© Syntegra Solar SYNTEGRA SOLAR CONFIDENTIAL
September 2016
Content
Page 1
1. Syntegra Solar: who we are
2. Syntegra Solar: what we do
3. Syntegra Solar: selected references in South-East Asia
4. Key Messages / Key Information regarding PV
© Syntegra Solar SYNTEGRA SOLAR CONFIDENTIAL Page 2
Syntegra Solar has emerged as the leading service provider of Owners Engineer and Lenders Technical Advisor Services in South-East Asia
On-time and on-budget PV Power Plant Completion:
Most recent PV Power Plant project references in South-East Asia
Key References, South-East Asia, 2015 -2016:
• RASLAG I, II 10+13 MWp I: completed/commissioned March 2015, the first large ground-mounted Phil. PV Power Plants,
II: completed and commissioned on 18.12.2015 – 5 weeks ahead of schedule
• bronzeoak - San Carlos 1A&B 22 MWp completed October 2014 – Syntegra Solar came in after failed DOE testing to replace OE
- San Carlos 1C&D 23 MWp completed and commissioned June 2015 – initial performance 7% over expected energy yield!
- La Carlotta 33 MWp completed and commissioned March 7, 2016
- Manapla 48 MWp completed and commissioned March 5, 2016
- Bais 18 MWp completed and commissioned February 27, 2016
• PGEC Tarlac City I 50 MWp commissioned on 28.01. 2016, exactly on-time and on-budget – total installation time 123 days!
• MW - Silay 25 Mwp completed and commissioned on February 23, 2016
- Bataan 18 MWp completed and commissioned on March14, 2016
- Toledo 60 MWp ongoing – Syntegra tasked after this project missed FIT deadlines, to be commissioned 09/2016
• ETS, Naic 50 MWp ongoing – Syntegra tasked after this project failed to obtain permits, to be commissioned 12/2016
We are engaged / have commissioned larger PV Power Plants totaling >370 MWp
in the Philippines alone
© Syntegra Solar SYNTEGRA SOLAR CONFIDENTIAL
One of the first larger ground-mounted PV Power Plants in the Philippines – commissioned 5 weeks ahead of schedule
For example:
Pictures of a 23,2 MWp PV Power Plant, RASLAG Phase 1 and Phase 2
Page 3
© Syntegra Solar SYNTEGRA SOLAR CONFIDENTIAL
First very large PV Power Plant Project on Negros
For example:
Pictures of a 43 MWp PV Power Plant Portfolio (SaCaSol 1A/B/C/D)
Page 4
© Syntegra Solar SYNTEGRA SOLAR CONFIDENTIAL
A state-of-the-art, standard setting PV Power Plant – a landmark installation by all accounts, see next page
For example:
Pictures of a 50,1 MWp PV Power Plant – the reference in South East Asia
Page 5
Total construction time – from “first pile in” to “first power out” – app. 4 month (123 days)
© Syntegra Solar SYNTEGRA SOLAR CONFIDENTIAL
PV Power Plant Projects developed and installed during 2012 to 2013
References in Thailand
Page 6
• 2 PV Power Plants total 20 MWp Ubon EPC Project Management (Bauleitung)
• 3 PV Power Plants total 28 MWp Kamphaenphet EPC Project Management (Bauleitung) Technical Details: Nominal Production Capacity: 48.377 kWp Number of PV Modules: 163.989 PV Module Make and Type: Canadian Solar 295Wp PV Inverter: Schneider XC 680 Commissioning: July 2014 Energy Harvest p.a.: app. 75.000 MWh p.a. CO2 Savings p.a.: app. 48.500 tons CO2 p.a. Role & Responsibility: Project/Construction Management