beton (polos/ulir)10.500kg13,000.00136,500.00Kawat beton0.150kg19,000.002,850.00Pekerja0.070OH45,000.003,150.00Tukang besi0.070OH60,000.004,200.00Kepala Tukang0.007OH75,000.00525.00Mandor0.004OH70,000.00280.00Jumlah147,505.00Dibulatkan147,500.00Untuk 1 Kg Besi Beton Polos (Jumlah A x 0,1)Jumlah14,750.00SNI. 7394:2008 6.17.bPembesian 10 kg dengan besi ulirBesi beton ulir10.500kg15,000.00157,500.00Kawat beton0.150kg19,000.002,850.00Pekerja0.070OH45,000.003,150.00Tukang besi0.070OH60,000.004,200.00Kepala Tukang0.007OH75,000.00525.00Mandor0.004OH70,000.00280.00Jumlah168,505.00Dibulatkan168,500.00Untuk 1 Kg Besi Beton Ulir (Jumlah A x 0,1)Jumlah16,850.00SNI. 7394:2008 6.20Memasang 1 m2 bekisting untuk pondasiKayu kelas III0.040m33,100,000.00124,000.00Paku 5 cm - 10 cm0.300kg16,000.004,800.00Minyak bekisting0.100Liter10,000.001,000.00Pekerja0.520OH45,000.0023,400.00Tukang kayu0.260OH60,000.0015,600.00Kepala Tukang0.026OH75,000.001,950.00Mandor0.026OH70,000.001,820.00Jumlah172,570.00Dibulatkan172,500.00SNI. 7394:2008 6.21Memasang 1 m2 bekisting untuk sloofKayu kelas III0.045m33,100,000.00139,500.00Paku 5 cm - 10 cm0.300kg16,000.004,800.00Minyak bekisting0.100Liter10,000.001,000.00Pekerja0.520OH45,000.0023,400.00Tukang kayu0.260OH60,000.0015,600.00Kepala Tukang0.026OH75,000.001,950.00Mandor0.026OH70,000.001,820.00Jumlah188,070.00Dibulatkan188,000.00SNI. 7394:2008 6.22Memasang 1 m2 bekisting untuk kolomKayu kelas III0.040m3Paku 5 cm - 12 cm0.400kgMinyak bekisting0.200LiterBalok kayu kelas III0.015m3Plywood tebal 9 mm0.350LbrDolken kayu galam (8-10) cm, panjang 4 m2.000BatangPekerja0.660OH45,000.0029,700.00Tukang kayu0.330OH60,000.001,980.00Kepala Tukang0.033OH75,000.00Mandor0.033OH70,000.00Jumlah31,680.00Dibulatkan31,600.00SNI. 7394:2008 6.23Memasang 1 m2 bekisting untuk balokKayu kelas III0.040m3Paku 5 cm - 12 cm0.400kgMinyak bekisting0.200LiterBalok kayu kelas III0.018m3Plywood tebal 9 mm0.350LbrDolken kayu galam (8-10) cm, panjang 4 m2.000BatangPekerja0.660OH45,000.0029,700.00Tukang kayu0.330OH60,000.001,980.00Kepala Tukang0.033OH75,000.00Mandor0.033OH70,000.00Jumlah31,680.00Dibulatkan31,600.00SNI. 7394:2008 6.24Memasang 1 m2 bekisting untuk plat lantaiKayu kelas III0.040m3Paku 5 cm - 12 cm0.400kgMinyak bekisting0.200LiterBalok kayu kelas III0.015m3Pl,ywood tebal 9 mm0.350LbrDolken kayu galam (8-10) cm, panjang 4 m6.000BatangPekerja0.660OH45,000.0029,700.00Tukang kayu0.330OH60,000.001,980.00Kepala Tukang0.033OH75,000.00Mandor0.033OH70,000.00Jumlah31,680.00Dibulatkan31,600.00VIIIPEKERJAAN PENUTUP LANTAI DAN DINDINGSNI. 7395:2008 6.1Memasang 1 m2 lantai ubin PC abu-abu ukuran (40 x 40) cmUbin abu-abu6.630BhPC9.800kgPP0.045m3Pekerja0.250OH45,000.0011,250.00Tukang batu0.125OH60,000.007,500.00Kepala Tukang0.013OH75,000.00Mandor0.013OH70,000.00Jumlah18,750.00SNI. 7395:2008 6.2Dibulatkan18,700.00Memasang 1 m2 lantai ubin PC abu-abu ukuran (30 x 30) cmUbin abu-abu11.870BhPC10.000kgPP0.045m3Pekerja0.260OH45,000.0011,700.00Tukang batu0.130OH60,000.007,800.00Kepala Tukang0.013OH75,000.00Mandor0.013OH70,000.00Jumlah19,500.00Dibulatkan19,500.00SNI. 7395:2008 6.3Memasang 1 m2 lantai ubin PC abu-abu ukuran (20 x 20) cmUbin abu-abu26.500BhPC10.400kgPP0.045m3Pekerja0.270OH45,000.0012,150.00Tukang batu0.135OH60,000.008,100.00Kepala Tukang0.014OH75,000.00Mandor0.014OH70,000.00Jumlah20,250.00Dibulatkan20,200.00SNI. 7395:2008 6.4Memasang 1 m2 lantai ubin warna ukuran (40 x 40) cmUbin warna6.630BhPC9.800kgPP0.045m3Semen warna1.500kgPekerja0.260OH45,000.0011,700.00Tukang batu0.130OH60,000.007,800.00Kepala Tukang0.013OH75,000.00Mandor0.013OH70,000.00Jumlah19,500.00Dibulatkan19,500.00SNI. 7395:2008 6.5Memasang 1 m2 lantai ubin warna ukuran (30 x 30) cmUbin warna6.630BhPC9.800kgPP0.045m3Semen warna1.300kgPekerja0.250OH45,000.0011,250.00Tukang batu0.125OH60,000.007,500.00Kepala Tukang0.013OH75,000.00Mandor0.013OH70,000.00Jumlah18,750.00Dibulatkan18,700.00SNI. 7395:2008 6.6Memasang 1 m2 lantai ubin warna ukuran (20 x 20) cmUbin warna26.500BhPC10.400kgPP0.045m3Semen warna1.620kgPekerja0.270OH45,000.0012,150.00Tukang batu0.135OH60,000.008,100.00Kepala Tukang0.040OH75,000.00Mandor0.014OH70,000.00Jumlah20,250.00Dibulatkan20,200.00SNI. 7395:2008 6.9Memasang 1 m2 lantai ubin granit ukuran (40 x 40) cmUbin Granit6.630BhPC9.800kgPP0.045m3Semen warna1.300kgPekerja0.250OH45,000.0011,250.00Tukang batu0.125OH60,000.007,500.00Kepala Tukang0.013OH75,000.00Mandor0.013OH70,000.00Jumlah18,750.00Dibulatkan18,700.00SNI. 7395:2008 6.9Memasang 1 m2 lantai ubin granit ukuran (40 x 40) cmUbin Granit6.630BhPC9.800kgPP0.045m3Semen warna1.300kgPekerja0.250OH45,000.0011,250.00Tukang batu0.125OH60,000.007,500.00Kepala Tukang0.013OH75,000.00Mandor0.013OH70,000.00Jumlah18,750.00Dibulatkan18,700.00VIIIPEKERJAAN PENUTUP LANTAI DAN DINDING

&L&RAnalisa