22
Solar and Wind Energy September 19, 2012 NC DOR Michael Brown Dave Duty

Solar and Wind Energy

  • Upload
    lynde

  • View
    39

  • Download
    4

Embed Size (px)

DESCRIPTION

Solar and Wind Energy. September 19, 2012 NC DOR Michael Brown Dave Duty. Where Are We Currently?. N.C. Wind Projects Stalled; Buyers, Activists Blamed. Stalled projects : - PowerPoint PPT Presentation

Citation preview

Page 1: Solar and Wind Energy

Solar and Wind Energy

September 19, 2012

NC DOR Michael Brown

Dave Duty

Page 2: Solar and Wind Energy

Where Are We Currently?

Page 3: Solar and Wind Energy

N.C. Wind Projects Stalled; Buyers, Activists Blamed

• Stalled projects:- Invenergy has yet to apply for a state permit for its Hales Lake project of more than 100 turbines in Camden and Currituck counties.

- In Beaufort County, the Pantego project, consisting of 49 turbines, is on indefinite hold as further studies are done on migrating swans and geese.

- In Pasquotank County, - Atlantic Wind LLC's 150-turbine farm - has yet to begin construction because the company is waiting to find a buyer of the electricity it would produce.

• Source: PilotOnline.com, Aug. 4, 2012

Page 4: Solar and Wind Energy

Transporting the Blades

Page 5: Solar and Wind Energy
Page 6: Solar and Wind Energy

Wind Power Facts• Tower height: range from 200 to 300 feet

• Blade length: range from 66 to 130 feet, or more, usually having three blades

• A 1.5 MW turbine is 260 ft. tall. The rotor assembly (blades and hub) weighs 48, 000 lbs. The nacelle, generator component weights 115,000 lbs. The concrete for the tower is 58, 000 lbs. of reinforcing steel and 250 cubic yards of concrete. The base is 50 feet in diameter and 8 ft. thick near the center.

• Source: Wikipedia

Page 7: Solar and Wind Energy

Source: http://www.appstate.edu/~js77542/REI-Broyhill-wind.html

Page 8: Solar and Wind Energy

Example Solar Farm

• South Robeson Farm Project – 6.4 MW• Rowland, Robeson NC• Output - South Robeson produces

approximately 8,880 MWh of electricity a year, which is the same amount of energy used by 1,000 average homes in North Carolina.

Page 9: Solar and Wind Energy

Robeson County

Page 10: Solar and Wind Energy

Robeson County

Page 11: Solar and Wind Energy

Street Overpass in Raleigh

Page 12: Solar and Wind Energy

Business Rooftops

Page 13: Solar and Wind Energy

Residential

Page 14: Solar and Wind Energy

Government/Private Venture

Page 15: Solar and Wind Energy

Market Value

• Value the land as commercial property using your schedule of values from your most recent reappraisal. Add any value for improvements made to the land.

Page 16: Solar and Wind Energy

Present-Use ValueBusiness Entity Ownership Issue

• For property owned by a business entity that may convert some of the property to a solar farm the “principal business” requirement still applies.

• So, the income from the farming and solar farm may need to be reviewed to determine if the property still qualifies for present-use value.

Page 17: Solar and Wind Energy

Present-Use ValueAssuming Property is in PUV

• Land that is in present-use value program and the land is sold to a non-qualifying owner the rollback will be due.

• Land is no longer in production of agricultural, horticultural or forest land the rollback will be due. This could be any fenced off area or base area of wind turbine.

Page 18: Solar and Wind Energy

Solar Farming, Sheep and Present-Use Value

• Can sheep and solar farms exist in present-use value?

• If the land that is converted to a solar farm and stays in production raising sheep, then our opinion is yes.

• This is to be reviewed on a case by case basis.• Other animals may qualify, currently we are only

aware of situations where sheep are being used.

Page 19: Solar and Wind Energy

Just to Clarify the Issue.

• Solar panels are high enough off the ground for animals to freely graze under.

• Fencing is around the perimeter of the solar farm is okay. Fencing which prevents the animals from grazing under the panels is not.

• This only relates to production, assuming that all other requirements of PUV have been met.

Page 20: Solar and Wind Energy

Solar Farms and Sheep

Page 21: Solar and Wind Energy

Solar Farms and Sheep

Page 22: Solar and Wind Energy

Contact Information

NC Department of Revenue919.733.7711

Michael [email protected]

David [email protected]