Upload
others
View
9
Download
0
Embed Size (px)
Citation preview
Soliman Structures Inc GENERAL CONTRACTOR LlC It CGC 1518101
Concrete Structural Shell Contractor
WWWSOLIMANSTRUCTURESCOM
Miguelsolimanstructurescom
Resume
5511 SW 8h Street Suite 202
Miami FL 33135 Off (786) 717-7477 Fax (786) 717-7478
Cell (786) 367-0323
Organization of Corporation
Date of Incorporation September 30111 2003
State of Incorporation Florida
Presidents name Miguel Soliman (100 Owner)
Certified as State of Florida Certified General Contractor License number CGC1S18101 (Held by Miguel Soliman)
Certified as State of Florida Certified Building Contractor License number CBC028090 (Held by Miguel Soliman)
Registered as Miami-Dade County General Contractor Pool Contractor and Roofing Contractor
License number CC-04BS00186 (Held by Miguel Soliman)
PERSONAL RESUME MIGUEL SOLIMAN MIAMIFL
Education High School Diploma Garces Commercial College (Architectural Drafting Diploma 18 months) Certificate How to Manage Stress Certificate Assertiveness Training
Experience Architectural Designer 1980 to 1984 Construction Manager 1984 to 1985 Burger King Corporation Prepare and implement BuildingZoning Code requirements to produce Working drawings for Permitting and Construction of Burger King Restaurants throughout the entire United States
Project Superintendent 1985 to 1987 H G Enterprises Supervised and coordinated the construction of a 1200 residential homes development Estancia in South Miami Dade County
OwnerPresident since 1987 to 2003 Builders amp Developers Corp company was diversified into residential and commercial construction
OwnerPresident since October 2003 Soliman Structures Inc Mid-rise and high-rise building structural shell contractor
COMPANY HISTORYPERFORMANCE
PROJECTS UNDER CONSTRUCTION
PROJECT NAME amp ADDRESS
STADIUM APARTMENTS 1244 NW 5 STREET MIAMI FL 33125 (GENERAL CONTRACTOR)
CONTACT NAME amp INFORMATION
DEVELOPERGENERAL CONTRACTOR BANYAN FLORIDA INVESTMENTS LLC MR ROLANDO HOLZ CELL (305) 305-9039 4 STORY 10 UNIT APARTMENT BLDG TOT AL PROJECT COST $79600000
AURORA APARTMENTS 900 SW 7TH STREET MIAMI FL 33130 (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERGERNERALCONTRACTOR AURORA APARTMENTS LLC MR DIEGO RESTREPO CELL (305) 281-4862 5 STORY 21 UNIT APARTMENT BLDG TOT AL PROJECT COST $115000000
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
AQUARELLA CONDOMINIUM 401 SW 17TH AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GERNERALCONTRACTOR
JCOM CONSTRUCTION INC MR JOSE CAYMARES CELL (305) 281-4862 6 STORY 35 UNIT CONDO BLDG TOTAL PROJECT COST $155000000
ALLEGRO LIFE APARTMENTS 568 NE 66TH STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERAL CONTRACTOR BRUCIA LLC MR ROLANDO HOLZ CELL (305) 305-9039 6 STORY 10 UNIT APT BLDG TOT AL PROJECT COST $61000000
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
PONCE ENTRANCE APARTMENTS 101 SW 36TH COURT MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERGENERAL CONTRACTOR SUNCOAST CONSTRUCTION GROUP INC MR JAVIER SANCHEZ CELL (305) 491-1647 8 STORY 59 UNIT APT BLDG WITH A SUBBASEMENT PARKING GARAGE TOTAL PROJECT COST $260000000
MIRAMAR APARTMENTS 1023 SW 6TH STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERGENERAL CONTRACTOR MIRAMAR APARTMENTS LLC MRERNIE ABREU CELL (786) 287-0996 6- STORY 44 UNIT APT BLDG TOTAL PROJECT COST $254000000 COMPLETION DATE SEPTEMBER 2012
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
MONSERRATE APARTMENTS 435 SW 12TH AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERAL CONTRACTOR MONSERRATE APARTMENTS LLC MR ERNIE ABREU CELL (786) 287-0996 7 STORY 35 UNIT APT BLDG TOTAL PROJECT COST $197000000 COMPLETION DATE OCTOBER 2011
HOFFMAN GARDENS GENERAL CONTRACTOR 925 W 75 TH STREET GREYSTOKE CONSTRUCTION HIALEAH FL MR GUST A VO BLAZQUEZ (STRUCTURAL SHELL CONTRACTOR) CELL (786) 417-9060
2 STORY 22 UNIT APT BLDG TOTAL PROJECT COST $37000000 COMPLETION DATE JUNE 2010
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
MARLfNS BALLPARK PARKfNG GARAGE I amp II 1650 N W 7TH STREET HIALEAH FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR SUFFOLK CONTRUCTION MR TIM STERLfNG CELL (305) 970-5549 CONTRUCTION OF FOUNDATIONS FOR PARKING GARAGE I amp II TOTAL PROJECT COST $118500000 COMPLETION DATE JANUARY 2011
LAS BRISAS DE V ARADERO 4840 N W 7TH STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERGENERAL CONTRACTOR M ARAN AT A CONSTRUCTION MR ISMAEL SORIANO CELL (305) 796-8807 5 STORY 46 UNIT APT BLDG TOTAL PROJECT COST $93750000 COMPLETION DATE APRIL 2009
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
VALUE PLACE HOTEL 2750 NE 8TH STREET HOMESTEAD FL (STRUCTURAL SHELL CONTRACTOR)
MI PRIM ERA ILLUSION VILLAS 502 SW 18TH AVENUE M1AMI FL (OWNER)
GENERAL CONTRACTOR TRl-TECH CONSTRUCTION MR SERJIO ELIKOPOLJSKI CELL (305) 796-8807 4 STORY 120 UNIT HOTEL BLDG TOTAL PROJECT COST $67500000 COMPLETION DATE NOVEMBER 2008
DEVELOPERJGClSHELL CONTRACTOR MR MIGUEL SOLIMAN CELL (786) 367-0323 4 STORY 30 UNIT CONDO BLDG TOTAL PROJECT COST $420000000 COMPLETION DATE DECEMBER 2008
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
BIG HA V ANA LLC 602 SW 5TH AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPER MR MAURO SCAITALINI CELL (786) 877-5187 5 STORY CONDOMINIUM BLDG TOTAL PROJECT COST $74585000 COMPLETION DATE AUGUST 2007
R amp E DEVELOPMENT DEVELOPERlGC 295 NW 57th AVE MR RAFAEL ROSADO MIAMI FL OFF (305) 267-9006 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APARTMENT BLDG
TOTAL PROJECT COST $135267500 COMPLETION DATE JANUARY 2008
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
R amp E DEVELOPMENT 12039 SW 132ND COURT MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERlGC MR RAFAEL ROSADO OFF (305) 267-9006 2 STORY OFFICE BLDG TOTAL PROJECT COST $72000000 COMPLETION DATE SEPTEMBER 2007
MIAMI FOREST VILLAS GENERAL CONTRACTOR 954 SW 36TH COURT MR JORGE LEON MIAMI FL OFF (786) 295-2798 (STRUCTURAL SHELL CONTRACTOR) 5 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $45000000 COMPLETION DATE OCTOBER 2005
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
THE LUXOR RESIDENCES DEVELOPERJGC 2700 SW 23RD STREET MR EDGAR SABBAGH MIAMI FL OFF (786) 402-6468 (STRUCTURAL SHELL CONTRACTOR) 15 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $414612900 COMPLETION DATE MAY 2006
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
LOFTS ON BRlCKELL 1 amp 2 1528 AND 1660 BRICKELL AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERALCONTRACTOR
MR ALFREDO ACOSTA OFF (305) 371-6220 (2) 5 STORY CONDOMUNIUM BUILDINGS (28000 sq ft each) TOT AL PROJECT COST $197202600 COMPLETION DATE JUNE 2005
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
BA YLOFT CONDOMINnJMS 425 NE 25 tl1 STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR AGUSTIN MORALES OFF (786) 256-0078 9 STORY CONDOMINIUM BUILDING (110000 sq ft) TOTAL PROJECT COST $192000000 COMPLETION DATE MAY 2004
DIXIE GROVE CONDOMINnJMS OWNER 2630 SW 2S tl1 STREET MR CARLOS RUA COCONUT GROVE FL OFF (305) 441-2242 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APT BLDG WI BASEMENT
PARKING GARAGE (70000 sq ft) TOTAL PROJECT COST $224000000 COMPLETION DATE MARCH 2004
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
STORAGE MART 9900 BIRD ROAD MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR JOHN BERG CELL (305) 216-1971 4 STORY SELF STORAGE FACILITY (90000 sq ft) TOT AL PROJECT COST $187000000 COMPLETION DATE JANUARY 2004
TERRALAND WAREHOUSE (No Picture) DEVELOPER 13500 SW 131 ST STREET MR JOSE GONZALEZ MIAMI FL OFF (786) 256-0078 (STRUCTURAL SHELL CONTRACTOR) OFFICEIWAREHOUSE BUILDING CON
(25000 sq ft) TOTAL PROJECT COST $84000000
CONSTRUCTION PROJECTS COMPLETED (dba Builders amp Developers Corp)
TAMAYO WAREHOUSE 10741 SW 23 RD STREET MIAMI FL
DISPLA Y INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
DISPLAY INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
JOSE GONZALEZ 14340 SW 99TH AVENUE MIAMI FL
13500 SF WAREHOUSE (5) BAYS TOT AL PROJECT COST $65722400
10850 SF WAREHOUSE ADDITION TOTAL PROJECT COST$43800000
2850 SF WAREHOUSE ADDITION TOT AL PROJECT COST$13800000
4500 SF RESIDENCE TOTAL PROJECT COST$26290000
JOSE GONZALEZ 14651 SW 99TH COURT MIAMI FL
JOSE GONZALEZ 14610 SW AVENUE MIAMI FL
RENE ALVAREZ PAINT AND BODY SHOP 10750 NW ST MIAMI FL
MAIL EXPRESS 8299 NW 30TH TERR
FL
SOTHYS WAREHOUSE 1550NW AVE
FL
LUBARSEAFOOD 8325 NW TERR
FL
MARlTIME FRIEGHT 10875 NW 33RD ST MIMlI FL
SENNARI 10775 NW ST MIAMI FL
GA TEW A Y FRIEGHT 10855 NW ST MIANIl FL
SAFEW A Y FRIEGHT 10871 NW ST MIAMI FL
SILMAR 10945 NW MIAMI FL
NIPRO MEDICAL 10877 NW 33 RD ST MIAMI FL
SIRUBA INDUSTRIES 10905 NW ST MIAMI FL
WENNIN FRIEGHT 10825 NW 33RD ST MIAMI FL
MIGUEL SOLIMAN
6300 SF RESIDENCE TOTAL PROJECT COST$36890000
SF RESIDENCE TOT AL PROJECT COSTS21290000
SF AUTO BODY SHOP INCLUDING ALL SITE DRAINAGE PAVING AND EXT PREP FACILITIES TOTAL PROJECT COST $31500000
20000 SF AND WAREHOUSE TOT AL PROJECT COST $76800000
J 8000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $57600000
24000 SF AND WAREHOUSE TOT AL PROJECT COST $77900000
10000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $33500000
I SF OFFICE AND WAREHOUSE TOT AL PROJECT COST $57750000
20000 SF OFFICE WAREHOUSE TOTAL PROJECT COST $66300000
SF OFFICE AND WAREHOUSE TOT AL COST $28900000
J SF AND WAREHOUSE TOTAL PROJECT COST $49300000
15000 SF OFFICE AND WAREHOUSE TOTAL PROJECT $48000000
I SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $48600000
SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $29400000
6200 SF SINGLE FAMILY RESIDENCE SOLD 1996 $48400000
FUTURE DEVELOPERS INC r Y AIRA SUBDIVISION ) WEST ST amp AVE HIALEAH FL
PROJECT FINANCED BY READY STATE BANK
UNIFIED INC e MELENA SUBDIVISION ) WEST 70TH ST amp AVE
FL
NOTE PROJECT WAS ONGOING WHEN HURRlCANE ANDREW HIT DADE COUNTY
FUTURE INC ( JIBACOA SUBDIVISION ) WEST n ND ST amp 26TH AVE
FL
FUTURE DEVELOPERS INC e BAYAMO SUBDIVISION ) WEST 74TH ST amp AVE
FL
FUTURE INC r ALAMEDA SUBDIVISION )
SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AlfD THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH (8) MONTHS TOTAL PROJECT COST $191500000
(42) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE (42) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH ( MONTH TOTAL PROJECT COST $249400000
(23) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 1700 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO
PROJECT $143700000
(21) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 2200 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT FPL SOUTHERN BELL AND
THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION AND DRAINAGE SYSTEM THE 1) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $130200000
(10) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 900
WEST 69TH ST amp AVE FL
CITGO GASOLINE STATION 7200 SW AVENUE MIAMI FL
CALECO FLORIDA INVESTMENTS INC (HIALEAH GARDENS INDUSTRiAL 12190NW AVE HIALEAH FL
CMA INC (CORAL SPRINGS MEDICAL CENTER) 8150 ROYAL PALM DRNE CORAL FL
HG ENTERPRISES INC
AVE
G PROULX BUILDING MATERIALS ATTN KELO MARTINEZ 3275 SW 42ND STREET FT LAUDERDALE FL 33312
ADONEL CONCRETE ATTN LUIS GARCIA 2101 NW 110 AVENUE MIAlVII FL 33172
BUILDING ATTN JEFF NUDELMAN 1341 NW 1 STREET POMPANO FL 33172
JOHN ABELL CORPORATION ATTN ANGEL RODRIGUEZ 10500 SW 1 STREET MIAMI FL 33157
TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE FIOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $57600000
400 SF BUILDING FI RESTROOMS OFFICE AND STORAGE TOTAL PROJECT COST$2875000
THIS CONTRACT WAS TO TAKE A RAW PIECE OF LAND DEMUCK FILL AND CONSTRUCT A (9) BAY SF
AND COMPLEX FROM FOUNDATION TO CERTIFICATE OF OCCUPANCY TOTAL PROJECT COST $58000000
THIS CONTRACT WAS TO BUILT A DENT AL OFFICE WITH EXTENSIVE PLUMBING AND GAS SYSTEMS THIS CONTRACT WAS A TURN KEY OPERATION TOTAL PROJECT COST $14200000
THIS CONTRACT WAS TO PROVIDE CONTRUCTION OF STRUCTURAL AND FRAMING SHELL FOR (56) SINGLE FAMILY RESIDENCES TOTAL PROJECTS COST $94080000
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
COMPANY HISTORYPERFORMANCE
PROJECTS UNDER CONSTRUCTION
PROJECT NAME amp ADDRESS
STADIUM APARTMENTS 1244 NW 5 STREET MIAMI FL 33125 (GENERAL CONTRACTOR)
CONTACT NAME amp INFORMATION
DEVELOPERGENERAL CONTRACTOR BANYAN FLORIDA INVESTMENTS LLC MR ROLANDO HOLZ CELL (305) 305-9039 4 STORY 10 UNIT APARTMENT BLDG TOT AL PROJECT COST $79600000
AURORA APARTMENTS 900 SW 7TH STREET MIAMI FL 33130 (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERGERNERALCONTRACTOR AURORA APARTMENTS LLC MR DIEGO RESTREPO CELL (305) 281-4862 5 STORY 21 UNIT APARTMENT BLDG TOT AL PROJECT COST $115000000
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
AQUARELLA CONDOMINIUM 401 SW 17TH AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GERNERALCONTRACTOR
JCOM CONSTRUCTION INC MR JOSE CAYMARES CELL (305) 281-4862 6 STORY 35 UNIT CONDO BLDG TOTAL PROJECT COST $155000000
ALLEGRO LIFE APARTMENTS 568 NE 66TH STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERAL CONTRACTOR BRUCIA LLC MR ROLANDO HOLZ CELL (305) 305-9039 6 STORY 10 UNIT APT BLDG TOT AL PROJECT COST $61000000
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
PONCE ENTRANCE APARTMENTS 101 SW 36TH COURT MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERGENERAL CONTRACTOR SUNCOAST CONSTRUCTION GROUP INC MR JAVIER SANCHEZ CELL (305) 491-1647 8 STORY 59 UNIT APT BLDG WITH A SUBBASEMENT PARKING GARAGE TOTAL PROJECT COST $260000000
MIRAMAR APARTMENTS 1023 SW 6TH STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERGENERAL CONTRACTOR MIRAMAR APARTMENTS LLC MRERNIE ABREU CELL (786) 287-0996 6- STORY 44 UNIT APT BLDG TOTAL PROJECT COST $254000000 COMPLETION DATE SEPTEMBER 2012
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
MONSERRATE APARTMENTS 435 SW 12TH AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERAL CONTRACTOR MONSERRATE APARTMENTS LLC MR ERNIE ABREU CELL (786) 287-0996 7 STORY 35 UNIT APT BLDG TOTAL PROJECT COST $197000000 COMPLETION DATE OCTOBER 2011
HOFFMAN GARDENS GENERAL CONTRACTOR 925 W 75 TH STREET GREYSTOKE CONSTRUCTION HIALEAH FL MR GUST A VO BLAZQUEZ (STRUCTURAL SHELL CONTRACTOR) CELL (786) 417-9060
2 STORY 22 UNIT APT BLDG TOTAL PROJECT COST $37000000 COMPLETION DATE JUNE 2010
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
MARLfNS BALLPARK PARKfNG GARAGE I amp II 1650 N W 7TH STREET HIALEAH FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR SUFFOLK CONTRUCTION MR TIM STERLfNG CELL (305) 970-5549 CONTRUCTION OF FOUNDATIONS FOR PARKING GARAGE I amp II TOTAL PROJECT COST $118500000 COMPLETION DATE JANUARY 2011
LAS BRISAS DE V ARADERO 4840 N W 7TH STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERGENERAL CONTRACTOR M ARAN AT A CONSTRUCTION MR ISMAEL SORIANO CELL (305) 796-8807 5 STORY 46 UNIT APT BLDG TOTAL PROJECT COST $93750000 COMPLETION DATE APRIL 2009
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
VALUE PLACE HOTEL 2750 NE 8TH STREET HOMESTEAD FL (STRUCTURAL SHELL CONTRACTOR)
MI PRIM ERA ILLUSION VILLAS 502 SW 18TH AVENUE M1AMI FL (OWNER)
GENERAL CONTRACTOR TRl-TECH CONSTRUCTION MR SERJIO ELIKOPOLJSKI CELL (305) 796-8807 4 STORY 120 UNIT HOTEL BLDG TOTAL PROJECT COST $67500000 COMPLETION DATE NOVEMBER 2008
DEVELOPERJGClSHELL CONTRACTOR MR MIGUEL SOLIMAN CELL (786) 367-0323 4 STORY 30 UNIT CONDO BLDG TOTAL PROJECT COST $420000000 COMPLETION DATE DECEMBER 2008
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
BIG HA V ANA LLC 602 SW 5TH AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPER MR MAURO SCAITALINI CELL (786) 877-5187 5 STORY CONDOMINIUM BLDG TOTAL PROJECT COST $74585000 COMPLETION DATE AUGUST 2007
R amp E DEVELOPMENT DEVELOPERlGC 295 NW 57th AVE MR RAFAEL ROSADO MIAMI FL OFF (305) 267-9006 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APARTMENT BLDG
TOTAL PROJECT COST $135267500 COMPLETION DATE JANUARY 2008
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
R amp E DEVELOPMENT 12039 SW 132ND COURT MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERlGC MR RAFAEL ROSADO OFF (305) 267-9006 2 STORY OFFICE BLDG TOTAL PROJECT COST $72000000 COMPLETION DATE SEPTEMBER 2007
MIAMI FOREST VILLAS GENERAL CONTRACTOR 954 SW 36TH COURT MR JORGE LEON MIAMI FL OFF (786) 295-2798 (STRUCTURAL SHELL CONTRACTOR) 5 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $45000000 COMPLETION DATE OCTOBER 2005
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
THE LUXOR RESIDENCES DEVELOPERJGC 2700 SW 23RD STREET MR EDGAR SABBAGH MIAMI FL OFF (786) 402-6468 (STRUCTURAL SHELL CONTRACTOR) 15 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $414612900 COMPLETION DATE MAY 2006
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
LOFTS ON BRlCKELL 1 amp 2 1528 AND 1660 BRICKELL AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERALCONTRACTOR
MR ALFREDO ACOSTA OFF (305) 371-6220 (2) 5 STORY CONDOMUNIUM BUILDINGS (28000 sq ft each) TOT AL PROJECT COST $197202600 COMPLETION DATE JUNE 2005
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
BA YLOFT CONDOMINnJMS 425 NE 25 tl1 STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR AGUSTIN MORALES OFF (786) 256-0078 9 STORY CONDOMINIUM BUILDING (110000 sq ft) TOTAL PROJECT COST $192000000 COMPLETION DATE MAY 2004
DIXIE GROVE CONDOMINnJMS OWNER 2630 SW 2S tl1 STREET MR CARLOS RUA COCONUT GROVE FL OFF (305) 441-2242 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APT BLDG WI BASEMENT
PARKING GARAGE (70000 sq ft) TOTAL PROJECT COST $224000000 COMPLETION DATE MARCH 2004
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
STORAGE MART 9900 BIRD ROAD MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR JOHN BERG CELL (305) 216-1971 4 STORY SELF STORAGE FACILITY (90000 sq ft) TOT AL PROJECT COST $187000000 COMPLETION DATE JANUARY 2004
TERRALAND WAREHOUSE (No Picture) DEVELOPER 13500 SW 131 ST STREET MR JOSE GONZALEZ MIAMI FL OFF (786) 256-0078 (STRUCTURAL SHELL CONTRACTOR) OFFICEIWAREHOUSE BUILDING CON
(25000 sq ft) TOTAL PROJECT COST $84000000
CONSTRUCTION PROJECTS COMPLETED (dba Builders amp Developers Corp)
TAMAYO WAREHOUSE 10741 SW 23 RD STREET MIAMI FL
DISPLA Y INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
DISPLAY INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
JOSE GONZALEZ 14340 SW 99TH AVENUE MIAMI FL
13500 SF WAREHOUSE (5) BAYS TOT AL PROJECT COST $65722400
10850 SF WAREHOUSE ADDITION TOTAL PROJECT COST$43800000
2850 SF WAREHOUSE ADDITION TOT AL PROJECT COST$13800000
4500 SF RESIDENCE TOTAL PROJECT COST$26290000
JOSE GONZALEZ 14651 SW 99TH COURT MIAMI FL
JOSE GONZALEZ 14610 SW AVENUE MIAMI FL
RENE ALVAREZ PAINT AND BODY SHOP 10750 NW ST MIAMI FL
MAIL EXPRESS 8299 NW 30TH TERR
FL
SOTHYS WAREHOUSE 1550NW AVE
FL
LUBARSEAFOOD 8325 NW TERR
FL
MARlTIME FRIEGHT 10875 NW 33RD ST MIMlI FL
SENNARI 10775 NW ST MIAMI FL
GA TEW A Y FRIEGHT 10855 NW ST MIANIl FL
SAFEW A Y FRIEGHT 10871 NW ST MIAMI FL
SILMAR 10945 NW MIAMI FL
NIPRO MEDICAL 10877 NW 33 RD ST MIAMI FL
SIRUBA INDUSTRIES 10905 NW ST MIAMI FL
WENNIN FRIEGHT 10825 NW 33RD ST MIAMI FL
MIGUEL SOLIMAN
6300 SF RESIDENCE TOTAL PROJECT COST$36890000
SF RESIDENCE TOT AL PROJECT COSTS21290000
SF AUTO BODY SHOP INCLUDING ALL SITE DRAINAGE PAVING AND EXT PREP FACILITIES TOTAL PROJECT COST $31500000
20000 SF AND WAREHOUSE TOT AL PROJECT COST $76800000
J 8000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $57600000
24000 SF AND WAREHOUSE TOT AL PROJECT COST $77900000
10000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $33500000
I SF OFFICE AND WAREHOUSE TOT AL PROJECT COST $57750000
20000 SF OFFICE WAREHOUSE TOTAL PROJECT COST $66300000
SF OFFICE AND WAREHOUSE TOT AL COST $28900000
J SF AND WAREHOUSE TOTAL PROJECT COST $49300000
15000 SF OFFICE AND WAREHOUSE TOTAL PROJECT $48000000
I SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $48600000
SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $29400000
6200 SF SINGLE FAMILY RESIDENCE SOLD 1996 $48400000
FUTURE DEVELOPERS INC r Y AIRA SUBDIVISION ) WEST ST amp AVE HIALEAH FL
PROJECT FINANCED BY READY STATE BANK
UNIFIED INC e MELENA SUBDIVISION ) WEST 70TH ST amp AVE
FL
NOTE PROJECT WAS ONGOING WHEN HURRlCANE ANDREW HIT DADE COUNTY
FUTURE INC ( JIBACOA SUBDIVISION ) WEST n ND ST amp 26TH AVE
FL
FUTURE DEVELOPERS INC e BAYAMO SUBDIVISION ) WEST 74TH ST amp AVE
FL
FUTURE INC r ALAMEDA SUBDIVISION )
SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AlfD THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH (8) MONTHS TOTAL PROJECT COST $191500000
(42) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE (42) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH ( MONTH TOTAL PROJECT COST $249400000
(23) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 1700 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO
PROJECT $143700000
(21) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 2200 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT FPL SOUTHERN BELL AND
THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION AND DRAINAGE SYSTEM THE 1) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $130200000
(10) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 900
WEST 69TH ST amp AVE FL
CITGO GASOLINE STATION 7200 SW AVENUE MIAMI FL
CALECO FLORIDA INVESTMENTS INC (HIALEAH GARDENS INDUSTRiAL 12190NW AVE HIALEAH FL
CMA INC (CORAL SPRINGS MEDICAL CENTER) 8150 ROYAL PALM DRNE CORAL FL
HG ENTERPRISES INC
AVE
G PROULX BUILDING MATERIALS ATTN KELO MARTINEZ 3275 SW 42ND STREET FT LAUDERDALE FL 33312
ADONEL CONCRETE ATTN LUIS GARCIA 2101 NW 110 AVENUE MIAlVII FL 33172
BUILDING ATTN JEFF NUDELMAN 1341 NW 1 STREET POMPANO FL 33172
JOHN ABELL CORPORATION ATTN ANGEL RODRIGUEZ 10500 SW 1 STREET MIAMI FL 33157
TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE FIOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $57600000
400 SF BUILDING FI RESTROOMS OFFICE AND STORAGE TOTAL PROJECT COST$2875000
THIS CONTRACT WAS TO TAKE A RAW PIECE OF LAND DEMUCK FILL AND CONSTRUCT A (9) BAY SF
AND COMPLEX FROM FOUNDATION TO CERTIFICATE OF OCCUPANCY TOTAL PROJECT COST $58000000
THIS CONTRACT WAS TO BUILT A DENT AL OFFICE WITH EXTENSIVE PLUMBING AND GAS SYSTEMS THIS CONTRACT WAS A TURN KEY OPERATION TOTAL PROJECT COST $14200000
THIS CONTRACT WAS TO PROVIDE CONTRUCTION OF STRUCTURAL AND FRAMING SHELL FOR (56) SINGLE FAMILY RESIDENCES TOTAL PROJECTS COST $94080000
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
AQUARELLA CONDOMINIUM 401 SW 17TH AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GERNERALCONTRACTOR
JCOM CONSTRUCTION INC MR JOSE CAYMARES CELL (305) 281-4862 6 STORY 35 UNIT CONDO BLDG TOTAL PROJECT COST $155000000
ALLEGRO LIFE APARTMENTS 568 NE 66TH STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERAL CONTRACTOR BRUCIA LLC MR ROLANDO HOLZ CELL (305) 305-9039 6 STORY 10 UNIT APT BLDG TOT AL PROJECT COST $61000000
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
PONCE ENTRANCE APARTMENTS 101 SW 36TH COURT MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERGENERAL CONTRACTOR SUNCOAST CONSTRUCTION GROUP INC MR JAVIER SANCHEZ CELL (305) 491-1647 8 STORY 59 UNIT APT BLDG WITH A SUBBASEMENT PARKING GARAGE TOTAL PROJECT COST $260000000
MIRAMAR APARTMENTS 1023 SW 6TH STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERGENERAL CONTRACTOR MIRAMAR APARTMENTS LLC MRERNIE ABREU CELL (786) 287-0996 6- STORY 44 UNIT APT BLDG TOTAL PROJECT COST $254000000 COMPLETION DATE SEPTEMBER 2012
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
MONSERRATE APARTMENTS 435 SW 12TH AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERAL CONTRACTOR MONSERRATE APARTMENTS LLC MR ERNIE ABREU CELL (786) 287-0996 7 STORY 35 UNIT APT BLDG TOTAL PROJECT COST $197000000 COMPLETION DATE OCTOBER 2011
HOFFMAN GARDENS GENERAL CONTRACTOR 925 W 75 TH STREET GREYSTOKE CONSTRUCTION HIALEAH FL MR GUST A VO BLAZQUEZ (STRUCTURAL SHELL CONTRACTOR) CELL (786) 417-9060
2 STORY 22 UNIT APT BLDG TOTAL PROJECT COST $37000000 COMPLETION DATE JUNE 2010
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
MARLfNS BALLPARK PARKfNG GARAGE I amp II 1650 N W 7TH STREET HIALEAH FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR SUFFOLK CONTRUCTION MR TIM STERLfNG CELL (305) 970-5549 CONTRUCTION OF FOUNDATIONS FOR PARKING GARAGE I amp II TOTAL PROJECT COST $118500000 COMPLETION DATE JANUARY 2011
LAS BRISAS DE V ARADERO 4840 N W 7TH STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERGENERAL CONTRACTOR M ARAN AT A CONSTRUCTION MR ISMAEL SORIANO CELL (305) 796-8807 5 STORY 46 UNIT APT BLDG TOTAL PROJECT COST $93750000 COMPLETION DATE APRIL 2009
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
VALUE PLACE HOTEL 2750 NE 8TH STREET HOMESTEAD FL (STRUCTURAL SHELL CONTRACTOR)
MI PRIM ERA ILLUSION VILLAS 502 SW 18TH AVENUE M1AMI FL (OWNER)
GENERAL CONTRACTOR TRl-TECH CONSTRUCTION MR SERJIO ELIKOPOLJSKI CELL (305) 796-8807 4 STORY 120 UNIT HOTEL BLDG TOTAL PROJECT COST $67500000 COMPLETION DATE NOVEMBER 2008
DEVELOPERJGClSHELL CONTRACTOR MR MIGUEL SOLIMAN CELL (786) 367-0323 4 STORY 30 UNIT CONDO BLDG TOTAL PROJECT COST $420000000 COMPLETION DATE DECEMBER 2008
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
BIG HA V ANA LLC 602 SW 5TH AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPER MR MAURO SCAITALINI CELL (786) 877-5187 5 STORY CONDOMINIUM BLDG TOTAL PROJECT COST $74585000 COMPLETION DATE AUGUST 2007
R amp E DEVELOPMENT DEVELOPERlGC 295 NW 57th AVE MR RAFAEL ROSADO MIAMI FL OFF (305) 267-9006 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APARTMENT BLDG
TOTAL PROJECT COST $135267500 COMPLETION DATE JANUARY 2008
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
R amp E DEVELOPMENT 12039 SW 132ND COURT MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERlGC MR RAFAEL ROSADO OFF (305) 267-9006 2 STORY OFFICE BLDG TOTAL PROJECT COST $72000000 COMPLETION DATE SEPTEMBER 2007
MIAMI FOREST VILLAS GENERAL CONTRACTOR 954 SW 36TH COURT MR JORGE LEON MIAMI FL OFF (786) 295-2798 (STRUCTURAL SHELL CONTRACTOR) 5 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $45000000 COMPLETION DATE OCTOBER 2005
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
THE LUXOR RESIDENCES DEVELOPERJGC 2700 SW 23RD STREET MR EDGAR SABBAGH MIAMI FL OFF (786) 402-6468 (STRUCTURAL SHELL CONTRACTOR) 15 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $414612900 COMPLETION DATE MAY 2006
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
LOFTS ON BRlCKELL 1 amp 2 1528 AND 1660 BRICKELL AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERALCONTRACTOR
MR ALFREDO ACOSTA OFF (305) 371-6220 (2) 5 STORY CONDOMUNIUM BUILDINGS (28000 sq ft each) TOT AL PROJECT COST $197202600 COMPLETION DATE JUNE 2005
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
BA YLOFT CONDOMINnJMS 425 NE 25 tl1 STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR AGUSTIN MORALES OFF (786) 256-0078 9 STORY CONDOMINIUM BUILDING (110000 sq ft) TOTAL PROJECT COST $192000000 COMPLETION DATE MAY 2004
DIXIE GROVE CONDOMINnJMS OWNER 2630 SW 2S tl1 STREET MR CARLOS RUA COCONUT GROVE FL OFF (305) 441-2242 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APT BLDG WI BASEMENT
PARKING GARAGE (70000 sq ft) TOTAL PROJECT COST $224000000 COMPLETION DATE MARCH 2004
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
STORAGE MART 9900 BIRD ROAD MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR JOHN BERG CELL (305) 216-1971 4 STORY SELF STORAGE FACILITY (90000 sq ft) TOT AL PROJECT COST $187000000 COMPLETION DATE JANUARY 2004
TERRALAND WAREHOUSE (No Picture) DEVELOPER 13500 SW 131 ST STREET MR JOSE GONZALEZ MIAMI FL OFF (786) 256-0078 (STRUCTURAL SHELL CONTRACTOR) OFFICEIWAREHOUSE BUILDING CON
(25000 sq ft) TOTAL PROJECT COST $84000000
CONSTRUCTION PROJECTS COMPLETED (dba Builders amp Developers Corp)
TAMAYO WAREHOUSE 10741 SW 23 RD STREET MIAMI FL
DISPLA Y INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
DISPLAY INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
JOSE GONZALEZ 14340 SW 99TH AVENUE MIAMI FL
13500 SF WAREHOUSE (5) BAYS TOT AL PROJECT COST $65722400
10850 SF WAREHOUSE ADDITION TOTAL PROJECT COST$43800000
2850 SF WAREHOUSE ADDITION TOT AL PROJECT COST$13800000
4500 SF RESIDENCE TOTAL PROJECT COST$26290000
JOSE GONZALEZ 14651 SW 99TH COURT MIAMI FL
JOSE GONZALEZ 14610 SW AVENUE MIAMI FL
RENE ALVAREZ PAINT AND BODY SHOP 10750 NW ST MIAMI FL
MAIL EXPRESS 8299 NW 30TH TERR
FL
SOTHYS WAREHOUSE 1550NW AVE
FL
LUBARSEAFOOD 8325 NW TERR
FL
MARlTIME FRIEGHT 10875 NW 33RD ST MIMlI FL
SENNARI 10775 NW ST MIAMI FL
GA TEW A Y FRIEGHT 10855 NW ST MIANIl FL
SAFEW A Y FRIEGHT 10871 NW ST MIAMI FL
SILMAR 10945 NW MIAMI FL
NIPRO MEDICAL 10877 NW 33 RD ST MIAMI FL
SIRUBA INDUSTRIES 10905 NW ST MIAMI FL
WENNIN FRIEGHT 10825 NW 33RD ST MIAMI FL
MIGUEL SOLIMAN
6300 SF RESIDENCE TOTAL PROJECT COST$36890000
SF RESIDENCE TOT AL PROJECT COSTS21290000
SF AUTO BODY SHOP INCLUDING ALL SITE DRAINAGE PAVING AND EXT PREP FACILITIES TOTAL PROJECT COST $31500000
20000 SF AND WAREHOUSE TOT AL PROJECT COST $76800000
J 8000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $57600000
24000 SF AND WAREHOUSE TOT AL PROJECT COST $77900000
10000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $33500000
I SF OFFICE AND WAREHOUSE TOT AL PROJECT COST $57750000
20000 SF OFFICE WAREHOUSE TOTAL PROJECT COST $66300000
SF OFFICE AND WAREHOUSE TOT AL COST $28900000
J SF AND WAREHOUSE TOTAL PROJECT COST $49300000
15000 SF OFFICE AND WAREHOUSE TOTAL PROJECT $48000000
I SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $48600000
SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $29400000
6200 SF SINGLE FAMILY RESIDENCE SOLD 1996 $48400000
FUTURE DEVELOPERS INC r Y AIRA SUBDIVISION ) WEST ST amp AVE HIALEAH FL
PROJECT FINANCED BY READY STATE BANK
UNIFIED INC e MELENA SUBDIVISION ) WEST 70TH ST amp AVE
FL
NOTE PROJECT WAS ONGOING WHEN HURRlCANE ANDREW HIT DADE COUNTY
FUTURE INC ( JIBACOA SUBDIVISION ) WEST n ND ST amp 26TH AVE
FL
FUTURE DEVELOPERS INC e BAYAMO SUBDIVISION ) WEST 74TH ST amp AVE
FL
FUTURE INC r ALAMEDA SUBDIVISION )
SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AlfD THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH (8) MONTHS TOTAL PROJECT COST $191500000
(42) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE (42) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH ( MONTH TOTAL PROJECT COST $249400000
(23) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 1700 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO
PROJECT $143700000
(21) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 2200 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT FPL SOUTHERN BELL AND
THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION AND DRAINAGE SYSTEM THE 1) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $130200000
(10) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 900
WEST 69TH ST amp AVE FL
CITGO GASOLINE STATION 7200 SW AVENUE MIAMI FL
CALECO FLORIDA INVESTMENTS INC (HIALEAH GARDENS INDUSTRiAL 12190NW AVE HIALEAH FL
CMA INC (CORAL SPRINGS MEDICAL CENTER) 8150 ROYAL PALM DRNE CORAL FL
HG ENTERPRISES INC
AVE
G PROULX BUILDING MATERIALS ATTN KELO MARTINEZ 3275 SW 42ND STREET FT LAUDERDALE FL 33312
ADONEL CONCRETE ATTN LUIS GARCIA 2101 NW 110 AVENUE MIAlVII FL 33172
BUILDING ATTN JEFF NUDELMAN 1341 NW 1 STREET POMPANO FL 33172
JOHN ABELL CORPORATION ATTN ANGEL RODRIGUEZ 10500 SW 1 STREET MIAMI FL 33157
TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE FIOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $57600000
400 SF BUILDING FI RESTROOMS OFFICE AND STORAGE TOTAL PROJECT COST$2875000
THIS CONTRACT WAS TO TAKE A RAW PIECE OF LAND DEMUCK FILL AND CONSTRUCT A (9) BAY SF
AND COMPLEX FROM FOUNDATION TO CERTIFICATE OF OCCUPANCY TOTAL PROJECT COST $58000000
THIS CONTRACT WAS TO BUILT A DENT AL OFFICE WITH EXTENSIVE PLUMBING AND GAS SYSTEMS THIS CONTRACT WAS A TURN KEY OPERATION TOTAL PROJECT COST $14200000
THIS CONTRACT WAS TO PROVIDE CONTRUCTION OF STRUCTURAL AND FRAMING SHELL FOR (56) SINGLE FAMILY RESIDENCES TOTAL PROJECTS COST $94080000
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
PONCE ENTRANCE APARTMENTS 101 SW 36TH COURT MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERGENERAL CONTRACTOR SUNCOAST CONSTRUCTION GROUP INC MR JAVIER SANCHEZ CELL (305) 491-1647 8 STORY 59 UNIT APT BLDG WITH A SUBBASEMENT PARKING GARAGE TOTAL PROJECT COST $260000000
MIRAMAR APARTMENTS 1023 SW 6TH STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERGENERAL CONTRACTOR MIRAMAR APARTMENTS LLC MRERNIE ABREU CELL (786) 287-0996 6- STORY 44 UNIT APT BLDG TOTAL PROJECT COST $254000000 COMPLETION DATE SEPTEMBER 2012
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
MONSERRATE APARTMENTS 435 SW 12TH AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERAL CONTRACTOR MONSERRATE APARTMENTS LLC MR ERNIE ABREU CELL (786) 287-0996 7 STORY 35 UNIT APT BLDG TOTAL PROJECT COST $197000000 COMPLETION DATE OCTOBER 2011
HOFFMAN GARDENS GENERAL CONTRACTOR 925 W 75 TH STREET GREYSTOKE CONSTRUCTION HIALEAH FL MR GUST A VO BLAZQUEZ (STRUCTURAL SHELL CONTRACTOR) CELL (786) 417-9060
2 STORY 22 UNIT APT BLDG TOTAL PROJECT COST $37000000 COMPLETION DATE JUNE 2010
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
MARLfNS BALLPARK PARKfNG GARAGE I amp II 1650 N W 7TH STREET HIALEAH FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR SUFFOLK CONTRUCTION MR TIM STERLfNG CELL (305) 970-5549 CONTRUCTION OF FOUNDATIONS FOR PARKING GARAGE I amp II TOTAL PROJECT COST $118500000 COMPLETION DATE JANUARY 2011
LAS BRISAS DE V ARADERO 4840 N W 7TH STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERGENERAL CONTRACTOR M ARAN AT A CONSTRUCTION MR ISMAEL SORIANO CELL (305) 796-8807 5 STORY 46 UNIT APT BLDG TOTAL PROJECT COST $93750000 COMPLETION DATE APRIL 2009
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
VALUE PLACE HOTEL 2750 NE 8TH STREET HOMESTEAD FL (STRUCTURAL SHELL CONTRACTOR)
MI PRIM ERA ILLUSION VILLAS 502 SW 18TH AVENUE M1AMI FL (OWNER)
GENERAL CONTRACTOR TRl-TECH CONSTRUCTION MR SERJIO ELIKOPOLJSKI CELL (305) 796-8807 4 STORY 120 UNIT HOTEL BLDG TOTAL PROJECT COST $67500000 COMPLETION DATE NOVEMBER 2008
DEVELOPERJGClSHELL CONTRACTOR MR MIGUEL SOLIMAN CELL (786) 367-0323 4 STORY 30 UNIT CONDO BLDG TOTAL PROJECT COST $420000000 COMPLETION DATE DECEMBER 2008
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
BIG HA V ANA LLC 602 SW 5TH AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPER MR MAURO SCAITALINI CELL (786) 877-5187 5 STORY CONDOMINIUM BLDG TOTAL PROJECT COST $74585000 COMPLETION DATE AUGUST 2007
R amp E DEVELOPMENT DEVELOPERlGC 295 NW 57th AVE MR RAFAEL ROSADO MIAMI FL OFF (305) 267-9006 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APARTMENT BLDG
TOTAL PROJECT COST $135267500 COMPLETION DATE JANUARY 2008
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
R amp E DEVELOPMENT 12039 SW 132ND COURT MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERlGC MR RAFAEL ROSADO OFF (305) 267-9006 2 STORY OFFICE BLDG TOTAL PROJECT COST $72000000 COMPLETION DATE SEPTEMBER 2007
MIAMI FOREST VILLAS GENERAL CONTRACTOR 954 SW 36TH COURT MR JORGE LEON MIAMI FL OFF (786) 295-2798 (STRUCTURAL SHELL CONTRACTOR) 5 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $45000000 COMPLETION DATE OCTOBER 2005
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
THE LUXOR RESIDENCES DEVELOPERJGC 2700 SW 23RD STREET MR EDGAR SABBAGH MIAMI FL OFF (786) 402-6468 (STRUCTURAL SHELL CONTRACTOR) 15 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $414612900 COMPLETION DATE MAY 2006
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
LOFTS ON BRlCKELL 1 amp 2 1528 AND 1660 BRICKELL AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERALCONTRACTOR
MR ALFREDO ACOSTA OFF (305) 371-6220 (2) 5 STORY CONDOMUNIUM BUILDINGS (28000 sq ft each) TOT AL PROJECT COST $197202600 COMPLETION DATE JUNE 2005
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
BA YLOFT CONDOMINnJMS 425 NE 25 tl1 STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR AGUSTIN MORALES OFF (786) 256-0078 9 STORY CONDOMINIUM BUILDING (110000 sq ft) TOTAL PROJECT COST $192000000 COMPLETION DATE MAY 2004
DIXIE GROVE CONDOMINnJMS OWNER 2630 SW 2S tl1 STREET MR CARLOS RUA COCONUT GROVE FL OFF (305) 441-2242 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APT BLDG WI BASEMENT
PARKING GARAGE (70000 sq ft) TOTAL PROJECT COST $224000000 COMPLETION DATE MARCH 2004
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
STORAGE MART 9900 BIRD ROAD MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR JOHN BERG CELL (305) 216-1971 4 STORY SELF STORAGE FACILITY (90000 sq ft) TOT AL PROJECT COST $187000000 COMPLETION DATE JANUARY 2004
TERRALAND WAREHOUSE (No Picture) DEVELOPER 13500 SW 131 ST STREET MR JOSE GONZALEZ MIAMI FL OFF (786) 256-0078 (STRUCTURAL SHELL CONTRACTOR) OFFICEIWAREHOUSE BUILDING CON
(25000 sq ft) TOTAL PROJECT COST $84000000
CONSTRUCTION PROJECTS COMPLETED (dba Builders amp Developers Corp)
TAMAYO WAREHOUSE 10741 SW 23 RD STREET MIAMI FL
DISPLA Y INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
DISPLAY INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
JOSE GONZALEZ 14340 SW 99TH AVENUE MIAMI FL
13500 SF WAREHOUSE (5) BAYS TOT AL PROJECT COST $65722400
10850 SF WAREHOUSE ADDITION TOTAL PROJECT COST$43800000
2850 SF WAREHOUSE ADDITION TOT AL PROJECT COST$13800000
4500 SF RESIDENCE TOTAL PROJECT COST$26290000
JOSE GONZALEZ 14651 SW 99TH COURT MIAMI FL
JOSE GONZALEZ 14610 SW AVENUE MIAMI FL
RENE ALVAREZ PAINT AND BODY SHOP 10750 NW ST MIAMI FL
MAIL EXPRESS 8299 NW 30TH TERR
FL
SOTHYS WAREHOUSE 1550NW AVE
FL
LUBARSEAFOOD 8325 NW TERR
FL
MARlTIME FRIEGHT 10875 NW 33RD ST MIMlI FL
SENNARI 10775 NW ST MIAMI FL
GA TEW A Y FRIEGHT 10855 NW ST MIANIl FL
SAFEW A Y FRIEGHT 10871 NW ST MIAMI FL
SILMAR 10945 NW MIAMI FL
NIPRO MEDICAL 10877 NW 33 RD ST MIAMI FL
SIRUBA INDUSTRIES 10905 NW ST MIAMI FL
WENNIN FRIEGHT 10825 NW 33RD ST MIAMI FL
MIGUEL SOLIMAN
6300 SF RESIDENCE TOTAL PROJECT COST$36890000
SF RESIDENCE TOT AL PROJECT COSTS21290000
SF AUTO BODY SHOP INCLUDING ALL SITE DRAINAGE PAVING AND EXT PREP FACILITIES TOTAL PROJECT COST $31500000
20000 SF AND WAREHOUSE TOT AL PROJECT COST $76800000
J 8000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $57600000
24000 SF AND WAREHOUSE TOT AL PROJECT COST $77900000
10000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $33500000
I SF OFFICE AND WAREHOUSE TOT AL PROJECT COST $57750000
20000 SF OFFICE WAREHOUSE TOTAL PROJECT COST $66300000
SF OFFICE AND WAREHOUSE TOT AL COST $28900000
J SF AND WAREHOUSE TOTAL PROJECT COST $49300000
15000 SF OFFICE AND WAREHOUSE TOTAL PROJECT $48000000
I SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $48600000
SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $29400000
6200 SF SINGLE FAMILY RESIDENCE SOLD 1996 $48400000
FUTURE DEVELOPERS INC r Y AIRA SUBDIVISION ) WEST ST amp AVE HIALEAH FL
PROJECT FINANCED BY READY STATE BANK
UNIFIED INC e MELENA SUBDIVISION ) WEST 70TH ST amp AVE
FL
NOTE PROJECT WAS ONGOING WHEN HURRlCANE ANDREW HIT DADE COUNTY
FUTURE INC ( JIBACOA SUBDIVISION ) WEST n ND ST amp 26TH AVE
FL
FUTURE DEVELOPERS INC e BAYAMO SUBDIVISION ) WEST 74TH ST amp AVE
FL
FUTURE INC r ALAMEDA SUBDIVISION )
SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AlfD THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH (8) MONTHS TOTAL PROJECT COST $191500000
(42) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE (42) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH ( MONTH TOTAL PROJECT COST $249400000
(23) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 1700 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO
PROJECT $143700000
(21) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 2200 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT FPL SOUTHERN BELL AND
THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION AND DRAINAGE SYSTEM THE 1) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $130200000
(10) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 900
WEST 69TH ST amp AVE FL
CITGO GASOLINE STATION 7200 SW AVENUE MIAMI FL
CALECO FLORIDA INVESTMENTS INC (HIALEAH GARDENS INDUSTRiAL 12190NW AVE HIALEAH FL
CMA INC (CORAL SPRINGS MEDICAL CENTER) 8150 ROYAL PALM DRNE CORAL FL
HG ENTERPRISES INC
AVE
G PROULX BUILDING MATERIALS ATTN KELO MARTINEZ 3275 SW 42ND STREET FT LAUDERDALE FL 33312
ADONEL CONCRETE ATTN LUIS GARCIA 2101 NW 110 AVENUE MIAlVII FL 33172
BUILDING ATTN JEFF NUDELMAN 1341 NW 1 STREET POMPANO FL 33172
JOHN ABELL CORPORATION ATTN ANGEL RODRIGUEZ 10500 SW 1 STREET MIAMI FL 33157
TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE FIOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $57600000
400 SF BUILDING FI RESTROOMS OFFICE AND STORAGE TOTAL PROJECT COST$2875000
THIS CONTRACT WAS TO TAKE A RAW PIECE OF LAND DEMUCK FILL AND CONSTRUCT A (9) BAY SF
AND COMPLEX FROM FOUNDATION TO CERTIFICATE OF OCCUPANCY TOTAL PROJECT COST $58000000
THIS CONTRACT WAS TO BUILT A DENT AL OFFICE WITH EXTENSIVE PLUMBING AND GAS SYSTEMS THIS CONTRACT WAS A TURN KEY OPERATION TOTAL PROJECT COST $14200000
THIS CONTRACT WAS TO PROVIDE CONTRUCTION OF STRUCTURAL AND FRAMING SHELL FOR (56) SINGLE FAMILY RESIDENCES TOTAL PROJECTS COST $94080000
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
MONSERRATE APARTMENTS 435 SW 12TH AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERAL CONTRACTOR MONSERRATE APARTMENTS LLC MR ERNIE ABREU CELL (786) 287-0996 7 STORY 35 UNIT APT BLDG TOTAL PROJECT COST $197000000 COMPLETION DATE OCTOBER 2011
HOFFMAN GARDENS GENERAL CONTRACTOR 925 W 75 TH STREET GREYSTOKE CONSTRUCTION HIALEAH FL MR GUST A VO BLAZQUEZ (STRUCTURAL SHELL CONTRACTOR) CELL (786) 417-9060
2 STORY 22 UNIT APT BLDG TOTAL PROJECT COST $37000000 COMPLETION DATE JUNE 2010
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
MARLfNS BALLPARK PARKfNG GARAGE I amp II 1650 N W 7TH STREET HIALEAH FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR SUFFOLK CONTRUCTION MR TIM STERLfNG CELL (305) 970-5549 CONTRUCTION OF FOUNDATIONS FOR PARKING GARAGE I amp II TOTAL PROJECT COST $118500000 COMPLETION DATE JANUARY 2011
LAS BRISAS DE V ARADERO 4840 N W 7TH STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERGENERAL CONTRACTOR M ARAN AT A CONSTRUCTION MR ISMAEL SORIANO CELL (305) 796-8807 5 STORY 46 UNIT APT BLDG TOTAL PROJECT COST $93750000 COMPLETION DATE APRIL 2009
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
VALUE PLACE HOTEL 2750 NE 8TH STREET HOMESTEAD FL (STRUCTURAL SHELL CONTRACTOR)
MI PRIM ERA ILLUSION VILLAS 502 SW 18TH AVENUE M1AMI FL (OWNER)
GENERAL CONTRACTOR TRl-TECH CONSTRUCTION MR SERJIO ELIKOPOLJSKI CELL (305) 796-8807 4 STORY 120 UNIT HOTEL BLDG TOTAL PROJECT COST $67500000 COMPLETION DATE NOVEMBER 2008
DEVELOPERJGClSHELL CONTRACTOR MR MIGUEL SOLIMAN CELL (786) 367-0323 4 STORY 30 UNIT CONDO BLDG TOTAL PROJECT COST $420000000 COMPLETION DATE DECEMBER 2008
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
BIG HA V ANA LLC 602 SW 5TH AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPER MR MAURO SCAITALINI CELL (786) 877-5187 5 STORY CONDOMINIUM BLDG TOTAL PROJECT COST $74585000 COMPLETION DATE AUGUST 2007
R amp E DEVELOPMENT DEVELOPERlGC 295 NW 57th AVE MR RAFAEL ROSADO MIAMI FL OFF (305) 267-9006 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APARTMENT BLDG
TOTAL PROJECT COST $135267500 COMPLETION DATE JANUARY 2008
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
R amp E DEVELOPMENT 12039 SW 132ND COURT MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERlGC MR RAFAEL ROSADO OFF (305) 267-9006 2 STORY OFFICE BLDG TOTAL PROJECT COST $72000000 COMPLETION DATE SEPTEMBER 2007
MIAMI FOREST VILLAS GENERAL CONTRACTOR 954 SW 36TH COURT MR JORGE LEON MIAMI FL OFF (786) 295-2798 (STRUCTURAL SHELL CONTRACTOR) 5 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $45000000 COMPLETION DATE OCTOBER 2005
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
THE LUXOR RESIDENCES DEVELOPERJGC 2700 SW 23RD STREET MR EDGAR SABBAGH MIAMI FL OFF (786) 402-6468 (STRUCTURAL SHELL CONTRACTOR) 15 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $414612900 COMPLETION DATE MAY 2006
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
LOFTS ON BRlCKELL 1 amp 2 1528 AND 1660 BRICKELL AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERALCONTRACTOR
MR ALFREDO ACOSTA OFF (305) 371-6220 (2) 5 STORY CONDOMUNIUM BUILDINGS (28000 sq ft each) TOT AL PROJECT COST $197202600 COMPLETION DATE JUNE 2005
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
BA YLOFT CONDOMINnJMS 425 NE 25 tl1 STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR AGUSTIN MORALES OFF (786) 256-0078 9 STORY CONDOMINIUM BUILDING (110000 sq ft) TOTAL PROJECT COST $192000000 COMPLETION DATE MAY 2004
DIXIE GROVE CONDOMINnJMS OWNER 2630 SW 2S tl1 STREET MR CARLOS RUA COCONUT GROVE FL OFF (305) 441-2242 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APT BLDG WI BASEMENT
PARKING GARAGE (70000 sq ft) TOTAL PROJECT COST $224000000 COMPLETION DATE MARCH 2004
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
STORAGE MART 9900 BIRD ROAD MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR JOHN BERG CELL (305) 216-1971 4 STORY SELF STORAGE FACILITY (90000 sq ft) TOT AL PROJECT COST $187000000 COMPLETION DATE JANUARY 2004
TERRALAND WAREHOUSE (No Picture) DEVELOPER 13500 SW 131 ST STREET MR JOSE GONZALEZ MIAMI FL OFF (786) 256-0078 (STRUCTURAL SHELL CONTRACTOR) OFFICEIWAREHOUSE BUILDING CON
(25000 sq ft) TOTAL PROJECT COST $84000000
CONSTRUCTION PROJECTS COMPLETED (dba Builders amp Developers Corp)
TAMAYO WAREHOUSE 10741 SW 23 RD STREET MIAMI FL
DISPLA Y INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
DISPLAY INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
JOSE GONZALEZ 14340 SW 99TH AVENUE MIAMI FL
13500 SF WAREHOUSE (5) BAYS TOT AL PROJECT COST $65722400
10850 SF WAREHOUSE ADDITION TOTAL PROJECT COST$43800000
2850 SF WAREHOUSE ADDITION TOT AL PROJECT COST$13800000
4500 SF RESIDENCE TOTAL PROJECT COST$26290000
JOSE GONZALEZ 14651 SW 99TH COURT MIAMI FL
JOSE GONZALEZ 14610 SW AVENUE MIAMI FL
RENE ALVAREZ PAINT AND BODY SHOP 10750 NW ST MIAMI FL
MAIL EXPRESS 8299 NW 30TH TERR
FL
SOTHYS WAREHOUSE 1550NW AVE
FL
LUBARSEAFOOD 8325 NW TERR
FL
MARlTIME FRIEGHT 10875 NW 33RD ST MIMlI FL
SENNARI 10775 NW ST MIAMI FL
GA TEW A Y FRIEGHT 10855 NW ST MIANIl FL
SAFEW A Y FRIEGHT 10871 NW ST MIAMI FL
SILMAR 10945 NW MIAMI FL
NIPRO MEDICAL 10877 NW 33 RD ST MIAMI FL
SIRUBA INDUSTRIES 10905 NW ST MIAMI FL
WENNIN FRIEGHT 10825 NW 33RD ST MIAMI FL
MIGUEL SOLIMAN
6300 SF RESIDENCE TOTAL PROJECT COST$36890000
SF RESIDENCE TOT AL PROJECT COSTS21290000
SF AUTO BODY SHOP INCLUDING ALL SITE DRAINAGE PAVING AND EXT PREP FACILITIES TOTAL PROJECT COST $31500000
20000 SF AND WAREHOUSE TOT AL PROJECT COST $76800000
J 8000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $57600000
24000 SF AND WAREHOUSE TOT AL PROJECT COST $77900000
10000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $33500000
I SF OFFICE AND WAREHOUSE TOT AL PROJECT COST $57750000
20000 SF OFFICE WAREHOUSE TOTAL PROJECT COST $66300000
SF OFFICE AND WAREHOUSE TOT AL COST $28900000
J SF AND WAREHOUSE TOTAL PROJECT COST $49300000
15000 SF OFFICE AND WAREHOUSE TOTAL PROJECT $48000000
I SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $48600000
SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $29400000
6200 SF SINGLE FAMILY RESIDENCE SOLD 1996 $48400000
FUTURE DEVELOPERS INC r Y AIRA SUBDIVISION ) WEST ST amp AVE HIALEAH FL
PROJECT FINANCED BY READY STATE BANK
UNIFIED INC e MELENA SUBDIVISION ) WEST 70TH ST amp AVE
FL
NOTE PROJECT WAS ONGOING WHEN HURRlCANE ANDREW HIT DADE COUNTY
FUTURE INC ( JIBACOA SUBDIVISION ) WEST n ND ST amp 26TH AVE
FL
FUTURE DEVELOPERS INC e BAYAMO SUBDIVISION ) WEST 74TH ST amp AVE
FL
FUTURE INC r ALAMEDA SUBDIVISION )
SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AlfD THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH (8) MONTHS TOTAL PROJECT COST $191500000
(42) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE (42) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH ( MONTH TOTAL PROJECT COST $249400000
(23) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 1700 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO
PROJECT $143700000
(21) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 2200 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT FPL SOUTHERN BELL AND
THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION AND DRAINAGE SYSTEM THE 1) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $130200000
(10) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 900
WEST 69TH ST amp AVE FL
CITGO GASOLINE STATION 7200 SW AVENUE MIAMI FL
CALECO FLORIDA INVESTMENTS INC (HIALEAH GARDENS INDUSTRiAL 12190NW AVE HIALEAH FL
CMA INC (CORAL SPRINGS MEDICAL CENTER) 8150 ROYAL PALM DRNE CORAL FL
HG ENTERPRISES INC
AVE
G PROULX BUILDING MATERIALS ATTN KELO MARTINEZ 3275 SW 42ND STREET FT LAUDERDALE FL 33312
ADONEL CONCRETE ATTN LUIS GARCIA 2101 NW 110 AVENUE MIAlVII FL 33172
BUILDING ATTN JEFF NUDELMAN 1341 NW 1 STREET POMPANO FL 33172
JOHN ABELL CORPORATION ATTN ANGEL RODRIGUEZ 10500 SW 1 STREET MIAMI FL 33157
TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE FIOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $57600000
400 SF BUILDING FI RESTROOMS OFFICE AND STORAGE TOTAL PROJECT COST$2875000
THIS CONTRACT WAS TO TAKE A RAW PIECE OF LAND DEMUCK FILL AND CONSTRUCT A (9) BAY SF
AND COMPLEX FROM FOUNDATION TO CERTIFICATE OF OCCUPANCY TOTAL PROJECT COST $58000000
THIS CONTRACT WAS TO BUILT A DENT AL OFFICE WITH EXTENSIVE PLUMBING AND GAS SYSTEMS THIS CONTRACT WAS A TURN KEY OPERATION TOTAL PROJECT COST $14200000
THIS CONTRACT WAS TO PROVIDE CONTRUCTION OF STRUCTURAL AND FRAMING SHELL FOR (56) SINGLE FAMILY RESIDENCES TOTAL PROJECTS COST $94080000
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
MARLfNS BALLPARK PARKfNG GARAGE I amp II 1650 N W 7TH STREET HIALEAH FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR SUFFOLK CONTRUCTION MR TIM STERLfNG CELL (305) 970-5549 CONTRUCTION OF FOUNDATIONS FOR PARKING GARAGE I amp II TOTAL PROJECT COST $118500000 COMPLETION DATE JANUARY 2011
LAS BRISAS DE V ARADERO 4840 N W 7TH STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERGENERAL CONTRACTOR M ARAN AT A CONSTRUCTION MR ISMAEL SORIANO CELL (305) 796-8807 5 STORY 46 UNIT APT BLDG TOTAL PROJECT COST $93750000 COMPLETION DATE APRIL 2009
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
VALUE PLACE HOTEL 2750 NE 8TH STREET HOMESTEAD FL (STRUCTURAL SHELL CONTRACTOR)
MI PRIM ERA ILLUSION VILLAS 502 SW 18TH AVENUE M1AMI FL (OWNER)
GENERAL CONTRACTOR TRl-TECH CONSTRUCTION MR SERJIO ELIKOPOLJSKI CELL (305) 796-8807 4 STORY 120 UNIT HOTEL BLDG TOTAL PROJECT COST $67500000 COMPLETION DATE NOVEMBER 2008
DEVELOPERJGClSHELL CONTRACTOR MR MIGUEL SOLIMAN CELL (786) 367-0323 4 STORY 30 UNIT CONDO BLDG TOTAL PROJECT COST $420000000 COMPLETION DATE DECEMBER 2008
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
BIG HA V ANA LLC 602 SW 5TH AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPER MR MAURO SCAITALINI CELL (786) 877-5187 5 STORY CONDOMINIUM BLDG TOTAL PROJECT COST $74585000 COMPLETION DATE AUGUST 2007
R amp E DEVELOPMENT DEVELOPERlGC 295 NW 57th AVE MR RAFAEL ROSADO MIAMI FL OFF (305) 267-9006 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APARTMENT BLDG
TOTAL PROJECT COST $135267500 COMPLETION DATE JANUARY 2008
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
R amp E DEVELOPMENT 12039 SW 132ND COURT MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERlGC MR RAFAEL ROSADO OFF (305) 267-9006 2 STORY OFFICE BLDG TOTAL PROJECT COST $72000000 COMPLETION DATE SEPTEMBER 2007
MIAMI FOREST VILLAS GENERAL CONTRACTOR 954 SW 36TH COURT MR JORGE LEON MIAMI FL OFF (786) 295-2798 (STRUCTURAL SHELL CONTRACTOR) 5 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $45000000 COMPLETION DATE OCTOBER 2005
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
THE LUXOR RESIDENCES DEVELOPERJGC 2700 SW 23RD STREET MR EDGAR SABBAGH MIAMI FL OFF (786) 402-6468 (STRUCTURAL SHELL CONTRACTOR) 15 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $414612900 COMPLETION DATE MAY 2006
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
LOFTS ON BRlCKELL 1 amp 2 1528 AND 1660 BRICKELL AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERALCONTRACTOR
MR ALFREDO ACOSTA OFF (305) 371-6220 (2) 5 STORY CONDOMUNIUM BUILDINGS (28000 sq ft each) TOT AL PROJECT COST $197202600 COMPLETION DATE JUNE 2005
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
BA YLOFT CONDOMINnJMS 425 NE 25 tl1 STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR AGUSTIN MORALES OFF (786) 256-0078 9 STORY CONDOMINIUM BUILDING (110000 sq ft) TOTAL PROJECT COST $192000000 COMPLETION DATE MAY 2004
DIXIE GROVE CONDOMINnJMS OWNER 2630 SW 2S tl1 STREET MR CARLOS RUA COCONUT GROVE FL OFF (305) 441-2242 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APT BLDG WI BASEMENT
PARKING GARAGE (70000 sq ft) TOTAL PROJECT COST $224000000 COMPLETION DATE MARCH 2004
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
STORAGE MART 9900 BIRD ROAD MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR JOHN BERG CELL (305) 216-1971 4 STORY SELF STORAGE FACILITY (90000 sq ft) TOT AL PROJECT COST $187000000 COMPLETION DATE JANUARY 2004
TERRALAND WAREHOUSE (No Picture) DEVELOPER 13500 SW 131 ST STREET MR JOSE GONZALEZ MIAMI FL OFF (786) 256-0078 (STRUCTURAL SHELL CONTRACTOR) OFFICEIWAREHOUSE BUILDING CON
(25000 sq ft) TOTAL PROJECT COST $84000000
CONSTRUCTION PROJECTS COMPLETED (dba Builders amp Developers Corp)
TAMAYO WAREHOUSE 10741 SW 23 RD STREET MIAMI FL
DISPLA Y INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
DISPLAY INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
JOSE GONZALEZ 14340 SW 99TH AVENUE MIAMI FL
13500 SF WAREHOUSE (5) BAYS TOT AL PROJECT COST $65722400
10850 SF WAREHOUSE ADDITION TOTAL PROJECT COST$43800000
2850 SF WAREHOUSE ADDITION TOT AL PROJECT COST$13800000
4500 SF RESIDENCE TOTAL PROJECT COST$26290000
JOSE GONZALEZ 14651 SW 99TH COURT MIAMI FL
JOSE GONZALEZ 14610 SW AVENUE MIAMI FL
RENE ALVAREZ PAINT AND BODY SHOP 10750 NW ST MIAMI FL
MAIL EXPRESS 8299 NW 30TH TERR
FL
SOTHYS WAREHOUSE 1550NW AVE
FL
LUBARSEAFOOD 8325 NW TERR
FL
MARlTIME FRIEGHT 10875 NW 33RD ST MIMlI FL
SENNARI 10775 NW ST MIAMI FL
GA TEW A Y FRIEGHT 10855 NW ST MIANIl FL
SAFEW A Y FRIEGHT 10871 NW ST MIAMI FL
SILMAR 10945 NW MIAMI FL
NIPRO MEDICAL 10877 NW 33 RD ST MIAMI FL
SIRUBA INDUSTRIES 10905 NW ST MIAMI FL
WENNIN FRIEGHT 10825 NW 33RD ST MIAMI FL
MIGUEL SOLIMAN
6300 SF RESIDENCE TOTAL PROJECT COST$36890000
SF RESIDENCE TOT AL PROJECT COSTS21290000
SF AUTO BODY SHOP INCLUDING ALL SITE DRAINAGE PAVING AND EXT PREP FACILITIES TOTAL PROJECT COST $31500000
20000 SF AND WAREHOUSE TOT AL PROJECT COST $76800000
J 8000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $57600000
24000 SF AND WAREHOUSE TOT AL PROJECT COST $77900000
10000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $33500000
I SF OFFICE AND WAREHOUSE TOT AL PROJECT COST $57750000
20000 SF OFFICE WAREHOUSE TOTAL PROJECT COST $66300000
SF OFFICE AND WAREHOUSE TOT AL COST $28900000
J SF AND WAREHOUSE TOTAL PROJECT COST $49300000
15000 SF OFFICE AND WAREHOUSE TOTAL PROJECT $48000000
I SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $48600000
SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $29400000
6200 SF SINGLE FAMILY RESIDENCE SOLD 1996 $48400000
FUTURE DEVELOPERS INC r Y AIRA SUBDIVISION ) WEST ST amp AVE HIALEAH FL
PROJECT FINANCED BY READY STATE BANK
UNIFIED INC e MELENA SUBDIVISION ) WEST 70TH ST amp AVE
FL
NOTE PROJECT WAS ONGOING WHEN HURRlCANE ANDREW HIT DADE COUNTY
FUTURE INC ( JIBACOA SUBDIVISION ) WEST n ND ST amp 26TH AVE
FL
FUTURE DEVELOPERS INC e BAYAMO SUBDIVISION ) WEST 74TH ST amp AVE
FL
FUTURE INC r ALAMEDA SUBDIVISION )
SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AlfD THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH (8) MONTHS TOTAL PROJECT COST $191500000
(42) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE (42) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH ( MONTH TOTAL PROJECT COST $249400000
(23) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 1700 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO
PROJECT $143700000
(21) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 2200 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT FPL SOUTHERN BELL AND
THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION AND DRAINAGE SYSTEM THE 1) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $130200000
(10) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 900
WEST 69TH ST amp AVE FL
CITGO GASOLINE STATION 7200 SW AVENUE MIAMI FL
CALECO FLORIDA INVESTMENTS INC (HIALEAH GARDENS INDUSTRiAL 12190NW AVE HIALEAH FL
CMA INC (CORAL SPRINGS MEDICAL CENTER) 8150 ROYAL PALM DRNE CORAL FL
HG ENTERPRISES INC
AVE
G PROULX BUILDING MATERIALS ATTN KELO MARTINEZ 3275 SW 42ND STREET FT LAUDERDALE FL 33312
ADONEL CONCRETE ATTN LUIS GARCIA 2101 NW 110 AVENUE MIAlVII FL 33172
BUILDING ATTN JEFF NUDELMAN 1341 NW 1 STREET POMPANO FL 33172
JOHN ABELL CORPORATION ATTN ANGEL RODRIGUEZ 10500 SW 1 STREET MIAMI FL 33157
TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE FIOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $57600000
400 SF BUILDING FI RESTROOMS OFFICE AND STORAGE TOTAL PROJECT COST$2875000
THIS CONTRACT WAS TO TAKE A RAW PIECE OF LAND DEMUCK FILL AND CONSTRUCT A (9) BAY SF
AND COMPLEX FROM FOUNDATION TO CERTIFICATE OF OCCUPANCY TOTAL PROJECT COST $58000000
THIS CONTRACT WAS TO BUILT A DENT AL OFFICE WITH EXTENSIVE PLUMBING AND GAS SYSTEMS THIS CONTRACT WAS A TURN KEY OPERATION TOTAL PROJECT COST $14200000
THIS CONTRACT WAS TO PROVIDE CONTRUCTION OF STRUCTURAL AND FRAMING SHELL FOR (56) SINGLE FAMILY RESIDENCES TOTAL PROJECTS COST $94080000
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
VALUE PLACE HOTEL 2750 NE 8TH STREET HOMESTEAD FL (STRUCTURAL SHELL CONTRACTOR)
MI PRIM ERA ILLUSION VILLAS 502 SW 18TH AVENUE M1AMI FL (OWNER)
GENERAL CONTRACTOR TRl-TECH CONSTRUCTION MR SERJIO ELIKOPOLJSKI CELL (305) 796-8807 4 STORY 120 UNIT HOTEL BLDG TOTAL PROJECT COST $67500000 COMPLETION DATE NOVEMBER 2008
DEVELOPERJGClSHELL CONTRACTOR MR MIGUEL SOLIMAN CELL (786) 367-0323 4 STORY 30 UNIT CONDO BLDG TOTAL PROJECT COST $420000000 COMPLETION DATE DECEMBER 2008
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
BIG HA V ANA LLC 602 SW 5TH AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPER MR MAURO SCAITALINI CELL (786) 877-5187 5 STORY CONDOMINIUM BLDG TOTAL PROJECT COST $74585000 COMPLETION DATE AUGUST 2007
R amp E DEVELOPMENT DEVELOPERlGC 295 NW 57th AVE MR RAFAEL ROSADO MIAMI FL OFF (305) 267-9006 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APARTMENT BLDG
TOTAL PROJECT COST $135267500 COMPLETION DATE JANUARY 2008
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
R amp E DEVELOPMENT 12039 SW 132ND COURT MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERlGC MR RAFAEL ROSADO OFF (305) 267-9006 2 STORY OFFICE BLDG TOTAL PROJECT COST $72000000 COMPLETION DATE SEPTEMBER 2007
MIAMI FOREST VILLAS GENERAL CONTRACTOR 954 SW 36TH COURT MR JORGE LEON MIAMI FL OFF (786) 295-2798 (STRUCTURAL SHELL CONTRACTOR) 5 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $45000000 COMPLETION DATE OCTOBER 2005
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
THE LUXOR RESIDENCES DEVELOPERJGC 2700 SW 23RD STREET MR EDGAR SABBAGH MIAMI FL OFF (786) 402-6468 (STRUCTURAL SHELL CONTRACTOR) 15 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $414612900 COMPLETION DATE MAY 2006
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
LOFTS ON BRlCKELL 1 amp 2 1528 AND 1660 BRICKELL AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERALCONTRACTOR
MR ALFREDO ACOSTA OFF (305) 371-6220 (2) 5 STORY CONDOMUNIUM BUILDINGS (28000 sq ft each) TOT AL PROJECT COST $197202600 COMPLETION DATE JUNE 2005
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
BA YLOFT CONDOMINnJMS 425 NE 25 tl1 STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR AGUSTIN MORALES OFF (786) 256-0078 9 STORY CONDOMINIUM BUILDING (110000 sq ft) TOTAL PROJECT COST $192000000 COMPLETION DATE MAY 2004
DIXIE GROVE CONDOMINnJMS OWNER 2630 SW 2S tl1 STREET MR CARLOS RUA COCONUT GROVE FL OFF (305) 441-2242 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APT BLDG WI BASEMENT
PARKING GARAGE (70000 sq ft) TOTAL PROJECT COST $224000000 COMPLETION DATE MARCH 2004
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
STORAGE MART 9900 BIRD ROAD MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR JOHN BERG CELL (305) 216-1971 4 STORY SELF STORAGE FACILITY (90000 sq ft) TOT AL PROJECT COST $187000000 COMPLETION DATE JANUARY 2004
TERRALAND WAREHOUSE (No Picture) DEVELOPER 13500 SW 131 ST STREET MR JOSE GONZALEZ MIAMI FL OFF (786) 256-0078 (STRUCTURAL SHELL CONTRACTOR) OFFICEIWAREHOUSE BUILDING CON
(25000 sq ft) TOTAL PROJECT COST $84000000
CONSTRUCTION PROJECTS COMPLETED (dba Builders amp Developers Corp)
TAMAYO WAREHOUSE 10741 SW 23 RD STREET MIAMI FL
DISPLA Y INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
DISPLAY INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
JOSE GONZALEZ 14340 SW 99TH AVENUE MIAMI FL
13500 SF WAREHOUSE (5) BAYS TOT AL PROJECT COST $65722400
10850 SF WAREHOUSE ADDITION TOTAL PROJECT COST$43800000
2850 SF WAREHOUSE ADDITION TOT AL PROJECT COST$13800000
4500 SF RESIDENCE TOTAL PROJECT COST$26290000
JOSE GONZALEZ 14651 SW 99TH COURT MIAMI FL
JOSE GONZALEZ 14610 SW AVENUE MIAMI FL
RENE ALVAREZ PAINT AND BODY SHOP 10750 NW ST MIAMI FL
MAIL EXPRESS 8299 NW 30TH TERR
FL
SOTHYS WAREHOUSE 1550NW AVE
FL
LUBARSEAFOOD 8325 NW TERR
FL
MARlTIME FRIEGHT 10875 NW 33RD ST MIMlI FL
SENNARI 10775 NW ST MIAMI FL
GA TEW A Y FRIEGHT 10855 NW ST MIANIl FL
SAFEW A Y FRIEGHT 10871 NW ST MIAMI FL
SILMAR 10945 NW MIAMI FL
NIPRO MEDICAL 10877 NW 33 RD ST MIAMI FL
SIRUBA INDUSTRIES 10905 NW ST MIAMI FL
WENNIN FRIEGHT 10825 NW 33RD ST MIAMI FL
MIGUEL SOLIMAN
6300 SF RESIDENCE TOTAL PROJECT COST$36890000
SF RESIDENCE TOT AL PROJECT COSTS21290000
SF AUTO BODY SHOP INCLUDING ALL SITE DRAINAGE PAVING AND EXT PREP FACILITIES TOTAL PROJECT COST $31500000
20000 SF AND WAREHOUSE TOT AL PROJECT COST $76800000
J 8000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $57600000
24000 SF AND WAREHOUSE TOT AL PROJECT COST $77900000
10000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $33500000
I SF OFFICE AND WAREHOUSE TOT AL PROJECT COST $57750000
20000 SF OFFICE WAREHOUSE TOTAL PROJECT COST $66300000
SF OFFICE AND WAREHOUSE TOT AL COST $28900000
J SF AND WAREHOUSE TOTAL PROJECT COST $49300000
15000 SF OFFICE AND WAREHOUSE TOTAL PROJECT $48000000
I SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $48600000
SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $29400000
6200 SF SINGLE FAMILY RESIDENCE SOLD 1996 $48400000
FUTURE DEVELOPERS INC r Y AIRA SUBDIVISION ) WEST ST amp AVE HIALEAH FL
PROJECT FINANCED BY READY STATE BANK
UNIFIED INC e MELENA SUBDIVISION ) WEST 70TH ST amp AVE
FL
NOTE PROJECT WAS ONGOING WHEN HURRlCANE ANDREW HIT DADE COUNTY
FUTURE INC ( JIBACOA SUBDIVISION ) WEST n ND ST amp 26TH AVE
FL
FUTURE DEVELOPERS INC e BAYAMO SUBDIVISION ) WEST 74TH ST amp AVE
FL
FUTURE INC r ALAMEDA SUBDIVISION )
SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AlfD THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH (8) MONTHS TOTAL PROJECT COST $191500000
(42) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE (42) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH ( MONTH TOTAL PROJECT COST $249400000
(23) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 1700 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO
PROJECT $143700000
(21) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 2200 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT FPL SOUTHERN BELL AND
THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION AND DRAINAGE SYSTEM THE 1) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $130200000
(10) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 900
WEST 69TH ST amp AVE FL
CITGO GASOLINE STATION 7200 SW AVENUE MIAMI FL
CALECO FLORIDA INVESTMENTS INC (HIALEAH GARDENS INDUSTRiAL 12190NW AVE HIALEAH FL
CMA INC (CORAL SPRINGS MEDICAL CENTER) 8150 ROYAL PALM DRNE CORAL FL
HG ENTERPRISES INC
AVE
G PROULX BUILDING MATERIALS ATTN KELO MARTINEZ 3275 SW 42ND STREET FT LAUDERDALE FL 33312
ADONEL CONCRETE ATTN LUIS GARCIA 2101 NW 110 AVENUE MIAlVII FL 33172
BUILDING ATTN JEFF NUDELMAN 1341 NW 1 STREET POMPANO FL 33172
JOHN ABELL CORPORATION ATTN ANGEL RODRIGUEZ 10500 SW 1 STREET MIAMI FL 33157
TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE FIOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $57600000
400 SF BUILDING FI RESTROOMS OFFICE AND STORAGE TOTAL PROJECT COST$2875000
THIS CONTRACT WAS TO TAKE A RAW PIECE OF LAND DEMUCK FILL AND CONSTRUCT A (9) BAY SF
AND COMPLEX FROM FOUNDATION TO CERTIFICATE OF OCCUPANCY TOTAL PROJECT COST $58000000
THIS CONTRACT WAS TO BUILT A DENT AL OFFICE WITH EXTENSIVE PLUMBING AND GAS SYSTEMS THIS CONTRACT WAS A TURN KEY OPERATION TOTAL PROJECT COST $14200000
THIS CONTRACT WAS TO PROVIDE CONTRUCTION OF STRUCTURAL AND FRAMING SHELL FOR (56) SINGLE FAMILY RESIDENCES TOTAL PROJECTS COST $94080000
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
BIG HA V ANA LLC 602 SW 5TH AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPER MR MAURO SCAITALINI CELL (786) 877-5187 5 STORY CONDOMINIUM BLDG TOTAL PROJECT COST $74585000 COMPLETION DATE AUGUST 2007
R amp E DEVELOPMENT DEVELOPERlGC 295 NW 57th AVE MR RAFAEL ROSADO MIAMI FL OFF (305) 267-9006 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APARTMENT BLDG
TOTAL PROJECT COST $135267500 COMPLETION DATE JANUARY 2008
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
R amp E DEVELOPMENT 12039 SW 132ND COURT MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERlGC MR RAFAEL ROSADO OFF (305) 267-9006 2 STORY OFFICE BLDG TOTAL PROJECT COST $72000000 COMPLETION DATE SEPTEMBER 2007
MIAMI FOREST VILLAS GENERAL CONTRACTOR 954 SW 36TH COURT MR JORGE LEON MIAMI FL OFF (786) 295-2798 (STRUCTURAL SHELL CONTRACTOR) 5 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $45000000 COMPLETION DATE OCTOBER 2005
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
THE LUXOR RESIDENCES DEVELOPERJGC 2700 SW 23RD STREET MR EDGAR SABBAGH MIAMI FL OFF (786) 402-6468 (STRUCTURAL SHELL CONTRACTOR) 15 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $414612900 COMPLETION DATE MAY 2006
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
LOFTS ON BRlCKELL 1 amp 2 1528 AND 1660 BRICKELL AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERALCONTRACTOR
MR ALFREDO ACOSTA OFF (305) 371-6220 (2) 5 STORY CONDOMUNIUM BUILDINGS (28000 sq ft each) TOT AL PROJECT COST $197202600 COMPLETION DATE JUNE 2005
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
BA YLOFT CONDOMINnJMS 425 NE 25 tl1 STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR AGUSTIN MORALES OFF (786) 256-0078 9 STORY CONDOMINIUM BUILDING (110000 sq ft) TOTAL PROJECT COST $192000000 COMPLETION DATE MAY 2004
DIXIE GROVE CONDOMINnJMS OWNER 2630 SW 2S tl1 STREET MR CARLOS RUA COCONUT GROVE FL OFF (305) 441-2242 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APT BLDG WI BASEMENT
PARKING GARAGE (70000 sq ft) TOTAL PROJECT COST $224000000 COMPLETION DATE MARCH 2004
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
STORAGE MART 9900 BIRD ROAD MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR JOHN BERG CELL (305) 216-1971 4 STORY SELF STORAGE FACILITY (90000 sq ft) TOT AL PROJECT COST $187000000 COMPLETION DATE JANUARY 2004
TERRALAND WAREHOUSE (No Picture) DEVELOPER 13500 SW 131 ST STREET MR JOSE GONZALEZ MIAMI FL OFF (786) 256-0078 (STRUCTURAL SHELL CONTRACTOR) OFFICEIWAREHOUSE BUILDING CON
(25000 sq ft) TOTAL PROJECT COST $84000000
CONSTRUCTION PROJECTS COMPLETED (dba Builders amp Developers Corp)
TAMAYO WAREHOUSE 10741 SW 23 RD STREET MIAMI FL
DISPLA Y INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
DISPLAY INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
JOSE GONZALEZ 14340 SW 99TH AVENUE MIAMI FL
13500 SF WAREHOUSE (5) BAYS TOT AL PROJECT COST $65722400
10850 SF WAREHOUSE ADDITION TOTAL PROJECT COST$43800000
2850 SF WAREHOUSE ADDITION TOT AL PROJECT COST$13800000
4500 SF RESIDENCE TOTAL PROJECT COST$26290000
JOSE GONZALEZ 14651 SW 99TH COURT MIAMI FL
JOSE GONZALEZ 14610 SW AVENUE MIAMI FL
RENE ALVAREZ PAINT AND BODY SHOP 10750 NW ST MIAMI FL
MAIL EXPRESS 8299 NW 30TH TERR
FL
SOTHYS WAREHOUSE 1550NW AVE
FL
LUBARSEAFOOD 8325 NW TERR
FL
MARlTIME FRIEGHT 10875 NW 33RD ST MIMlI FL
SENNARI 10775 NW ST MIAMI FL
GA TEW A Y FRIEGHT 10855 NW ST MIANIl FL
SAFEW A Y FRIEGHT 10871 NW ST MIAMI FL
SILMAR 10945 NW MIAMI FL
NIPRO MEDICAL 10877 NW 33 RD ST MIAMI FL
SIRUBA INDUSTRIES 10905 NW ST MIAMI FL
WENNIN FRIEGHT 10825 NW 33RD ST MIAMI FL
MIGUEL SOLIMAN
6300 SF RESIDENCE TOTAL PROJECT COST$36890000
SF RESIDENCE TOT AL PROJECT COSTS21290000
SF AUTO BODY SHOP INCLUDING ALL SITE DRAINAGE PAVING AND EXT PREP FACILITIES TOTAL PROJECT COST $31500000
20000 SF AND WAREHOUSE TOT AL PROJECT COST $76800000
J 8000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $57600000
24000 SF AND WAREHOUSE TOT AL PROJECT COST $77900000
10000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $33500000
I SF OFFICE AND WAREHOUSE TOT AL PROJECT COST $57750000
20000 SF OFFICE WAREHOUSE TOTAL PROJECT COST $66300000
SF OFFICE AND WAREHOUSE TOT AL COST $28900000
J SF AND WAREHOUSE TOTAL PROJECT COST $49300000
15000 SF OFFICE AND WAREHOUSE TOTAL PROJECT $48000000
I SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $48600000
SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $29400000
6200 SF SINGLE FAMILY RESIDENCE SOLD 1996 $48400000
FUTURE DEVELOPERS INC r Y AIRA SUBDIVISION ) WEST ST amp AVE HIALEAH FL
PROJECT FINANCED BY READY STATE BANK
UNIFIED INC e MELENA SUBDIVISION ) WEST 70TH ST amp AVE
FL
NOTE PROJECT WAS ONGOING WHEN HURRlCANE ANDREW HIT DADE COUNTY
FUTURE INC ( JIBACOA SUBDIVISION ) WEST n ND ST amp 26TH AVE
FL
FUTURE DEVELOPERS INC e BAYAMO SUBDIVISION ) WEST 74TH ST amp AVE
FL
FUTURE INC r ALAMEDA SUBDIVISION )
SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AlfD THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH (8) MONTHS TOTAL PROJECT COST $191500000
(42) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE (42) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH ( MONTH TOTAL PROJECT COST $249400000
(23) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 1700 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO
PROJECT $143700000
(21) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 2200 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT FPL SOUTHERN BELL AND
THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION AND DRAINAGE SYSTEM THE 1) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $130200000
(10) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 900
WEST 69TH ST amp AVE FL
CITGO GASOLINE STATION 7200 SW AVENUE MIAMI FL
CALECO FLORIDA INVESTMENTS INC (HIALEAH GARDENS INDUSTRiAL 12190NW AVE HIALEAH FL
CMA INC (CORAL SPRINGS MEDICAL CENTER) 8150 ROYAL PALM DRNE CORAL FL
HG ENTERPRISES INC
AVE
G PROULX BUILDING MATERIALS ATTN KELO MARTINEZ 3275 SW 42ND STREET FT LAUDERDALE FL 33312
ADONEL CONCRETE ATTN LUIS GARCIA 2101 NW 110 AVENUE MIAlVII FL 33172
BUILDING ATTN JEFF NUDELMAN 1341 NW 1 STREET POMPANO FL 33172
JOHN ABELL CORPORATION ATTN ANGEL RODRIGUEZ 10500 SW 1 STREET MIAMI FL 33157
TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE FIOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $57600000
400 SF BUILDING FI RESTROOMS OFFICE AND STORAGE TOTAL PROJECT COST$2875000
THIS CONTRACT WAS TO TAKE A RAW PIECE OF LAND DEMUCK FILL AND CONSTRUCT A (9) BAY SF
AND COMPLEX FROM FOUNDATION TO CERTIFICATE OF OCCUPANCY TOTAL PROJECT COST $58000000
THIS CONTRACT WAS TO BUILT A DENT AL OFFICE WITH EXTENSIVE PLUMBING AND GAS SYSTEMS THIS CONTRACT WAS A TURN KEY OPERATION TOTAL PROJECT COST $14200000
THIS CONTRACT WAS TO PROVIDE CONTRUCTION OF STRUCTURAL AND FRAMING SHELL FOR (56) SINGLE FAMILY RESIDENCES TOTAL PROJECTS COST $94080000
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
R amp E DEVELOPMENT 12039 SW 132ND COURT MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPERlGC MR RAFAEL ROSADO OFF (305) 267-9006 2 STORY OFFICE BLDG TOTAL PROJECT COST $72000000 COMPLETION DATE SEPTEMBER 2007
MIAMI FOREST VILLAS GENERAL CONTRACTOR 954 SW 36TH COURT MR JORGE LEON MIAMI FL OFF (786) 295-2798 (STRUCTURAL SHELL CONTRACTOR) 5 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $45000000 COMPLETION DATE OCTOBER 2005
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
THE LUXOR RESIDENCES DEVELOPERJGC 2700 SW 23RD STREET MR EDGAR SABBAGH MIAMI FL OFF (786) 402-6468 (STRUCTURAL SHELL CONTRACTOR) 15 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $414612900 COMPLETION DATE MAY 2006
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
LOFTS ON BRlCKELL 1 amp 2 1528 AND 1660 BRICKELL AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERALCONTRACTOR
MR ALFREDO ACOSTA OFF (305) 371-6220 (2) 5 STORY CONDOMUNIUM BUILDINGS (28000 sq ft each) TOT AL PROJECT COST $197202600 COMPLETION DATE JUNE 2005
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
BA YLOFT CONDOMINnJMS 425 NE 25 tl1 STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR AGUSTIN MORALES OFF (786) 256-0078 9 STORY CONDOMINIUM BUILDING (110000 sq ft) TOTAL PROJECT COST $192000000 COMPLETION DATE MAY 2004
DIXIE GROVE CONDOMINnJMS OWNER 2630 SW 2S tl1 STREET MR CARLOS RUA COCONUT GROVE FL OFF (305) 441-2242 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APT BLDG WI BASEMENT
PARKING GARAGE (70000 sq ft) TOTAL PROJECT COST $224000000 COMPLETION DATE MARCH 2004
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
STORAGE MART 9900 BIRD ROAD MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR JOHN BERG CELL (305) 216-1971 4 STORY SELF STORAGE FACILITY (90000 sq ft) TOT AL PROJECT COST $187000000 COMPLETION DATE JANUARY 2004
TERRALAND WAREHOUSE (No Picture) DEVELOPER 13500 SW 131 ST STREET MR JOSE GONZALEZ MIAMI FL OFF (786) 256-0078 (STRUCTURAL SHELL CONTRACTOR) OFFICEIWAREHOUSE BUILDING CON
(25000 sq ft) TOTAL PROJECT COST $84000000
CONSTRUCTION PROJECTS COMPLETED (dba Builders amp Developers Corp)
TAMAYO WAREHOUSE 10741 SW 23 RD STREET MIAMI FL
DISPLA Y INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
DISPLAY INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
JOSE GONZALEZ 14340 SW 99TH AVENUE MIAMI FL
13500 SF WAREHOUSE (5) BAYS TOT AL PROJECT COST $65722400
10850 SF WAREHOUSE ADDITION TOTAL PROJECT COST$43800000
2850 SF WAREHOUSE ADDITION TOT AL PROJECT COST$13800000
4500 SF RESIDENCE TOTAL PROJECT COST$26290000
JOSE GONZALEZ 14651 SW 99TH COURT MIAMI FL
JOSE GONZALEZ 14610 SW AVENUE MIAMI FL
RENE ALVAREZ PAINT AND BODY SHOP 10750 NW ST MIAMI FL
MAIL EXPRESS 8299 NW 30TH TERR
FL
SOTHYS WAREHOUSE 1550NW AVE
FL
LUBARSEAFOOD 8325 NW TERR
FL
MARlTIME FRIEGHT 10875 NW 33RD ST MIMlI FL
SENNARI 10775 NW ST MIAMI FL
GA TEW A Y FRIEGHT 10855 NW ST MIANIl FL
SAFEW A Y FRIEGHT 10871 NW ST MIAMI FL
SILMAR 10945 NW MIAMI FL
NIPRO MEDICAL 10877 NW 33 RD ST MIAMI FL
SIRUBA INDUSTRIES 10905 NW ST MIAMI FL
WENNIN FRIEGHT 10825 NW 33RD ST MIAMI FL
MIGUEL SOLIMAN
6300 SF RESIDENCE TOTAL PROJECT COST$36890000
SF RESIDENCE TOT AL PROJECT COSTS21290000
SF AUTO BODY SHOP INCLUDING ALL SITE DRAINAGE PAVING AND EXT PREP FACILITIES TOTAL PROJECT COST $31500000
20000 SF AND WAREHOUSE TOT AL PROJECT COST $76800000
J 8000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $57600000
24000 SF AND WAREHOUSE TOT AL PROJECT COST $77900000
10000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $33500000
I SF OFFICE AND WAREHOUSE TOT AL PROJECT COST $57750000
20000 SF OFFICE WAREHOUSE TOTAL PROJECT COST $66300000
SF OFFICE AND WAREHOUSE TOT AL COST $28900000
J SF AND WAREHOUSE TOTAL PROJECT COST $49300000
15000 SF OFFICE AND WAREHOUSE TOTAL PROJECT $48000000
I SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $48600000
SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $29400000
6200 SF SINGLE FAMILY RESIDENCE SOLD 1996 $48400000
FUTURE DEVELOPERS INC r Y AIRA SUBDIVISION ) WEST ST amp AVE HIALEAH FL
PROJECT FINANCED BY READY STATE BANK
UNIFIED INC e MELENA SUBDIVISION ) WEST 70TH ST amp AVE
FL
NOTE PROJECT WAS ONGOING WHEN HURRlCANE ANDREW HIT DADE COUNTY
FUTURE INC ( JIBACOA SUBDIVISION ) WEST n ND ST amp 26TH AVE
FL
FUTURE DEVELOPERS INC e BAYAMO SUBDIVISION ) WEST 74TH ST amp AVE
FL
FUTURE INC r ALAMEDA SUBDIVISION )
SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AlfD THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH (8) MONTHS TOTAL PROJECT COST $191500000
(42) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE (42) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH ( MONTH TOTAL PROJECT COST $249400000
(23) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 1700 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO
PROJECT $143700000
(21) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 2200 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT FPL SOUTHERN BELL AND
THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION AND DRAINAGE SYSTEM THE 1) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $130200000
(10) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 900
WEST 69TH ST amp AVE FL
CITGO GASOLINE STATION 7200 SW AVENUE MIAMI FL
CALECO FLORIDA INVESTMENTS INC (HIALEAH GARDENS INDUSTRiAL 12190NW AVE HIALEAH FL
CMA INC (CORAL SPRINGS MEDICAL CENTER) 8150 ROYAL PALM DRNE CORAL FL
HG ENTERPRISES INC
AVE
G PROULX BUILDING MATERIALS ATTN KELO MARTINEZ 3275 SW 42ND STREET FT LAUDERDALE FL 33312
ADONEL CONCRETE ATTN LUIS GARCIA 2101 NW 110 AVENUE MIAlVII FL 33172
BUILDING ATTN JEFF NUDELMAN 1341 NW 1 STREET POMPANO FL 33172
JOHN ABELL CORPORATION ATTN ANGEL RODRIGUEZ 10500 SW 1 STREET MIAMI FL 33157
TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE FIOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $57600000
400 SF BUILDING FI RESTROOMS OFFICE AND STORAGE TOTAL PROJECT COST$2875000
THIS CONTRACT WAS TO TAKE A RAW PIECE OF LAND DEMUCK FILL AND CONSTRUCT A (9) BAY SF
AND COMPLEX FROM FOUNDATION TO CERTIFICATE OF OCCUPANCY TOTAL PROJECT COST $58000000
THIS CONTRACT WAS TO BUILT A DENT AL OFFICE WITH EXTENSIVE PLUMBING AND GAS SYSTEMS THIS CONTRACT WAS A TURN KEY OPERATION TOTAL PROJECT COST $14200000
THIS CONTRACT WAS TO PROVIDE CONTRUCTION OF STRUCTURAL AND FRAMING SHELL FOR (56) SINGLE FAMILY RESIDENCES TOTAL PROJECTS COST $94080000
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
THE LUXOR RESIDENCES DEVELOPERJGC 2700 SW 23RD STREET MR EDGAR SABBAGH MIAMI FL OFF (786) 402-6468 (STRUCTURAL SHELL CONTRACTOR) 15 STORY CONDOMINIUM BLDG
TOTAL PROJECT COST $414612900 COMPLETION DATE MAY 2006
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
LOFTS ON BRlCKELL 1 amp 2 1528 AND 1660 BRICKELL AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERALCONTRACTOR
MR ALFREDO ACOSTA OFF (305) 371-6220 (2) 5 STORY CONDOMUNIUM BUILDINGS (28000 sq ft each) TOT AL PROJECT COST $197202600 COMPLETION DATE JUNE 2005
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
BA YLOFT CONDOMINnJMS 425 NE 25 tl1 STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR AGUSTIN MORALES OFF (786) 256-0078 9 STORY CONDOMINIUM BUILDING (110000 sq ft) TOTAL PROJECT COST $192000000 COMPLETION DATE MAY 2004
DIXIE GROVE CONDOMINnJMS OWNER 2630 SW 2S tl1 STREET MR CARLOS RUA COCONUT GROVE FL OFF (305) 441-2242 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APT BLDG WI BASEMENT
PARKING GARAGE (70000 sq ft) TOTAL PROJECT COST $224000000 COMPLETION DATE MARCH 2004
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
STORAGE MART 9900 BIRD ROAD MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR JOHN BERG CELL (305) 216-1971 4 STORY SELF STORAGE FACILITY (90000 sq ft) TOT AL PROJECT COST $187000000 COMPLETION DATE JANUARY 2004
TERRALAND WAREHOUSE (No Picture) DEVELOPER 13500 SW 131 ST STREET MR JOSE GONZALEZ MIAMI FL OFF (786) 256-0078 (STRUCTURAL SHELL CONTRACTOR) OFFICEIWAREHOUSE BUILDING CON
(25000 sq ft) TOTAL PROJECT COST $84000000
CONSTRUCTION PROJECTS COMPLETED (dba Builders amp Developers Corp)
TAMAYO WAREHOUSE 10741 SW 23 RD STREET MIAMI FL
DISPLA Y INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
DISPLAY INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
JOSE GONZALEZ 14340 SW 99TH AVENUE MIAMI FL
13500 SF WAREHOUSE (5) BAYS TOT AL PROJECT COST $65722400
10850 SF WAREHOUSE ADDITION TOTAL PROJECT COST$43800000
2850 SF WAREHOUSE ADDITION TOT AL PROJECT COST$13800000
4500 SF RESIDENCE TOTAL PROJECT COST$26290000
JOSE GONZALEZ 14651 SW 99TH COURT MIAMI FL
JOSE GONZALEZ 14610 SW AVENUE MIAMI FL
RENE ALVAREZ PAINT AND BODY SHOP 10750 NW ST MIAMI FL
MAIL EXPRESS 8299 NW 30TH TERR
FL
SOTHYS WAREHOUSE 1550NW AVE
FL
LUBARSEAFOOD 8325 NW TERR
FL
MARlTIME FRIEGHT 10875 NW 33RD ST MIMlI FL
SENNARI 10775 NW ST MIAMI FL
GA TEW A Y FRIEGHT 10855 NW ST MIANIl FL
SAFEW A Y FRIEGHT 10871 NW ST MIAMI FL
SILMAR 10945 NW MIAMI FL
NIPRO MEDICAL 10877 NW 33 RD ST MIAMI FL
SIRUBA INDUSTRIES 10905 NW ST MIAMI FL
WENNIN FRIEGHT 10825 NW 33RD ST MIAMI FL
MIGUEL SOLIMAN
6300 SF RESIDENCE TOTAL PROJECT COST$36890000
SF RESIDENCE TOT AL PROJECT COSTS21290000
SF AUTO BODY SHOP INCLUDING ALL SITE DRAINAGE PAVING AND EXT PREP FACILITIES TOTAL PROJECT COST $31500000
20000 SF AND WAREHOUSE TOT AL PROJECT COST $76800000
J 8000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $57600000
24000 SF AND WAREHOUSE TOT AL PROJECT COST $77900000
10000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $33500000
I SF OFFICE AND WAREHOUSE TOT AL PROJECT COST $57750000
20000 SF OFFICE WAREHOUSE TOTAL PROJECT COST $66300000
SF OFFICE AND WAREHOUSE TOT AL COST $28900000
J SF AND WAREHOUSE TOTAL PROJECT COST $49300000
15000 SF OFFICE AND WAREHOUSE TOTAL PROJECT $48000000
I SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $48600000
SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $29400000
6200 SF SINGLE FAMILY RESIDENCE SOLD 1996 $48400000
FUTURE DEVELOPERS INC r Y AIRA SUBDIVISION ) WEST ST amp AVE HIALEAH FL
PROJECT FINANCED BY READY STATE BANK
UNIFIED INC e MELENA SUBDIVISION ) WEST 70TH ST amp AVE
FL
NOTE PROJECT WAS ONGOING WHEN HURRlCANE ANDREW HIT DADE COUNTY
FUTURE INC ( JIBACOA SUBDIVISION ) WEST n ND ST amp 26TH AVE
FL
FUTURE DEVELOPERS INC e BAYAMO SUBDIVISION ) WEST 74TH ST amp AVE
FL
FUTURE INC r ALAMEDA SUBDIVISION )
SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AlfD THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH (8) MONTHS TOTAL PROJECT COST $191500000
(42) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE (42) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH ( MONTH TOTAL PROJECT COST $249400000
(23) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 1700 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO
PROJECT $143700000
(21) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 2200 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT FPL SOUTHERN BELL AND
THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION AND DRAINAGE SYSTEM THE 1) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $130200000
(10) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 900
WEST 69TH ST amp AVE FL
CITGO GASOLINE STATION 7200 SW AVENUE MIAMI FL
CALECO FLORIDA INVESTMENTS INC (HIALEAH GARDENS INDUSTRiAL 12190NW AVE HIALEAH FL
CMA INC (CORAL SPRINGS MEDICAL CENTER) 8150 ROYAL PALM DRNE CORAL FL
HG ENTERPRISES INC
AVE
G PROULX BUILDING MATERIALS ATTN KELO MARTINEZ 3275 SW 42ND STREET FT LAUDERDALE FL 33312
ADONEL CONCRETE ATTN LUIS GARCIA 2101 NW 110 AVENUE MIAlVII FL 33172
BUILDING ATTN JEFF NUDELMAN 1341 NW 1 STREET POMPANO FL 33172
JOHN ABELL CORPORATION ATTN ANGEL RODRIGUEZ 10500 SW 1 STREET MIAMI FL 33157
TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE FIOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $57600000
400 SF BUILDING FI RESTROOMS OFFICE AND STORAGE TOTAL PROJECT COST$2875000
THIS CONTRACT WAS TO TAKE A RAW PIECE OF LAND DEMUCK FILL AND CONSTRUCT A (9) BAY SF
AND COMPLEX FROM FOUNDATION TO CERTIFICATE OF OCCUPANCY TOTAL PROJECT COST $58000000
THIS CONTRACT WAS TO BUILT A DENT AL OFFICE WITH EXTENSIVE PLUMBING AND GAS SYSTEMS THIS CONTRACT WAS A TURN KEY OPERATION TOTAL PROJECT COST $14200000
THIS CONTRACT WAS TO PROVIDE CONTRUCTION OF STRUCTURAL AND FRAMING SHELL FOR (56) SINGLE FAMILY RESIDENCES TOTAL PROJECTS COST $94080000
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
CONSTRUCTION PROJECTS COMPLETED (dba Soliman Structures Inc)
LOFTS ON BRlCKELL 1 amp 2 1528 AND 1660 BRICKELL AVENUE MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
DEVELOPE~GENERALCONTRACTOR
MR ALFREDO ACOSTA OFF (305) 371-6220 (2) 5 STORY CONDOMUNIUM BUILDINGS (28000 sq ft each) TOT AL PROJECT COST $197202600 COMPLETION DATE JUNE 2005
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
BA YLOFT CONDOMINnJMS 425 NE 25 tl1 STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR AGUSTIN MORALES OFF (786) 256-0078 9 STORY CONDOMINIUM BUILDING (110000 sq ft) TOTAL PROJECT COST $192000000 COMPLETION DATE MAY 2004
DIXIE GROVE CONDOMINnJMS OWNER 2630 SW 2S tl1 STREET MR CARLOS RUA COCONUT GROVE FL OFF (305) 441-2242 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APT BLDG WI BASEMENT
PARKING GARAGE (70000 sq ft) TOTAL PROJECT COST $224000000 COMPLETION DATE MARCH 2004
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
STORAGE MART 9900 BIRD ROAD MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR JOHN BERG CELL (305) 216-1971 4 STORY SELF STORAGE FACILITY (90000 sq ft) TOT AL PROJECT COST $187000000 COMPLETION DATE JANUARY 2004
TERRALAND WAREHOUSE (No Picture) DEVELOPER 13500 SW 131 ST STREET MR JOSE GONZALEZ MIAMI FL OFF (786) 256-0078 (STRUCTURAL SHELL CONTRACTOR) OFFICEIWAREHOUSE BUILDING CON
(25000 sq ft) TOTAL PROJECT COST $84000000
CONSTRUCTION PROJECTS COMPLETED (dba Builders amp Developers Corp)
TAMAYO WAREHOUSE 10741 SW 23 RD STREET MIAMI FL
DISPLA Y INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
DISPLAY INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
JOSE GONZALEZ 14340 SW 99TH AVENUE MIAMI FL
13500 SF WAREHOUSE (5) BAYS TOT AL PROJECT COST $65722400
10850 SF WAREHOUSE ADDITION TOTAL PROJECT COST$43800000
2850 SF WAREHOUSE ADDITION TOT AL PROJECT COST$13800000
4500 SF RESIDENCE TOTAL PROJECT COST$26290000
JOSE GONZALEZ 14651 SW 99TH COURT MIAMI FL
JOSE GONZALEZ 14610 SW AVENUE MIAMI FL
RENE ALVAREZ PAINT AND BODY SHOP 10750 NW ST MIAMI FL
MAIL EXPRESS 8299 NW 30TH TERR
FL
SOTHYS WAREHOUSE 1550NW AVE
FL
LUBARSEAFOOD 8325 NW TERR
FL
MARlTIME FRIEGHT 10875 NW 33RD ST MIMlI FL
SENNARI 10775 NW ST MIAMI FL
GA TEW A Y FRIEGHT 10855 NW ST MIANIl FL
SAFEW A Y FRIEGHT 10871 NW ST MIAMI FL
SILMAR 10945 NW MIAMI FL
NIPRO MEDICAL 10877 NW 33 RD ST MIAMI FL
SIRUBA INDUSTRIES 10905 NW ST MIAMI FL
WENNIN FRIEGHT 10825 NW 33RD ST MIAMI FL
MIGUEL SOLIMAN
6300 SF RESIDENCE TOTAL PROJECT COST$36890000
SF RESIDENCE TOT AL PROJECT COSTS21290000
SF AUTO BODY SHOP INCLUDING ALL SITE DRAINAGE PAVING AND EXT PREP FACILITIES TOTAL PROJECT COST $31500000
20000 SF AND WAREHOUSE TOT AL PROJECT COST $76800000
J 8000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $57600000
24000 SF AND WAREHOUSE TOT AL PROJECT COST $77900000
10000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $33500000
I SF OFFICE AND WAREHOUSE TOT AL PROJECT COST $57750000
20000 SF OFFICE WAREHOUSE TOTAL PROJECT COST $66300000
SF OFFICE AND WAREHOUSE TOT AL COST $28900000
J SF AND WAREHOUSE TOTAL PROJECT COST $49300000
15000 SF OFFICE AND WAREHOUSE TOTAL PROJECT $48000000
I SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $48600000
SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $29400000
6200 SF SINGLE FAMILY RESIDENCE SOLD 1996 $48400000
FUTURE DEVELOPERS INC r Y AIRA SUBDIVISION ) WEST ST amp AVE HIALEAH FL
PROJECT FINANCED BY READY STATE BANK
UNIFIED INC e MELENA SUBDIVISION ) WEST 70TH ST amp AVE
FL
NOTE PROJECT WAS ONGOING WHEN HURRlCANE ANDREW HIT DADE COUNTY
FUTURE INC ( JIBACOA SUBDIVISION ) WEST n ND ST amp 26TH AVE
FL
FUTURE DEVELOPERS INC e BAYAMO SUBDIVISION ) WEST 74TH ST amp AVE
FL
FUTURE INC r ALAMEDA SUBDIVISION )
SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AlfD THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH (8) MONTHS TOTAL PROJECT COST $191500000
(42) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE (42) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH ( MONTH TOTAL PROJECT COST $249400000
(23) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 1700 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO
PROJECT $143700000
(21) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 2200 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT FPL SOUTHERN BELL AND
THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION AND DRAINAGE SYSTEM THE 1) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $130200000
(10) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 900
WEST 69TH ST amp AVE FL
CITGO GASOLINE STATION 7200 SW AVENUE MIAMI FL
CALECO FLORIDA INVESTMENTS INC (HIALEAH GARDENS INDUSTRiAL 12190NW AVE HIALEAH FL
CMA INC (CORAL SPRINGS MEDICAL CENTER) 8150 ROYAL PALM DRNE CORAL FL
HG ENTERPRISES INC
AVE
G PROULX BUILDING MATERIALS ATTN KELO MARTINEZ 3275 SW 42ND STREET FT LAUDERDALE FL 33312
ADONEL CONCRETE ATTN LUIS GARCIA 2101 NW 110 AVENUE MIAlVII FL 33172
BUILDING ATTN JEFF NUDELMAN 1341 NW 1 STREET POMPANO FL 33172
JOHN ABELL CORPORATION ATTN ANGEL RODRIGUEZ 10500 SW 1 STREET MIAMI FL 33157
TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE FIOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $57600000
400 SF BUILDING FI RESTROOMS OFFICE AND STORAGE TOTAL PROJECT COST$2875000
THIS CONTRACT WAS TO TAKE A RAW PIECE OF LAND DEMUCK FILL AND CONSTRUCT A (9) BAY SF
AND COMPLEX FROM FOUNDATION TO CERTIFICATE OF OCCUPANCY TOTAL PROJECT COST $58000000
THIS CONTRACT WAS TO BUILT A DENT AL OFFICE WITH EXTENSIVE PLUMBING AND GAS SYSTEMS THIS CONTRACT WAS A TURN KEY OPERATION TOTAL PROJECT COST $14200000
THIS CONTRACT WAS TO PROVIDE CONTRUCTION OF STRUCTURAL AND FRAMING SHELL FOR (56) SINGLE FAMILY RESIDENCES TOTAL PROJECTS COST $94080000
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
BA YLOFT CONDOMINnJMS 425 NE 25 tl1 STREET MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR AGUSTIN MORALES OFF (786) 256-0078 9 STORY CONDOMINIUM BUILDING (110000 sq ft) TOTAL PROJECT COST $192000000 COMPLETION DATE MAY 2004
DIXIE GROVE CONDOMINnJMS OWNER 2630 SW 2S tl1 STREET MR CARLOS RUA COCONUT GROVE FL OFF (305) 441-2242 (STRUCTURAL SHELL CONTRACTOR) 5 STORY APT BLDG WI BASEMENT
PARKING GARAGE (70000 sq ft) TOTAL PROJECT COST $224000000 COMPLETION DATE MARCH 2004
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
STORAGE MART 9900 BIRD ROAD MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR JOHN BERG CELL (305) 216-1971 4 STORY SELF STORAGE FACILITY (90000 sq ft) TOT AL PROJECT COST $187000000 COMPLETION DATE JANUARY 2004
TERRALAND WAREHOUSE (No Picture) DEVELOPER 13500 SW 131 ST STREET MR JOSE GONZALEZ MIAMI FL OFF (786) 256-0078 (STRUCTURAL SHELL CONTRACTOR) OFFICEIWAREHOUSE BUILDING CON
(25000 sq ft) TOTAL PROJECT COST $84000000
CONSTRUCTION PROJECTS COMPLETED (dba Builders amp Developers Corp)
TAMAYO WAREHOUSE 10741 SW 23 RD STREET MIAMI FL
DISPLA Y INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
DISPLAY INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
JOSE GONZALEZ 14340 SW 99TH AVENUE MIAMI FL
13500 SF WAREHOUSE (5) BAYS TOT AL PROJECT COST $65722400
10850 SF WAREHOUSE ADDITION TOTAL PROJECT COST$43800000
2850 SF WAREHOUSE ADDITION TOT AL PROJECT COST$13800000
4500 SF RESIDENCE TOTAL PROJECT COST$26290000
JOSE GONZALEZ 14651 SW 99TH COURT MIAMI FL
JOSE GONZALEZ 14610 SW AVENUE MIAMI FL
RENE ALVAREZ PAINT AND BODY SHOP 10750 NW ST MIAMI FL
MAIL EXPRESS 8299 NW 30TH TERR
FL
SOTHYS WAREHOUSE 1550NW AVE
FL
LUBARSEAFOOD 8325 NW TERR
FL
MARlTIME FRIEGHT 10875 NW 33RD ST MIMlI FL
SENNARI 10775 NW ST MIAMI FL
GA TEW A Y FRIEGHT 10855 NW ST MIANIl FL
SAFEW A Y FRIEGHT 10871 NW ST MIAMI FL
SILMAR 10945 NW MIAMI FL
NIPRO MEDICAL 10877 NW 33 RD ST MIAMI FL
SIRUBA INDUSTRIES 10905 NW ST MIAMI FL
WENNIN FRIEGHT 10825 NW 33RD ST MIAMI FL
MIGUEL SOLIMAN
6300 SF RESIDENCE TOTAL PROJECT COST$36890000
SF RESIDENCE TOT AL PROJECT COSTS21290000
SF AUTO BODY SHOP INCLUDING ALL SITE DRAINAGE PAVING AND EXT PREP FACILITIES TOTAL PROJECT COST $31500000
20000 SF AND WAREHOUSE TOT AL PROJECT COST $76800000
J 8000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $57600000
24000 SF AND WAREHOUSE TOT AL PROJECT COST $77900000
10000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $33500000
I SF OFFICE AND WAREHOUSE TOT AL PROJECT COST $57750000
20000 SF OFFICE WAREHOUSE TOTAL PROJECT COST $66300000
SF OFFICE AND WAREHOUSE TOT AL COST $28900000
J SF AND WAREHOUSE TOTAL PROJECT COST $49300000
15000 SF OFFICE AND WAREHOUSE TOTAL PROJECT $48000000
I SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $48600000
SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $29400000
6200 SF SINGLE FAMILY RESIDENCE SOLD 1996 $48400000
FUTURE DEVELOPERS INC r Y AIRA SUBDIVISION ) WEST ST amp AVE HIALEAH FL
PROJECT FINANCED BY READY STATE BANK
UNIFIED INC e MELENA SUBDIVISION ) WEST 70TH ST amp AVE
FL
NOTE PROJECT WAS ONGOING WHEN HURRlCANE ANDREW HIT DADE COUNTY
FUTURE INC ( JIBACOA SUBDIVISION ) WEST n ND ST amp 26TH AVE
FL
FUTURE DEVELOPERS INC e BAYAMO SUBDIVISION ) WEST 74TH ST amp AVE
FL
FUTURE INC r ALAMEDA SUBDIVISION )
SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AlfD THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH (8) MONTHS TOTAL PROJECT COST $191500000
(42) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE (42) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH ( MONTH TOTAL PROJECT COST $249400000
(23) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 1700 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO
PROJECT $143700000
(21) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 2200 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT FPL SOUTHERN BELL AND
THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION AND DRAINAGE SYSTEM THE 1) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $130200000
(10) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 900
WEST 69TH ST amp AVE FL
CITGO GASOLINE STATION 7200 SW AVENUE MIAMI FL
CALECO FLORIDA INVESTMENTS INC (HIALEAH GARDENS INDUSTRiAL 12190NW AVE HIALEAH FL
CMA INC (CORAL SPRINGS MEDICAL CENTER) 8150 ROYAL PALM DRNE CORAL FL
HG ENTERPRISES INC
AVE
G PROULX BUILDING MATERIALS ATTN KELO MARTINEZ 3275 SW 42ND STREET FT LAUDERDALE FL 33312
ADONEL CONCRETE ATTN LUIS GARCIA 2101 NW 110 AVENUE MIAlVII FL 33172
BUILDING ATTN JEFF NUDELMAN 1341 NW 1 STREET POMPANO FL 33172
JOHN ABELL CORPORATION ATTN ANGEL RODRIGUEZ 10500 SW 1 STREET MIAMI FL 33157
TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE FIOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $57600000
400 SF BUILDING FI RESTROOMS OFFICE AND STORAGE TOTAL PROJECT COST$2875000
THIS CONTRACT WAS TO TAKE A RAW PIECE OF LAND DEMUCK FILL AND CONSTRUCT A (9) BAY SF
AND COMPLEX FROM FOUNDATION TO CERTIFICATE OF OCCUPANCY TOTAL PROJECT COST $58000000
THIS CONTRACT WAS TO BUILT A DENT AL OFFICE WITH EXTENSIVE PLUMBING AND GAS SYSTEMS THIS CONTRACT WAS A TURN KEY OPERATION TOTAL PROJECT COST $14200000
THIS CONTRACT WAS TO PROVIDE CONTRUCTION OF STRUCTURAL AND FRAMING SHELL FOR (56) SINGLE FAMILY RESIDENCES TOTAL PROJECTS COST $94080000
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
CONSTRUCTION PROJECT COMPLETED (dba Soliman Structures Inc)
STORAGE MART 9900 BIRD ROAD MIAMI FL (STRUCTURAL SHELL CONTRACTOR)
GENERAL CONTRACTOR MR JOHN BERG CELL (305) 216-1971 4 STORY SELF STORAGE FACILITY (90000 sq ft) TOT AL PROJECT COST $187000000 COMPLETION DATE JANUARY 2004
TERRALAND WAREHOUSE (No Picture) DEVELOPER 13500 SW 131 ST STREET MR JOSE GONZALEZ MIAMI FL OFF (786) 256-0078 (STRUCTURAL SHELL CONTRACTOR) OFFICEIWAREHOUSE BUILDING CON
(25000 sq ft) TOTAL PROJECT COST $84000000
CONSTRUCTION PROJECTS COMPLETED (dba Builders amp Developers Corp)
TAMAYO WAREHOUSE 10741 SW 23 RD STREET MIAMI FL
DISPLA Y INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
DISPLAY INTERNATIONAL CORP 5701 MIAMI LAKES DRIVE MIAMI LAKES FL
JOSE GONZALEZ 14340 SW 99TH AVENUE MIAMI FL
13500 SF WAREHOUSE (5) BAYS TOT AL PROJECT COST $65722400
10850 SF WAREHOUSE ADDITION TOTAL PROJECT COST$43800000
2850 SF WAREHOUSE ADDITION TOT AL PROJECT COST$13800000
4500 SF RESIDENCE TOTAL PROJECT COST$26290000
JOSE GONZALEZ 14651 SW 99TH COURT MIAMI FL
JOSE GONZALEZ 14610 SW AVENUE MIAMI FL
RENE ALVAREZ PAINT AND BODY SHOP 10750 NW ST MIAMI FL
MAIL EXPRESS 8299 NW 30TH TERR
FL
SOTHYS WAREHOUSE 1550NW AVE
FL
LUBARSEAFOOD 8325 NW TERR
FL
MARlTIME FRIEGHT 10875 NW 33RD ST MIMlI FL
SENNARI 10775 NW ST MIAMI FL
GA TEW A Y FRIEGHT 10855 NW ST MIANIl FL
SAFEW A Y FRIEGHT 10871 NW ST MIAMI FL
SILMAR 10945 NW MIAMI FL
NIPRO MEDICAL 10877 NW 33 RD ST MIAMI FL
SIRUBA INDUSTRIES 10905 NW ST MIAMI FL
WENNIN FRIEGHT 10825 NW 33RD ST MIAMI FL
MIGUEL SOLIMAN
6300 SF RESIDENCE TOTAL PROJECT COST$36890000
SF RESIDENCE TOT AL PROJECT COSTS21290000
SF AUTO BODY SHOP INCLUDING ALL SITE DRAINAGE PAVING AND EXT PREP FACILITIES TOTAL PROJECT COST $31500000
20000 SF AND WAREHOUSE TOT AL PROJECT COST $76800000
J 8000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $57600000
24000 SF AND WAREHOUSE TOT AL PROJECT COST $77900000
10000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $33500000
I SF OFFICE AND WAREHOUSE TOT AL PROJECT COST $57750000
20000 SF OFFICE WAREHOUSE TOTAL PROJECT COST $66300000
SF OFFICE AND WAREHOUSE TOT AL COST $28900000
J SF AND WAREHOUSE TOTAL PROJECT COST $49300000
15000 SF OFFICE AND WAREHOUSE TOTAL PROJECT $48000000
I SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $48600000
SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $29400000
6200 SF SINGLE FAMILY RESIDENCE SOLD 1996 $48400000
FUTURE DEVELOPERS INC r Y AIRA SUBDIVISION ) WEST ST amp AVE HIALEAH FL
PROJECT FINANCED BY READY STATE BANK
UNIFIED INC e MELENA SUBDIVISION ) WEST 70TH ST amp AVE
FL
NOTE PROJECT WAS ONGOING WHEN HURRlCANE ANDREW HIT DADE COUNTY
FUTURE INC ( JIBACOA SUBDIVISION ) WEST n ND ST amp 26TH AVE
FL
FUTURE DEVELOPERS INC e BAYAMO SUBDIVISION ) WEST 74TH ST amp AVE
FL
FUTURE INC r ALAMEDA SUBDIVISION )
SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AlfD THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH (8) MONTHS TOTAL PROJECT COST $191500000
(42) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE (42) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH ( MONTH TOTAL PROJECT COST $249400000
(23) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 1700 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO
PROJECT $143700000
(21) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 2200 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT FPL SOUTHERN BELL AND
THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION AND DRAINAGE SYSTEM THE 1) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $130200000
(10) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 900
WEST 69TH ST amp AVE FL
CITGO GASOLINE STATION 7200 SW AVENUE MIAMI FL
CALECO FLORIDA INVESTMENTS INC (HIALEAH GARDENS INDUSTRiAL 12190NW AVE HIALEAH FL
CMA INC (CORAL SPRINGS MEDICAL CENTER) 8150 ROYAL PALM DRNE CORAL FL
HG ENTERPRISES INC
AVE
G PROULX BUILDING MATERIALS ATTN KELO MARTINEZ 3275 SW 42ND STREET FT LAUDERDALE FL 33312
ADONEL CONCRETE ATTN LUIS GARCIA 2101 NW 110 AVENUE MIAlVII FL 33172
BUILDING ATTN JEFF NUDELMAN 1341 NW 1 STREET POMPANO FL 33172
JOHN ABELL CORPORATION ATTN ANGEL RODRIGUEZ 10500 SW 1 STREET MIAMI FL 33157
TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE FIOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $57600000
400 SF BUILDING FI RESTROOMS OFFICE AND STORAGE TOTAL PROJECT COST$2875000
THIS CONTRACT WAS TO TAKE A RAW PIECE OF LAND DEMUCK FILL AND CONSTRUCT A (9) BAY SF
AND COMPLEX FROM FOUNDATION TO CERTIFICATE OF OCCUPANCY TOTAL PROJECT COST $58000000
THIS CONTRACT WAS TO BUILT A DENT AL OFFICE WITH EXTENSIVE PLUMBING AND GAS SYSTEMS THIS CONTRACT WAS A TURN KEY OPERATION TOTAL PROJECT COST $14200000
THIS CONTRACT WAS TO PROVIDE CONTRUCTION OF STRUCTURAL AND FRAMING SHELL FOR (56) SINGLE FAMILY RESIDENCES TOTAL PROJECTS COST $94080000
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
JOSE GONZALEZ 14651 SW 99TH COURT MIAMI FL
JOSE GONZALEZ 14610 SW AVENUE MIAMI FL
RENE ALVAREZ PAINT AND BODY SHOP 10750 NW ST MIAMI FL
MAIL EXPRESS 8299 NW 30TH TERR
FL
SOTHYS WAREHOUSE 1550NW AVE
FL
LUBARSEAFOOD 8325 NW TERR
FL
MARlTIME FRIEGHT 10875 NW 33RD ST MIMlI FL
SENNARI 10775 NW ST MIAMI FL
GA TEW A Y FRIEGHT 10855 NW ST MIANIl FL
SAFEW A Y FRIEGHT 10871 NW ST MIAMI FL
SILMAR 10945 NW MIAMI FL
NIPRO MEDICAL 10877 NW 33 RD ST MIAMI FL
SIRUBA INDUSTRIES 10905 NW ST MIAMI FL
WENNIN FRIEGHT 10825 NW 33RD ST MIAMI FL
MIGUEL SOLIMAN
6300 SF RESIDENCE TOTAL PROJECT COST$36890000
SF RESIDENCE TOT AL PROJECT COSTS21290000
SF AUTO BODY SHOP INCLUDING ALL SITE DRAINAGE PAVING AND EXT PREP FACILITIES TOTAL PROJECT COST $31500000
20000 SF AND WAREHOUSE TOT AL PROJECT COST $76800000
J 8000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $57600000
24000 SF AND WAREHOUSE TOT AL PROJECT COST $77900000
10000 SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $33500000
I SF OFFICE AND WAREHOUSE TOT AL PROJECT COST $57750000
20000 SF OFFICE WAREHOUSE TOTAL PROJECT COST $66300000
SF OFFICE AND WAREHOUSE TOT AL COST $28900000
J SF AND WAREHOUSE TOTAL PROJECT COST $49300000
15000 SF OFFICE AND WAREHOUSE TOTAL PROJECT $48000000
I SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $48600000
SF OFFICE AND WAREHOUSE TOTAL PROJECT COST $29400000
6200 SF SINGLE FAMILY RESIDENCE SOLD 1996 $48400000
FUTURE DEVELOPERS INC r Y AIRA SUBDIVISION ) WEST ST amp AVE HIALEAH FL
PROJECT FINANCED BY READY STATE BANK
UNIFIED INC e MELENA SUBDIVISION ) WEST 70TH ST amp AVE
FL
NOTE PROJECT WAS ONGOING WHEN HURRlCANE ANDREW HIT DADE COUNTY
FUTURE INC ( JIBACOA SUBDIVISION ) WEST n ND ST amp 26TH AVE
FL
FUTURE DEVELOPERS INC e BAYAMO SUBDIVISION ) WEST 74TH ST amp AVE
FL
FUTURE INC r ALAMEDA SUBDIVISION )
SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AlfD THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH (8) MONTHS TOTAL PROJECT COST $191500000
(42) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE (42) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH ( MONTH TOTAL PROJECT COST $249400000
(23) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 1700 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO
PROJECT $143700000
(21) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 2200 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT FPL SOUTHERN BELL AND
THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION AND DRAINAGE SYSTEM THE 1) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $130200000
(10) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 900
WEST 69TH ST amp AVE FL
CITGO GASOLINE STATION 7200 SW AVENUE MIAMI FL
CALECO FLORIDA INVESTMENTS INC (HIALEAH GARDENS INDUSTRiAL 12190NW AVE HIALEAH FL
CMA INC (CORAL SPRINGS MEDICAL CENTER) 8150 ROYAL PALM DRNE CORAL FL
HG ENTERPRISES INC
AVE
G PROULX BUILDING MATERIALS ATTN KELO MARTINEZ 3275 SW 42ND STREET FT LAUDERDALE FL 33312
ADONEL CONCRETE ATTN LUIS GARCIA 2101 NW 110 AVENUE MIAlVII FL 33172
BUILDING ATTN JEFF NUDELMAN 1341 NW 1 STREET POMPANO FL 33172
JOHN ABELL CORPORATION ATTN ANGEL RODRIGUEZ 10500 SW 1 STREET MIAMI FL 33157
TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE FIOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $57600000
400 SF BUILDING FI RESTROOMS OFFICE AND STORAGE TOTAL PROJECT COST$2875000
THIS CONTRACT WAS TO TAKE A RAW PIECE OF LAND DEMUCK FILL AND CONSTRUCT A (9) BAY SF
AND COMPLEX FROM FOUNDATION TO CERTIFICATE OF OCCUPANCY TOTAL PROJECT COST $58000000
THIS CONTRACT WAS TO BUILT A DENT AL OFFICE WITH EXTENSIVE PLUMBING AND GAS SYSTEMS THIS CONTRACT WAS A TURN KEY OPERATION TOTAL PROJECT COST $14200000
THIS CONTRACT WAS TO PROVIDE CONTRUCTION OF STRUCTURAL AND FRAMING SHELL FOR (56) SINGLE FAMILY RESIDENCES TOTAL PROJECTS COST $94080000
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
FUTURE DEVELOPERS INC r Y AIRA SUBDIVISION ) WEST ST amp AVE HIALEAH FL
PROJECT FINANCED BY READY STATE BANK
UNIFIED INC e MELENA SUBDIVISION ) WEST 70TH ST amp AVE
FL
NOTE PROJECT WAS ONGOING WHEN HURRlCANE ANDREW HIT DADE COUNTY
FUTURE INC ( JIBACOA SUBDIVISION ) WEST n ND ST amp 26TH AVE
FL
FUTURE DEVELOPERS INC e BAYAMO SUBDIVISION ) WEST 74TH ST amp AVE
FL
FUTURE INC r ALAMEDA SUBDIVISION )
SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AlfD THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH (8) MONTHS TOTAL PROJECT COST $191500000
(42) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 4000 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE (42) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT LENGTH ( MONTH TOTAL PROJECT COST $249400000
(23) SINGLE FAMILY RESIDENCES SITE W AS FULLY DEMUCKED 1700 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT FPL SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE THE HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO
PROJECT $143700000
(21) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 2200 TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUlLT FPL SOUTHERN BELL AND
THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION AND DRAINAGE SYSTEM THE 1) HOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $130200000
(10) SINGLE FAMILY RESIDENCES SITE WAS FULLY DEMUCKED 900
WEST 69TH ST amp AVE FL
CITGO GASOLINE STATION 7200 SW AVENUE MIAMI FL
CALECO FLORIDA INVESTMENTS INC (HIALEAH GARDENS INDUSTRiAL 12190NW AVE HIALEAH FL
CMA INC (CORAL SPRINGS MEDICAL CENTER) 8150 ROYAL PALM DRNE CORAL FL
HG ENTERPRISES INC
AVE
G PROULX BUILDING MATERIALS ATTN KELO MARTINEZ 3275 SW 42ND STREET FT LAUDERDALE FL 33312
ADONEL CONCRETE ATTN LUIS GARCIA 2101 NW 110 AVENUE MIAlVII FL 33172
BUILDING ATTN JEFF NUDELMAN 1341 NW 1 STREET POMPANO FL 33172
JOHN ABELL CORPORATION ATTN ANGEL RODRIGUEZ 10500 SW 1 STREET MIAMI FL 33157
TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE FIOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $57600000
400 SF BUILDING FI RESTROOMS OFFICE AND STORAGE TOTAL PROJECT COST$2875000
THIS CONTRACT WAS TO TAKE A RAW PIECE OF LAND DEMUCK FILL AND CONSTRUCT A (9) BAY SF
AND COMPLEX FROM FOUNDATION TO CERTIFICATE OF OCCUPANCY TOTAL PROJECT COST $58000000
THIS CONTRACT WAS TO BUILT A DENT AL OFFICE WITH EXTENSIVE PLUMBING AND GAS SYSTEMS THIS CONTRACT WAS A TURN KEY OPERATION TOTAL PROJECT COST $14200000
THIS CONTRACT WAS TO PROVIDE CONTRUCTION OF STRUCTURAL AND FRAMING SHELL FOR (56) SINGLE FAMILY RESIDENCES TOTAL PROJECTS COST $94080000
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
WEST 69TH ST amp AVE FL
CITGO GASOLINE STATION 7200 SW AVENUE MIAMI FL
CALECO FLORIDA INVESTMENTS INC (HIALEAH GARDENS INDUSTRiAL 12190NW AVE HIALEAH FL
CMA INC (CORAL SPRINGS MEDICAL CENTER) 8150 ROYAL PALM DRNE CORAL FL
HG ENTERPRISES INC
AVE
G PROULX BUILDING MATERIALS ATTN KELO MARTINEZ 3275 SW 42ND STREET FT LAUDERDALE FL 33312
ADONEL CONCRETE ATTN LUIS GARCIA 2101 NW 110 AVENUE MIAlVII FL 33172
BUILDING ATTN JEFF NUDELMAN 1341 NW 1 STREET POMPANO FL 33172
JOHN ABELL CORPORATION ATTN ANGEL RODRIGUEZ 10500 SW 1 STREET MIAMI FL 33157
TRUCKS OF FILL WERE HAULED IN WATER AND SEWER SYSTEMS WERE BUILT SOUTHERN BELL AND THE CABLE COMPANY WERE COORDINATED WITH ONGOING CONSTRUCTION ROADS AND DRAINAGE SYSTEM THE FIOMES WERE CONSTRUCTED FROM GROUND BREAKING TO CO TOTAL PROJECT COST $57600000
400 SF BUILDING FI RESTROOMS OFFICE AND STORAGE TOTAL PROJECT COST$2875000
THIS CONTRACT WAS TO TAKE A RAW PIECE OF LAND DEMUCK FILL AND CONSTRUCT A (9) BAY SF
AND COMPLEX FROM FOUNDATION TO CERTIFICATE OF OCCUPANCY TOTAL PROJECT COST $58000000
THIS CONTRACT WAS TO BUILT A DENT AL OFFICE WITH EXTENSIVE PLUMBING AND GAS SYSTEMS THIS CONTRACT WAS A TURN KEY OPERATION TOTAL PROJECT COST $14200000
THIS CONTRACT WAS TO PROVIDE CONTRUCTION OF STRUCTURAL AND FRAMING SHELL FOR (56) SINGLE FAMILY RESIDENCES TOTAL PROJECTS COST $94080000
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
MIAMI-DADE COUNTY BUILDING DEPT ATfN FLAVIO GOMEZ BLDG DIRECTOR 11805 SW 26 STREET MIAMI-DADE COUNTY FL 33175 CONTACT (305) 219-3113
CITY OF MIAMI BUILDING DEPT ATTN MAURICE BLDG OFFICIAL 444 SW FLOOR
FL 33130 CONTACT 469-2180
LATIN AMERICAN BUSINESS ASSOCIATION (LABA) ATTN WILLIAM PRESIDENT 782 NW 42ND AVENUE MIAMI FL 33126
LAW OFFICES OF DIEGO L RESTREPO ATTN DIEGO RESTREPO ATTORNEY and REAL ESTATE DEVELOPER 2600 SOUTH DOUGLAS SUITE 1007 CORAL GABLES FL 33137 CONTACT (305) 801-8744
BRUCIA LLC ATTN AUGUSTO FRANCHINO CHIEF MANAGING MEMBERJDEVELOPER 333 NE STREET SUITE 411 MIAMI FL 33137 CONTACT (305) 143
BANYAN FLORIDA LLC ATTN ROLANDO CHIEF MANAGING MEMBERJDEVELOPER 9595 COLLINS SUITE 305
FL 33154 CONT ACT 305-9039
SUNCOAST CONSTRUCTION GROUP INC ATTN NIGEL PROJECT MANAGER 2030 DOUGLAS ROAD SUITE 212 CORAL FL 33134 CONTACT (786) 973-6578
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
LETTERS OF RECOMENDATIONS
BANYAN FLORIDA INVESTMENTSnc 9595 COLUNS AVENUE SUITE 305 SURFSIDE FL 33151shy
May 182015
RE Letter of Recommendation Soliman Structures Inc
To Whom It May Conceru
Let me begin by commending Soliman Structures Inc on creating a business culture with eXmIJlalry strength and This is filled with hardworking individuals from top to and is truly respectable and as an organization can be
I began working with Soliman Structures as a on a building in which they were the structural contractor From day one myrln this has been a very pleasant rlltgtO( In the past when I was in was there to resolve whatever issue
manner continuously strictly to the schedule for each project There also have never
would arise both in the field and in n()lrk They have worked in a
been any issues in Soliman Their contract is that a contract and will never try to swindle or deceive in any way for their benefit or fmandal
Soliman Structures have managed to impress me to the point of when I began together my own project they came to mind Without delay I a contract with Soliman Structures for the structural shell all while refusing to even any other contractor to bid
I have in this organization I utterly without he~itatioll highly recommend any of those in need of their services
I hope this letter ofrecommendation finds you well as Soliman Structures is well suited in running a smooth and profitable in any for which they are involved Their level of commitment is courageous because even Til of dire straits they will no crumble or buckle This is thelype of organization you rush to do business with
Please do not hesitate in me if any shall arise in response to this recommendation letter and I wi 1I be happy to Soliman StnlctLlres is top notch and one of which I reserve my highest recommendation for
Rolando Holz PresidentlManaging Member
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
SUNCOAST CON TRUCTrON ROUP rNc
101 SW 0 103
ML~ll FL
To Whom It May Concern
Re Miguel Soliman Soliman Structures Inc
Soliman of Soliman Structures acted as the shell contractor on Ponce Entrance an 8 story 59 Mit apartment located at 101 S W 36th Ct Miami Florida
I cannot recOirunend Miguel and his team of extraordinary professionals more highly Suffice is to that apart from delivering a truly Miguel demonstrated his complete understanding of the complexities of structural design and to the extent that he was instrumental in identifYing and putting forth cost effective solutions to major structural that existed in our plans witbout to rely on major revisions by the
of record The skit set which Miguel to the table far our expectations and I would have no in contracting with Miguel and Soliman again or recommending him to other developers and General Contractors
team both on site and office were a to deal with at all times The onsile crew is nmI~liohl~ and diligent worked on and Sundays when necessary to up with the
office team was courteous and and kept pace with the somewhat paperwork that is a necessary part of any contractual OIllolIlL
subcontractOrs are carefully vetted and performed as necessary and his onsite Project Manager was very in managing the entire process and ensuring minimal disruption to our neighbors
Please fee free to contact me if you require any funher infonnation
President
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
SOFISA REALTY LLC 2600 S Road Suite 913
Coral Gables Florida 33134 Telephone (305) 447middot9430
182015
To whom it may concern
It came to uncierstaniirlg that Soliman Structures Inc wasin need of a recommendation and ithou t mgt1IltU~Ll I write his letter of reference in order to the excellent service Soliman Structures
via a mutual business associate and have Struclturs has been an in my
c()lmt2nv build and transform the area of Miami have several mid-rise VCUJUlJ~~ as the structural shell contractor for my company and we are in rlvInmmt of another project
Soliman Structures has excellent service on a consistent basis for many years and rcan attest first hand to that Without any issue in whkh arose before or after construction Soliman Structures was to help in any way and often did nT[wirlin
proper solutions with swift motion of action There were countless times in which vu occurred and Soliman never ran from a problem but understood that we were all project and ipound one had an issue we all did I would also like to extend their level of is When a concrete pour was scheduled for a certain lime no matter what the circumstances were the was done that without excuses Or when
was there sealrdUn for solutions iscnvlred one passing inspection and continuing on schedule
that set Soliman Structures apart but that would not give oTancizctticn DwvidES It is the little things as well as the
execution picture this firm that is seen in this inci1lttrv in this community Soliman Structures truly is an and recommend without reservation this in any endeavor so pursue I have worked with Soliman Structures on several occasions and to continue to do so It is a
and I respect and value
desire to discuss their pelfOltlruinlte or have any questions or concems with this recommendation feel free to contact me
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
To whom it may concern
It is my that Soliman Structures Inc was in the process of acquiring recommendltltlonletter It is my pleasure to express Soliman Structures as a very honest working and skillful organization for this is what they have shown countless of times through their consistency
Soliman Structures has an excellent reputation throughout the industry as a company that is straightforward and pulls no punches With that being said once r entered into a working relationship with this wonderful company they still exceeded my expectations we have a mid-rise nJrtn~lnl building with Soliman as the structural contractor works for many
projects
Soliman Structures effort in Whether out in the field or running the business in the to encounter any Soliman is responsible for On the contrary they have always been by my even al times where the issue far exceeded their scope of work Never have we had an issue with Soliman throughout our relationship or on any projects Also the agreed upon amount of our contract is honored and is Soliman expects to receive In my there have been countless of times in past where contractors absolve tbemselves of any
and any issues that shall occar during construction is tacked on as an extra charge a change a game contractors to participate in but not Soliman Structures Like I have
stated what you see is you get and you get is an organization dedicated to the utmost professionalism and urgency They are always on time on schedule and responsive during all working conditions pleasant or otherwise My faith in Soliman is neither blind nor but based on proven and consistent work I continue to work with Soliman Structures because it business A parmer one can trust is often difficult to find in business but an extraordinary one like Soliman is nearly impossible Therefore I highly recommend Soliman Structures as it is an organization that is in a league of their own
[f you should have any questions or concerns with this letter of recommendation please do not hesitate 10
contact me I am always available when it comes to Soliman Structures
333 NE 24th Street - Suite 411- Miami -FL 33137 1 392middot17961 (305) 646middot1870
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152
BURGER KING CORPORATION EXECUTiVE OffiCES 7360 NORTH KENDALL ORIVE
March 3 1987I
To Whom It May Concern
associated with Soliman for the past five During first four and one half
was employed as an Architectural Designer in Department at Burger King Corporation
time he was responsible for the and of architectural construction for restaurants the United states This
a degree of to insure they were in compliance codes
Miguels experience included the field personnel contractors building officials and outside
on an ongoing basis to coordinate his projects
at
like to say that I would not hesitate Soliman in the
field as would be a company
Sincerely yours
Richard L Director of
POST OFFICE BOX 520783 GENERAL MAIL FACI LlTY MIAMI FLORIDA 33152