INTRODUCTION TO SOFTWARE ENGINEERING
Chapter 2: Process Models
Week 3(Lecture 5,6)
Maha Butt
Linear ,iterative ,evolutionary ,parallel
Linear process flow executes each of the five activities in sequence.(start from communication and ended at deployment)
An iterative process flow repeats one or more of the activities before proceeding to the next.
An evolutionary process flow executes the activities in a circular manner. Each circuit leads to a more complete version of the software.
A parallel process flow executes one or more activities in parallel with other activities ( modeling for one aspect of the software in parallel with construction of another aspect of the software ).
SDLC SDLC is a process followed for a software
project, within a software organization. Software life cycle models describe
phases of the software cycle and the order in which those phases are executed
Planning & Requirement Analysis Take input from the customer Identify the problem to be solved Focus on “what” not “how” End Result: Functional specification. Reviewed by customer and designer.
Defining requirement define and document the product
requirements get them approved from the customer. This is done through ‘SRS’ – Software
Requirement Specification (A document which consists of all the product requirements to be designed and developed during the project life cycle.)
Designing Product Architecture Focus on “how” SRS is reference for product architecture Based on SRS more than one
architecture is defined in DDS(design document specification) view by stakeholders & implementers
the best design approach is selected for the product based on risk assessment, product robustness (strength), design modularity & time.
Developing the product The programming code is generated as
per DDS during this stage. Often the shortest phase if design is
performed in detailed & organized way. Reviewed by designers coders and
tester.
Testing product Verifying the code works according to
the functional specifications In this stage products defects are
reported, tracked, fixed and retested, until the product reaches the quality standards defined in the SRS
Deployment & maintenance Sometime product deployment happens
in stages as per the organizations’ business strategy.
The product may first be released in a limited segment and tested in the real business environment (UAT- User acceptance testing)
Get feedback for next version.
Waterfall model(classic life cycle)
The Waterfall Model was first Process Model to be introduced. It is also referred to as a linear-sequential life cycle model. (work flows from communication through deployment in a reasonably linear fashion)
each phase must be completed fully before the next phase can begin.
Simple to understand and use. Used when project is small and requirements are
clear Technology is understood
When to use Waterfall
The project is short Requirements are very well documented,
clear and fixed Product definition is stable There are no ambiguous requirements Technology is not dynamic
Advantages of Waterfall This model is simple and easy to
understand and use. Clearly defined stages Process and results are well documented It is easy to manage due to the rigidity
of the model Waterfall model works well for smaller
projects where requirements are very well understood.
Disadvantages of Waterfall High amounts of risk and uncertainty. Poor model for long and ongoing projects. Not a good model for complex and object-
oriented projects. Cannot accommodate changing requirements.
Example Software for medical store Software for library management
V Model The V model is SDLC model where
execution of the process happens in sequential manner in V-shape.
Also known as verification and validation model.
V Model Model is an extension of the waterfall
model based on association of a testing phase
for each corresponding development stage.
Verification phases on one side of the ‘V’ Validation phases on the other side. Coding phase joins the two sides of the
V-Model.
21
Verification VS Validation
Verification: Are we building the product right? check whether the software conforms to
specifications.
Validation: Are we building the right product? check whether software meets the customer
expectations and requirements.
22
Verification VS ValidationVerification Validation
Verification is a static practice of verifying documents, design, code and program.
Validation is a dynamic mechanism of validating and testing the actual product.
It does not involve executing the code.
It always involves executing the code.
It is human based checking of documents and files.
It is computer based execution of program.
Verification uses methods like inspections, reviews, walkthroughs, and Desk-checking etc.
Validation uses methods like black box (functional) testing, and white box (structural) testing etc.
It can catch errors that validation cannot catch.
It can catch errors that verification cannot catch.
Target is requirements specification, application and software architecture, high level, complete design, and database design etc.
Target is actual product-a unit, a module, a bent of integrated modules, and effective final product.
Verification is done by QA team to ensure that the software is as per the specifications in the SRS document.
Validation is carried out with the involvement of testing team.
23
The V-Model
24
The V-Model Verification phases
Requirements modeling Architecture design Module design Code generation
Validation phases Unit testing Integration testing System testing User acceptance testing
When to use V-Model The V-shaped model should be used for
small to medium sized projects where requirements are clearly defined and fixed.
The V-Shaped model should be chosen when sufficient technical resources are available with needed technical expertise.
26
Advantages of V-Model Simple and easy to use. Proactive defect tracking – that is defects are
found at early stage. Avoids the downward flow of the defects. Works well for small projects where requirements
are easily understood. Easy to manage due to the rigidity of model Testing activities like planning, test designing
happens well before coding. This saves a lot of time. Hence higher chance of success over the waterfall model.
27
Disadvantages of V-Model Very rigid and least flexible. Software is developed during the implementation
phase, so no early prototypes of the software are produced.
Does not easily handle dynamic changes in requirements
Poor model for long and ongoing projects. If any changes happen in midway, then the test
documents along with requirement documents has to be updated.
Does not handle iterations or phases
Example Software for Admission management
system
Incremental ModelIn incremental model the whole requirement is divided into various builds(chunks). Multiple development cycles take place here, making the life cycle a “multi-waterfall” cycle.
Cycles are divided up into smaller, more easily managed modules.
A working version of software is produced during the first module
So, Working software early on during the software life cycle.
Incremental Model
When to use the Incremental Model
This model can be used when the requirements of the complete system are clearly defined and understood.
When user want some portion of the software as early as possible.
There is a need to get a product to the market early.
Resources with needed skill set are not available There are some high risk features and goals. Major requirements must be defined; however,
some details can evolve with time.
Advantages of Incremental Model Generates working software quickly and early
during the software life cycle. This model is more flexible – less costly to change
scope and requirements. Time effective Lowers initial delivery cost. It is easier to test and debug during a smaller
iteration. In this model customer can respond to each built. Easier to manage risk because risky pieces are
identified and handled during it’d iteration.
Disadvantage of Incremental Model
Total cost is higher than waterfall. Needs good planning and design. Needs a clear and complete definition of
the whole system before it can be broken down and built incrementally.
Integration overhead
Example MS word Photoshop CorelDraw
Evolutionary Models Software system evolves(to change) over time
as requirements often change as development proceeds. Thus, a straight line to a complete end product is not possible. However, a limited version must be delivered to meet competitive pressure.
Usually a set of core product or system requirements is well understood, but the details and extension have yet to be defined.
Cont… You need a process model that has been
explicitly designed to accommodate a product that evolved over time.
It is iterative that enables you to develop increasingly more complete version of the software.
Two types are introduced, namely Prototype Process Model Spiral Process Models.
Evolutionary Models: Prototyping The basic idea here is that instead of freezing
the requirements before a design or coding can proceed, a throwaway prototype is built to understand the requirements. This prototype is developed based on the currently known requirements.
By using this prototype, the client can get an “actual feel” of the system, since the interactions with prototype can enable the client to better understand the requirements of the desired system.
Prototype The prototype are usually not complete
systems and many of the details are not built in the prototype. The goal is to provide a system with overall functionality.
It is just the Dummy product, or a sample product just to show the customer that how actual product will look like.
Customer evaluate prototype to refine requirements
Prototype Model
When to use Prototype Model Prototype model should be used when the desired
system needs to have a lot of interaction with the end users.
Typically, online systems, web interfaces have a very high amount of interaction with end users, are best suited for Prototype model. It might take a while for a system to be built that allows ease of use and needs minimal training for the end user.
Prototyping ensures that the end users constantly work with the system and provide a feedback which is incorporated in the prototype to result in a useable system. They are excellent for designing good human computer interface systems.
Advantages Since a working model of the system is displayed, the
users get better understanding of the system being develop
Errors can be detected much earlier. Reduces time and cost as the defects can be detected
much earlier. Quicker user feedback is available leading to better
solutions. Missing functionality can be identified easily Since in this methodology a working model of the system
is provided, the users get a better understanding of the system being developed.
Confusing or difficult functions can be identifiedRequirements validation, Quick implementation of, incomplete, but functional, application.
Disadvantages Leads to implementing and then repairing way
of building systems. Users may get confused in the prototypes and
actual systems. Practically, this methodology may increase the
complexity of the system as scope of the system may expand beyond original plans.
Incomplete application may cause application not to be used as the full system was designedIncomplete or inadequate problem analysis.
Example Web Apps online systems
Rapid Application Development Model
In RAD model the functional modules are developed in parallel as prototypes and are integrated to make the complete product for faster product delivery.
RAD Model
When to use RAD Model RAD should be used when there is a need to develop fully
functional system within very short time(60 to 90 days) Whole System can be divided in to small modules User want complete working software as soon as possible User is willing to pay more It should be used if there’s high availability of designers
for modeling RAD SDLC model should be chosen only if resources with
high business knowledge are available and there is a need to produce the system in a short span of time (2-3 months).
Advantages Changing requirements can be accommodated. Progress can be measured. Reduced development time. Increases reusability of components Encourages customer feedback Quick initial reviews occur Iteration time can be short with use of powerful RAD
tools. Productivity with fewer people in short time. Integration from very beginning solves a lot
of integration issues.
Disadvantages Only system that can be modularized can be built
using RAD. Requires highly skilled developers/designers. High dependency on modeling skills. Inapplicable to cheaper projects as cost of
modeling and automated code generation is very high.
Management complexity is more. Dependency on technically strong team members
for identifying business requirements. Suitable for systems that are component based
and scalable. Requires user involvement throughout the life
cycle. Suitable for project requiring shorter
development times.
Spiral Model A heavy-weight, plan-driven, highly-
structured approach for large projects. Especially designed for those with higher
chances of failure. Combines iterative model and waterfall,
emphasizes risk assessment(tashkhees), customer participation, prototyping, and more.
Definitely an iterative process.
Spiral ModelSpiral model has different phases depending upon the choice that team make.CommunicationPlanningModelingConstructionDeployment
Spiral Model
Spiral Model Planning Phase: Requirements are gathered
during the planning phase. Requirements like ‘BRS’ that is ‘Business Requirement Specifications’ and ‘SRS’ that is ‘System Requirement specifications’.
Risk Analysis: In this phase, a process is undertaken to identify risk and alternate solutions. A prototype is produced at the end of the risk analysis phase. If any risk is found during the risk analysis then alternate solutions are suggested and implemented.
Spiral Model Construction Phase: In this phase
software is developed, along with testing at the end of the phase. Hence in this phase the development and testing is done.
Deployment phase: This phase allows the customer to evaluate the output of the project to date before the project continues to the next spiral.
When to use Spiral Model When the project is large For medium to high-risk projects When costs and risk evaluation is important Users are unsure of their needs Requirements are complex New product line Long-term project commitment unwise because
of potential changes to economic priorities Significant changes are expected (research and
exploration)
Advantages of Spiral Model High amount of risk analysis hence,
avoidance of Risk is enhanced. Good for large and mission-critical
projects. Strong approval and documentation
control. Additional Functionality can be added at
a later date. Software is produced early in
the software life cycle.
Disadvantages Spiral Model Can be a costly model to use. Risk analysis requires highly specific
expertise. Project’s success is highly dependent on
the risk analysis phase. Doesn’t work well for smaller projects.
Example Robotic software
Win-Win Model The Win-Win spiral approach is an
extension of the spiral approach. The phase in this approach is same as the phase in the spiral approach. The only difference is that at the time of the identifying the requirements, the development team and the customer hold discussion and negotiate on the requirements that need to be included in the current iteration of the software.
Win-Win Model Addresses more on customer
communication, the following activities are defined:
1. Identification of the system or subsystem’s key “stakeholder”.
2. Determination of the stakeholders’ “win conditions”.
3. Negotiation of the stakeholders’ win conditions to reconcile them into a set of win-win conditions for all concerned.
Win-Win Model
Win-Win Model The approach is called Win-Win because it is a winning situation for the development team and also for the customer. The customer wins by getting the product that fulfills most of the requirements while the development team wins by delivering software which is developed with all the requirements established after negotiations with the customer. The Win-Win approach is generally used when you have time-bound releases.
Example Complex web app
Component Based Development Component based development—the
process to apply when reuse is a development objective (COTS)
Component based development Available component-based products are
researched and evaluated for the application domain in question.
Component integration issues are considered. A software architecture is designed to
accommodate the components. Components are integrated into the
architecture. Comprehensive testing is conducted to
ensure proper functionality.
Advantages The component-based development
model leads to software reuse, and reusability provides software engineers with a number of measurable benefits.
Your software engineering team can achieve a reduction in development cycle time
as well as reduction in project cost if component reuse becomes part of your culture.