Vikas Choudhary 200323811
Techniques for Operation Efficiency
1
1) What are the basics steps in the problem solving process? Explain them briefly. Ans: INTRODUCTION: Systematic problem solving provides a structured approach to problem solving. Depending upon the nature of problem (i.e. maintenance or improvement problem), some steps may be different. SOLVING A MAINTENANCE PROBLEM: Maintenance problems as mentioned earlier, surface when the status quo is distributed and decision make needs to recommend/take measures to restore and maintain the status quo.
Fig: Steps to solve a maintenance problem.
(a) Diagnose (define) the problem: Sound diagnosis is the crucial step in the problem solving process. Defining the problem sets the boundaries for that follows. Decision maker, like a doctor, must take into account all symptoms before prescribing the medicines (i.e. recommending the
Identify a maintenance problem
Collect data on “causes”
Perform Pareto Analysis
Identify root causes
Evolve alternatives & select (Brain storming)
Implement best alternative
Monitor effect
Is the problem resolved?
End
No
Vikas Choudhary 200323811
Techniques for Operation Efficiency
2
decision). Peter Drucker rightly states, “The books and articles on leadership are full of advice on how to make fast, forceful and useful decisions, but there is no more foolish and no more time wasting advice than to decide quickly what a problem really is. Defining the problem in most instances is a time-consuming task, but it is time well spent.” Sound diagnosis requires
(i) Measurement of the gap between the desired performance and the actual
performance. (ii) Identification of the root cause for the gap.
(iii) Identification of the restraints in the decision making process.
(b) Secure and analyse pertinent facts: Once the problem has been diagnosed (defined), the next step is to collect data. Data collection implies collecting background material, pertinent facts, decision taken in the past and their outcome, previous solutions to similar problems etc. General rules are:
(i) The information should be collected from the most reliable source. (ii) All relevant facts, regardless of how disorganized or unrelated they seem
at the time of data gathering, should be recorded. (iii) The information should be subjected to checks and cross checks. The
conflicting data must be resolved. The temptation to accept first response to inquiries should be avoided.
(iv) The facts wherever possible should be supported by tangible evidence in
the form of copies of the appropriate documents. Facts when cannot be supported by documentary evidence (i.e. facts which are bases on opinion of the individuals) should carry the names of the contributors so that they (individuals) can be contacted later if required.
Facts are next analysed to establish:
(i) The length of time to which the decision should apply. (ii) Effect of the decision on other functional areas. (iii) Qualitative considerations to take overall view of the business.
(c) Develop alternative solutions: This step concerns looking for the possible solutions and listing them down. Most common sources of collecting and listing of alternatives include experience, superiors, juniors, consultants, research, creativity, brain storming, critical examination, literature etc.
Vikas Choudhary 200323811
Techniques for Operation Efficiency
3
It is also the most important step and therefore good amount of time, effort and money should be spent /invested to get good alternative solutions. Generally, for every problem, alternative solutions exist and efforts need to put to unearth these alternatives. Usually, a brain storming or interaction session with those, concerned with the problem can highlight several alternatives. For example, the company was considering purchase of a CNC machine. The general manager held a series of brain storming session of his engineers and following alternatives got identified:
(a) continue to make the part by present method, or (b) buy the proposed CNC machine, or
(c) buy a machine other than the proposed one, or
(d) improvise the current method of making part (e.g retrofitting the
existing machine improves tooling and gauging method etc.), or
(e) subcontract CNC – compatible operations to a good quality vendor, or (f) discontinue manufacturing the part at company’s own plant and buy
the part from an outside source. After evaluating all the alternatives for their merits and demerits, the general manager opted for alternatives ‘d’, ‘e’ and ‘f’ and got the best results. (d) Evaluate alternatives: Once all the alternative solutions have been enumerated, they are next evaluated. This is usually done by testing each alternative against a set of objectives or specified criteria which the solution must meet. The steps involved are:
(i) Each alternative is analysed to see whether or not it meets the “must” objectives. An alternative which does not meet the “must” objective is immediately removed from further study.
(ii) Alternatives which meet the “must” objectives are next checked for “want”
objectives and those which are good in terms of “want” objectives are examined for adverse consequences. Since each alternative usually entails some risk, the decision maker next assesses the risk, the probability of risk, the probability or risk, and /or seriousness of the risk.
(iii) Every attempt is made to eliminate or minimize risk (or disadvantages). T
chart analysis is usually helpful.
(iv) Alternatives are next weighed for their effectiveness by identifying their long term and short term consequences. The advantages of the alternatives are quantified in terms of common denominator, usually the money.
Vikas Choudhary 200323811
Techniques for Operation Efficiency
4
(e) Select the best alternative: The alternative cleared at the evaluation stage are ranked according to their worth. Final selection is then made of the alternative which provides the maximum advantages while entailing acceptance risk (i.e. the alternative that best meets the solution criteria is selected) (f) Implement the selected decision: Once the final choice has been made the next step is to implement the decision and follow up for verification of the consequences (or effect of the decision) Though the steps mentioned above are sequential and separate but usually there is recycling among the steps. For example, while trying to evaluate alternatives, the decision maker may have to ho back to data collection step if he finds that he does not have all the information. STEPS FOR SOLVING AN IMPROVEMENT PROBLEM: The Japanese have provided a structured methodology for solving “improvement” problem. The methodology is also known as QC story and it comprises of the following six steps based on famous Deming Plan-Do-Check-Act (PDCA) cycle.
Vikas Choudhary 200323811
Techniques for Operation Efficiency
5
Fig: Steps to solve an improvement problem
Vikas Choudhary 200323811
Techniques for Operation Efficiency
6
Define improvement problem
Measure current status
Decide on desired level
Find gap in performance
Set Target
Prepare action plan (counter measure)
Implement counter measure
Measure /analyse achievement
Satisfactory performance?
New target
Stabilize/standardize (SDCA)
Maintain status quo
End
Plan (P)
Do (D)
Check (C)
No
Yes
No
Yes
Vikas Choudhary 200323811
Techniques for Operation Efficiency
7
2. (a) What is “Cause and effect” diagram? How is it useful in analyzing a problem? How is it constructed? Ans: INTRODUCTION: Every organization has contributory causes. The causes need to be identified to eliminate problems or minimize the effect of the problems. All causes including probable causes (i.e. which have not occurred earlier) should be identified so that preventive action can be taken (After all, prevention is better than cure) After the causes have been identified, they should be put into a systematic form that facilitates presentation and analysis. Cause and effect diagram is also called as “Ishikawa Diagram” or a fishbone diagram (due to its shape) – an effective tool for diagnosis to a problem – was developed by Dr. Kaoru Ishikawa, a professor of Tokyo University. The diagram lists out in a classified and systematic manner all causes which are responsible for the problem (called effect). The diagram consists of a main line to represent the actual problem and few lines to represent the major causes – materials, men, methods and machines – and horizontal or slanting arrows to represent sub-causes und relying each main cause. Procedure: Step1 : Specify the problem to be solved For eg:
(i) Accidents (ii) Process defectives (iii) Employer – employee relations (iv) Delayed delivery (v) Defective bills (vi) Labour efficiency
Step2: Brain storm to find all possible causes of the problem. Step3: Organize/ arrange these causes in few major themes (i.e. rational categories) Step4: Construct a cause and effect diagram that accurately displays the relationship of all data in each category. Steps in the construction of the diagram are as follows:
(a) Draw a box on the far right hand side of a large sheet of paper and write inside the box the description of the problem to be solved. Also draw a thick arrow that points to the box and look up on this as a main trunk of a tree.
(b) Enter the titles of the categories (also called themes) above and below the
horizontal line and connect them to horizontal line by vertical or standing arrows. Think of these as branches of the main truck of the tree.
Problem
Vikas Choudhary 200323811
Techniques for Operation Efficiency
8
(c) Enter the detailed cause data for each category / theme by arrows meeting the horizontal or slanting lines (i.e. lines representing the main theme). Look upon these as limbs or twigs of the branches.
(d) Review diagram drawn above to ensure that no cause has been missed.
Problem
Man Machine
Method Materials
Cause A
Cause B
Cause B
Cause D
Cause A
Cause C
Cause A Cause C
Cause ACause C
Cause C
Cause B Cause B
Cause D
Problem
Man Machine
Materials Method
Vikas Choudhary 200323811
Techniques for Operation Efficiency
9
A cross function team constituted to study problem of employees’ poor morale have conducted on following probable causes. Draw a “cause and effect” diagram from the given data… Ans:
Poor Management selection
Lack of communication
Improper management training
EMPLOYEE
HIRING REWARD/RECOGNITION
MANAGEMENT WORKING CONDITIONS
Poor selection
Incomplete job description
Recruiting errors
Poor Management selection
Low pay level
Wage differentials
Poor benefits
Favoritism
Lack of discipline methods
Public reprimands
Unclear company goals
Faulty working assignment Bad Lighting
Noise
Temperature
Long working hours
Excessive Criticism
Vikas Choudhary 200323811
Techniques for Operation Efficiency
10
3. a) What is Pie-Chart? How is it constructed? Ans: INTRODUCTION: Pie chart is also called an angular diagram. It is the graph of percentage breakdown of data. Steps in Construction of a PIE CHART:
i. Express value of each category of component group as a percentage of total of all categories or components or groups.
ii. Calculate degree of the angle formed by each category/component/group as under
Degree of particular category = Value of the group X 360 Total Value
iii. Draw a circle of a suitable diameter (say diameter of 3”) iv. Segment the circle into angles calculated in step 2 with the help of a
protractor v. Shade or color different segments suitable to make distinction between
different categories.
vi. Enter the percentage of each category in to the pie chart. b) Draw a Pie Chart to represent the following population in a village. Males Females Girls Boys Total 2000 1800 4200 2000 10000 Sol: S.No Gender Population Population % Degree 1. Males 2000 20% 72o 2. Females 1800 18% 64.8o 3. Girls 4200 42% 151.2o 4. Boys 2000 20% 72o Total 10000 100%
Vikas Choudhary 200323811
Techniques for Operation Efficiency
11
POPULATION
Girls42%
Females18%
Males20%
Boys20%
Males Females Girls Boys
4. a) What is Pareto’s analysis? How is it used for problem solving? Ans: Introduction: Every problem is the result of few causes and all causes are not equally important. Some causes are more significant than others. Pareto’s analysis underlines and operates his philosophy of “vital few: trivial many”. It is a technique of identifying vital causes by arranging the data according to the descending order of their frequency of occurrence. Pareto’s diagram is the outcome of the study conducted by Vilfredo Pareto to study the phenomenon of wealth in his country. Pareto observed that in his native country 80% of the wealth was held by 20% of the population. He eventually realized that he had discovered a universal law – around 20% of the activity causes 80% of the effect. For Example:
• 80% to 90% of the Italy’s wealth lay in the hands of 10% to 20% of the population.
• 80% of the accidents occur on 20% of the roads (i.e. some roads are more dangerous than others)
• 80% of the shopping that takes place is done in 20% of the time of the store are open.(i.e. people try to shop at the same time).
• 80% of the absenteeism in a company is generally on account of 20% of the work force.
• 20% of the machines are responsible for 80% of the total down time. • 20% of the end products generate 80% of sales revenue. • 20% of the clerks make 80% of the clerical errors. • 20% of the employees create 80% of the troubles. • 20% of the customers are responsible for 80% of the bad debts. • 20% of the total items in the stock account for 80% of the annual expenditure
on materials.
Vikas Choudhary 200323811
Techniques for Operation Efficiency
12
U.S Economist M.C. Lorenz presented this lop sided distribution in the form of theoretical curve, called Lorenz’s curve. Dr. J. M. Juran observed similar phenomenon in many other fields including quality. He names this phenomenon as Pareto Analysis in honor of the originator of the concept. We need to follow few steps in order to solve the problems using Pareto’s Chart. They are listed as follows:
1) Select the problem and identify causes into a handful of categories. For example, for a problem of “late coming to works”, possible categories of causes may be heavy traffic oversleeping, sickness, vehicle problem, family problem etc.
2) Select the standard unit for measurement (e.g. frequency, cost, sales etc.) 3) Select the time period over which data will be collected (e.g. 8 hours, 5 days, 2
weeks, etc.) 4) Collect necessary data on each category and summarize results.
It is generally convenient to create a three-column-table having heading as “error category”. “frequency (or cost)”, and “percentage of total”. This information can be directly taken from the check sheet.
5) Rearrange the data in the descending order of the frequency or cost. 6) Organize the Pareto’s chart
(a) Draw two vertical axis, one on either side of a horizontal side axis (leaving enough space on the horizontal axis to list the problem categories). Mark the frequency of occurrence of the problem along left vertical axis and percentage along right vertical axis.
(b) Divide the horizontal axis into intervals equal to the number of categories.
(c) List down the categories from left to right in their order of decreasing frequency or cost.
(d) Construct a bar or rectangle above each category with height equal to frequency or cost.
7) Draw the cumulative line /curve (Pareto’s curve) by plotting each point at the
right hand corner of each bar and them connecting these points. 8) Write all necessary information concerning the diagram.
Vikas Choudhary 200323811
Techniques for Operation Efficiency
13
b) Shrivastive, an administrative officer, working with Dattatreya Chemicals Ltd. has been receiving frequent complaints from internal customers regarding late and wrong receipt of mail delivered by his department. In order to correct the problem, he called a meeting of a small group of his internal customers and with their help identified five error categories, namely mail behind schedule, wrong deliveries, and late delivery of outgoing mail to post office, rude clerks and incorrect charges. The administrative officer then started tracking complaints. The data collected by him in a 30-day span in the form of a check-sheet reproduced below. Error Category Tally Mark Frequency Behind schedule mail lllll ll 7 Wrong delivery of mail lllll lllll lllll 20 Late delivery of outgoing mail to P.O lllll lllll ll 12 Rude clerks l 1 Incorrect charges lllll 5 Total 45 Draw a Pareto’s Chart. Sol:
1. Collect the data concerning the problem under study. 2. Rearrange the data in the descending order.
Error Category Frequency %of Error to total Cumulative% Wrong delivery of mail 20 44.44 44.44 Late delivery… 12 26.67 72.1 Behind schedule mail 7 15.55 86.65 Incorrect charges 5 11.11 97.76 Rude clerks 1 2.22 100.00
Vikas Choudhary 200323811
Techniques for Operation Efficiency
14
PARETO's DIAGRAM
2012 7 5 1
44.44
26.6715.55 11.11
2.22
44.44
72.186.65
97.76 100
0
20
40
60
80
100
120
0 2 4 6
Frequency%of Error to total Cumulative%Log. (Cumulative%)
5. What are the quality circles? How are they formed? Explain briefly the organization of quality circles. Ans: Introduction: Quality circle is basically a small group of employees – who volunteer to meet regularly to undertake work related projects – quality, productivity, safety, efficiency, cost, working conditions, etc., - and evolve recommendations to improve effectiveness in the selected functional area. The size of quality circle is important. Too big a size 9 (too many members) may not provide enough time to each member to effectively participate and too small a size may make a circle dormant. An ideal size of the circle is eight to ten members but in any case it should not exceed fifteen members. More than one circle may be formed if too many employees in a particular work area are willing to participate in the quality circle activities. For example, if there are 25 clerks in the organization doing identical jobs, 2 to 3 circles may be formed. Participation in the circle activities is absolutely voluntary. Members are not selected /nominated. They are not elected or rotated either. Employees, however, are encouraged to form circles. Ideally, members of a particular circle should be from the same area or who do similar work so that problems that they select /analyse / discuss will be familiar to all of them. Brief History: Japanese Union of Scientists and Engineers (JUSE) was established in 1946 after the World War II in which Japanese industries were completely destroyed. JUSE worked for growth and development of quality and in 1950 it invited Dr. Edward Deming, a renowned American expert on quality to visit Japan. Dr. Deming delivered a series of lectures on various aspects of quality control to the top management of several companies of Japan. These circles have lifted war-ravaged Japan to its present dominant position and have endangered even the very existence of American industry. A quality circle in Japan on the average saves $56, 000. All this is achieved without any monetary incentives.
Vikas Choudhary 200323811
Techniques for Operation Efficiency
15
Around 25% of the profitability of the Japanese industries is attributed to the quality circles. Nissan motor, for example works with 57,000 employees, has 4,200 quality circles which have helped the company to double its productivity in ten years. Quality circles in India were first launched in the Hyderabad unit of BHEL in 1980 which has now around 100 quality circles in its various branches throughout India. Quality circles forum of India was formed in 1982 to propagate concept. The concept of quality circles is gaining momentum and quite a few firms in the private and public sector – Kirloskars, Alwayns, Tata’s, H.A., Bharat Forge, Balaji Auto, Vulcan Laval, Rourkela Steel plant etc., have instituted quality circles. Organization for quality circles: The Organization of circles consists of:
i. Steering Committee: Steering committee is the apex body at the highest level of the plant which is made up of heads of the major departments like Production, Finance, Materials, Marketing, Engineering, Quality Assurance, etc, and is headed by the Chief Executive of the plant. The committee meet periodically and it- o Evolves policies and guidelines for the formation, functioning and
growth of quality circles. o Appoints facilitators and a co-coordinator. o Identifies overall quality and productivity problems in the
organization. o Authorizes budget for quality circle activities o Takes part in top management presentation and annual get-togethers o Demonstrates, in visible manner, management commitment and
support o Reviews performance of the quality circles regularly on the basis of
reports from the coordinator and facilitators. o Evolves guidelines for recognizing the good performance of quality
circles. The head of the Quality Assurance department takes the responsibility of convening the meeting of the committee.
ii. Facilitators: The facilitators are selected by the steering committee to supervise the activities of two, three or more circles. Facilitator is usually a senior officer nominated by the management who is incharge of shop or department. The facilitator acts as a teacher, a promoter, a catalyst, and a guide to the quality circles. The responsibilities of the facilitators include: o To co-ordinate the activities of quality circles under their supervision
and guidance o To train QC leaders and lend help in training QC members. o To interface between circles o To render support and assistance to the circles under his control. o To encourage employees to form more QC’s o To demonstrate support of the management.
iii. Leaders: A leader acts as an integral part of the quality circle. The leaders
should have good knowledge of statistical methods and approaches to be
Vikas Choudhary 200323811
Techniques for Operation Efficiency
16
used to identify and analysis problems. The leaders also, like other regular members, participate in the discussions. The leader should preferably be the first line supervisor but it not essential. Supervisors taking over the task of leaders ensure some leadership quality inputs are already available.
Responsibilities of the leader are: o To conduct training of members of the circle with the help of facilitator
and other agencies. o To prepare agenda for the meetings. o To organize and conduct meeting o To evolve action plans and milestone charts to compare actual progress
with targets by periodic reviews and take mid-course correction. o To assign roles to members and to guide them for effective
contribution towards the achievement of goals. o To ensure participation and involvement of all members in the
activities of the circle. o To ensure records and liaison with other agencies to obtain help in
solving the problem o To catalyse attitudinal changes in his own and other related areas. o To make management presentations o To take sincere interest individually by active involvement in the
progress of quality circle movement. o To endeavour to promote quality circles as a way of life in the
organization.
iv. Members: Members form hard core of the quality circles; Members are selected on “purely voluntarily basis” and are from the same or similar functional areas. The group should basically be small, between 8 to 10 members. The members should have adequate education and experience in the concerned field and should have the ability to express clearly and freely.
v. Co-ordinator: In a large manufacturing organization, some agency –
usually Quality Assurance – is required to co-ordinate the activities of the quality circles. The responsibility of the coordinating department includes: o Rendering assistance as request by circles o Disseminating literature relating to circle activities elsewhere o Organizing training programmes o Publishing newsletter to communicate circle activities o Providing circles with necessary facilities for the meeting o Organizing social get-together for circle members and senior
executives
Vikas Choudhary 200323811
Techniques for Operation Efficiency
17
6. “5-S is an excellent technique to achieve good house-keeping”. Discuss. Ans: Introduction: Good housekeeping is the foundation for and first step towards quality achievement in a manufacturing organization. It boosts employee morale and inspires customer confidence. Good quality of work place is essential as –
1. Good environment has a strong influence on the people and the quality of product they produce.
2. A customer visiting the plant sees in a quality work place a guarantee for the product quality.
3. Good housekeeping helps to eliminate waste by identifying non-value added activities, such as searching for tools, time lost in reaching out to retrieve items, over production, etc.
4. Housekeeping reflects management’s general attitude towards work in the organization.
Vikas Choudhary 200323811
Techniques for Operation Efficiency
18
Housekeeping is measured the way - Factory floor are swept and machines are cleaned - Tools are stored - Scarp and chips from machines are handled - Work tables are organized - Personal items are stored - Records are maintained - Targets and achievements are displayed or communicated to
employees. Good housekeeping is simply the basic to a better workplace and to –
- Reduce cost of products and service - Achieve discipline in manufacturing - Bring improvement in quality and productivity
5-S (Seiri, Seiton, Seiso, Seiketsu and Shitsuke) are considered in Japan the basics of any job. 5-S principles have been practiced in Japan the basics of any job. 5-S principles have been practiced in Japan to establish and maintain quality environment in the organization. Japanese managements are of the view that if the housekeeping in a plant is weak, no further diagnosis is needed to know as to why that plant produces poor quality products. 5-S technique has been defined as – “A systematic and rational approach to work place organization and methodical housekeeping with a sense of purpose”
Japanese English Meaning How to apply it to the work place?
Seiri Structurise Sorting Classify items into necessary and unnecessary, retain only those which are required and dispose off others. (i.e. those not needed)
Seiton Systematise Re-organise Store things systematically to ensure safety, quality and efficiency. Storage methods must permit efficient use of space-accident free stage, long shelf and easy retrievability of items within pre-fixed target retrieval time.
Seiso Sanitise Cleanup Maintain work place free of dirt/ dust and garbage by fixing individuals’ cleaning responsibility.
Seiketsu Standardize Standardization Maintain cleanliness through Seiri, Seiton and Seiso by ensuring transparency and uniformly of everything that is done in the organization.
Shitsuke Self-discipline Sustain Make a habit of doing things the way they are supposed to be done (i.e. developing habit of following rules/ practices) including 5-S practices.
Vikas Choudhary 200323811
Techniques for Operation Efficiency
19
Relationship between 5-S’s:
SEIRI (Organisation
SEIKETSU (Standardisation)
SHITSUKE (Discipline)
SEITON (Maintenance)
SEISO (Clean Up)
Vikas Choudhary 200323811
Techniques for Operation Efficiency
20
7. What is SMED? How is it used to reduce setup time of an operation? Ans: Introduction: Every organization must increase line of its products, accept low volume orders, shorten delivery lead time, and keep its cost low to maintain its market share in a competitive market. The organization must cut production lead time and decrease production batch sizes. It should also reduce inventory levels in the production and inventory systems. Since small batches require frequent changeovers, production capacity is expected to shrink unless setup times are reduced. Set up time reduction, therefore, is the key to developing or monitoring a company’s competitiveness in today’s market where more diversified products are desired at short production lead time. Quick Die/ set up change is not restricted to set-up reduction of press shop alone, it can be extended to all areas of manufacturing wherever there is requirement of tool change/ set up on a machine prior to manufacturing.
i. Presses ii. Multi-spindle automats iii. Lathes, turret lathes iv. Milling machines v. Drilling machines vi. Broaching machines. vii. Forging machines viii. Paint manufacturing equipment ix. Powder coating machines x. Oil extracting mill
Meaning: Set up time is the time required to prepare a machine or a group of machines to changeover from one job to another. Time of a conventional set up consists of following tasks.
(a) The time to study blue print , including time spent on receiving instructions from supervisor or foreman.
(b) The time to go to tool crib to get necessary tools and gauges, etc and to return the tools used to previous job.
(c) The time to select fixture (Vice, mandrel, suitable sized collets, face plate, etc) and secure it to the bed of the machines.
(d) The time to install/ mount necessary tools on to the machine, make adjustments, set longitudinal or traverse feed stoppers wherever necessary to ensure that each tool cuts properly and to dimensions.
(e) The time to call the inspector and get inspection done (pilot piece inspection). Alternatively it is the time necessary to deliver the part to the inspection booth for inspection. Inspection time, however, does not include time to manufacture the part.
(f) The time spent by the operative, over and above the unit standard time, to produce first few pieces.
(g) The time to physically count the jobs produced, including time to sign the completed work-order.
(h) The time to remove tools from their tool-holders after required quantity has been manufactured, clean each tool and put it away in proper place.
Vikas Choudhary 200323811
Techniques for Operation Efficiency
21
(i) The time to clean measuring instruments and put them away in proper places. (j) The time to release and remove fixture blow or brush it clean and keep it
aside. (k) The time to remove borings, turning, drilling etc, from the bed of the machine.
Normally, turnings/ drillings/ borings should be removed by a helper (even when the production is in progress) when these gather in large quantity. However, burns removal, would have to be considered part of set up operation if different material is required on the next job (e.g. Steel for the job just completed and brass for the job to be loaded).
Traditional set up operations involve several kinds of waste and SMED technique was developed to eliminate waste and to reduce set up time from hours to minutes. SMED also has interesting history of development. Reduction in set up time results in the following benefits:
o Reduction in batch sizes o Lowering of manufacturing lead times o Drop in inventory levels o Reduction in set-up scrap o Increase in machine efficiency o Increased flexibility to respond to changes.
The firm desiring to reduce change-over time may not achieve its target figure in one attempt, but after a series of improvements. From its current level of set up time of double digit on a particular machine, it may be able to reduce to single digit hours. And subsequently on the same machine from single digit hours to double digit minutes, still later from double digit minutes to single-digit ones and finally in to few extreme situations one touch change over.
Step-by-step reduction of set-up time
Elimination of sample runs, inspection, adjustments
Comp. A run
Study blue print
Remove existing
Replace too at the crib store
Install tools for the new job
Sample run
Adjust
Run for component A
SETUP Run for component B
Component B
Component A
Setup
Sample run
Vikas Choudhary 200323811
Techniques for Operation Efficiency
22
8 a) What is meaning of MUDA? What are the various types of MUDAS? Ans: Introduction: MUDA is a Japanese word for waste and waste means anything (or any activity) which does not add value to the product.
o A worker looking, even though affectionately, at an automatic machine does not add any value while machine does (MUDA of Waiting)
o A maintenance engineer who walks over a long distance with tool in his hand, does not add any value (value is added when he uses the tool to fix the machine) ( MUDA of Transport)
o Piles of material lying in racks in the stores don’t add any value but add to cost (MUDA of Stock)
o A material handler while pushing a heavy trolley full of parts, even though perspiring, adds no value (MUDA of Transport)
o An assembly operator, overstretching his hand to pick up parts for assembly, adds no value but causes fatigue to himself (MUDA of Motion)
o A welding operation, performed to join metal parts of assembly constituent, does add value but the welding operation performed to repair weld a blowhole in job is a non-value added activity (MUDA of Processing)
Waste (MUDA) is the major element of company’s product cost and must be continually identified and eliminated from its processes to stay competitive. Since labour cost is hardly 8-10% of total cost (which also is on the decline due to recent advances in manufacturing technologies), we also need to look at various other hidden wastages, besides human waste, to improve productivity. Types of MUDA: There are seven types of MUDA in manufacturing: 1. MUDA of Over Production. 2. MUDA of Stock (inventory)
3. MUDA of Waiting 4. MUDA of Transport
5. MUDA of Defects
6. MUDA of Motion
7. MUDA of Processing
Vikas Choudhary 200323811
Techniques for Operation Efficiency
23
b) What Causes MUDA of “Motions”? How can it be eliminated? Ans: Introduction: A workman while performing a task makes use of a number of motions. The scrutiny of these motions may reveal that some of these motions –
o Are unnecessary and can be eliminated o Can be combined / modified by changing their sequence o Can be simplified by effecting changes in work bench layout o Can be performed efficiently by other members of the body.
In the absence of the above mentioned actions, the workman makes motions which don’t add any value. Typical examples are –
o Walking to reach objects/ parts. Tools o Lifting or carrying objects o Picking up and putting down a work piece o Transferring objects from one hand to another o Searching to find the required object
While dealing with MUDA of motion it is recommended to get rid of operations that are difficult dirty and / or dangerous (3D’s). such actions include –
o Work that makes and employee move over long distances o Work that causes physical strain (i.e. use of undue physical effort) o Work that causes mental strain (e.g. work that needs memorizing lot of details) o Work that involves search or unnecessary sorting.
Tools and techniques to eliminate MUDA of Motion:
i) Improvement in layout: Lifting or carrying a heavy object is undesirable on two counts, firstly because it represents MUDA and secondly it causes physical exertion. The need for the operator to carry a heavy object can be eliminated by rearranging the work place.
ii) Motion economy principles: Motions of the hands/ legs can be shortened and some of them can be eliminated by rearranging the parts on work table and development of tools and jigs.
iii) Effective supervision: Finding workmen busy with their jobs may give supervisor satisfaction but it may do no good to the company. A supervisor must watch closely his people to find as to – - What are they doing? - How are they doing? - Do they need to do what they are doing? - Are they doing the right way? - Are they doing work which adds value? - Are they using motions of the lowest classification?
Vikas Choudhary 200323811
Techniques for Operation Efficiency
24
List down different kinds of human errors. How can they be eliminated? How is PokaYoke technique useful to eliminate human errors?
Ans:
“Poka-Yoke” is a combination of two Japanese words, “Poka” meaning “inadvertent errors” and “Yoke” (derived from Japanese word Yokerie) meaning “to avoid” and
Description of the error
Typical examples Remedial action
Forgetting to do a thing
3. Operator skipping an operation.
4. Operator forgetting to tighten bolts
5. station master forgetting to lower the crossing gate
Misunderstanding
Jumping to the wrong conclusion due to poor familiarity with the situation
1. Putting foot on clutch thinking it is brake
1. Training 2. Checking in advance 3. Standardizing work
procedures.
Mistaken identity
Misjudging a situation
1. Mistaking Rs.500 note as Rs.100 note
1. Improving attentiveness.
Errors by amateurs
Lack of experience 1. Improper welding 2. Wrong measurements
1. On-the-job training 2. Work Standardisation
Willful errors Ignoring rules/ deliberate wrong actions
1. Ignoring safety rules2. Crossing a street against
a red light just because there are no vehicles in sight at the moment.
3. Not replacing blunt tool on time
1. Attitude change. 2. Education
Inadvertent errors
Absent mindedness i.e. not knowing how the problem / error has occurred
1. Removing job before completing drilling of all holes
2. Crossing street without noticing that the light is red
1. Improving attentiveness 2. Work standardization
Judgmental errors
Errors due to absence of instructions of work standards
1. Difference in method of measurement used by vendor and by buyer’s inspection
2. Operator deciding his own
1. Works instructions 2. Work standardization.
Errors due to absence of standards
Lack of instructions or absence of work instructions
Measurements left to the discretion of the workman
1. Works instructions 2. Work standardization.
Type of Error
Forgetfulness 1. Altering operator in advance 2. Checking at regular intervals 3. Verification by another
employee
Vikas Choudhary 200323811
Techniques for Operation Efficiency
25
together they translate as “Error/ mistake proofing” or “Fool proofing” or “Failsafing” a work process system to eliminate inadvertent errors.
Poka-Yoke is a powerful and comprehensive tool for identification, measurement and analysis of mistakes/ defects at the Gemba (real piece of work) and implementation of measure that prevent the activity from being incorrectly performed, thereby ensuring production of quality goods and services. Errors are inevitable but can be eliminated, using Poka-Yoke technique. This is the technique that can help to analyse the kinds of mistakes employees make and to eliminate these mistakes by implementing / installing simple Poka-Yoke devices. Poka-Yoke Devices: Poka-Yoke may be designed either to help the operator to recognize the defect before it is about to occur called “Prevention type Poka-Yoke” or to help the operator to know immediately on occurrence of the defect called “Detection type Poka-Yoke”. Some of the Poka-Yoke devices which can help to avoid defects are – 1. Guide Pins / locators 2. Error detection buzzers/ alarms and blinking lights 3. Limit switches 4. Counters 5. Color coding 6. Checklist 9.a) What is Kaizen? What are different types of Kaizen? Ans: Introduction: Kaizen is a combination of two Japanese words, “Kai” and “Zen”, Kai means “to change or modify” and Zen means “to improve or make better” and together they translate as “improvement”. Kaizen when used in the context of a management process, has come to mean as continual and slow improvement in every aspect of management (i.e. improvement in whatever company does and the way it does things) through the active involvement of all company’s employees. Kaizen does not just merely mean doing things better but it is an unending process to eliminate muda, improve quality, cost and delivery, thereby creating more and more customers. Few Definitions: Kaizen is a management supported, employee driven process, where employees seek development of their own capabilities by challenging existing system and finding improvement in them - R.R. Asawa & Dr. D. R. Baheti Kaizen is a program, a philosophy and a strategy to improve quality of goods and services or an organization - Samuel KHO Kaizen means making a great number of continuous lasting improvements by discovering small problems and eliminating them permanently (attacking root causes of the problems) thereby helping the organization in setting and reaching higher standards of performance. - Surindra Narang
Vikas Choudhary 200323811
Techniques for Operation Efficiency
26
The Spirit of kaizen is that whatever you are doing, you can do better. Kaizen thus helps in setting and reaching higher standards of performance. The word “Kaizen” was used for the first time by Maasaki Imai, who wrote a look of same name. although a registered name of Kaizen Institute, the work is now widely used and understood all over the world to mean “continuous improvement”. The word “Kaizen” also now appears in the English dictionary. Recently, Imai has elaborated on Kaizen in his book titled “Gemba Kaizen” Types of Kaizen: Kaizen depending upon the complexity and level, can be placed into one of three categories
1) Management Kaizen 2) Group Kaizen 3) Individual Kaizen
1) Management oriented Kaizen: Concentrates on strategic issues and often
involves people from different departments working together on cross-functional problems as project teams. Typical examples of management oriented Kaizen are:
♦ Identification and elimination of waste in workers motions ♦ Charges in plant layout for better efficienvy ♦ Reduction in buffer stocks ♦ Just-in-time production ♦ System improvement
2) Group oriented Kaizen: Concentrates on improvement within the same
workplace or department brought about by employees working in small groups, called quality circles. Typical areas of group Kaizen generally include –
♦ Productivity improvement ♦ Defect prevention ♦ Accident prevention ♦ Absenteeism
3) Individual oriented Kaizen: Concentrates on issues concerning worker’s own
work area and improvements are brought about through worker’s own suggestions. Problems solved through individual Kaizen generally include –
♦ Improvement in machines and processes ♦ Improvement in jigs and fixtures ♦ Reduction in defect level ♦ Customer service and customer complaints ♦ Improvements in working environment.
Vikas Choudhary 200323811
Techniques for Operation Efficiency
27
b) Discuss in brief the Kaizen process and its steps. Ans: Introduction: Kaizen process provides a disciplined and analytical approach, sometimes called the kaizen story to problems solving. It consists of a series of sequential steps that can be used to guide a group (say an improvement team) for the process of identifying and fixing problems. The Kaizen story (or Kaizen process) is built on PDCA mnemonic – Plan, Do, Check and Act. The Kaizen process is a seven step basic procedure which allows any individual or team to solve problems scientifically, rationally, effectively and efficiently. These seven steps are –
1. Defining the problem 2. Understanding/ assessing the current status 3. Finding the root cause. 4. Planning counter measures 5. Implementing counter measure 6. Verifying results 7. Standardising and establishing control.
A brief of each of the steps in the Kaizen process is given.
Fig: Problem definition phase
Vikas Choudhary 200323811
Techniques for Operation Efficiency
28
When Deming cycle is used as a tool for systematic problem solving (improvement), the PDCA activities take the form as shown below…
Poka-yoke for failsafing
Model machine exercises in TPM
Exercises to identify MURA, MUDA and MURI
Spotting abnormalities at Gemba
Internal customer’s complaints
External customer’s complaints
Cost of Quality
SMED/ JIT Targets
5-S Audits
ISO-9000, QS-9000 and ISO-14000 non-conformities
Problems
Define Problems
Enlist problems
Prioritize problems
Select topics for Kaizen
Assign themes to Kaizen teams
Conduct PDCA-SDCA improvement cycles
Vikas Choudhary 200323811
Techniques for Operation Efficiency
29
Process Steps Objective Element of PDCA
Defining the problem Identification of the problem The “PLAN” element
Understanding / Assessing Current status
Establishing the base from which you are trying to improve
The “PLAN” element
Finding the root cause Identifying underlying causes of the problem
The “PLAN” element
The “PLAN” element Planning counter measures
Preparing action plan to fix the problem
The “DO” element Implementing counter measures
Verifying results
Standardizing and establishing control
Implementing the action plan
Confirming the effect of implementation
Consolidating the change
The “CHECK” element
The “ACT” element of PDCA and / or + the STANDARDIZE element of SDCA
Sem – 3rd Techniques for Operations Efficiency 2
Staff attitudemeasurement
Employee satisfactionindex
Employee satisfactionindex
Select The BlankQuestion ________ is an effect due to the muda of defect.
Correct Answer Wear & tear of parts while disassembling
Your Answer Poor production planning & control
Select The BlankQuestion If some defective parts are discovered by the subsequent
process they should be returned to the ________ to preventreoccurrence.
Correct Answer Preceding process
Your Answer Return to stores
Multiple Choice Multiple AnswerQuestion The results oriented efforts of the quality circle should also
include :-Correct Answer Efforts to avoid the problem permanently , Ultimate aim of the
customers satisfaction , Attacking the real root causes & allpossibilities
Your Answer Efforts to avoid the problem permanently , Publication oradvertisement of your contribution , Attacking the real rootcauses & all possibilities
Match The FollowingQuestion Correct Answer Your Answer
Parato diagram alwaysindicates
Magnitude of defects Philosophy of 20% of theactivity causes 80% of theeffect
Parato analysis underlines& operates on
Philosophy of "vitalfew:trivial many"
Philosophy of "vitalfew:trivial many"
Parato analysis istechnique of identifyingvital causes by
Arranging data accordingto the descending order oftheir frequency ofoccurrence
Arranging data accordingto the descending order oftheir frequency ofoccurrence
Parato diagram is a Bargraph with height or valuedrawn by
Arranging data indescending order
Magnitude of defects
Multiple Choice Multiple AnswerQuestion Few steps in construction in Radar chart are :-
Correct Answer Brainstorming to enlist characteristics which require to beevaluated & draw the circle & divide it into 'slices' equal tonumber of characteristics , The first slice begins at 12 noon.Then draw vertical line & calibrate it equal to the number of
Sem – 3rd Techniques for Operations Efficiency 3
levels required , Draw concentric circles from each gradiationusing 'o' point as centre
Your Answer Brainstorming to enlist characteristics which require to beevaluated & draw the circle & divide it into 'slices' equal tonumber of characteristics , The first slice begins at 12 noon.Then draw vertical line & calibrate it equal to the number oflevels required , Draw concentric circles from each gradiationusing 'o' point as centre
Select The BlankQuestion 5 S audit result is discussed in ________ meeting.
Correct Answer Monthly
Your Answer Monthly
True/FalseQuestion Fishbone analysis is used both in analysis & planning.
Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion One Green Belt may head a team of :-
Correct Answer 20 employees
Your Answer 20 employees
Multiple Choice Multiple AnswerQuestion Role of champions are :-
Correct Answer Approve six sigma projects , Remove road block in the path ofsix sigma implementation , Monitor progress of six sigmaprojects
Your Answer Monitor progress of six sigma projects , Approve six sigmaprojects , Remove road block in the path of six sigmaimplementation
Multiple Choice Multiple AnswerQuestion To draw control charts, sample must be representative of
homogeneous segment of production for which :-Correct Answer The items of the sample should be from the same machine
setting , The items should be of the same batch , Items shouldbe made from the same raw material batch
Your Answer The items of the sample should be from the same machinesetting , The items should be of the same batch , Items shouldbe made from the same raw material batch
Multiple Choice Single Answer
Sem – 3rd Techniques for Operations Efficiency 4
Question Failure mode and effect analysis (FMEA) establish
Correct Answer Process failure and minimize frequency
Your Answer Process failure and minimize frequency
Multiple Choice Multiple AnswerQuestion What are the steps in deciding the benchmarking partner?
Correct Answer Decide level of benchmarking , List down a few prospectivecandidates of partnership , Collect information of short listedpartners
Your Answer Decide level of benchmarking , List down a few prospectivecandidates of partnership , Collect information of short listedpartners
Multiple Choice Single AnswerQuestion One Master Black Belt may head a team of :-
Correct Answer 15-20 Black Belts
Your Answer 15-20 Black Belts
Multiple Choice Single AnswerQuestion Competitive benchmarking involves identifying key competitive
product, services or processes & comparing with those of :-Correct Answer Main competitor
Your Answer Main competitor
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-
Correct Answer Gap in performance
Your Answer Gap in performance
Select The BlankQuestion Number of defects in an individual component, like gear, shaft,
wheel etc can be monitored through ________ type of controlchart.
Correct Answer c-chart
Your Answer c-chart
True/FalseQuestion Non-availability of files /document in time is a problem to be
addressed by office TPM.Correct Answer True
Sem – 3rd Techniques for Operations Efficiency 5
Your Answer True
Multiple Choice Single AnswerQuestion Check sheet is easy to use because it is :-
Correct Answer Simplest tool
Your Answer Simplest tool
Multiple Choice Single AnswerQuestion Benchmarking helps to identify the gap between the current
performance of the organization and the :-Correct Answer Performance of the best organization
Your Answer Performance of the best organization
True/FalseQuestion Flow chart is pictorial representation of the steps in production
control.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Breakdown problem may be stratified by :-
Correct Answer Sections , Machines , Type of breakdown (e.g mech. Orelectrical)
Your Answer Sections , Machines , Type of breakdown (e.g mech. Orelectrical)
Select The BlankQuestion A control chart to exhibit counted data on number of defect is
called ________.Correct Answer c-chart
Your Answer c-chart
Select The BlankQuestion Procedure for implementation of TPM consists of ________
numbers of steps.Correct Answer 12
Your Answer 8
Select The BlankQuestion Capability index Cp = ________
Correct Answer Specification width/process width
Sem – 3rd Techniques for Operations Efficiency 6
Your Answer Specification width/process width
Multiple Choice Single AnswerQuestion Pareto's analysis underlines & operates philosophy of :-
Correct Answer Vital few = trivial many
Your Answer Vital few = trivial many
True/FalseQuestion Kanban signals are required when assembly work, subassembly
work and manufacturing at parts is carried out at differentlocations.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion To reduce clamping & declamping time, following actions are
desirable :-Correct Answer Standardize clamping bolts / screws , Cut off unnecessary
threads , Use quick clamping deviceYour Answer Standardize clamping bolts / screws , Cut off unnecessary
threads , Use quick clamping device
Select The BlankQuestion Benchmarking allows exchange of ________ between the
benchmarking partners.Correct Answer Information
Your Answer Information
Multiple Choice Multiple AnswerQuestion TQM can never flourish if the staff are:-
Correct Answer Worried about losing jobs , Afraid of being reprimanded if thereare mistakes , Scared of their bosses
Your Answer Worried about losing jobs , Afraid of being reprimanded if thereare mistakes , Scared of their bosses
True/FalseQuestion In bar graph each bar is of same height.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion During SMED implementation, primary study consists of :-
Sem – 3rd Techniques for Operations Efficiency 7
Correct Answer Equipment analysis , Setup change analysis , Preparation items(storage place , method) analysis
Your Answer Equipment analysis , Setup change analysis , Preparation items(storage place , method) analysis
True/FalseQuestion Daily work management can also be extended to non
manufacturing areas like procurement, QA, HRD etc.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Types of Poka-Yoke are :-
Correct Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Save time
True/FalseQuestion Along with problem solving tools experience and judgment is
also used.Correct Answer True
Your Answer False
Select The BlankQuestion JIT advocates the philosophy at elimination of waste from
system which occurs due to ________.Correct Answer Over Production
Your Answer Over Production
True/FalseQuestion Without measuring initial performance, target can't be set.
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion An erratic patterns falling above & below the control limits
indicates :-
Sem – 3rd Techniques for Operations Efficiency 8
Correct Answer Defect in materials , Frequent adjustment of machines , Poorlytrained operators
Your Answer Defect in materials , Frequent adjustment of machines , Poorlytrained operators
True/FalseQuestion Sample size for the construction of p-chart are larger than X bar-
R chart.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Histogram is an important diagnostic tool. Analysis of the
histogram gives :-Correct Answer It shows cause which affects the process , An idea of what is
happening to the process , Whether the process is capable ofmeeting process or not i.e. around correct average & withinspecific limits
Your Answer An idea of what is happening to the process , Whether theprocess is capable of meeting process or not i.e. around correctaverage & within specific limits , A bird's eye view of the variation
Multiple Choice Single AnswerQuestion Productivity improves by :-
Correct Answer Voluntary participants of everyone
Your Answer Voluntary participants of everyone
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion Cp for six sigma process is ________
Correct Answer 2
Your Answer 2
True/FalseQuestion Operator monitoring a machine while machine works on auto
cycle is an example of muda of waiting.Correct Answer True
Your Answer False
Select The BlankQuestion ________ PDCA cycle is the systematic approach towards
meeting the target.Correct Answer Kaoishikawa
Your Answer Deming
Multiple Choice Multiple AnswerQuestion As benchmark in Japan seiso activities means :-
Correct Answer Everyone, clerk to officer does cleaning his area , No sweeper orcleaner employees , Every family does cleaning of pavement oftheir residence
Your Answer Everyone, clerk to officer does cleaning his area , No sweeper orcleaner employees , Every family does cleaning of pavement oftheir residence
Multiple Choice Multiple AnswerQuestion Breakdown problem may be stratified by :-
Correct Answer Sections , Machines , Type of breakdown (e.g mech. Orelectrical)
Your Answer Sections , Machines , Type of breakdown (e.g mech. Orelectrical)
Multiple Choice Multiple AnswerQuestion After finding out the solution & working on it, the equally
important job is :-Correct Answer Prepare for the presentation of your work , Explain the progress
by presentation to steering committee , Convince committee forfinancial help for running the project
Your Answer Prepare for the presentation of your work , Explain the progressby presentation to steering committee , Convince committee for
financial help for running the project
Select The BlankQuestion A ________ is an excellent device to condense & present large
mass of data in an elegant form.Correct Answer Frequency distribution
Your Answer Frequency distribution
Match The FollowingQuestion Correct Answer Your Answer
Hidden faults come outwhile implementing.
Cleaning yourself yourequipments
shitsuke
Fix the place of items,tools as per frequency ofuse
Seiri Seiton
Responsibility same fromtop to bottom
Seiso Cleaning yourself yourequipments
Evolve standard operatingprocedure & implement.
Seiketsu Seiketsu
Multiple Choice Single AnswerQuestion Seiton means
Correct Answer Code Numbers to item as well as racks & drawers
Your Answer Code Numbers to item as well as racks & drawers
True/FalseQuestion np chart unlike P chart records the 'number of defective' instead
of "fraction or proportion of defectives".Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion One Green Belt may head a team of :-
Correct Answer 20 employees
Your Answer 20 employees
Select The BlankQuestion ________ is the critical element of TQM.
Correct Answer Focus on customer
Your Answer Focus on customer
Multiple Choice Single AnswerQuestion Requirement of more machines, is an example of :-
Correct Answer Muda of overproduction
Your Answer Muda of overproduction
Multiple Choice Single AnswerQuestion Accountability means :-
Correct Answer Responsibility of Business Results
Your Answer Responsibility Execution or Action
Select The BlankQuestion Benchmarking allows exchange of ________ between the
benchmarking partners.Correct Answer Information
Your Answer Information
Multiple Choice Multiple AnswerQuestion Actions that can be thought for the process having process
capability is higher than specification tolerance areCorrect Answer 100 % inspection is required , Reduce variability , Possibility of
squeezing tolerancesYour Answer 100 % inspection is required , Reduce variability
Multiple Choice Single AnswerQuestion To provide flexibility to supervisors in allocation of task, JIT
emphasizes :-Correct Answer Multiskilled operators
Your Answer Multiskilled operators
Multiple Choice Multiple AnswerQuestion The aim of education & training under TPM is :-
Correct Answer To develop abilities to respond quickly to abnormalities , Todevelop abilities to discover analyze malfunction
Your Answer To develop abilities to respond quickly to abnormalities , Todevelop abilities to discover analyze malfunction , To havemultiskilled employees in all departments
Multiple Choice Multiple AnswerQuestion Typical examples of process benchmark are :-
Correct Answer Procurement procedures , Budgeting , Recruitment
Your Answer Procurement procedures , Budgeting , Recruitment
True/FalseQuestion Along with problem solving tools experience and judgment is
also used.Correct Answer True
Your Answer True
Select The BlankQuestion A 'Radar chart' is used to portray ________ strength or
weakness of the activity.Correct Answer Relative
Your Answer Relative
True/FalseQuestion Exercise to identify MURA, MUDA & MURI is not helpful to
identify problems.Correct Answer False
Your Answer False
Select The BlankQuestion In traditional purchasing ________ inventory is required.
Correct Answer Plenty of
Your Answer Minimum
Multiple Choice Single AnswerQuestion Control chart can be used as :-
Correct Answer Process monitoring tool
Your Answer Process monitoring tool
Multiple Choice Single AnswerQuestion Productivity improves by :-
Correct Answer Voluntary participants of everyone
Your Answer Voluntary participants of everyone
Multiple Choice Multiple AnswerQuestion Tools and techniques for six sigma are :-
Correct Answer Process mapping , FMEA , QFD
Your Answer Process mapping , FMEA , QFD
Select The BlankQuestion World class benchmarking candidate in 'Quality' is ________.
Correct Answer Motorola
Your Answer Motorola
True/FalseQuestion Seiso prevents the potential problems by discovering
abnormalities while cleaning your own area.Correct Answer True
Your Answer True
Select The BlankQuestion ________ is an effect due to the muda of defect.
Correct Answer Wear & tear of parts while disassembling
Your Answer Wear & tear of parts while disassembling
Multiple Choice Single AnswerQuestion Quality circle should consist adequate experienced members
between :-Correct Answer 8 to 10
Your Answer 8 to 10
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when
value of 'y' decreases as the value of 'x' increases.Correct Answer Strong negative
Your Answer Strong negative
Multiple Choice Single AnswerQuestion POP is :-
Correct Answer Process Oriented Management
Your Answer Process Oriented Management
True/FalseQuestion TQM improves the quality by improving processes.
Correct Answer True
Your Answer True
True/FalseQuestion Generally time interval should be proportional to the average
frequency of out of control conditions.Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Problem solving tools used for Root cause analysis are :-
Correct Answer Check sheet , Pareto analysis , Fish bone analysis
Your Answer Check sheet , Pareto analysis , Fish bone analysis
Select The BlankQuestion Good ________ is the asset to acquire the success of quality
circle.Correct Answer Teamwork
Your Answer Teamwork
Multiple Choice Multiple AnswerQuestion The results oriented efforts of the quality circle should also
include :-Correct Answer Efforts to avoid the problem permanently , Ultimate aim of the
customers satisfaction , Attacking the real root causes & allpossibilities
Your Answer Efforts to avoid the problem permanently , Ultimate aim of thecustomers satisfaction , Attacking the real root causes & allpossibilities
True/FalseQuestion Process capability index Cp is a measure of capability of the
process to meet the specification limits.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Histogram is an important diagnostic tool. Analysis of the
histogram gives :-Correct Answer It shows cause which affects the process , An idea of what is
happening to the process , Whether the process is capable ofmeeting process or not i.e. around correct average & withinspecific limits
Your Answer It shows cause which affects the process , An idea of what ishappening to the process , Whether the process is capable ofmeeting process or not i.e. around correct average & withinspecific limits
True/FalseQuestion Any withdrawal without C-kanban is not permitted.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion During the steps of Deming cycle of PDCA what is important?
Correct Answer Plan unitedly for the target within reach , Make plan active by"doing it" i.e. everyone working , After some time check theresults for success
Your Answer Plan unitedly for the target within reach , Make plan active by"doing it" i.e. everyone working , After some time check theresults for success
Multiple Choice Single AnswerQuestion Discussion on people, problem & role play exercise helps to
develop :-Correct Answer Counseling skill
Your Answer Counseling skill
Match The FollowingQuestion Correct Answer Your Answer
LCLnp n p - 3 ( sq.root( n p( 1- p)))
n p - 3 ( sq.root( n p( 1- p)))
UCLp p + 3 ( sq.root( p ( 1 - p ) /n ))
p + 3 ( sq.root( p ( 1 - p ) /n ))
LCLp p - 3 ( sq.root( p ( 1- p ) /n))
p - 3 ( sq.root( p ( 1- p ) /n))
UCLnp n p + 3 ( sq.root( n p ( 1- p n p + 3 ( sq.root( n p ( 1- p
))) )))
Multiple Choice Single AnswerQuestion TPM implementation is done through:-
Correct Answer Small group
Your Answer Small group
Multiple Choice Single AnswerQuestion To hold the customer to do business with you :-
Correct Answer Reduce the amount of time, the customer spend till he receiveservice
Your Answer Increase the amount of time, the customer spend till he receiveservice
Multiple Choice Multiple AnswerQuestion During SMED implementation, primary study consists of :-
Correct Answer Equipment analysis , Setup change analysis , Preparation items(storage place , method) analysis
Your Answer Equipment analysis , Setup change analysis , Convertinginternal setup into external setup
True/FalseQuestion Everyone in the team of quality should target his own benefits
i.e. promotion, etc.Correct Answer False
Your Answer False
1
Techniques for Operations Efficiency assgn :01: NareshMultiple Choice Multiple AnswerQuestion Advantages of JIT :-
CorrectAnswer
Reduce incoming inspection , Reduce inventory , Lower per unit cost
Your Answer Reduce incoming inspection , Reduce inventory , Lower per unit cost
Multiple Choice Multiple AnswerQuestion Benefits from the standardized containers are
CorrectAnswer
Minimization of transit damages , Ease in verification of quantity of parts , Automaticsignal to supplier to replenish stock
Your Answer Minimization of transit damages , Ease in verification of quantity of parts , Automaticsignal to supplier to replenish stock
Multiple Choice Multiple AnswerQuestion Benefits from SMED are :-
CorrectAnswer
Reduce work in process , Better average daily production , Increase capacity
Your Answer Reduce work in process , Increase capacity
Multiple Choice Single AnswerQuestion Competitive benchmarking involves identifying key competitive product, services or
processes & comparing with those of :-Correct
AnswerMain competitor
Your Answer Main competitor
Multiple Choice Multiple AnswerQuestion Benefits of stratification are :-
CorrectAnswer
It helps to separate data into groups so that you can draw connect & meaningfulinference , It helps to diagnose & localize problem , It helps to identify the influencingfactors
Your Answer It helps to separate data into groups so that you can draw connect & meaningfulinference , It helps to diagnose & localize problem , Finding out different reasons
Multiple Choice Multiple AnswerQuestion Quality maintenance & pillar focuses on following production inputs :-
CorrectAnswer
Men , Machine , Material
Your Answer Men , Machine , Management
Multiple Choice Single AnswerQuestion The success indicators in quality, cost, delivery & product development are :-
CorrectAnswer
Managing points
Your Answer Accountability
Multiple Choice Multiple AnswerQuestion Steps in setup time reduction are :-
2
CorrectAnswer
Team formation , Training , Recoding of activities on multiple activity charts
Your Answer Team formation , Recoding of activities on multiple activity charts , Convert externalsetups in to internal setups
Multiple Choice Multiple AnswerQuestion POM essentially consists of :-
CorrectAnswer
Time management , Team participation and performance , Moral boosting
Your Answer Time management , Team participation and performance , Cost Management
Multiple Choice Single AnswerQuestion Activity under quality management is :-
CorrectAnswer
Use team approach to track down root causes of the problem
Your Answer Maintenance of equipment condition by eliminating lubricant leakage.
True/FalseQuestion Every department should make their own rules of standardization.
CorrectAnswer
False
Your Answer True
Multiple Choice Multiple AnswerQuestion Histogram is an important diagnostic tool. Analysis of the histogram gives :-
CorrectAnswer
It shows cause which affects the process , An idea of what is happening to the process, Whether the process is capable of meeting process or not i.e. around correct average& within specific limits
Your Answer It shows cause which affects the process , An idea of what is happening to the process, Whether the process is capable of meeting process or not i.e. around correct average& within specific limits
Match The FollowingQuestion Correct Answer Your Answer
Productivity performancemeasurement
Turnover employee Sales of the months
Financial performancemeasurement
Sales of the months Cash saving per department
Customer satisfactionmeasurement
Customer complaints per period Customer complaints per period
Staff attitude measurement Employee satisfaction index Employee satisfaction index
Multiple Choice Single AnswerQuestion TPM helps to reduce down time due to:-
CorrectAnswer
Breakdown of machine
Your Answer Breakdown of machine
3
Multiple Choice Single AnswerQuestion Kaizen emphasizes :-
CorrectAnswer
Implementation of ideas
Your Answer Collection of ideas
Select The BlankQuestion Create as many ________ system as possible for better Seiketsu.
CorrectAnswer
Visual control
Your Answer Visual control
True/FalseQuestion Inadequate maintenance of machine leads to muda of defects
CorrectAnswer
True
Your Answer False
Select The BlankQuestion The shape of histogram can provide a clue about the ________ of the lot.
CorrectAnswer
Quality
Your Answer Distribution
Multiple Choice Single AnswerQuestion Customer's return is an indicators of the MUDA of :-
CorrectAnswer
Defect
Your Answer Defect
Multiple Choice Single AnswerQuestion In bar graph the interval (gap) between the bars is :-
CorrectAnswer
Equal
Your Answer Symmetrical
True/FalseQuestion Inspection is poor method of assuring 100% quality.
CorrectAnswer
True
Your Answer False
True/FalseQuestion A radar chart is combination of a circle & line graph
CorrectAnswer
True
4
Your Answer True
Multiple Choice Single AnswerQuestion A workshop is to be treated as :-
CorrectAnswer
Place where one's creativity can be applied
Your Answer Place where one's creativity can be applied
True/FalseQuestion Customer wise outstanding is discussed in daily work management meeting by
operations head.Correct
AnswerFalse
Your Answer True
True/FalseQuestion Number of operation can change according to production requirement in U-Line
arrangement.Correct
AnswerFalse
Your Answer True
True/FalseQuestion Automation can correct the basic faults of a improper setup process.
CorrectAnswer
False
Your Answer True
Select The BlankQuestion Cp for six sigma process is ________
CorrectAnswer
2
Your Answer 1.66
Select The BlankQuestion Range ( R ) is obtained as the difference between the highest and ________
measurement of a sample.Correct
AnswerLowest
Your Answer Second highest
Select The BlankQuestion ________is an important step toward successful JIT purchasing.
CorrectAnswer
JIT Contract
Your Answer JIT Contract
True/False
5
Question U-Line layout is better than straight lime layout.
CorrectAnswer
True
Your Answer True
Multiple Choice Single AnswerQuestion TQM applicable to :-
CorrectAnswer
Marketing, design & manufacturing
Your Answer Quality Control department
Select The BlankQuestion Bar graph is display of data that facilitates ________ of quality.
CorrectAnswer
Comparison
Your Answer Performance
Multiple Choice Single AnswerQuestion Production kanban is presented by :-
CorrectAnswer
P-kanban
Your Answer R-kanban
Multiple Choice Single AnswerQuestion Check sheet are also used as :-
CorrectAnswer
Data gathering & interpretation tool
Your Answer Cause finding & effect finding tool
Select The BlankQuestion Japanese believe that when they are ________ they are cleaning there minds too.
CorrectAnswer
Cleaning
Your Answer Repairing machines
Select The BlankQuestion Poka-Yoke devices under category use ________ to distinguish between similar parts
which may be assembled in wrong position.Correct
AnswerColor coding
Your Answer Counting device
Select The BlankQuestion Shitsuke means ________ all the previous 4-S throughout the month/year.
CorrectAnswer
Sustaining
6
Your Answer Implementing
Multiple Choice Multiple AnswerQuestion Types of meetings held in DWM are :-
CorrectAnswer
Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meeting
Your Answer Weekly PDCA meeting , Monthly PDCA meeting , Yearly PDCA meeting
True/FalseQuestion By TPM, consumption of electrical energy can be reduced.
CorrectAnswer
True
Your Answer True
Multiple Choice Multiple AnswerQuestion According to Seiketsu Standardization means :-
CorrectAnswer
To develop easy to follow standards , Evolve standard operating procedure , Bettervisual management
Your Answer To develop easy to follow standards , Evolve standard operating procedure , Reductionof wastage
True/FalseQuestion Flow chart helps to stop an old process.
CorrectAnswer
False
Your Answer True
Multiple Choice Multiple AnswerQuestion Training related to Quality includes:-
CorrectAnswer
Quality measures , Quality failure
Your Answer Quality measures , Quality failure , Goal of business
Multiple Choice Single AnswerQuestion Total area under the normal curve is
CorrectAnswer
Unity
Your Answer Six
Multiple Choice Multiple AnswerQuestion Cpk =
CorrectAnswer
(x - USL)/3 sigma , (x - LSL)/3 sigma
Your Answer (x - USL)/6 sigma
Select The Blank
7
Question A histogram is a graphical display of distribution of measurements & reveals theamounts of ________ within the process.
CorrectAnswer
Variation
Your Answer Percentage defects
Match The FollowingQuestion Correct Answer Your Answer
Value analysis / valueengineering
To eliminate MUDA of processing To eliminate MUDA of overproduction
SMED To eliminate MUDA of overproduction
To eliminate MUDA of defect
VMI ( Vendor ManagementInventory) system
To eliminate MUDA of stock To eliminate MUDA of stock
Flow / string diagram To eliminate MUDA of transport To eliminate MUDA of processing
Select The BlankQuestion A 'Radar chart' is used to portray ________ strength or weakness of the activity.
CorrectAnswer
Relative
Your Answer Comparative
2nd assignmentTechniques for Operations Efficiency assgn :02: Naresh
True/FalseQuestion Performance benchmarking does not involves comparison of financial ratios at the
aggregate level.Correct
AnswerFalse
Your Answer False
Multiple Choice Multiple AnswerQuestion Few steps to construct a flow chart are :-
CorrectAnswer
Decide on the objective of flowchart & define boundaries of the process , Identifysteps in the process & construct a draft of the flowchart , Review the draft & connectthe changes as per review & name it & put the data & use it as 'Record'
Your Answer Decide on the objective of flowchart & define boundaries of the process , Identifysteps in the process & construct a draft of the flowchart , Review the draft & connectthe changes as per review & name it & put the data & use it as 'Record'
Select The BlankQuestion In PDCA cycle for benchmarking 'Identification of performance gap' is done in
________.Correct
AnswerChecking
Your Answer Checking
Select The BlankQuestion 5 S audit result is discussed in ________ meeting.
8
CorrectAnswer
Monthly
Your Answer Shift beginning
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when value of 'y' decreases
as the value of 'x' increases.Correct
AnswerStrong negative
Your Answer Strong negative
Select The BlankQuestion Kaizen projects are managed by ________
CorrectAnswer
Cross functional team
Your Answer Management
Multiple Choice Single AnswerQuestion Poka-yoke for employee not performing work as per established method is :-
CorrectAnswer
Implement work standard
Your Answer Implement work standard
Multiple Choice Multiple AnswerQuestion Typical examples of process benchmark are :-
CorrectAnswer
Procurement procedures , Budgeting , Recruitment
Your Answer Procurement procedures , Budgeting , Recruitment
Multiple Choice Multiple AnswerQuestion What are the steps in deciding the benchmarking partner?
CorrectAnswer
Decide level of benchmarking , List down a few prospective candidates of partnership ,Collect information of short listed partners
Your Answer Decide level of benchmarking , Collect information of short listed partners
Multiple Choice Single AnswerQuestion Errors by armatures is :-
CorrectAnswer
Lack of experience
Your Answer Absent mindedness
True/FalseQuestion Control chart is also called as run-chart.
CorrectAnswer
True
Your Answer True
9
Match The FollowingQuestion Correct Answer Your Answer
Reduce clamping & declampingtime
Use U-shaped washer Use U-shaped washer
Reduce time of external setup Improve work aids positioningmethod
Improve work aids positioningmethod
Convert internal setup intoexternal setup
Preparation of tools / dies as offline activity
Preparation of tools / dies as offline activity
Eliminate adjustment Pre setting of tool Pre setting of tool
Multiple Choice Single AnswerQuestion Muda of defect is very serious in case of:-
CorrectAnswer
High speed automatic machines
Your Answer High speed automatic machines
Multiple Choice Multiple AnswerQuestion To reduce clamping & declamping time, following actions are desirable :-
CorrectAnswer
Standardize clamping bolts / screws , Cut off unnecessary threads , Use quickclamping device
Your Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quickclamping device
Multiple Choice Single AnswerQuestion Requirement of more machines, is an example of :-
CorrectAnswer
Muda of overproduction
Your Answer Muda of waiting
Multiple Choice Single AnswerQuestion In India quality circle was first launched by :-
CorrectAnswer
Hyderabad unit of BHEL
Your Answer Hyderabad unit of BHEL
Multiple Choice Multiple AnswerQuestion 3M' is world class benchmarking ' candidates in the field of :-
CorrectAnswer
Product development , Technology transfer , Environmental Management
Your Answer Product development , Technology transfer , Environmental Management
Multiple Choice Single AnswerQuestion Responsibility for Quality should rest on:-
CorrectAnswer
Who produce the product
Your Answer Quality control department
10
True/FalseQuestion Increase in defect rate is an example of 'Deviation from an established norms'
CorrectAnswer
True
Your Answer True
Select The BlankQuestion ________ are implemented for defect detection & prevention.
CorrectAnswer
Poka-Yokes
Your Answer Poka-Yokes
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-
CorrectAnswer
Improve quality
Your Answer Improve quality
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-
CorrectAnswer
Gap in performance
Your Answer Lower efficiency
True/FalseQuestion Presentation of graphs in pictorial form of data collection are for easy understanding.
CorrectAnswer
True
Your Answer True
Select The BlankQuestion ________ waste is probably the biggest waste in most of the organizations.
CorrectAnswer
Time
Your Answer Labor
True/FalseQuestion Globalization of trade and industrial operations have forced Indian companies to
become more & more competitive and customer driven.Correct
AnswerTrue
Your Answer True
True/FalseQuestion TQM improves the quality by improving processes.
11
CorrectAnswer
True
Your Answer True
Multiple Choice Multiple AnswerQuestion An erratic patterns falling above & below the control limits indicates :-
CorrectAnswer
Poorly trained operators , Defect in materials , Frequent adjustment of machines
Your Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators
Multiple Choice Single AnswerQuestion Defects per million for the process at six sigma level are :-
CorrectAnswer
3.4
Your Answer 6210
Multiple Choice Single AnswerQuestion To provide flexibility to supervisors in allocation of task, JIT emphasizes :-
CorrectAnswer
Multiskilled operators
Your Answer Multiskilled operators
Multiple Choice Single AnswerQuestion To maintain smoothness in production :-
CorrectAnswer
Elimination of buffer stock is recommended
Your Answer Maintenance of buffer stock is recommended.
Select The BlankQuestion ________ should be used to exercise control on the process.
CorrectAnswer
Control chart
Your Answer Latest checking instruments
Match The FollowingQuestion Correct Answer Your Answer
Ideally the histogram will have abell shape
Tapering away on the both sidesfrom average value
Tapering away on the both sidesfrom average value
Histogram is a graphical displayof distribution of measurementsand
Reveals the amount of variationwithin the process
Reveals the amount of variationwithin the process
Histogram is a diagrammaticpresentation of
The frequency distribution of acharacteristics
The frequency distribution of acharacteristics
The shape of histogram can Provide a clue about the qualityof the lot
Provide a clue about the quality ofthe lot
True/False
12
Question In single card kanban system production greater than quantity withdrawn ispermitted.
CorrectAnswer
False
Your Answer False
True/FalseQuestion Flow chart are drawn to document a process charting the tasks performed & the
sequence in which tasks are performed.Correct
AnswerTrue
Your Answer True
Select The BlankQuestion Cpk for six sigma process is ________
CorrectAnswer
1.5
Your Answer 1.5
True/FalseQuestion Seiso prevents the potential problems by discovering abnormalities while cleaning
your own area.Correct
AnswerTrue
Your Answer True
Multiple Choice Multiple AnswerQuestion Some steps for stratification are :-
CorrectAnswer
Define the problem & identify the stratification variables , Sort out data intocategories & summarise information in each category , Present the information ingraphical form & study, decide if further stratification is required?
Your Answer Define the problem & identify the stratification variables , Sort out data intocategories & summarise information in each category , Present the information ingraphical form & study, decide if further stratification is required?
True/FalseQuestion Processing cost of a product is mainly decided by conversion process.
CorrectAnswer
True
Your Answer True
Multiple Choice Multiple AnswerQuestion Work standards enable management to minimize variation in :-
CorrectAnswer
Output , Quality , Cost
Your Answer Output , Quality , Cost
Multiple Choice Multiple AnswerQuestion Process can be made capable by :-
13
CorrectAnswer
Reducing process variability , Bringing target & average to fall at the same point ,Examine possibility of relaxing specification
Your Answer Reducing process variability , Bringing target & average to fall at the same point , Useof less precision machine
Multiple Choice Multiple AnswerQuestion Few steps in construction of Pie chart are :-
CorrectAnswer
Express value of each category as percentage of total of all categories & calculate thedegree of angle form by each category by equation degree = Value of groups/Totalvalue * 360 , Draw the circle & segment the circle into angles calculated in step one ,Colour different segments & enter the percentage of each category into pie chart
Your Answer Express value of each category as percentage of total of all categories & calculate thedegree of angle form by each category by equation degree = Value of groups/Totalvalue * 360 , Draw the circle & segment the circle into angles calculated in step one ,Colour different segments & enter the percentage of each category into pie chart
Multiple Choice Multiple AnswerQuestion As benchmark in Japan seiso activities means :-
CorrectAnswer
Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees ,Every family does cleaning of pavement of their residence
Your Answer Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees ,Every family does cleaning of pavement of their residence
Select The BlankQuestion Poka Yoke designed to help operators to know immediately ________ of the defeat
called detection type Poka-Yoke.Correct
AnswerOn occurrence
Your Answer Before Occurrence
Select The BlankQuestion Flow chart helps to dissect a process for better understanding & ________ of process.
CorrectAnswer
Analysis
Your Answer Analysis
Multiple Choice Single AnswerQuestion Small groups forming a circle should consist of :-
CorrectAnswer
Employees of different department related to the problem
Your Answer Employees of same department
Select The BlankQuestion Graphs convey a situation more ________ than summary of data or figures.
CorrectAnswer
Effectively & clearly
Your Answer Effectively & clearly
Multiple Choice Single AnswerQuestion Number of Kaizen projects suggested and implemented is checking point for :-
14
CorrectAnswer
Continual Improvement
Your Answer Continual Improvement
3rd assignmentTechniques for Operations Efficiency assgn :03: Senthil N
Multiple Choice Multiple AnswerQuestion Quality maintenance & pillar focuses on following production inputs :-
Correct Answer Material , Men , Machine
Your Answer Material , Men , Machine
Multiple Choice Multiple AnswerQuestion Histograms are useful to :-
Correct Answer Measure the current pattern & extent of variation , Assess current conformanceto specification & scope of improvement , Determine whether or not the processis in the state of control
Your Answer Measure the current pattern & extent of variation , Assess current conformanceto specification & scope of improvement , Determine whether or not the processis in the state of control
Multiple Choice Single AnswerQuestion In problem solving the best alternative is that :-
Correct Answer Which best meets the criteria
Your Answer Which best meets the criteria
Multiple Choice Single AnswerQuestion "Cause & effect" diagram was developed by :-
Correct Answer DR.Kaoru Ishikawa
Your Answer DR.Kaoru Ishikawa
Multiple Choice Single AnswerQuestion Identifying key preventive operational functions and comparing these
operational functions within the firm's own division & branches comes under :-Correct Answer Internal benchmarking
Your Answer Internal benchmarking
Select The BlankQuestion JIT advocates the philosophy at elimination of waste from system which occurs
due to ________.Correct Answer Over Production
Your Answer Over Production
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when there is
positive relationship upto certain level & negative thereafter or negativerelationship upto certain level & positive thereafter.
15
Correct Answer Curvilinear
Your Answer Curvilinear
True/FalseQuestion Kanban signals are required when assembly work, subassembly work and
manufacturing at parts is carried out at different locations.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Customers complaints may be segregated by :-
Correct Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excessquantity
Your Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excessquantity
True/FalseQuestion In case of more than one quality characteristics, separate chart is made for
each quality characteristics.Correct Answer True
Your Answer True
True/FalseQuestion Safety, hygiene and environment control is one of the pillar of TPM.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion 5-S technique is useful to:
Correct Answer To all places including homes
Your Answer To all places including homes
Match The FollowingQuestion Correct Answer Your Answer
Reduce time of external setup Improve work aids positioningmethod
Improve work aids positioningmethod
Convert internal setup intoexternal setup
Preparation of tools / dies as offline activity
Preparation of tools / dies as offline activity
Eliminate adjustment Pre setting of tool Pre setting of tool
Reduce clamping & declampingtime
Use U-shaped washer Use U-shaped washer
Multiple Choice Single AnswerQuestion The facilitator should be normally :-
16
Correct Answer Senior officer /Shop incharge
Your Answer Senior officer /Shop incharge
Match The FollowingQuestion Correct Answer Your Answer
Parato diagram always indicates Magnitude of defects Philosophy of 20% of the activitycauses 80% of the effect
Parato analysis underlines &operates on
Philosophy of "vital few:trivialmany"
Philosophy of "vital few:trivialmany"
Parato analysis is technique ofidentifying vital causes by
Arranging data according to thedescending order of theirfrequency of occurrence
Arranging data according to thedescending order of theirfrequency of occurrence
Parato diagram is a Bar graphwith height or value drawn by
Arranging data in descendingorder
Magnitude of defects
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Make work easy
True/FalseQuestion Pie chart is also called as angular diagram.
Correct Answer True
Your Answer True
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when value of 'y'
somewhat decreases as the value of 'x' increases.Correct Answer Weak negative
Your Answer Weak negative
Multiple Choice Single AnswerQuestion From scatter diagram the strength of relationship between two variables or
associated set of data can be inferred from the examination of the shape of :-Correct Answer Cloud
Your Answer Cloud
Multiple Choice Multiple AnswerQuestion Product benchmarking requires, comparison of product :-
Correct Answer Performance , Features , Cost
Your Answer Performance , Features , Cost
Multiple Choice Multiple Answer
17
Question Steps in construction of scatter diagram :-
Correct Answer Collect paired data (X,Y) from two variables who's relationship is to be studied ,Find out max & min values for both X & Y and these values to scale X & Y axis &plot the paired data , Examine the shape of the cloud of points & discover type& strength of relationship
Your Answer Collect paired data (X,Y) from two variables who's relationship is to be studied ,Find out max & min values for both X & Y and these values to scale X & Y axis &plot the paired data , Examine the shape of the cloud of points & discover type& strength of relationship
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-
Correct Answer Gap in performance
Your Answer Gap in performance
Select The BlankQuestion Each quality characteristic has permitted variation & is equal to ________.
Correct Answer USL - LSL
Your Answer USL - LSL
Select The BlankQuestion Kaizen is ________ supported process.
Correct Answer Management
Your Answer Management
True/FalseQuestion The flow charts are prepared to enhance the employees understanding of the
process by indicating interrelationship within the process.Correct Answer True
Your Answer False
True/FalseQuestion Gap analysis for production & dispatches is discussed in monthly meeting.
Correct Answer False
Your Answer False
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when value of 'y'
decreases as the value of 'x' increases.Correct Answer Strong negative
Your Answer Strong negative
Select The Blank
18
Question ________ is most difficult 'S' to implement & achieve.
Correct Answer Shitsuke
Your Answer Shitsuke
True/FalseQuestion Presentation of graphs in pictorial form of data collection are for easy
understanding.Correct Answer True
Your Answer True
Select The BlankQuestion Graphs convey a situation more ________ than summary of data or figures.
Correct Answer Effectively & clearly
Your Answer Effectively & clearly
Multiple Choice Single AnswerQuestion Errors by armatures is :-
Correct Answer Lack of experience
Your Answer Lack of experience
Multiple Choice Multiple AnswerQuestion While preparing scatter diagram following precautions are to be taken :-
Correct Answer Data should be properly stratified & should be collected for full range , Scaleselected should be right to avoid wrong conclusions , Data should be free frombias or undue importance
Your Answer Data should be properly stratified & should be collected for full range , Scaleselected should be right to avoid wrong conclusions , Data should be free frombias or undue importance
True/FalseQuestion Globalization of trade and industrial operations have forced Indian companies to
become more & more competitive and customer driven.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion If 'Annual saving in procurement expenses is managing point', then checking
points will be :-Correct Answer Price revision , Credit period , Transport expenses
Your Answer Price revision , Credit period , Transport expenses
Multiple Choice Single AnswerQuestion Number of kaizen in Group kaizen categories are :-
Correct Answer Two to three per year
19
Your Answer Two to three per year
True/FalseQuestion Flow chart is pictorial representation of the steps in production control.
Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion It is essential to convey customer's expectations to :-
Correct Answer Top Management
Your Answer Supervisors & workmen
Multiple Choice Single AnswerQuestion Check sheet is easy to use because it is :-
Correct Answer Simplest tool
Your Answer Simplest tool
Select The BlankQuestion Identification of non-value added operations & their elimination is the first step
to eliminate muda of ________.Correct Answer Processing
Your Answer Processing
Select The BlankQuestion A 'Radar chart' is used to portray ________ strength or weakness of the
activity.Correct Answer Relative
Your Answer Relative
Multiple Choice Single AnswerQuestion Pareto's analysis underlines & operates philosophy of :-
Correct Answer Vital few = trivial many
Your Answer Vital few = trivial many
True/FalseQuestion In single card kanban system production greater than quantity withdrawn is
permitted.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Benefits of planned maintenance are :-
20
Correct Answer Improved reliability mean time between failures , Improved maintainabilitymean time to repair , Improvement in breakdown
Your Answer Improved reliability mean time between failures , Improved maintainabilitymean time to repair
Multiple Choice Multiple AnswerQuestion Gap analysis & problem identification is done during converting internal setups
into external setups in the areas like :-Correct Answer Equipment , Method , Human
Your Answer Equipment , Method , Human
Multiple Choice Single AnswerQuestion Some quantity in stock of item, is desirable if :-
Correct Answer Manufacturing lead time is more
Your Answer Manufacturing lead time is more
Multiple Choice Single AnswerQuestion Sorting of usable items should be
Correct Answer Planned storage based on frequency of use
Your Answer Within visual reach method
Multiple Choice Multiple AnswerQuestion Benefits of Quality maintenance are :-
Correct Answer Reduction in customer quality complaints , Reduction in inspection time
Your Answer Reduction in customer quality complaints , Reduction in inspection time
4th assignmentTechniques for Operations Efficiency assgn :04: Sameer
Multiple Choice Multiple AnswerQuestion Training related to Quality includes:-Correct Answer Quality measures , Quality failureYour Answer Negotiation skill , Goal of business , Quality measures , Quality failure
Multiple Choice Single AnswerQuestion If defects found at own process, the cost to the company is :-Correct Answer Very littleYour Answer Very high
Multiple Choice Multiple AnswerQuestion Histogram is an important diagnostic tool. Analysis of the histogram gives :-Correct Answer It shows cause which affects the process , An idea of what is happening to the
process , Whether the process is capable of meeting process or not i.e. around correct average &within specific limitsYour Answer It shows cause which affects the process , An idea of what is happening to the process
, Whether the process is capable of meeting process or not i.e. around correct average & within specificlimits , A bird's eye view of the variation
True/FalseQuestion In bar graph each bar is of same height.
21
Correct Answer FalseYour Answer False
Select The BlankQuestion Basic objective of control chart is to ________ the variation due to chance & assignable
cause.Correct Answer Separate outYour Answer Separate out
Multiple Choice Multiple AnswerQuestion Benefits of stratification are :-Correct Answer It helps to separate data into groups so that you can draw connect & meaningful
inference , It helps to diagnose & localize problem , It helps to identify the influencing factorsYour Answer It helps to separate data into groups so that you can draw connect & meaningful
inference , It helps to diagnose & localize problem , It helps to identify the influencing factors , Findingout different reasons
Multiple Choice Single AnswerQuestion For 'Timely clearance of GRR's', checking point will be :-Correct Answer Number of GRRs pending beyond 1 dayYour Answer Number of GRRs pending beyond 1 day
Multiple Choice Single AnswerQuestion Organizing the place is not enough , what is required is :Correct Answer Planning storage based on Frequency of useYour Answer Planning storage based on Frequency of use
Select The BlankQuestion JIT helps to ________ the waste in the purchasing process.Correct Answer EliminatesYour Answer Eliminates
Multiple Choice Single AnswerQuestion In cellular manufacturing system, the cells are designed so that the material flow within
the cell and between the cells are :-Correct Answer MinimizedYour Answer Minimized
True/FalseQuestion Kanban signals are required when assembly work, subassembly work and manufacturing
at parts is carried out at different locations.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Causes of Muda of transport are :-Correct Answer Faulty layout , Over productionYour Answer Faulty layout , Over production , Proper material handling equipment , Low rejection /
rework
Multiple Choice Multiple AnswerQuestion Types of meetings held in DWM are :-Correct Answer Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meetingYour Answer Monthly PDCA meeting , Daily PDCA meeting , Weekly PDCA meeting
Multiple Choice Multiple AnswerQuestion Customers complaints may be segregated by :-Correct Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantityYour Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity ,
Payment problem
22
Multiple Choice Multiple AnswerQuestion Cleaning your own area/equipments gives benefits of :-Correct Answer You know your self how to avoid dust , When you touch while cleaning you may find
a fault , Saving of further failure due to dustYour Answer You know your self how to avoid dust , When you touch while cleaning you may find a
fault , Saving of further failure due to dust , Utilization of spare time
Multiple Choice Multiple AnswerQuestion Role of champions are :-Correct Answer Approve six sigma projects , Remove road block in the path of six sigma
implementation , Monitor progress of six sigma projectsYour Answer Approve six sigma projects , Remove road block in the path of six sigma
implementation , Monitor progress of six sigma projects , Deliver presentation to teams on six sigmaprojects
Select The BlankQuestion Benchmarking shows how an organization is ________ in comparison to its competitors.Correct Answer PerformingYour Answer Performing
True/FalseQuestion Inspection is poor method of assuring 100% quality.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Benefits of TQM are :-Correct Answer Greater customer satisfaction , Lower manufacturing costYour Answer Greater customer satisfaction , Lower manufacturing cost
Select The BlankQuestion ________ ensures that communication is simple & effective.Correct Answer Visual ManagementYour Answer Visual Management
True/FalseQuestion Daily work management develops problem finding & solving attitude.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Key principles of TQM :-Correct Answer Continuous improvement , People involvement , Cost of qualityYour Answer Continuous improvement , People involvement , Cost of quality , Competitor focus
Select The BlankQuestion A histogram is a graphical display of distribution of measurements & reveals the amounts
of ________ within the process.Correct Answer VariationYour Answer Variation
Select The BlankQuestion To assess effectiveness of training ________ is essential.Correct Answer EvaluationYour Answer Evaluation
Select The BlankQuestion ________ are implemented for defect detection & prevention.Correct Answer Poka-YokesYour Answer TPM
23
True/FalseQuestion To achieve quality, it has to be designed into the product.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Setting & maintaining optimal process condition to get quality product is the aim of :-Correct Answer Quality maintenanceYour Answer Quality maintenance
Match The FollowingQuestion Correct Answer Your Answer
Productivity performance measurement Turnover employee Cost of quality
Financial performance measurement Sales of the months Sales of the months
Customer satisfaction measurement Customer complaints per period Customer complaints per period
Staff attitude measurement Employee satisfaction index Employee satisfaction index
Multiple Choice Single AnswerQuestion Recording of the entire setup operators focusing on hand, eye and body movements of the
person doing the setting is done through :-Correct Answer Video recordingYour Answer Video recording
Match The FollowingQuestion Correct Answer Your Answer
In scatter diagram, the strength of relationship can be determined By "correlation coefficient" By"correlation coefficient"
The scatter diagram provides the technique to establish The possible relationship between a pair ofvariables The possible dependency between a pair of variables
The scatter diagram displays The pair of data as a cloud of points The possible relationship between apair of variables
The scatter is also known as Correlation diagram Correlation diagram
Multiple Choice Single AnswerQuestion What is to be done before selecting benchmarking partner?Correct Answer level of benchmarking is to be decidedYour Answer level of benchmarking is to be decided
True/FalseQuestion Flow chart helps to stop an old process.Correct Answer FalseYour Answer False
Select The BlankQuestion Create as many ________ system as possible for better Seiketsu.Correct Answer Visual controlYour Answer Labeling
Multiple Choice Single AnswerQuestion Allowing worker's to stop machine / assembly line if they believe that product quality is
below standard' is an example of :-
24
Correct Answer EmpowermentYour Answer Empowerment
Multiple Choice Single AnswerQuestion Kanban Signals are required when :-Correct Answer Set up time on the feeding operation is higher then the receiving operation.Your Answer Set up time on the feeding operation is higher then the receiving operation.
Multiple Choice Single AnswerQuestion Kanban system isCorrect Answer 1. Pull SystemYour Answer 1. Pull System
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-Correct Answer Improve qualityYour Answer Improve quality
Multiple Choice Single AnswerQuestion To avoid short receipt of items to customers, provide the dispatch clerk with :Correct Answer The check list for verificationYour Answer The check list for verification
True/FalseQuestion Control chart is also called as 'Mean -Range or X-chart'.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Flow chart is required :-Correct Answer When trying to improve the process , At the time of review of the process , To
understand steps in a process by pictorial presentationYour Answer When trying to improve the process , At the time of review of the process , To
understand steps in a process by pictorial presentation , For defects finding of the products
Select The BlankQuestion ________ is the critical element of TQM.Correct Answer Focus on customerYour Answer Focus on customer
Multiple Choice Multiple AnswerQuestion Management skill includes :-Correct Answer Leadership , Motivation , Performance appraisalsYour Answer Leadership , Motivation , Performance appraisals , Quality measurement
Multiple Choice Single AnswerQuestion 5-S technique is useful to:Correct Answer To all places including homesYour Answer To all places including homes
True/FalseQuestion Safety, hygiene and environment control is one of the pillar of TPM.Correct Answer TrueYour Answer True
Select The BlankQuestion Inspection activity for semi finished & finished component should be ________ to reduce
muda of transport .Correct Answer DecentralizedYour Answer Decentralized
25
True/FalseQuestion Flow chart is pictorial representation of the steps in production control.Correct Answer FalseYour Answer True
Select The BlankQuestion Good ________ is the asset to acquire the success of quality circle.Correct Answer TeamworkYour Answer Teamwork
5th assignment
True/FalseQuestion Performance benchmarking does not involves comparison of financial ratios at the aggregate
level.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Setup time includes :-
Correct Answer Internal setup time & External setup time
Your Answer Internal setup time & External setup time
Multiple Choice Single AnswerQuestion Participants of the groups for quality circles should be decided by :-
Correct Answer Employees coming together by their own enthusiasm
Your Answer Employees coming together by their own enthusiasm
Multiple Choice Single AnswerQuestion Check sheet are also used as :-
Correct Answer Data gathering & interpretation tool
Your Answer Data gathering & interpretation tool
Multiple Choice Single AnswerQuestion SMED means :-
Correct Answer Single minute exchange of dies
Your Answer Single minute exchange of dies
Match The FollowingQuestion Correct Answer Your Answer
Productivity performancemeasurement
Turnover employee Cost of quality
Financial performancemeasurement
Sales of the months Sales of the months
26
Customer satisfaction measurement Customer complaints per period Customer complaints per period
Staff attitude measurement Employee satisfaction index Employee satisfaction index
Select The BlankQuestion ________ is an effect due to the muda of defect.
Correct Answer Wear & tear of parts while disassembling
Your Answer Poor production planning & control
Select The BlankQuestion If some defective parts are discovered by the subsequent process they should be returned to
the ________ to prevent reoccurrence.Correct Answer Preceding process
Your Answer Return to stores
Multiple Choice Multiple AnswerQuestion The results oriented efforts of the quality circle should also include :-
Correct Answer Efforts to avoid the problem permanently , Ultimate aim of the customers satisfaction ,Attacking the real root causes & all possibilities
Your Answer Efforts to avoid the problem permanently , Publication or advertisement of your contribution ,Attacking the real root causes & all possibilities
Match The FollowingQuestion Correct Answer Your Answer
Parato diagram always indicates Magnitude of defects Philosophy of 20% of the activitycauses 80% of the effect
Parato analysis underlines &operates on
Philosophy of "vital few:trivial many" Philosophy of "vital few:trivial many"
Parato analysis is technique ofidentifying vital causes by
Arranging data according to thedescending order of their frequencyof occurrence
Arranging data according to thedescending order of their frequencyof occurrence
Parato diagram is a Bar graph withheight or value drawn by
Arranging data in descending order Magnitude of defects
Multiple Choice Multiple AnswerQuestion Few steps in construction in Radar chart are :-
Correct Answer Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divideit into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then drawvertical line & calibrate it equal to the number of levels required , Draw concentric circles fromeach gradiation using 'o' point as centre
Your Answer Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divideit into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then drawvertical line & calibrate it equal to the number of levels required , Draw concentric circles fromeach gradiation using 'o' point as centre
Select The BlankQuestion 5 S audit result is discussed in ________ meeting.
Correct Answer Monthly
27
Your Answer Monthly
True/FalseQuestion Fishbone analysis is used both in analysis & planning.
Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion One Green Belt may head a team of :-
Correct Answer 20 employees
Your Answer 20 employees
Multiple Choice Multiple AnswerQuestion Role of champions are :-
Correct Answer Approve six sigma projects , Remove road block in the path of six sigma implementation ,Monitor progress of six sigma projects
Your Answer Monitor progress of six sigma projects , Approve six sigma projects , Remove road block in thepath of six sigma implementation
Multiple Choice Multiple AnswerQuestion To draw control charts, sample must be representative of homogeneous segment of
production for which :-Correct Answer The items of the sample should be from the same machine setting , The items should be of
the same batch , Items should be made from the same raw material batchYour Answer The items of the sample should be from the same machine setting , The items should be of
the same batch , Items should be made from the same raw material batch
Multiple Choice Single AnswerQuestion Failure mode and effect analysis (FMEA) establish
Correct Answer Process failure and minimize frequency
Your Answer Process failure and minimize frequency
Multiple Choice Multiple AnswerQuestion What are the steps in deciding the benchmarking partner?
Correct Answer Decide level of benchmarking , List down a few prospective candidates of partnership , Collectinformation of short listed partners
Your Answer Decide level of benchmarking , List down a few prospective candidates of partnership , Collectinformation of short listed partners
Multiple Choice Single AnswerQuestion One Master Black Belt may head a team of :-
Correct Answer 15-20 Black Belts
Your Answer 15-20 Black Belts
Multiple Choice Single Answer
28
Question Competitive benchmarking involves identifying key competitive product, services or processes& comparing with those of :-
Correct Answer Main competitor
Your Answer Main competitor
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-
Correct Answer Gap in performance
Your Answer Gap in performance
Select The BlankQuestion Number of defects in an individual component, like gear, shaft, wheel etc can be monitored
through ________ type of control chart.Correct Answer c-chart
Your Answer c-chart
True/FalseQuestion Non-availability of files /document in time is a problem to be addressed by office TPM.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Check sheet is easy to use because it is :-
Correct Answer Simplest tool
Your Answer Simplest tool
Multiple Choice Single AnswerQuestion Benchmarking helps to identify the gap between the current performance of the organization
and the :-Correct Answer Performance of the best organization
Your Answer Performance of the best organization
True/FalseQuestion Flow chart is pictorial representation of the steps in production control.
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Breakdown problem may be stratified by :-
Correct Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Your Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical)
29
Select The BlankQuestion A control chart to exhibit counted data on number of defect is called ________.
Correct Answer c-chart
Your Answer c-chart
Select The BlankQuestion Procedure for implementation of TPM consists of ________ numbers of steps.
Correct Answer 12
Your Answer 8
Select The BlankQuestion Capability index Cp = ________
Correct Answer Specification width/process width
Your Answer Specification width/process width
Multiple Choice Single AnswerQuestion Pareto's analysis underlines & operates philosophy of :-
Correct Answer Vital few = trivial many
Your Answer Vital few = trivial many
True/FalseQuestion Kanban signals are required when assembly work, subassembly work and manufacturing at
parts is carried out at different locations.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion To reduce clamping & declamping time, following actions are desirable :-
Correct Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clampingdevice
Your Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clampingdevice
Select The BlankQuestion Benchmarking allows exchange of ________ between the benchmarking partners.
Correct Answer Information
Your Answer Information
Multiple Choice Multiple AnswerQuestion TQM can never flourish if the staff are:-
Correct Answer Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of theirbosses
30
Your Answer Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of theirbosses
True/FalseQuestion In bar graph each bar is of same height.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion During SMED implementation, primary study consists of :-
Correct Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method)analysis
Your Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method)analysis
True/FalseQuestion Daily work management can also be extended to non manufacturing areas like procurement,
QA, HRD etc.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Types of Poka-Yoke are :-
Correct Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Save time
True/FalseQuestion Along with problem solving tools experience and judgment is also used.
Correct Answer True
Your Answer False
Select The BlankQuestion JIT advocates the philosophy at elimination of waste from system which occurs due to
________.Correct Answer Over Production
Your Answer Over Production
True/FalseQuestion Without measuring initial performance, target can't be set.
31
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion An erratic patterns falling above & below the control limits indicates :-
Correct Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators
Your Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators
True/FalseQuestion Sample size for the construction of p-chart are larger than X bar-R chart.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Histogram is an important diagnostic tool. Analysis of the histogram gives :-
Correct Answer It shows cause which affects the process , An idea of what is happening to the process ,Whether the process is capable of meeting process or not i.e. around correct average & withinspecific limits
Your Answer An idea of what is happening to the process , Whether the process is capable of meetingprocess or not i.e. around correct average & within specific limits , A bird's eye view of thevariation
Multiple Choice Single AnswerQuestion Productivity improves by :-
Correct Answer Voluntary participants of everyone
Your Answer Voluntary participants of everyone
6th assignments
Multiple Choice Multiple AnswerQuestion Steps to six sigma process consists of :-Correct
AnswerIdentify the work you do , Identify your customers , Map the process
True/FalseQuestion Member giving suggestion in his quality circle may not concern for the work
related problem.Correct
AnswerFalse
Match The FollowingQuestion Correct Answer Your Answer
Review your efforts & successachieved
Check Check
Act about the causes found out Do Act
Collect the initial data for the Plan Control
32
problem
Actions further after reviewingthe progress
Act Repeat
True/FalseQuestion Seiso means cleaning the workplace, is the responsibility of sweeper or cleaning
person.Correct
AnswerFalse
Multiple Choice Multiple AnswerQuestion The purpose of Shitsuke is especially for :-Correct
AnswerMaintaining the 4-S consistently , Develop discipline attitude in everyone , Anyday throughout the year sustain the discipline
Multiple Choice Single AnswerQuestion Chronic problems of poor quality, bad quality delivery, absentism etc, all gets
hide if inventory isCorrect
AnswerHigh
Multiple Choice Single AnswerQuestion Quality is the responsibility of :-Correct
AnswerEveryone in the organization
Multiple Choice Single AnswerQuestion "DOW chemical' is world class benchmarking candidate in :-
CorrectAnswer
Environmental Management
True/FalseQuestion Benefits of DWN is faster response to customer needs.
CorrectAnswer
True
Multiple Choice Single AnswerQuestion Control chart is a graphical method of ascertaining / checking :-
CorrectAnswer
Stability of the process
Select The BlankQuestion Poka-Yoke devices under category 'locating pins' to eliminate cause of ________Correct
AnswerIncorrect positioning
Match The FollowingQuestion Correct Answer Your Answer
In scatter diagram, the strengthof relationship can bedetermined
By "correlation coefficient" By "correlation coefficient"
The scatter diagram provides The possible relationship The possible dependency
33
the technique to establish between a pair of variables between a pair of variables
The scatter diagram displays The pair of data as a cloud ofpoints
The pair of data as a cloud ofpoints
The scatter is also known as Correlation diagram By "correlation ratio"
Multiple Choice Single AnswerQuestion Time required to prepare machine to change over from one job to another is
called :-Correct
AnswerSetup time
Select The BlankQuestion ________ % of quality problems are due to individual errors.
CorrectAnswer
15
Multiple Choice Multiple AnswerQuestion Benefits of stratification are :-
CorrectAnswer
It helps to separate data into groups so that you can draw connect & meaningfulinference , It helps to diagnose & localize problem , It helps to identify theinfluencing factors
Multiple Choice Multiple AnswerQuestion Product benchmarking requires, comparison of product :-
CorrectAnswer
Performance , Features , Cost
Multiple Choice Single AnswerQuestion To help operators to recognize the defect before it occurs :-
CorrectAnswer
Build up low cost automated detection method for each process
Multiple Choice Multiple AnswerQuestion Interrupted flow of work from the preceeding operation which may be due to :-
CorrectAnswer
Lack of parts , Machine breakdown , Operator temporarily absent from place ofwork
True/FalseQuestion Daily work management develops problem finding & solving attitude.
CorrectAnswer
True
Multiple Choice Multiple AnswerQuestion Typical examples of process benchmark are :-
CorrectAnswer
Procurement procedures , Budgeting , Recruitment
Select The BlankQuestion Suppliers may________ their prices to cover for cost of delivery, small production
run etc.
34
CorrectAnswer
Raise
Multiple Choice Single AnswerQuestion Benefits of Seiton means
CorrectAnswer
Easy irretrievability of material
True/FalseQuestion New benchmarking projects are initiated after reviewing competitive position
periodically.Correct
AnswerTrue
Select The BlankQuestion Graphs convey a situation more ________ than summary of data or figures.
CorrectAnswer
Effectively & clearly
True/FalseQuestion TQM improves the quality by improving processes.
CorrectAnswer
True
Multiple Choice Multiple AnswerQuestion Scatter diagram is used :-
CorrectAnswer
To discover relationship between two associated sets of data , To display therelationship between two variables , To confirm anticipated relationship betweentwo variables / associated sets of data
Select The BlankQuestion Basic objective of control chart is to ________ the variation due to chance &
assignable cause.Correct
AnswerSeparate out
True/FalseQuestion TQM improves manufacturing as well as clerical activities.
CorrectAnswer
True
Select The BlankQuestion Poka Yoke designed to help operators to know immediately ________ of the
defeat called detection type Poka-Yoke.Correct
AnswerOn occurrence
True/FalseQuestion A control chart is a chart with UCL & LCL placed at 6 Sigma distance on either
side of the process average.Correct
AnswerFalse
Multiple Choice Multiple Answer
35
Question Cleaning your own area/equipments gives benefits of :-
CorrectAnswer
You know your self how to avoid dust , When you touch while cleaning you mayfind a fault , Saving of further failure due to dust
Multiple Choice Single AnswerQuestion For 'Analysis of non conformance' checking point will be :-
CorrectAnswer
Find out root cause and take corrective & preventive action
Multiple Choice Single AnswerQuestion Assignable causes :-
CorrectAnswer
Can be eliminated
Select The BlankQuestion ________ used to detect drop in air pressure.
CorrectAnswer
Buzzers / alarms
Multiple Choice Single AnswerQuestion Statistical process control is application of statistical technique to control :-Correct
AnswerProcess
Multiple Choice Multiple AnswerQuestion Benefits from SMED are :-Correct
AnswerReduce work in process , Better average daily production , Increase capacity
Multiple Choice Multiple AnswerQuestion According to Seiketsu Standardization means :-
CorrectAnswer
To develop easy to follow standards , Evolve standard operating procedure ,Better visual management
Select The BlankQuestion ________ PDCA cycle is the systematic approach towards meeting the target.
CorrectAnswer
Kaoishikawa
Multiple Choice Multiple AnswerQuestion To draw control charts, sample must be representative of homogeneous segment
of production for which :-Correct
AnswerThe items of the sample should be from the same machine setting , The itemsshould be of the same batch , Items should be made from the same raw materialbatch
Multiple Choice Single AnswerQuestion Withdrawal kanban is presented by :-Correct
AnswerC- kanban
Multiple Choice Multiple AnswerQuestion Steps in construction of scatter diagram :-
36
CorrectAnswer
Collect paired data (X,Y) from two variables who's relationship is to be studied ,Find out max & min values for both X & Y and these values to scale X & Y axis &plot the paired data , Examine the shape of the cloud of points & discover type &strength of relationship
Multiple Choice Single AnswerQuestion Small groups forming a circle should consist of :-
CorrectAnswer
Employees of different department related to the problem
Select The BlankQuestion A ________ is an excellent device to condense & present large mass of data in an
elegant form.Correct
AnswerFrequency distribution
Select The BlankQuestion In PDCA cycle for benchmarking 'Identification of performance gap' is done in
________.Correct
AnswerChecking
True/FalseQuestion Low level of delegation is an example of muda in office.Correct
AnswerTrue
True/FalseQuestion Change of job titles can help to raise employee's morale.Correct
AnswerTrue
Select The BlankQuestion ________ is benefit of TPM.Correct
AnswerLow production cost
My assignment attempt 2nd
True/FalseQuestion The flow charts are prepared to enhance the employees understanding of the process by
indicating interrelationship within the process.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Some quantity in stock of item, is desirable if :-
Correct Answer Manufacturing lead time is more
Your Answer Manufacturing lead time is more
Multiple Choice Single AnswerQuestion Setup time includes :-
37
Correct Answer Internal setup time & External setup time
Your Answer Internal setup time & External setup time
Multiple Choice Multiple AnswerQuestion Flow chart is prepared when :-
Correct Answer Defining the problem , Trying to know the activities involved in the process , Identifying theroot causes
Your Answer Defining the problem , Trying to know the activities involved in the process , Identifying theroot causes
Multiple Choice Multiple AnswerQuestion Benefits of stratification are :-
Correct Answer It helps to separate data into groups so that you can draw connect & meaningful inference , Ithelps to diagnose & localize problem , It helps to identify the influencing factors
Your Answer It helps to separate data into groups so that you can draw connect & meaningful inference , Ithelps to diagnose & localize problem , It helps to identify the influencing factors
Match The FollowingQuestion Correct Answer Your Answer
World class benchmarking companyin assembly automation
Ford Ford
World class benchmarking companyin marketing
Microsoft Microsoft
World class benchmarking companyin quality
Motorola Motorola
World class benchmarking companyin training
General Electric General Electric
Multiple Choice Multiple AnswerQuestion 3M' is world class benchmarking ' candidates in the field of :-
Correct Answer Product development , Technology transfer , Environmental Management
Your Answer Product development , Technology transfer , Environmental Management
True/FalseQuestion By TPM, consumption of electrical energy can be reduced.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Statistical process control (SPC) is the application of statistical technique for the purpose of :-
Correct Answer Process control
Your Answer Process control
Multiple Choice Single AnswerQuestion The area enclosed under normal distribution curve between mean +1standard deviation is :-
38
Correct Answer 0.6826
Your Answer 1
Multiple Choice Single AnswerQuestion Quality maintenance means :-
Correct Answer Incorporating quality into product
Your Answer Incorporating quality into product
True/FalseQuestion Kanban signals are required when assembly work, subassembly work and manufacturing at
parts is carried out at different locations.Correct Answer True
Your Answer True
True/FalseQuestion Fishbone analysis is used both in analysis & planning.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion A drive for people involved should start with the :-
Correct Answer Study of staff attitudes
Your Answer Developing basic skill
Match The FollowingQuestion Correct Answer Your Answer
Ideally the histogram will have a bellshape
Tapering away on the both sidesfrom average value
Tapering away on the both sidesfrom average value
Histogram is a graphical display ofdistribution of measurements and
Reveals the amount of variationwithin the process
Reveals the amount of variationwithin the process
Histogram is a diagrammaticpresentation of
The frequency distribution of acharacteristics
The frequency distribution of acharacteristics
The shape of histogram can Provide a clue about the quality ofthe lot
Provide a clue about the quality ofthe lot
Multiple Choice Multiple AnswerQuestion Some steps for stratification are :-
Correct Answer Define the problem & identify the stratification variables , Sort out data into categories &summarise information in each category , Present the information in graphical form & study,decide if further stratification is required?
Your Answer Define the problem & identify the stratification variables , Sort out data into categories &summarise information in each category , Present the information in graphical form & study,decide if further stratification is required?
Select The Blank
39
Question Capability index Cp = ________
Correct Answer Specification width/process width
Your Answer Specification width/process width
Select The BlankQuestion Pie chart is the graph of ________ data.
Correct Answer Percentage breakdown
Your Answer Percentage breakdown
Select The BlankQuestion ________feel that quality circle cause erosion of their control over workmen.
Correct Answer Supervisors
Your Answer Supervisors
True/FalseQuestion Globalization of trade and industrial operations have forced Indian companies to become more
& more competitive and customer driven.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion For 'Control on PPM and rework level;, checking points' will be :-
Correct Answer PPM level , Initiate corrective actions on rejection/rework , Initiate preventive action onrejection / rework
Your Answer PPM level , Initiate preventive action on rejection / rework , 100% inspection
Multiple Choice Multiple AnswerQuestion Histograms are useful to :-
Correct Answer Measure the current pattern & extent of variation , Assess current conformance tospecification & scope of improvement , Determine whether or not the process is in the state ofcontrol
Your Answer Measure the current pattern & extent of variation , Assess current conformance tospecification & scope of improvement , Determine whether or not the process is in the state ofcontrol
Multiple Choice Multiple AnswerQuestion Training related to Quality includes:-
Correct Answer Quality measures , Quality failure
Your Answer Quality measures , Quality failure
Select The BlankQuestion Benchmarking allows exchange of ________ between the benchmarking partners.
Correct Answer Information
40
Your Answer Information
Select The BlankQuestion Good ________ is the asset to acquire the success of quality circle.
Correct Answer Teamwork
Your Answer Teamwork
Select The BlankQuestion Ideally the histogram will have a symmetrical ( i.e. also called as bell) shape tapering away on
both sides from ________ value.Correct Answer Average
Your Answer Average
Select The BlankQuestion Japanese believe that when they are ________ they are cleaning there minds too.
Correct Answer Cleaning
Your Answer Cleaning
True/FalseQuestion Key element of JIT is continuous improvement.
Correct Answer True
Your Answer True
True/FalseQuestion Statistical limits are calculated from averages of samples, instead of a single sample of large
size.Correct Answer True
Your Answer True
Select The BlankQuestion World class benchmarking candidate in 'Quality' is ________.
Correct Answer Motorola
Your Answer DOW chemical
Multiple Choice Single AnswerQuestion To maintain smoothness in production :-
Correct Answer Elimination of buffer stock is recommended
Your Answer Elimination of buffer stock is recommended
Select The BlankQuestion ________ are implemented for defect detection & prevention.
41
Correct Answer Poka-Yokes
Your Answer Poka-Yokes
Multiple Choice Single AnswerQuestion Muda of defect is very serious in case of:-
Correct Answer High speed automatic machines
Your Answer High speed automatic machines
Multiple Choice Multiple AnswerQuestion While preparing scatter diagram following precautions are to be taken :-
Correct Answer Data should be properly stratified & should be collected for full range , Scale selected shouldbe right to avoid wrong conclusions , Data should be free from bias or undue importance
Your Answer Data should be properly stratified & should be collected for full range , Scale selected shouldbe right to avoid wrong conclusions , Data should be free from bias or undue importance
Multiple Choice Multiple AnswerQuestion The purpose of Shitsuke is especially for :-
Correct Answer Maintaining the 4-S consistently , Develop discipline attitude in everyone , Any day throughoutthe year sustain the discipline
Your Answer Maintaining the 4-S consistently , Develop discipline attitude in everyone , Any day throughoutthe year sustain the discipline
Multiple Choice Multiple AnswerQuestion Breakdown problem may be stratified by :-
Correct Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Your Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Select The BlankQuestion Range ( R ) is obtained as the difference between the highest and ________ measurement of
a sample.Correct Answer Lowest
Your Answer Lowest
True/FalseQuestion Automation can correct the basic faults of a improper setup process.
Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion What is to be done before selecting benchmarking partner?
Correct Answer level of benchmarking is to be decided
Your Answer level of benchmarking is to be decided
True/False
42
Question Operator monitoring a machine while machine works on auto cycle is an example of muda ofwaiting.
Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion Frequencies, values, tabulated in the frequency table, can be represented pictorially in the
form of bar graph & this graph of frequency is called as :-Correct Answer Histogram
Your Answer Histogram
Select The BlankQuestion To assess effectiveness of training ________ is essential.
Correct Answer Evaluation
Your Answer Evaluation
Multiple Choice Multiple AnswerQuestion Benefits from SMED are :-
Correct Answer Reduce work in process , Better average daily production , Increase capacity
Your Answer Reduce work in process , Better average daily production , Increase capacity
Multiple Choice Single AnswerQuestion Line graph is also called as :-
Correct Answer Run chart
Your Answer Radar chart
Multiple Choice Single AnswerQuestion In bar graph each bar is of same :-
Correct Answer Width
Your Answer Width
Multiple Choice Multiple AnswerQuestion The alternate meaning of seiso is
Correct Answer Sanities , Cleanup , Dust free / scrab
Your Answer Cleanup , Dust free / scrab , Neatness
True/FalseQuestion In P-chart, the value of P can never be negative.
Correct Answer True
Your Answer True
43
My skipped qustions
1. Control chart is a graphicalmethod of checking
1. As process monitoring tool
2. Control chart can be used todetermine
2. At 6 Sigma distance on either side of the process average
3. Control chart is a chart withUCL & LCL placed
3. For quality monitoring
4. Control chart can be used 4. Stability of the process
5. How much variability in the process is due to random causes& how much is due to assignable causes
6. At 3 Sigma distance on either side of the process average
Quality circle should consists employees ofLow er levels
who are not usually considered capablecontributing
Shitsuke is most difficult out of all 5-S because it means to sustain all the first 4-S throughout the year.
After choosing the problem area, to go ahead further what is required?
a)
b)
c)
d)
Regular meeting plan to follow
Discuss on the root cause bybrainstorming
Study individually for the problem
Follow the Deming PDCA circle
Mechanization &Discipline
are the two constituents of streamlining
29.is serve as a stepping stone to TQM
Actions that can be thought for the process having process capability is approximately equal tothe specification tolerance are :-
a)
b)
c)
d)
Greaterattention tocentering ofthe process
Keepmean &standarddeviationunder strictcontrol
Putefforts toreducevariability
44
Use oflessprecisionmachine
Technique involved in listing of setup task, establishing technological relationship between tasks, drawing
arrow diagram is called as
36. .
True
False
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Advantages of JIT :-
Correct Answer Reduce incoming inspection , Reduce inventory , Lower per unit cost
Your Answer Reduce incoming inspection , Reduce inventory , Lower per unit cost
Multiple Choice Multiple AnswerQuestion Benefits from the standardized containers are
Correct Answer Minimization of transit damages , Ease in verification of quantity ofparts , Automatic signal to supplier to replenish stock
Your Answer Minimization of transit damages , Ease in verification of quantity ofparts , Automatic signal to supplier to replenish stock
Multiple Choice Multiple AnswerQuestion Benefits from SMED are :-
Correct Answer Reduce work in process , Better average daily production , Increasecapacity
Your Answer Reduce work in process , Increase capacity
Multiple Choice Single AnswerQuestion Competitive benchmarking involves identifying key competitive
product, services or processes & comparing with those of :-Correct Answer Main competitor
Your Answer Main competitor
Multiple Choice Multiple AnswerQuestion Benefits of stratification are :-
Correct Answer It helps to separate data into groups so that you can draw connect &meaningful inference , It helps to diagnose & localize problem , Ithelps to identify the influencing factors
Your Answer It helps to separate data into groups so that you can draw connect &meaningful inference , It helps to diagnose & localize problem ,Finding out different reasons
Multiple Choice Multiple AnswerQuestion Quality maintenance & pillar focuses on following production inputs
:-Correct Answer Men , Machine , Material
Your Answer Men , Machine , Management
Multiple Choice Single AnswerQuestion The success indicators in quality, cost, delivery & product
development are :-
Correct Answer Managing points
Your Answer Accountability
Multiple Choice Multiple AnswerQuestion Steps in setup time reduction are :-
Correct Answer Team formation , Training , Recoding of activities on multiple activitycharts
Your Answer Team formation , Recoding of activities on multiple activity charts ,Convert external setups in to internal setups
Multiple Choice Multiple AnswerQuestion POM essentially consists of :-
Correct Answer Time management , Team participation and performance , Moralboosting
Your Answer Time management , Team participation and performance , CostManagement
Multiple Choice Single AnswerQuestion Activity under quality management is :-
Correct Answer Use team approach to track down root causes of the problem
Your Answer Maintenance of equipment condition by eliminating lubricantleakage.
True/FalseQuestion Every department should make their own rules of standardization.
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Histogram is an important diagnostic tool. Analysis of the histogram
gives :-Correct Answer It shows cause which affects the process , An idea of what is
happening to the process , Whether the process is capable ofmeeting process or not i.e. around correct average & within specificlimits
Your Answer It shows cause which affects the process , An idea of what ishappening to the process , Whether the process is capable ofmeeting process or not i.e. around correct average & within specificlimits
Match The FollowingQuestion Correct Answer Your Answer
Productivity performancemeasurement
Turnover employee Sales of the months
Financial performancemeasurement
Sales of the months Cash saving per department
Customer satisfactionmeasurement
Customer complaints perperiod
Customer complaints perperiod
Staff attitude measurement Employee satisfactionindex
Employee satisfaction index
Multiple Choice Single AnswerQuestion TPM helps to reduce down time due to:-
Correct Answer Breakdown of machine
Your Answer Breakdown of machine
Multiple Choice Single AnswerQuestion Kaizen emphasizes :-
Correct Answer Implementation of ideas
Your Answer Collection of ideas
Select The BlankQuestion Create as many ________ system as possible for better Seiketsu.
Correct Answer Visual control
Your Answer Visual control
True/FalseQuestion Inadequate maintenance of machine leads to muda of defects
Correct Answer True
Your Answer False
Select The BlankQuestion The shape of histogram can provide a clue about the ________ of
the lot.Correct Answer Quality
Your Answer Distribution
Multiple Choice Single AnswerQuestion Customer's return is an indicators of the MUDA of :-
Correct Answer Defect
Your Answer Defect
Multiple Choice Single AnswerQuestion In bar graph the interval (gap) between the bars is :-
Correct Answer Equal
Your Answer Symmetrical
True/FalseQuestion Inspection is poor method of assuring 100% quality.
Correct Answer True
Your Answer False
True/FalseQuestion A radar chart is combination of a circle & line graph
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion A workshop is to be treated as :-
Correct Answer Place where one's creativity can be applied
Your Answer Place where one's creativity can be applied
True/FalseQuestion Customer wise outstanding is discussed in daily work management
meeting by operations head.Correct Answer False
Your Answer True
True/FalseQuestion Number of operation can change according to production
requirement in U-Line arrangement.Correct Answer False
Your Answer True
True/FalseQuestion Automation can correct the basic faults of a improper setup process.
Correct Answer False
Your Answer True
Select The BlankQuestion Cp for six sigma process is ________
Correct Answer 2
Your Answer 1.66
Select The BlankQuestion Range ( R ) is obtained as the difference between the highest and
________ measurement of a sample.Correct Answer Lowest
Your Answer Second highest
Select The BlankQuestion ________is an important step toward successful JIT purchasing.
Correct Answer JIT Contract
Your Answer JIT Contract
True/FalseQuestion U-Line layout is better than straight lime layout.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion TQM applicable to :-
Correct Answer Marketing, design & manufacturing
Your Answer Quality Control department
Select The BlankQuestion Bar graph is display of data that facilitates ________ of quality.
Correct Answer Comparison
Your Answer Performance
Multiple Choice Single AnswerQuestion Production kanban is presented by :-
Correct Answer P-kanban
Your Answer R-kanban
Multiple Choice Single AnswerQuestion Check sheet are also used as :-
Correct Answer Data gathering & interpretation tool
Your Answer Cause finding & effect finding tool
Select The BlankQuestion Japanese believe that when they are ________ they are cleaning
there minds too.Correct Answer Cleaning
Your Answer Repairing machines
Select The BlankQuestion Poka-Yoke devices under category use ________ to distinguish
between similar parts which may be assembled in wrong position.Correct Answer Color coding
Your Answer Counting device
Select The BlankQuestion Shitsuke means ________ all the previous 4-S throughout the
month/year.Correct Answer Sustaining
Your Answer Implementing
Multiple Choice Multiple AnswerQuestion Types of meetings held in DWM are :-
Correct Answer Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCAmeeting
Your Answer Weekly PDCA meeting , Monthly PDCA meeting , Yearly PDCAmeeting
True/FalseQuestion By TPM, consumption of electrical energy can be reduced.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion According to Seiketsu Standardization means :-
Correct Answer To develop easy to follow standards , Evolve standard operatingprocedure , Better visual management
Your Answer To develop easy to follow standards , Evolve standard operatingprocedure , Reduction of wastage
True/FalseQuestion Flow chart helps to stop an old process.
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Training related to Quality includes:-
Correct Answer Quality measures , Quality failure
Your Answer Quality measures , Quality failure , Goal of business
Multiple Choice Single AnswerQuestion Total area under the normal curve is
Correct Answer Unity
Your Answer Six
Multiple Choice Multiple AnswerQuestion Cpk =
Correct Answer (x - USL)/3 sigma , (x - LSL)/3 sigma
Your Answer (x - USL)/6 sigma
Select The BlankQuestion A histogram is a graphical display of distribution of measurements &
reveals the amounts of ________ within the process.Correct Answer Variation
Your Answer Percentage defects
Match The FollowingQuestion Correct Answer Your Answer
Value analysis / valueengineering
To eliminate MUDA ofprocessing
To eliminate MUDA of overproduction
SMED To eliminate MUDA of overproduction
To eliminate MUDA ofdefect
VMI ( Vendor ManagementInventory) system
To eliminate MUDA ofstock
To eliminate MUDA of stock
Flow / string diagram To eliminate MUDA oftransport
To eliminate MUDA ofprocessing
Select The BlankQuestion A 'Radar chart' is used to portray ________ strength or weakness of
the activity.Correct Answer Relative
Your Answer Comparative
1. TPM 1. Waste elimination
2. JIT 2. Visual management
3. Kanban 3. Best way of doing job
4. Work standards 4. Reducing breakdown of machines
5. Pull system6. Statistical process control
1. Parato analysis underlines &operates on
1. Arranging data according to thedescending order of their frequency ofoccurrence
2. Parato analysis is technique ofidentifying vital causes by
2. Philosophy of 20% of the activity causes80% of the effect
3. Parato diagram is a Bar graphwith height or value drawn by
3. Magnitude of defects
4. Parato diagram alwaysindicates
4. Arranging data in ascending order
5. Arranging data in descending order
6. Philosophy of "vital few:trivial many"
27. Total area under the normal curve is
a)
b)
c)
d)
Unity
Zero
Infinity
Six
U shape arrangement of layout provides the operator degree of mobility.
48. Quality problems may be segregated by & regrouped by :-
a)
b)
c)
Machines
Workers
Materials
d)Suggestion
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion TQM can never flourish if the staff are:-
Correct Answer Scared of their bosses , Worried about losing jobs , Afraid ofbeing reprimanded if there are mistakes
Your Answer Scared of their bosses , Worried about losing jobs , Afraid ofbeing reprimanded if there are mistakes
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Improve quality
Multiple Choice Single AnswerQuestion The concept of quality circle was mooted by :-
Correct Answer Prof. Kaoishikawa
Your Answer Prof. Kaoishikawa
Match The FollowingQuestion Correct Answer Your Answer
SMED Setup time reduction Setup time reduction
5 'S Cleanliness Total productivemaintenance
Muda elimination Waste elimination Waste elimination
Poka-Yoke Error proofing Error proofing
Multiple Choice Single AnswerQuestion Allowing worker's to stop machine / assembly line if they believe
that product quality is below standard' is an example of :-Correct Answer Empowerment
Your Answer Involvement
Select The BlankQuestion Kaizen is ________ supported process.
Correct Answer Management
Your Answer Workmen
Select The BlankQuestion Ratio of ________ to the number of pieces inspected is called
fraction defectives.Correct Answer Number of item rejected
Your Answer Number of item rejected
Multiple Choice Single AnswerQuestion Histogram always indicates :-
Correct Answer Only height
Your Answer Percentage defect
Multiple Choice Single AnswerQuestion List of customers, to carry out parato analysis to identify
customers who gives business includes :-Correct Answer Present & past customers
Your Answer Present & past customers
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-
Correct Answer Gap in performance
Your Answer Gap in performance
Multiple Choice Multiple AnswerQuestion Steps to six sigma process consists of :-
Correct Answer Identify the work you do , Identify your customers , Map theprocess
Your Answer Identify the work you do , Identify your customers , Map theprocess
Multiple Choice Single AnswerQuestion From scatter diagram the strength of relationship between two
variables or associated set of data can be inferred from theexamination of the shape of :-
Correct Answer Cloud
Your Answer Cloud
True/FalseQuestion Non-availability of files /document in time is a problem to be
addressed by office TPM.Correct Answer True
Your Answer True
Select The BlankQuestion ________ used to detect drop in air pressure.
Correct Answer Buzzers / alarms
Your Answer Locators
Multiple Choice Single AnswerQuestion TQM is a way to improve quality of product and service :-
Correct Answer Continuously
Your Answer Continuously
Multiple Choice Multiple AnswerQuestion The aim of education & training under TPM is :-
Correct Answer To develop abilities to respond quickly to abnormalities , Todevelop abilities to discover analyze malfunction
Your Answer To develop abilities to respond quickly to abnormalities , Todevelop abilities to discover analyze malfunction , To havemultiskilled employees in all departments
Match The FollowingQuestion Correct Answer Your Answer
In scatter diagram, thestrength of relationshipcan be determined
By "correlation coefficient" By "correlation coefficient"
The scatter diagramprovides the technique toestablish
The possible relationshipbetween a pair ofvariables
The possible relationshipbetween a pair of variables
The scatter diagramdisplays
The pair of data as acloud of points
The pair of data as a cloudof points
The scatter is also knownas
Correlation diagram Correlation diagram
True/FalseQuestion Flow chart is pictorial representation of the steps in production
control.Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Pareto's analysis underlines & operates philosophy of :-
Correct Answer Vital few = trivial many
Your Answer Vital few = trivial many
Multiple Choice Single AnswerQuestion Pareto diagram always indicate magnitude of :-
Correct Answer Defect
Your Answer Influence of defect
True/FalseQuestion By cutting the cost of quality, profitability decreases.
Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Check sheet is easy to use because it is :-
Correct Answer Simplest tool
Your Answer Simplest tool
True/FalseQuestion The flow charts are prepared to enhance the employees
understanding of the process by indicating interrelationshipwithin the process.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Abnormal variations can occur if :-
Correct Answer There are assignable causes
Your Answer There are assignable causes
Multiple Choice Multiple AnswerQuestion Types of Poka-Yoke are :-
Correct Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer Prevention type Poka-Yoke , Detection type Poka-Yoke ,Standards type Poka-Yoke
True/FalseQuestion Control limits of control charts should be revised from time to
time as additional data is accumulated.Correct Answer True
Your Answer True
Select The BlankQuestion Kaizen is an excellent method to involve ________ to unearth &
eliminate hidden waste.Correct Answer Employees
Your Answer Employers
Multiple Choice Multiple AnswerQuestion To reduce Muda of transport, techniques used are :-
Correct Answer Cellular layout , Method study , 5 'S
Your Answer Cellular layout , Method study , 5 'S
Select The BlankQuestion Cp for six sigma process is ________
Correct Answer 2
Your Answer 2
Select The BlankQuestion ________ participants in monthly meeting(MRM)
Correct Answer GM, operation heads, corporate functional heads
Your Answer Department heads & supervisors
True/False
Question Processing cost of a product is mainly decided by conversionprocess.
Correct Answer True
Your Answer True
Select The BlankQuestion Production in last shift & production plan for next shift is
discussed during ________.Correct Answer Shift beginning & shift end/change meeting
Your Answer Shift beginning & shift end/change meeting
Multiple Choice Multiple AnswerQuestion Material Supply on DSL basis helps :-
Correct Answer To eliminate handling , To reduce transporting , To reduceinspection
Your Answer To eliminate handling , To reduce transporting , To reduceinspection
True/FalseQuestion Inadequate maintenance of machine leads to muda of defects
Correct Answer True
Your Answer True
True/FalseQuestion Most of the external setups are treated as internal setup.
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Benefits from SMED are :-
Correct Answer Reduce work in process , Better average daily production ,Increase capacity
Your Answer Reduce work in process , Better average daily production ,Increase capacity
Multiple Choice Multiple AnswerQuestion Typical examples of process benchmark are :-
Correct Answer Procurement procedures , Budgeting , Recruitment
Your Answer Procurement procedures , Budgeting , Recruitment
True/FalseQuestion Low level of delegation is an example of muda in office.
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Histograms are useful to :-
Correct Answer Measure the current pattern & extent of variation , Assesscurrent conformance to specification & scope of improvement ,Determine whether or not the process is in the state of control
Your Answer Measure the current pattern & extent of variation , Assesscurrent conformance to specification & scope of improvement ,Determine whether or not the process is in the state of control
Multiple Choice Multiple AnswerQuestion While preparing scatter diagram following precautions are to be
taken :-Correct Answer Data should be properly stratified & should be collected for full
range , Scale selected should be right to avoid wrongconclusions , Data should be free from bias or undue importance
Your Answer Data should be properly stratified & should be collected for fullrange , Scale selected should be right to avoid wrongconclusions , Data should be free from bias or undue importance
Multiple Choice Single AnswerQuestion Through continuous improvement in the process & procedures,
kobetsu-kaizen is continuously improve utilization of :-Correct Answer Worker, equipment & material
Your Answer Workers & materials
True/FalseQuestion Every department should make their own rules of
standardization.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Quality circle should consist adequate experienced members
between :-Correct Answer 8 to 10
Your Answer 8 to 10
Multiple Choice Single AnswerQuestion Number of kaizen in Group kaizen categories are :-
Correct Answer Two to three per year
Your Answer As many as management decides
Select The BlankQuestion Flow chart helps to provide clarity of the ________ without
visiting actual spot.Correct Answer Process
Your Answer Process
Multiple Choice Single AnswerQuestion Gap in performance = Ideal situation minus :-
Correct Answer Current situation
Your Answer Current situation
Select The BlankQuestion Seminar talks and video show are organized to introduce TPM
concept to ________Correct Answer General employees
Your Answer General employees
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Performance benchmarking does not involves comparison of
financial ratios at the aggregate level.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Few steps to construct a flow chart are :-
Correct Answer Decide on the objective of flowchart & define boundaries of theprocess , Identify steps in the process & construct a draft of theflowchart , Review the draft & connect the changes as per review &name it & put the data & use it as 'Record'
Your Answer Decide on the objective of flowchart & define boundaries of theprocess , Identify steps in the process & construct a draft of theflowchart , Review the draft & connect the changes as per review &name it & put the data & use it as 'Record'
Select The BlankQuestion In PDCA cycle for benchmarking 'Identification of performance gap'
is done in ________.Correct Answer Checking
Your Answer Checking
Select The BlankQuestion 5 S audit result is discussed in ________ meeting.
Correct Answer Monthly
Your Answer Shift beginning
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when
value of 'y' decreases as the value of 'x' increases.Correct Answer Strong negative
Your Answer Strong negative
Select The BlankQuestion Kaizen projects are managed by ________
Correct Answer Cross functional team
Your Answer Management
Multiple Choice Single Answer
Question Poka-yoke for employee not performing work as per establishedmethod is :-
Correct Answer Implement work standard
Your Answer Implement work standard
Multiple Choice Multiple AnswerQuestion Typical examples of process benchmark are :-
Correct Answer Procurement procedures , Budgeting , Recruitment
Your Answer Procurement procedures , Budgeting , Recruitment
Multiple Choice Multiple AnswerQuestion What are the steps in deciding the benchmarking partner?
Correct Answer Decide level of benchmarking , List down a few prospectivecandidates of partnership , Collect information of short listedpartners
Your Answer Decide level of benchmarking , Collect information of short listedpartners
Multiple Choice Single AnswerQuestion Errors by armatures is :-
Correct Answer Lack of experience
Your Answer Absent mindedness
True/FalseQuestion Control chart is also called as run-chart.
Correct Answer True
Your Answer True
Match The FollowingQuestion Correct Answer Your Answer
Reduce clamping &declamping time
Use U-shaped washer Use U-shaped washer
Reduce time of externalsetup
Improve work aidspositioning method
Improve work aidspositioning method
Convert internal setup intoexternal setup
Preparation of tools / diesas off line activity
Preparation of tools / dies asoff line activity
Eliminate adjustment Pre setting of tool Pre setting of tool
Multiple Choice Single AnswerQuestion Muda of defect is very serious in case of:-
Correct Answer High speed automatic machines
Your Answer High speed automatic machines
Multiple Choice Multiple AnswerQuestion To reduce clamping & declamping time, following actions are
desirable :-Correct Answer Standardize clamping bolts / screws , Cut off unnecessary threads ,
Use quick clamping deviceYour Answer Standardize clamping bolts / screws , Cut off unnecessary threads ,
Use quick clamping device
Multiple Choice Single AnswerQuestion Requirement of more machines, is an example of :-
Correct Answer Muda of overproduction
Your Answer Muda of waiting
Multiple Choice Single AnswerQuestion In India quality circle was first launched by :-
Correct Answer Hyderabad unit of BHEL
Your Answer Hyderabad unit of BHEL
Multiple Choice Multiple AnswerQuestion 3M' is world class benchmarking ' candidates in the field of :-
Correct Answer Product development , Technology transfer , EnvironmentalManagement
Your Answer Product development , Technology transfer , EnvironmentalManagement
Multiple Choice Single AnswerQuestion Responsibility for Quality should rest on:-
Correct Answer Who produce the product
Your Answer Quality control department
True/FalseQuestion Increase in defect rate is an example of 'Deviation from an
established norms'Correct Answer True
Your Answer True
Select The BlankQuestion ________ are implemented for defect detection & prevention.
Correct Answer Poka-Yokes
Your Answer Poka-Yokes
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Improve quality
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-
Correct Answer Gap in performance
Your Answer Lower efficiency
True/FalseQuestion Presentation of graphs in pictorial form of data collection are for
easy understanding.Correct Answer True
Your Answer True
Select The BlankQuestion ________ waste is probably the biggest waste in most of the
organizations.Correct Answer Time
Your Answer Labor
True/FalseQuestion Globalization of trade and industrial operations have forced Indian
companies to become more & more competitive and customerdriven.
Correct Answer True
Your Answer True
True/FalseQuestion TQM improves the quality by improving processes.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion An erratic patterns falling above & below the control limits indicates
:-Correct Answer Poorly trained operators , Defect in materials , Frequent adjustment
of machines
Your Answer Defect in materials , Frequent adjustment of machines , Poorlytrained operators
Multiple Choice Single AnswerQuestion Defects per million for the process at six sigma level are :-
Correct Answer 3.4
Your Answer 6210
Multiple Choice Single AnswerQuestion To provide flexibility to supervisors in allocation of task, JIT
emphasizes :-Correct Answer Multiskilled operators
Your Answer Multiskilled operators
Multiple Choice Single AnswerQuestion To maintain smoothness in production :-
Correct Answer Elimination of buffer stock is recommended
Your Answer Maintenance of buffer stock is recommended.
Select The BlankQuestion ________ should be used to exercise control on the process.
Correct Answer Control chart
Your Answer Latest checking instruments
Match The FollowingQuestion Correct Answer Your Answer
Ideally the histogram willhave a bell shape
Tapering away on the bothsides from average value
Tapering away on the bothsides from average value
Histogram is a graphicaldisplay of distribution ofmeasurements and
Reveals the amount ofvariation within the process
Reveals the amount ofvariation within the process
Histogram is adiagrammatic presentationof
The frequency distributionof a characteristics
The frequency distribution ofa characteristics
The shape of histogramcan
Provide a clue about thequality of the lot
Provide a clue about thequality of the lot
True/FalseQuestion In single card kanban system production greater than quantity
withdrawn is permitted.Correct Answer False
Your Answer False
True/FalseQuestion Flow chart are drawn to document a process charting the tasks
performed & the sequence in which tasks are performed.Correct Answer True
Your Answer True
Select The BlankQuestion Cpk for six sigma process is ________
Correct Answer 1.5
Your Answer 1.5
True/FalseQuestion Seiso prevents the potential problems by discovering abnormalities
while cleaning your own area.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Some steps for stratification are :-
Correct Answer Define the problem & identify the stratification variables , Sort outdata into categories & summarise information in each category ,Present the information in graphical form & study, decide if furtherstratification is required?
Your Answer Define the problem & identify the stratification variables , Sort outdata into categories & summarise information in each category ,Present the information in graphical form & study, decide if furtherstratification is required?
True/FalseQuestion Processing cost of a product is mainly decided by conversion
process.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Work standards enable management to minimize variation in :-
Correct Answer Output , Quality , Cost
Your Answer Output , Quality , Cost
Multiple Choice Multiple AnswerQuestion Process can be made capable by :-
Correct Answer Reducing process variability , Bringing target & average to fall at thesame point , Examine possibility of relaxing specification
Your Answer Reducing process variability , Bringing target & average to fall at thesame point , Use of less precision machine
Multiple Choice Multiple AnswerQuestion Few steps in construction of Pie chart are :-
Correct Answer Express value of each category as percentage of total of allcategories & calculate the degree of angle form by each category byequation degree = Value of groups/Total value * 360 , Draw thecircle & segment the circle into angles calculated in step one ,Colour different segments & enter the percentage of each categoryinto pie chart
Your Answer Express value of each category as percentage of total of allcategories & calculate the degree of angle form by each category byequation degree = Value of groups/Total value * 360 , Draw thecircle & segment the circle into angles calculated in step one ,Colour different segments & enter the percentage of each categoryinto pie chart
Multiple Choice Multiple AnswerQuestion As benchmark in Japan seiso activities means :-
Correct Answer Everyone, clerk to officer does cleaning his area , No sweeper orcleaner employees , Every family does cleaning of pavement of theirresidence
Your Answer Everyone, clerk to officer does cleaning his area , No sweeper orcleaner employees , Every family does cleaning of pavement of theirresidence
Select The BlankQuestion Poka Yoke designed to help operators to know immediately
________ of the defeat called detection type Poka-Yoke.Correct Answer On occurrence
Your Answer Before Occurrence
Select The BlankQuestion Flow chart helps to dissect a process for better understanding &
________ of process.Correct Answer Analysis
Your Answer Analysis
Multiple Choice Single AnswerQuestion Small groups forming a circle should consist of :-
Correct Answer Employees of different department related to the problem
Your Answer Employees of same department
Select The Blank
Question Graphs convey a situation more ________ than summary of data orfigures.
Correct Answer Effectively & clearly
Your Answer Effectively & clearly
Multiple Choice Single AnswerQuestion Number of Kaizen projects suggested and implemented is checking
point for :-Correct Answer Continual Improvement
Your Answer Continual Improvement
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Quality maintenance & pillar focuses on following production
inputs :-Correct Answer Material , Men , Machine
Your Answer Material , Men , Machine
Multiple Choice Multiple AnswerQuestion Histograms are useful to :-
Correct Answer Measure the current pattern & extent of variation , Assesscurrent conformance to specification & scope of improvement ,Determine whether or not the process is in the state of control
Your Answer Measure the current pattern & extent of variation , Assesscurrent conformance to specification & scope of improvement ,Determine whether or not the process is in the state of control
Multiple Choice Single AnswerQuestion In problem solving the best alternative is that :-
Correct Answer Which best meets the criteria
Your Answer Which best meets the criteria
Multiple Choice Single AnswerQuestion "Cause & effect" diagram was developed by :-
Correct Answer DR.Kaoru Ishikawa
Your Answer DR.Kaoru Ishikawa
Multiple Choice Single AnswerQuestion Identifying key preventive operational functions and comparing
these operational functions within the firm's own division &branches comes under :-
Correct Answer Internal benchmarking
Your Answer Internal benchmarking
Select The BlankQuestion JIT advocates the philosophy at elimination of waste from
system which occurs due to ________.Correct Answer Over Production
Your Answer Over Production
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when
there is positive relationship upto certain level & negativethereafter or negative relationship upto certain level & positivethereafter.
Correct Answer Curvilinear
Your Answer Curvilinear
True/FalseQuestion Kanban signals are required when assembly work, subassembly
work and manufacturing at parts is carried out at differentlocations.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Customers complaints may be segregated by :-
Correct Answer Nature of compliant i.e. defective product , Delayed delivery ,Short/excess quantity
Your Answer Nature of compliant i.e. defective product , Delayed delivery ,Short/excess quantity
True/FalseQuestion In case of more than one quality characteristics, separate chart
is made for each quality characteristics.Correct Answer True
Your Answer True
True/FalseQuestion Safety, hygiene and environment control is one of the pillar of
TPM.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion 5-S technique is useful to:
Correct Answer To all places including homes
Your Answer To all places including homes
Match The Following
Question Correct Answer Your Answer
Reduce time of externalsetup
Improve work aidspositioning method
Improve work aidspositioning method
Convert internal setup intoexternal setup
Preparation of tools / diesas off line activity
Preparation of tools / diesas off line activity
Eliminate adjustment Pre setting of tool Pre setting of tool
Reduce clamping &declamping time
Use U-shaped washer Use U-shaped washer
Multiple Choice Single AnswerQuestion The facilitator should be normally :-
Correct Answer Senior officer /Shop incharge
Your Answer Senior officer /Shop incharge
Match The FollowingQuestion Correct Answer Your Answer
Parato diagram alwaysindicates
Magnitude of defects Philosophy of 20% of theactivity causes 80% of theeffect
Parato analysisunderlines & operates on
Philosophy of "vitalfew:trivial many"
Philosophy of "vitalfew:trivial many"
Parato analysis istechnique of identifyingvital causes by
Arranging data accordingto the descending order oftheir frequency ofoccurrence
Arranging data accordingto the descending order oftheir frequency ofoccurrence
Parato diagram is a Bargraph with height or valuedrawn by
Arranging data indescending order
Magnitude of defects
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Make work easy
True/FalseQuestion Pie chart is also called as angular diagram.
Correct Answer True
Your Answer True
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when
value of 'y' somewhat decreases as the value of 'x' increases.Correct Answer Weak negative
Your Answer Weak negative
Multiple Choice Single AnswerQuestion From scatter diagram the strength of relationship between two
variables or associated set of data can be inferred from theexamination of the shape of :-
Correct Answer Cloud
Your Answer Cloud
Multiple Choice Multiple AnswerQuestion Product benchmarking requires, comparison of product :-
Correct Answer Performance , Features , Cost
Your Answer Performance , Features , Cost
Multiple Choice Multiple AnswerQuestion Steps in construction of scatter diagram :-
Correct Answer Collect paired data (X,Y) from two variables who's relationship isto be studied , Find out max & min values for both X & Y andthese values to scale X & Y axis & plot the paired data ,Examine the shape of the cloud of points & discover type &strength of relationship
Your Answer Collect paired data (X,Y) from two variables who's relationship isto be studied , Find out max & min values for both X & Y andthese values to scale X & Y axis & plot the paired data ,Examine the shape of the cloud of points & discover type &strength of relationship
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-
Correct Answer Gap in performance
Your Answer Gap in performance
Select The BlankQuestion Each quality characteristic has permitted variation & is equal to
________.Correct Answer USL - LSL
Your Answer USL - LSL
Select The BlankQuestion Kaizen is ________ supported process.
Correct Answer Management
Your Answer Management
True/FalseQuestion The flow charts are prepared to enhance the employees
understanding of the process by indicating interrelationshipwithin the process.
Correct Answer True
Your Answer False
True/FalseQuestion Gap analysis for production & dispatches is discussed in
monthly meeting.Correct Answer False
Your Answer False
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when
value of 'y' decreases as the value of 'x' increases.Correct Answer Strong negative
Your Answer Strong negative
Select The BlankQuestion ________ is most difficult 'S' to implement & achieve.
Correct Answer Shitsuke
Your Answer Shitsuke
True/FalseQuestion Presentation of graphs in pictorial form of data collection are for
easy understanding.Correct Answer True
Your Answer True
Select The Blank
Question Graphs convey a situation more ________ than summary ofdata or figures.
Correct Answer Effectively & clearly
Your Answer Effectively & clearly
Multiple Choice Single AnswerQuestion Errors by armatures is :-
Correct Answer Lack of experience
Your Answer Lack of experience
Multiple Choice Multiple AnswerQuestion While preparing scatter diagram following precautions are to be
taken :-Correct Answer Data should be properly stratified & should be collected for full
range , Scale selected should be right to avoid wrongconclusions , Data should be free from bias or undueimportance
Your Answer Data should be properly stratified & should be collected for fullrange , Scale selected should be right to avoid wrongconclusions , Data should be free from bias or undueimportance
True/FalseQuestion Globalization of trade and industrial operations have forced
Indian companies to become more & more competitive andcustomer driven.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion If 'Annual saving in procurement expenses is managing point',
then checking points will be :-Correct Answer Price revision , Credit period , Transport expenses
Your Answer Price revision , Credit period , Transport expenses
Multiple Choice Single AnswerQuestion Number of kaizen in Group kaizen categories are :-
Correct Answer Two to three per year
Your Answer Two to three per year
True/False
Question Flow chart is pictorial representation of the steps in productioncontrol.
Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion It is essential to convey customer's expectations to :-
Correct Answer Top Management
Your Answer Supervisors & workmen
Multiple Choice Single AnswerQuestion Check sheet is easy to use because it is :-
Correct Answer Simplest tool
Your Answer Simplest tool
Select The BlankQuestion Identification of non-value added operations & their elimination
is the first step to eliminate muda of ________.Correct Answer Processing
Your Answer Processing
Select The BlankQuestion A 'Radar chart' is used to portray ________ strength or
weakness of the activity.Correct Answer Relative
Your Answer Relative
Multiple Choice Single AnswerQuestion Pareto's analysis underlines & operates philosophy of :-
Correct Answer Vital few = trivial many
Your Answer Vital few = trivial many
True/FalseQuestion In single card kanban system production greater than quantity
withdrawn is permitted.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Benefits of planned maintenance are :-
Correct Answer Improved reliability mean time between failures , Improvedmaintainability mean time to repair , Improvement in breakdown
Your Answer Improved reliability mean time between failures , Improvedmaintainability mean time to repair
Multiple Choice Multiple AnswerQuestion Gap analysis & problem identification is done during converting
internal setups into external setups in the areas like :-Correct Answer Equipment , Method , Human
Your Answer Equipment , Method , Human
Multiple Choice Single AnswerQuestion Some quantity in stock of item, is desirable if :-
Correct Answer Manufacturing lead time is more
Your Answer Manufacturing lead time is more
Multiple Choice Single AnswerQuestion Sorting of usable items should be
Correct Answer Planned storage based on frequency of use
Your Answer Within visual reach method
Multiple Choice Multiple AnswerQuestion Benefits of Quality maintenance are :-
Correct Answer Reduction in customer quality complaints , Reduction ininspection time
Your Answer Reduction in customer quality complaints , Reduction ininspection time
Sem – 3rd Techniques for Operations Efficiency 1
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Performance benchmarking does not involves comparison of
financial ratios at the aggregate level.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Setup time includes :-
Correct Answer Internal setup time & External setup time
Your Answer Internal setup time & External setup time
Multiple Choice Single AnswerQuestion Participants of the groups for quality circles should be decided
by :-Correct Answer Employees coming together by their own enthusiasm
Your Answer Employees coming together by their own enthusiasm
Multiple Choice Single AnswerQuestion Check sheet are also used as :-
Correct Answer Data gathering & interpretation tool
Your Answer Data gathering & interpretation tool
Multiple Choice Single AnswerQuestion SMED means :-
Correct Answer Single minute exchange of dies
Your Answer Single minute exchange of dies
Match The FollowingQuestion Correct Answer Your Answer
Productivity performancemeasurement
Turnover employee Cost of quality
Financial performancemeasurement
Sales of the months Sales of the months
Customer satisfactionmeasurement
Customer complaints perperiod
Customer complaints perperiod
Sem – 3rd Techniques for Operations Efficiency 2
Staff attitudemeasurement
Employee satisfactionindex
Employee satisfactionindex
Select The BlankQuestion ________ is an effect due to the muda of defect.
Correct Answer Wear & tear of parts while disassembling
Your Answer Poor production planning & control
Select The BlankQuestion If some defective parts are discovered by the subsequent
process they should be returned to the ________ to preventreoccurrence.
Correct Answer Preceding process
Your Answer Return to stores
Multiple Choice Multiple AnswerQuestion The results oriented efforts of the quality circle should also
include :-Correct Answer Efforts to avoid the problem permanently , Ultimate aim of the
customers satisfaction , Attacking the real root causes & allpossibilities
Your Answer Efforts to avoid the problem permanently , Publication oradvertisement of your contribution , Attacking the real rootcauses & all possibilities
Match The FollowingQuestion Correct Answer Your Answer
Parato diagram alwaysindicates
Magnitude of defects Philosophy of 20% of theactivity causes 80% of theeffect
Parato analysis underlines& operates on
Philosophy of "vitalfew:trivial many"
Philosophy of "vitalfew:trivial many"
Parato analysis istechnique of identifyingvital causes by
Arranging data accordingto the descending order oftheir frequency ofoccurrence
Arranging data accordingto the descending order oftheir frequency ofoccurrence
Parato diagram is a Bargraph with height or valuedrawn by
Arranging data indescending order
Magnitude of defects
Multiple Choice Multiple AnswerQuestion Few steps in construction in Radar chart are :-
Correct Answer Brainstorming to enlist characteristics which require to beevaluated & draw the circle & divide it into 'slices' equal tonumber of characteristics , The first slice begins at 12 noon.Then draw vertical line & calibrate it equal to the number of
Sem – 3rd Techniques for Operations Efficiency 3
levels required , Draw concentric circles from each gradiationusing 'o' point as centre
Your Answer Brainstorming to enlist characteristics which require to beevaluated & draw the circle & divide it into 'slices' equal tonumber of characteristics , The first slice begins at 12 noon.Then draw vertical line & calibrate it equal to the number oflevels required , Draw concentric circles from each gradiationusing 'o' point as centre
Select The BlankQuestion 5 S audit result is discussed in ________ meeting.
Correct Answer Monthly
Your Answer Monthly
True/FalseQuestion Fishbone analysis is used both in analysis & planning.
Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion One Green Belt may head a team of :-
Correct Answer 20 employees
Your Answer 20 employees
Multiple Choice Multiple AnswerQuestion Role of champions are :-
Correct Answer Approve six sigma projects , Remove road block in the path ofsix sigma implementation , Monitor progress of six sigmaprojects
Your Answer Monitor progress of six sigma projects , Approve six sigmaprojects , Remove road block in the path of six sigmaimplementation
Multiple Choice Multiple AnswerQuestion To draw control charts, sample must be representative of
homogeneous segment of production for which :-Correct Answer The items of the sample should be from the same machine
setting , The items should be of the same batch , Items shouldbe made from the same raw material batch
Your Answer The items of the sample should be from the same machinesetting , The items should be of the same batch , Items shouldbe made from the same raw material batch
Multiple Choice Single Answer
Sem – 3rd Techniques for Operations Efficiency 4
Question Failure mode and effect analysis (FMEA) establish
Correct Answer Process failure and minimize frequency
Your Answer Process failure and minimize frequency
Multiple Choice Multiple AnswerQuestion What are the steps in deciding the benchmarking partner?
Correct Answer Decide level of benchmarking , List down a few prospectivecandidates of partnership , Collect information of short listedpartners
Your Answer Decide level of benchmarking , List down a few prospectivecandidates of partnership , Collect information of short listedpartners
Multiple Choice Single AnswerQuestion One Master Black Belt may head a team of :-
Correct Answer 15-20 Black Belts
Your Answer 15-20 Black Belts
Multiple Choice Single AnswerQuestion Competitive benchmarking involves identifying key competitive
product, services or processes & comparing with those of :-Correct Answer Main competitor
Your Answer Main competitor
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-
Correct Answer Gap in performance
Your Answer Gap in performance
Select The BlankQuestion Number of defects in an individual component, like gear, shaft,
wheel etc can be monitored through ________ type of controlchart.
Correct Answer c-chart
Your Answer c-chart
True/FalseQuestion Non-availability of files /document in time is a problem to be
addressed by office TPM.Correct Answer True
Sem – 3rd Techniques for Operations Efficiency 5
Your Answer True
Multiple Choice Single AnswerQuestion Check sheet is easy to use because it is :-
Correct Answer Simplest tool
Your Answer Simplest tool
Multiple Choice Single AnswerQuestion Benchmarking helps to identify the gap between the current
performance of the organization and the :-Correct Answer Performance of the best organization
Your Answer Performance of the best organization
True/FalseQuestion Flow chart is pictorial representation of the steps in production
control.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Breakdown problem may be stratified by :-
Correct Answer Sections , Machines , Type of breakdown (e.g mech. Orelectrical)
Your Answer Sections , Machines , Type of breakdown (e.g mech. Orelectrical)
Select The BlankQuestion A control chart to exhibit counted data on number of defect is
called ________.Correct Answer c-chart
Your Answer c-chart
Select The BlankQuestion Procedure for implementation of TPM consists of ________
numbers of steps.Correct Answer 12
Your Answer 8
Select The BlankQuestion Capability index Cp = ________
Correct Answer Specification width/process width
Sem – 3rd Techniques for Operations Efficiency 6
Your Answer Specification width/process width
Multiple Choice Single AnswerQuestion Pareto's analysis underlines & operates philosophy of :-
Correct Answer Vital few = trivial many
Your Answer Vital few = trivial many
True/FalseQuestion Kanban signals are required when assembly work, subassembly
work and manufacturing at parts is carried out at differentlocations.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion To reduce clamping & declamping time, following actions are
desirable :-Correct Answer Standardize clamping bolts / screws , Cut off unnecessary
threads , Use quick clamping deviceYour Answer Standardize clamping bolts / screws , Cut off unnecessary
threads , Use quick clamping device
Select The BlankQuestion Benchmarking allows exchange of ________ between the
benchmarking partners.Correct Answer Information
Your Answer Information
Multiple Choice Multiple AnswerQuestion TQM can never flourish if the staff are:-
Correct Answer Worried about losing jobs , Afraid of being reprimanded if thereare mistakes , Scared of their bosses
Your Answer Worried about losing jobs , Afraid of being reprimanded if thereare mistakes , Scared of their bosses
True/FalseQuestion In bar graph each bar is of same height.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion During SMED implementation, primary study consists of :-
Sem – 3rd Techniques for Operations Efficiency 7
Correct Answer Equipment analysis , Setup change analysis , Preparation items(storage place , method) analysis
Your Answer Equipment analysis , Setup change analysis , Preparation items(storage place , method) analysis
True/FalseQuestion Daily work management can also be extended to non
manufacturing areas like procurement, QA, HRD etc.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Types of Poka-Yoke are :-
Correct Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Save time
True/FalseQuestion Along with problem solving tools experience and judgment is
also used.Correct Answer True
Your Answer False
Select The BlankQuestion JIT advocates the philosophy at elimination of waste from
system which occurs due to ________.Correct Answer Over Production
Your Answer Over Production
True/FalseQuestion Without measuring initial performance, target can't be set.
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion An erratic patterns falling above & below the control limits
indicates :-
Sem – 3rd Techniques for Operations Efficiency 8
Correct Answer Defect in materials , Frequent adjustment of machines , Poorlytrained operators
Your Answer Defect in materials , Frequent adjustment of machines , Poorlytrained operators
True/FalseQuestion Sample size for the construction of p-chart are larger than X bar-
R chart.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Histogram is an important diagnostic tool. Analysis of the
histogram gives :-Correct Answer It shows cause which affects the process , An idea of what is
happening to the process , Whether the process is capable ofmeeting process or not i.e. around correct average & withinspecific limits
Your Answer An idea of what is happening to the process , Whether theprocess is capable of meeting process or not i.e. around correctaverage & within specific limits , A bird's eye view of the variation
Multiple Choice Single AnswerQuestion Productivity improves by :-
Correct Answer Voluntary participants of everyone
Your Answer Voluntary participants of everyone
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Training related to Quality includes:-Correct Answer Quality measures , Quality failureYour Answer Negotiation skill , Goal of business , Quality measures , Quality failure
Multiple Choice Single AnswerQuestion If defects found at own process, the cost to the company is :-Correct Answer Very littleYour Answer Very high
Multiple Choice Multiple AnswerQuestion Histogram is an important diagnostic tool. Analysis of the histogram gives :-Correct Answer It shows cause which affects the process , An idea of what is
happening to the process , Whether the process is capable of meeting process or not i.e.around correct average & within specific limits
Your Answer It shows cause which affects the process , An idea of what is happeningto the process , Whether the process is capable of meeting process or not i.e. aroundcorrect average & within specific limits , A bird's eye view of the variation
True/FalseQuestion In bar graph each bar is of same height.Correct Answer FalseYour Answer False
Select The BlankQuestion Basic objective of control chart is to ________ the variation due to chance &
assignable cause.Correct Answer Separate outYour Answer Separate out
Multiple Choice Multiple AnswerQuestion Benefits of stratification are :-Correct Answer It helps to separate data into groups so that you can draw connect &
meaningful inference , It helps to diagnose & localize problem , It helps to identify theinfluencing factors
Your Answer It helps to separate data into groups so that you can draw connect &meaningful inference , It helps to diagnose & localize problem , It helps to identify theinfluencing factors , Finding out different reasons
Multiple Choice Single AnswerQuestion For 'Timely clearance of GRR's', checking point will be :-Correct Answer Number of GRRs pending beyond 1 dayYour Answer Number of GRRs pending beyond 1 day
Multiple Choice Single AnswerQuestion Organizing the place is not enough , what is required is :Correct Answer Planning storage based on Frequency of useYour Answer Planning storage based on Frequency of use
Select The BlankQuestion JIT helps to ________ the waste in the purchasing process.Correct Answer EliminatesYour Answer Eliminates
Multiple Choice Single AnswerQuestion In cellular manufacturing system, the cells are designed so that the material
flow within the cell and between the cells are :-Correct Answer MinimizedYour Answer Minimized
True/FalseQuestion Kanban signals are required when assembly work, subassembly work and
manufacturing at parts is carried out at different locations.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Causes of Muda of transport are :-Correct Answer Faulty layout , Over productionYour Answer Faulty layout , Over production , Proper material handling equipment ,
Low rejection / rework
Multiple Choice Multiple AnswerQuestion Types of meetings held in DWM are :-Correct Answer Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA
meetingYour Answer Monthly PDCA meeting , Daily PDCA meeting , Weekly PDCA
meeting
Multiple Choice Multiple AnswerQuestion Customers complaints may be segregated by :-Correct Answer Nature of compliant i.e. defective product , Delayed delivery ,
Short/excess quantityYour Answer Nature of compliant i.e. defective product , Delayed delivery ,
Short/excess quantity , Payment problem
Multiple Choice Multiple AnswerQuestion Cleaning your own area/equipments gives benefits of :-Correct Answer You know your self how to avoid dust , When you touch while
cleaning you may find a fault , Saving of further failure due to dust
Your Answer You know your self how to avoid dust , When you touch while cleaningyou may find a fault , Saving of further failure due to dust , Utilization of spare time
Multiple Choice Multiple AnswerQuestion Role of champions are :-Correct Answer Approve six sigma projects , Remove road block in the path of six
sigma implementation , Monitor progress of six sigma projectsYour Answer Approve six sigma projects , Remove road block in the path of six sigma
implementation , Monitor progress of six sigma projects , Deliver presentation to teamson six sigma projects
Select The BlankQuestion Benchmarking shows how an organization is ________ in comparison to its
competitors.Correct Answer PerformingYour Answer Performing
True/FalseQuestion Inspection is poor method of assuring 100% quality.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Benefits of TQM are :-Correct Answer Greater customer satisfaction , Lower manufacturing costYour Answer Greater customer satisfaction , Lower manufacturing cost
Select The BlankQuestion ________ ensures that communication is simple & effective.Correct Answer Visual ManagementYour Answer Visual Management
True/FalseQuestion Daily work management develops problem finding & solving attitude.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Key principles of TQM :-Correct Answer Continuous improvement , People involvement , Cost of qualityYour Answer Continuous improvement , People involvement , Cost of quality ,
Competitor focus
Select The BlankQuestion A histogram is a graphical display of distribution of measurements & reveals
the amounts of ________ within the process.
Correct Answer VariationYour Answer Variation
Select The BlankQuestion To assess effectiveness of training ________ is essential.Correct Answer EvaluationYour Answer Evaluation
Select The BlankQuestion ________ are implemented for defect detection & prevention.Correct Answer Poka-YokesYour Answer TPM
True/FalseQuestion To achieve quality, it has to be designed into the product.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Setting & maintaining optimal process condition to get quality product is the
aim of :-Correct Answer Quality maintenanceYour Answer Quality maintenance
Match The FollowingQuestion Correct Answer Your Answer
Productivity performance measurement Turnover employee Cost of quality
Financial performance measurement Sales of the months Sales of the months
Customer satisfaction measurement Customer complaints per period Customercomplaints per period
Staff attitude measurement Employee satisfaction index Employee satisfaction index
Multiple Choice Single AnswerQuestion Recording of the entire setup operators focusing on hand, eye and body
movements of the person doing the setting is done through :-Correct Answer Video recordingYour Answer Video recording
Match The FollowingQuestion Correct Answer Your Answer
In scatter diagram, the strength of relationship can be determined By "correlationcoefficient" By "correlation coefficient"
The scatter diagram provides the technique to establish The possible relationship betweena pair of variables The possible dependency between a pair of variables
The scatter diagram displays The pair of data as a cloud of points The possiblerelationship between a pair of variables
The scatter is also known as Correlation diagram Correlation diagram
Multiple Choice Single AnswerQuestion What is to be done before selecting benchmarking partner?Correct Answer level of benchmarking is to be decidedYour Answer level of benchmarking is to be decided
True/FalseQuestion Flow chart helps to stop an old process.Correct Answer FalseYour Answer False
Select The BlankQuestion Create as many ________ system as possible for better Seiketsu.Correct Answer Visual controlYour Answer Labeling
Multiple Choice Single AnswerQuestion Allowing worker's to stop machine / assembly line if they believe that
product quality is below standard' is an example of :-Correct Answer EmpowermentYour Answer Empowerment
Multiple Choice Single AnswerQuestion Kanban Signals are required when :-Correct Answer Set up time on the feeding operation is higher then the receiving
operation.Your Answer Set up time on the feeding operation is higher then the receiving
operation.
Multiple Choice Single AnswerQuestion Kanban system isCorrect Answer 1. Pull SystemYour Answer 1. Pull System
Multiple Choice Single Answer
Question Quality problem solving tool is used to :-Correct Answer Improve qualityYour Answer Improve quality
Multiple Choice Single AnswerQuestion To avoid short receipt of items to customers, provide the dispatch clerk with :Correct Answer The check list for verificationYour Answer The check list for verification
True/FalseQuestion Control chart is also called as 'Mean -Range or X-chart'.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Flow chart is required :-Correct Answer When trying to improve the process , At the time of review of the
process , To understand steps in a process by pictorial presentationYour Answer When trying to improve the process , At the time of review of the
process , To understand steps in a process by pictorial presentation , For defects findingof the products
Select The BlankQuestion ________ is the critical element of TQM.Correct Answer Focus on customerYour Answer Focus on customer
Multiple Choice Multiple AnswerQuestion Management skill includes :-Correct Answer Leadership , Motivation , Performance appraisalsYour Answer Leadership , Motivation , Performance appraisals , Quality measurement
Multiple Choice Single AnswerQuestion 5-S technique is useful to:Correct Answer To all places including homesYour Answer To all places including homes
True/FalseQuestion Safety, hygiene and environment control is one of the pillar of TPM.Correct Answer TrueYour Answer True
Select The BlankQuestion Inspection activity for semi finished & finished component should be
________ to reduce muda of transport .Correct Answer Decentralized
Your Answer Decentralized
True/FalseQuestion Flow chart is pictorial representation of the steps in production control.Correct Answer FalseYour Answer True
Select The BlankQuestion Good ________ is the asset to acquire the success of quality circle.Correct Answer TeamworkYour Answer Teamwork
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Training related to Quality includes:-Correct Answer Quality measures , Quality failureYour Answer Negotiation skill , Goal of business , Quality measures , Quality failure
Multiple Choice Single AnswerQuestion If defects found at own process, the cost to the company is :-Correct Answer Very littleYour Answer Very high
Multiple Choice Multiple AnswerQuestion Histogram is an important diagnostic tool. Analysis of the histogram gives :-Correct Answer It shows cause which affects the process , An idea of what is
happening to the process , Whether the process is capable of meeting process or not i.e.around correct average & within specific limits
Your Answer It shows cause which affects the process , An idea of what is happeningto the process , Whether the process is capable of meeting process or not i.e. aroundcorrect average & within specific limits , A bird's eye view of the variation
True/FalseQuestion In bar graph each bar is of same height.Correct Answer FalseYour Answer False
Select The BlankQuestion Basic objective of control chart is to ________ the variation due to chance &
assignable cause.Correct Answer Separate outYour Answer Separate out
Multiple Choice Multiple AnswerQuestion Benefits of stratification are :-Correct Answer It helps to separate data into groups so that you can draw connect &
meaningful inference , It helps to diagnose & localize problem , It helps to identify theinfluencing factors
Your Answer It helps to separate data into groups so that you can draw connect &meaningful inference , It helps to diagnose & localize problem , It helps to identify theinfluencing factors , Finding out different reasons
Multiple Choice Single AnswerQuestion For 'Timely clearance of GRR's', checking point will be :-Correct Answer Number of GRRs pending beyond 1 dayYour Answer Number of GRRs pending beyond 1 day
Multiple Choice Single AnswerQuestion Organizing the place is not enough , what is required is :Correct Answer Planning storage based on Frequency of useYour Answer Planning storage based on Frequency of use
Select The BlankQuestion JIT helps to ________ the waste in the purchasing process.Correct Answer EliminatesYour Answer Eliminates
Multiple Choice Single AnswerQuestion In cellular manufacturing system, the cells are designed so that the material
flow within the cell and between the cells are :-Correct Answer MinimizedYour Answer Minimized
True/FalseQuestion Kanban signals are required when assembly work, subassembly work and
manufacturing at parts is carried out at different locations.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Causes of Muda of transport are :-Correct Answer Faulty layout , Over productionYour Answer Faulty layout , Over production , Proper material handling equipment ,
Low rejection / rework
Multiple Choice Multiple AnswerQuestion Types of meetings held in DWM are :-Correct Answer Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA
meetingYour Answer Monthly PDCA meeting , Daily PDCA meeting , Weekly PDCA
meeting
Multiple Choice Multiple AnswerQuestion Customers complaints may be segregated by :-Correct Answer Nature of compliant i.e. defective product , Delayed delivery ,
Short/excess quantityYour Answer Nature of compliant i.e. defective product , Delayed delivery ,
Short/excess quantity , Payment problem
Multiple Choice Multiple AnswerQuestion Cleaning your own area/equipments gives benefits of :-Correct Answer You know your self how to avoid dust , When you touch while
cleaning you may find a fault , Saving of further failure due to dust
Your Answer You know your self how to avoid dust , When you touch while cleaningyou may find a fault , Saving of further failure due to dust , Utilization of spare time
Multiple Choice Multiple AnswerQuestion Role of champions are :-Correct Answer Approve six sigma projects , Remove road block in the path of six
sigma implementation , Monitor progress of six sigma projectsYour Answer Approve six sigma projects , Remove road block in the path of six sigma
implementation , Monitor progress of six sigma projects , Deliver presentation to teamson six sigma projects
Select The BlankQuestion Benchmarking shows how an organization is ________ in comparison to its
competitors.Correct Answer PerformingYour Answer Performing
True/FalseQuestion Inspection is poor method of assuring 100% quality.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Benefits of TQM are :-Correct Answer Greater customer satisfaction , Lower manufacturing costYour Answer Greater customer satisfaction , Lower manufacturing cost
Select The BlankQuestion ________ ensures that communication is simple & effective.Correct Answer Visual ManagementYour Answer Visual Management
True/FalseQuestion Daily work management develops problem finding & solving attitude.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Key principles of TQM :-Correct Answer Continuous improvement , People involvement , Cost of qualityYour Answer Continuous improvement , People involvement , Cost of quality ,
Competitor focus
Select The BlankQuestion A histogram is a graphical display of distribution of measurements & reveals
the amounts of ________ within the process.
Correct Answer VariationYour Answer Variation
Select The BlankQuestion To assess effectiveness of training ________ is essential.Correct Answer EvaluationYour Answer Evaluation
Select The BlankQuestion ________ are implemented for defect detection & prevention.Correct Answer Poka-YokesYour Answer TPM
True/FalseQuestion To achieve quality, it has to be designed into the product.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Setting & maintaining optimal process condition to get quality product is the
aim of :-Correct Answer Quality maintenanceYour Answer Quality maintenance
Match The FollowingQuestion Correct Answer Your Answer
Productivity performance measurement Turnover employee Cost of quality
Financial performance measurement Sales of the months Sales of the months
Customer satisfaction measurement Customer complaints per period Customercomplaints per period
Staff attitude measurement Employee satisfaction index Employee satisfaction index
Multiple Choice Single AnswerQuestion Recording of the entire setup operators focusing on hand, eye and body
movements of the person doing the setting is done through :-Correct Answer Video recordingYour Answer Video recording
Match The FollowingQuestion Correct Answer Your Answer
In scatter diagram, the strength of relationship can be determined By "correlationcoefficient" By "correlation coefficient"
The scatter diagram provides the technique to establish The possible relationship betweena pair of variables The possible dependency between a pair of variables
The scatter diagram displays The pair of data as a cloud of points The possiblerelationship between a pair of variables
The scatter is also known as Correlation diagram Correlation diagram
Multiple Choice Single AnswerQuestion What is to be done before selecting benchmarking partner?Correct Answer level of benchmarking is to be decidedYour Answer level of benchmarking is to be decided
True/FalseQuestion Flow chart helps to stop an old process.Correct Answer FalseYour Answer False
Select The BlankQuestion Create as many ________ system as possible for better Seiketsu.Correct Answer Visual controlYour Answer Labeling
Multiple Choice Single AnswerQuestion Allowing worker's to stop machine / assembly line if they believe that
product quality is below standard' is an example of :-Correct Answer EmpowermentYour Answer Empowerment
Multiple Choice Single AnswerQuestion Kanban Signals are required when :-Correct Answer Set up time on the feeding operation is higher then the receiving
operation.Your Answer Set up time on the feeding operation is higher then the receiving
operation.
Multiple Choice Single AnswerQuestion Kanban system isCorrect Answer 1. Pull SystemYour Answer 1. Pull System
Multiple Choice Single Answer
Question Quality problem solving tool is used to :-Correct Answer Improve qualityYour Answer Improve quality
Multiple Choice Single AnswerQuestion To avoid short receipt of items to customers, provide the dispatch clerk with :Correct Answer The check list for verificationYour Answer The check list for verification
True/FalseQuestion Control chart is also called as 'Mean -Range or X-chart'.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Flow chart is required :-Correct Answer When trying to improve the process , At the time of review of the
process , To understand steps in a process by pictorial presentationYour Answer When trying to improve the process , At the time of review of the
process , To understand steps in a process by pictorial presentation , For defects findingof the products
Select The BlankQuestion ________ is the critical element of TQM.Correct Answer Focus on customerYour Answer Focus on customer
Multiple Choice Multiple AnswerQuestion Management skill includes :-Correct Answer Leadership , Motivation , Performance appraisalsYour Answer Leadership , Motivation , Performance appraisals , Quality measurement
Multiple Choice Single AnswerQuestion 5-S technique is useful to:Correct Answer To all places including homesYour Answer To all places including homes
True/FalseQuestion Safety, hygiene and environment control is one of the pillar of TPM.Correct Answer TrueYour Answer True
Select The BlankQuestion Inspection activity for semi finished & finished component should be
________ to reduce muda of transport .Correct Answer Decentralized
Your Answer Decentralized
True/FalseQuestion Flow chart is pictorial representation of the steps in production control.Correct Answer FalseYour Answer True
Select The BlankQuestion Good ________ is the asset to acquire the success of quality circle.Correct Answer TeamworkYour Answer Teamwork
1. TPM 1. Waste elimination
2. JIT 2. Visual management
3. Kanban 3. Best way of doing job
4. Work standards 4. Reducing breakdown of machines
5. Pull system6. Statistical process control
1. Parato analysis underlines &operates on
1. Arranging data according to thedescending order of their frequency ofoccurrence
2. Parato analysis is technique ofidentifying vital causes by
2. Philosophy of 20% of the activity causes80% of the effect
3. Parato diagram is a Bar graphwith height or value drawn by
3. Magnitude of defects
4. Parato diagram alwaysindicates
4. Arranging data in ascending order
5. Arranging data in descending order
6. Philosophy of "vital few:trivial many"
27. Total area under the normal curve is
a)
b)
c)
d)
Unity
Zero
Infinity
Six
U shape arrangement of layout provides the operator degree of mobility.
48. Quality problems may be segregated by & regrouped by :-
a)
b)
c)
Machines
Workers
Materials
d)Suggestion
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion TQM can never flourish if the staff are:-
Correct Answer Scared of their bosses , Worried about losing jobs , Afraid ofbeing reprimanded if there are mistakes
Your Answer Scared of their bosses , Worried about losing jobs , Afraid ofbeing reprimanded if there are mistakes
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Improve quality
Multiple Choice Single AnswerQuestion The concept of quality circle was mooted by :-
Correct Answer Prof. Kaoishikawa
Your Answer Prof. Kaoishikawa
Match The FollowingQuestion Correct Answer Your Answer
SMED Setup time reduction Setup time reduction
5 'S Cleanliness Total productivemaintenance
Muda elimination Waste elimination Waste elimination
Poka-Yoke Error proofing Error proofing
Multiple Choice Single AnswerQuestion Allowing worker's to stop machine / assembly line if they believe
that product quality is below standard' is an example of :-Correct Answer Empowerment
Your Answer Involvement
Select The BlankQuestion Kaizen is ________ supported process.
Correct Answer Management
Your Answer Workmen
Select The BlankQuestion Ratio of ________ to the number of pieces inspected is called
fraction defectives.Correct Answer Number of item rejected
Your Answer Number of item rejected
Multiple Choice Single AnswerQuestion Histogram always indicates :-
Correct Answer Only height
Your Answer Percentage defect
Multiple Choice Single AnswerQuestion List of customers, to carry out parato analysis to identify
customers who gives business includes :-Correct Answer Present & past customers
Your Answer Present & past customers
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-
Correct Answer Gap in performance
Your Answer Gap in performance
Multiple Choice Multiple AnswerQuestion Steps to six sigma process consists of :-
Correct Answer Identify the work you do , Identify your customers , Map theprocess
Your Answer Identify the work you do , Identify your customers , Map theprocess
Multiple Choice Single AnswerQuestion From scatter diagram the strength of relationship between two
variables or associated set of data can be inferred from theexamination of the shape of :-
Correct Answer Cloud
Your Answer Cloud
True/FalseQuestion Non-availability of files /document in time is a problem to be
addressed by office TPM.Correct Answer True
Your Answer True
Select The BlankQuestion ________ used to detect drop in air pressure.
Correct Answer Buzzers / alarms
Your Answer Locators
Multiple Choice Single AnswerQuestion TQM is a way to improve quality of product and service :-
Correct Answer Continuously
Your Answer Continuously
Multiple Choice Multiple AnswerQuestion The aim of education & training under TPM is :-
Correct Answer To develop abilities to respond quickly to abnormalities , Todevelop abilities to discover analyze malfunction
Your Answer To develop abilities to respond quickly to abnormalities , Todevelop abilities to discover analyze malfunction , To havemultiskilled employees in all departments
Match The FollowingQuestion Correct Answer Your Answer
In scatter diagram, thestrength of relationshipcan be determined
By "correlation coefficient" By "correlation coefficient"
The scatter diagramprovides the technique toestablish
The possible relationshipbetween a pair ofvariables
The possible relationshipbetween a pair of variables
The scatter diagramdisplays
The pair of data as acloud of points
The pair of data as a cloudof points
The scatter is also knownas
Correlation diagram Correlation diagram
True/FalseQuestion Flow chart is pictorial representation of the steps in production
control.Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Pareto's analysis underlines & operates philosophy of :-
Correct Answer Vital few = trivial many
Your Answer Vital few = trivial many
Multiple Choice Single AnswerQuestion Pareto diagram always indicate magnitude of :-
Correct Answer Defect
Your Answer Influence of defect
True/FalseQuestion By cutting the cost of quality, profitability decreases.
Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Check sheet is easy to use because it is :-
Correct Answer Simplest tool
Your Answer Simplest tool
True/FalseQuestion The flow charts are prepared to enhance the employees
understanding of the process by indicating interrelationshipwithin the process.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Abnormal variations can occur if :-
Correct Answer There are assignable causes
Your Answer There are assignable causes
Multiple Choice Multiple AnswerQuestion Types of Poka-Yoke are :-
Correct Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer Prevention type Poka-Yoke , Detection type Poka-Yoke ,Standards type Poka-Yoke
True/FalseQuestion Control limits of control charts should be revised from time to
time as additional data is accumulated.Correct Answer True
Your Answer True
Select The BlankQuestion Kaizen is an excellent method to involve ________ to unearth &
eliminate hidden waste.Correct Answer Employees
Your Answer Employers
Multiple Choice Multiple AnswerQuestion To reduce Muda of transport, techniques used are :-
Correct Answer Cellular layout , Method study , 5 'S
Your Answer Cellular layout , Method study , 5 'S
Select The BlankQuestion Cp for six sigma process is ________
Correct Answer 2
Your Answer 2
Select The BlankQuestion ________ participants in monthly meeting(MRM)
Correct Answer GM, operation heads, corporate functional heads
Your Answer Department heads & supervisors
True/False
Question Processing cost of a product is mainly decided by conversionprocess.
Correct Answer True
Your Answer True
Select The BlankQuestion Production in last shift & production plan for next shift is
discussed during ________.Correct Answer Shift beginning & shift end/change meeting
Your Answer Shift beginning & shift end/change meeting
Multiple Choice Multiple AnswerQuestion Material Supply on DSL basis helps :-
Correct Answer To eliminate handling , To reduce transporting , To reduceinspection
Your Answer To eliminate handling , To reduce transporting , To reduceinspection
True/FalseQuestion Inadequate maintenance of machine leads to muda of defects
Correct Answer True
Your Answer True
True/FalseQuestion Most of the external setups are treated as internal setup.
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Benefits from SMED are :-
Correct Answer Reduce work in process , Better average daily production ,Increase capacity
Your Answer Reduce work in process , Better average daily production ,Increase capacity
Multiple Choice Multiple AnswerQuestion Typical examples of process benchmark are :-
Correct Answer Procurement procedures , Budgeting , Recruitment
Your Answer Procurement procedures , Budgeting , Recruitment
True/FalseQuestion Low level of delegation is an example of muda in office.
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion Histograms are useful to :-
Correct Answer Measure the current pattern & extent of variation , Assesscurrent conformance to specification & scope of improvement ,Determine whether or not the process is in the state of control
Your Answer Measure the current pattern & extent of variation , Assesscurrent conformance to specification & scope of improvement ,Determine whether or not the process is in the state of control
Multiple Choice Multiple AnswerQuestion While preparing scatter diagram following precautions are to be
taken :-Correct Answer Data should be properly stratified & should be collected for full
range , Scale selected should be right to avoid wrongconclusions , Data should be free from bias or undue importance
Your Answer Data should be properly stratified & should be collected for fullrange , Scale selected should be right to avoid wrongconclusions , Data should be free from bias or undue importance
Multiple Choice Single AnswerQuestion Through continuous improvement in the process & procedures,
kobetsu-kaizen is continuously improve utilization of :-Correct Answer Worker, equipment & material
Your Answer Workers & materials
True/FalseQuestion Every department should make their own rules of
standardization.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Quality circle should consist adequate experienced members
between :-Correct Answer 8 to 10
Your Answer 8 to 10
Multiple Choice Single AnswerQuestion Number of kaizen in Group kaizen categories are :-
Correct Answer Two to three per year
Your Answer As many as management decides
Select The BlankQuestion Flow chart helps to provide clarity of the ________ without
visiting actual spot.Correct Answer Process
Your Answer Process
Multiple Choice Single AnswerQuestion Gap in performance = Ideal situation minus :-
Correct Answer Current situation
Your Answer Current situation
Select The BlankQuestion Seminar talks and video show are organized to introduce TPM
concept to ________Correct Answer General employees
Your Answer General employees
TechniquesForOperationsEfficiency_8LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion Seiketsu is to ensure that ________ of first three 'S' i.e. Seiri,
Seiton & Seiso.Correct Answer ImplementationYour Answer Implementation
True/FalseQuestion Benefits of DWN is faster response to customer needs.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Recording of the entire setup operators focusing on hand, eye and
body movements of the person doing the setting is done through :-Correct Answer Video recordingYour Answer Video recording
Multiple Choice Multiple AnswerQuestion During SMED implementation, primary study consists of :-Correct Answer Equipment analysis , Setup change analysis , Preparation
items (storage place , method) analysisYour Answer Equipment analysis , Setup change analysis , Preparation
items (storage place , method) analysis
Select The BlankQuestion Ideally the histogram will have a symmetrical ( i.e. also called as
bell) shape tapering away on both sides from ________ value.Correct Answer AverageYour Answer Average
Select The BlankQuestion ________ is the critical element of TQM.Correct Answer Focus on customerYour Answer Focus on customer
Multiple Choice Multiple AnswerQuestion Role of champions are :-Correct Answer Approve six sigma projects , Remove road block in the path
of six sigma implementation , Monitor progress of six sigma projectsYour Answer Approve six sigma projects , Remove road block in the path of
Page 1
TechniquesForOperationsEfficiency_8six sigma implementation , Monitor progress of six sigma projects
Multiple Choice Multiple AnswerQuestion For 'Control on PPM and rework level;, checking points' will be :-Correct Answer PPM level , Initiate corrective actions on rejection/rework ,
Initiate preventive action on rejection / reworkYour Answer PPM level , Initiate corrective actions on rejection/rework ,
Initiate preventive action on rejection / rework
Multiple Choice Single AnswerQuestion POP is :-Correct Answer Process Oriented ManagementYour Answer Process Oriented Management
True/FalseQuestion TQM improves the quality by improving processes.Correct Answer TrueYour Answer True
True/FalseQuestion Review is important step in problem solving.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion After finding out the solution & working on it, the equally
important job is :-Correct Answer Prepare for the presentation of your work , Explain the
progress by presentation to steering committee , Convince committee forfinancial help for running the projectYour Answer Prepare for the presentation of your work , Explain the
progress by presentation to steering committee , Convince committee forfinancial help for running the project
Match The FollowingQuestion Correct Answer Your Answer
In scatter diagram, the strength of relationship can be determined By"correlation coefficient" By "correlation coefficient"
The scatter diagram provides the technique to establish The possiblerelationship between a pair of variables The possible relationship between a
Page 2
TechniquesForOperationsEfficiency_8pair of variables
The scatter diagram displays The pair of data as a cloud of points The pair ofdata as a cloud of points
The scatter is also known as Correlation diagram Correlation diagram
True/FalseQuestion In single card kanban system production greater than quantity
withdrawn is permitted.Correct Answer FalseYour Answer False
Select The BlankQuestion ________ is the root cause of the problems.Correct Answer VariationYour Answer Variation
Multiple Choice Single AnswerQuestion While assessing the current status during problem solving Go to
Gamba and look at gembustu is :-Correct Answer EssentialYour Answer Essential depends upon situation
Multiple Choice Multiple AnswerQuestion In absence of P-kanban the workman may :-Correct Answer Carry out machine clean up , Work on improvement
project. , Receive trainingYour Answer Carry out machine clean up , Work on improvement project.
Multiple Choice Single AnswerQuestion The concept of quality circle was mooted by :-Correct Answer Prof. KaoishikawaYour Answer Prof. Kaoishikawa
Select The BlankQuestion ________ helps to generate creative ideas .Correct Answer BrainstormingYour Answer Brainstorming
Multiple Choice Single AnswerPage 3
TechniquesForOperationsEfficiency_8Question For small batch quality production, number of setups :-Correct Answer IncreasesYour Answer Increases
True/FalseQuestion Process capability refers to ability of the process to meet the
design specification for a product or a service.Correct Answer TrueYour Answer True
True/FalseQuestion Kaizen looks at process as a part of quality & quantity as a part of
processCorrect Answer FalseYour Answer True
Select The BlankQuestion ________ participants in monthly meeting(MRM)Correct Answer GM, operation heads, corporate functional headsYour Answer Department heads & supervisors
Multiple Choice Multiple AnswerQuestion Examples of Muda of defects are :-Correct Answer Customer complaints , Poor material yield , Rejection and
reworkYour Answer Customer complaints , Poor material yield , Rejection and
rework
Multiple Choice Single AnswerQuestion Vilfredo Pareto had discovered a universal law as :-Correct Answer "around 20% of the activity causes 80% of the effect"Your Answer "around 20% of the activity causes 80% of the effect"
Multiple Choice Multiple AnswerQuestion Benefits from the standardized containers areCorrect Answer Minimization of transit damages , Ease in verification of
quantity of parts , Automatic signal to supplier to replenish stockYour Answer Minimization of transit damages , Ease in verification of
quantity of parts , Automatic signal to supplier to replenish stock
True/FalseQuestion TQM organizations also harness the goodwill and interest of the
Page 4
TechniquesForOperationsEfficiency_8family members of the employees.Correct Answer TrueYour Answer True
Select The BlankQuestion Technique involved in listing of setup task, establishing
technological relationship between tasks, drawing arrow diagram is called as________.Correct Answer Network diagramYour Answer Flow chart
Multiple Choice Multiple AnswerQuestion Kanban System may be :-Correct Answer Single card kanban system , Double card kanban systemYour Answer Single card kanban system , Double card kanban system
Multiple Choice Single AnswerQuestion Bulk production, to reduce setup time is an example of :-Correct Answer Over productionYour Answer Machine utilization
Multiple Choice Single AnswerQuestion SWOT analysis is an important step in :-Correct Answer Deciding what to benchmarkYour Answer Deciding what to benchmark
Multiple Choice Multiple AnswerQuestion Remedial actions for error of misunderstanding is :-Correct Answer Training , Checking in advance , Standardizing work
proceduresYour Answer Training , Checking in advance , Standardizing work
procedures
Select The BlankQuestion ________ is a must in meeting of quality circles.Correct Answer BrainstormingYour Answer Brainstorming
Multiple Choice Single AnswerQuestion The Steering committee as apex body should be :-Correct Answer Only one for all the groups in organizationYour Answer Only one for all the groups in organization
Page 5
TechniquesForOperationsEfficiency_8
Multiple Choice Single AnswerQuestion Muda of transport can be eliminated significantly by :-Correct Answer Self inspection by suppliers & operatorsYour Answer Self inspection by suppliers & operators
Select The BlankQuestion A histogram is a graphical display of distribution of
measurements & reveals the amounts of ________ within the process.Correct Answer VariationYour Answer Variation
Multiple Choice Single AnswerQuestion Statistical process control is application of statistical technique to
control :-Correct Answer ProcessYour Answer Process
Multiple Choice Single AnswerQuestion In India quality circle was first launched by :-Correct Answer Hyderabad unit of BHELYour Answer Hyderabad unit of BHEL
True/FalseQuestion A control chart is a chart with UCL & LCL placed at 6 Sigma
distance on either side of the process average.Correct Answer FalseYour Answer False
True/FalseQuestion Control limits of control charts should be revised from time to time
as additional data is accumulated.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Examples of Muda of motion are :-Correct Answer Lifting objects , Walking to reach object , Searching for
objectYour Answer Lifting objects , Walking to reach object , Searching for object
True/FalsePage 6
TechniquesForOperationsEfficiency_8Question Kanban signals are required when assembly work, subassembly
work and manufacturing at parts is carried out at different locations.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Six sigma organization consists of :-Correct Answer Champions , Black Belts , Green BeltsYour Answer Champions , Black Belts , Green Belts
Match The FollowingQuestion Correct Answer Your Answer
LCLnp n p - 3 ( sq.root( n p( 1- p ))) n p - 3 ( sq.root( n p( 1- p )))
UCLp p + 3 ( sq.root( p ( 1 - p ) / n )) p + 3 ( sq.root( p ( 1 - p ) / n ))
LCLp p - 3 ( sq.root( p ( 1- p ) / n)) p - 3 ( sq.root( p ( 1- p ) / n))
UCLnp n p + 3 ( sq.root( n p ( 1- p ))) n p + 3 ( sq.root( n p ( 1- p )))
Multiple Choice Multiple AnswerQuestion Product benchmarking requires, comparison of product :-Correct Answer Performance , Features , CostYour Answer Performance , Features , Cost
Select The BlankQuestion JIT helps to ________ the waste in the purchasing process.Correct Answer EliminatesYour Answer Eliminates
Select The BlankQuestion Poka Yoke is ________.Correct Answer Simple techniqueYour Answer Simple technique
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single AnswerQuestion 5-S technique is useful to:
Page 7
TechniquesForOperationsEfficiency_8Correct Answer To all places including homesYour Answer To all places including homes
Multiple Choice Single AnswerQuestion Empowerment means making best use of the firm's most valuable
resource, namely:-Correct Answer HumanYour Answer Human
Select The BlankQuestion Number of defects in an individual component, like gear, shaft,
wheel etc can be monitored through ________ type of control chart.Correct Answer c-chartYour Answer c-chart
Multiple Choice Single AnswerQuestion TQM is a way to improve quality of product and service :-Correct Answer ContinuouslyYour Answer Continuously
Multiple Choice Multiple AnswerQuestion Best practices for standardization in implementing Seiketsu are :-Correct Answer Create as many visual control systems as possible , Use
colour code system for easy control , Fix one colour (e.g. Red) for dangerzones/out of controlsYour Answer Create as many visual control systems as possible , Use colour
code system for easy control , Display warning notices
True/FalseQuestion JIT is not possible for each and every item held as inventoryCorrect Answer TrueYour Answer False
True/FalseQuestion Customer wise outstanding is discussed in daily work
management meeting by operations head.Correct Answer FalseYour Answer False
Select The BlankQuestion Poka-Yoke devices under category 'locating pins' to eliminate
cause of ________Page 8
TechniquesForOperationsEfficiency_8Correct Answer Incorrect positioningYour Answer Incorrect positioning
Multiple Choice Single AnswerQuestion Customer's return is an indicators of the MUDA of :-Correct Answer DefectYour Answer Defect
Match The FollowingQuestion Correct Answer Your Answer
Evolve standard operating procedure & implement. Seiketsu Seiketsu
Hidden faults come out while implementing. Cleaning yourself yourequipments Seiso
Fix the place of items, tools as per frequency of use Seiri Seiton
Responsibility same from top to bottom Seiso shitsuke
Multiple Choice Single AnswerQuestion Accountability means :-Correct Answer Responsibility of Business ResultsYour Answer Responsibility Execution or Action
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-Correct Answer Improve qualityYour Answer Improve quality
True/FalseQuestion Performance benchmarking does not involves comparison of
financial ratios at the aggregate level.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion Competitive benchmarking is usually conducted :-Correct Answer Through third party researchYour Answer Through third party research
Page 9
TechniquesForOperationsEfficiency_8Multiple Choice Single AnswerQuestion Small groups forming a circle should consist of :-Correct Answer Employees of different department related to the problemYour Answer Employees of different department related to the problem
True/FalseQuestion In cellular manufacturing system cell may consist of a single
machine or more than one machine arranged in line.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Histograms are useful to :-Correct Answer Measure the current pattern & extent of variation , Assess
current conformance to specification & scope of improvement , Determinewhether or not the process is in the state of controlYour Answer Measure the current pattern & extent of variation , Assess
current conformance to specification & scope of improvement , Determinewhether or not the process is in the state of control
True/FalseQuestion Non-availability of files /document in time is a problem to be
addressed by office TPM.Correct Answer TrueYour Answer True
Select The BlankQuestion A control chart to exhibit counted data on number of defect is
called ________.Correct Answer c-chartYour Answer c-chart
True/FalseQuestion Fishbone analysis is used both in analysis & planning.Correct Answer TrueYour Answer True
Select The BlankQuestion Inspection activity for semi finished & finished component should
be ________ to reduce muda of transport .Correct Answer DecentralizedYour Answer Decentralized
Page 10
TechniquesForOperationsEfficiency_8
Multiple Choice Multiple AnswerQuestion Scatter diagram is used :-Correct Answer To discover relationship between two associated sets of
data , To display the relationship between two variables , To confirmanticipated relationship between two variables / associated sets of dataYour Answer To discover relationship between two associated sets of data ,
To display the relationship between two variables , To confirm anticipatedrelationship between two variables / associated sets of data
Select The BlankQuestion U shape arrangement of layout provides the operator ________
degree of mobility.Correct Answer 360Your Answer 360
True/FalseQuestion Chance causes can not be identified.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion During the steps of Deming cycle of PDCA what is important?Correct Answer Plan unitedly for the target within reach , Make plan active
by "doing it" i.e. everyone working , After some time check the results forsuccessYour Answer Plan unitedly for the target within reach , Make plan active by
"doing it" i.e. everyone working , After some time check the results for success
Multiple Choice Multiple AnswerQuestion Benefits of Quality maintenance are :-Correct Answer Reduction in customer quality complaints , Reduction in
inspection timeYour Answer Reduction in customer quality complaints , Reduction in
inspection time
Multiple Choice Multiple AnswerQuestion Causes of Muda of transport are :-Correct Answer Faulty layout , Over productionYour Answer Faulty layout , Over production
Page 11
TechniquesForOperationsEfficiency_8Multiple Choice Multiple AnswerQuestion Types of Poka-Yoke are :-Correct Answer Prevention type Poka-Yoke , Detection type Poka-YokeYour Answer Prevention type Poka-Yoke , Detection type Poka-Yoke ,
Standards type Poka-Yoke
Multiple Choice Single AnswerQuestion Pie chart is also called as :-Correct Answer Angular diagramYour Answer Angular diagram
Multiple Choice Multiple AnswerQuestion The aim of education & training under TPM is :-Correct Answer To develop abilities to respond quickly to abnormalities , To
develop abilities to discover analyze malfunctionYour Answer To develop abilities to respond quickly to abnormalities , To
develop abilities to discover analyze malfunction , To have multiskilledemployees in all departments
Multiple Choice Multiple AnswerQuestion Material Supply on DSL basis helps :-Correct Answer To eliminate handling , To reduce transporting , To reduce
inspectionYour Answer To eliminate handling , To reduce transporting , To reduce
inspection
Select The BlankQuestion Poka Yoke designed to help operators to know immediately
________ of the defeat called detection type Poka-Yoke.Correct Answer On occurrenceYour Answer On occurrence
Multiple Choice Multiple AnswerQuestion Typical examples of process benchmark are :-Correct Answer Procurement procedures , Budgeting , RecruitmentYour Answer Procurement procedures , Budgeting , Recruitment
Multiple Choice Single AnswerQuestion The area enclosed under normal distribution curve between mean
+2standard deviation is :-Correct Answer 0.9545Your Answer 1
Page 12
TechniquesForOperationsEfficiency_8
True/FalseQuestion Daily work management can also be extended to non
manufacturing areas like procurement, QA, HRD etc.Correct Answer TrueYour Answer True
Match The FollowingQuestion Correct Answer Your Answer
4 th level in six sigma organization Green Belts Green Belts
1 st level in six sigma organization Champions Champions
2 nd level in six sigma organization Master Black Belts Master Black Belts
3 rd level in six sigma organization Black Belts Black Belts
Select The BlankQuestion ________ PDCA cycle is the systematic approach towards
meeting the target.Correct Answer KaoishikawaYour Answer Deming
Select The BlankQuestion ________is serve as a stepping stone to TQMCorrect Answer ISO-9000 quality standardYour Answer TPM
Select The BlankQuestion Histogram is a diagrammatic presentation of the ________
distribution of characteristics such as strength, diameter, etc.Correct Answer FrequencyYour Answer Frequency
Multiple Choice Single AnswerQuestion Through continuous improvement in the process & procedures,
kobetsu-kaizen is continuously improve utilization of :-Correct Answer Worker, equipment & materialYour Answer Worker, equipment & material
Page 13
TechniquesForOperationsEfficiency_8Multiple Choice Single AnswerQuestion Frequencies, values, tabulated in the frequency table, can be
represented pictorially in the form of bar graph & this graph of frequency iscalled as :-Correct Answer HistogramYour Answer Histogram
Multiple Choice Multiple AnswerQuestion Muda of waiting is due to :-Correct Answer Interrupted flow of work , Delay in movement of raw
material from storesYour Answer Interrupted flow of work , Delay in movement of raw
material from stores
Select The BlankQuestion CFT ( cross functional team ) consisting of ________Correct Answer Operators, supervisors from different departmentsYour Answer Operators, supervisors from different departments
Select The BlankQuestion In PDCA cycle for benchmarking 'Identification of performance
gap' is done in ________.Correct Answer CheckingYour Answer Checking
Multiple Choice Multiple AnswerQuestion Management skill includes :-Correct Answer Leadership , Motivation , Performance appraisalsYour Answer Leadership , Motivation
Multiple Choice Single AnswerQuestion Zero loss concept means :-Correct Answer Zero accident, zero defect, zero breakdownYour Answer Zero accident, zero defect, zero breakdown
True/FalseQuestion Flow charts are drawn to identify deviations by observing actual
& comparing with running process.Correct Answer FalseYour Answer False
LIST OF ATTEMPTED QUESTIONS AND ANSWERSPage 14
TechniquesForOperationsEfficiency_8
Multiple Choice Multiple AnswerQuestion TQM can never flourish if the staff are:-Correct Answer Worried about losing jobs , Afraid of being reprimanded if
there are mistakes , Scared of their bossesYour Answer Worried about losing jobs , Afraid of being reprimanded if
there are mistakes , Scared of their bosses
Multiple Choice Single AnswerQuestion Toyota, Honda & Nissan are world class benchmarking
candidates in :-Correct Answer Employee selectionYour Answer Employee selection
Multiple Choice Single AnswerQuestion The leader of the circle should be selected by :-Correct Answer Circle membersYour Answer Steering committee
Multiple Choice Multiple AnswerQuestion Missing parts is due to :-Correct Answer Willful errors , Inadvertent error , Judgment errorYour Answer Willful errors , Inadvertent error
Multiple Choice Single AnswerQuestion Rushing to complete a job is considered symptom of :-Correct Answer Poor planningYour Answer Poor planning
Multiple Choice Multiple AnswerQuestion The purpose of Shitsuke is especially for :-Correct Answer Maintaining the 4-S consistently , Develop discipline
attitude in everyone , Any day throughout the year sustain the disciplineYour Answer Maintaining the 4-S consistently , Develop discipline attitude
in everyone , Any day throughout the year sustain the discipline
Multiple Choice Multiple AnswerQuestion Few typical shapes of histograms are :-Correct Answer Symmetrical (or bell shaped) , Asymmetrical skewed
positive , Double peakedYour Answer Symmetrical (or bell shaped) , Asymmetrical skewed positive ,
Double peakedPage 15
TechniquesForOperationsEfficiency_8
Multiple Choice Single AnswerQuestion In autonomus modules or cells, rate of production increases :-Correct Answer Number of operators increasesYour Answer Number of operators increases
True/FalseQuestion Inspection is poor method of assuring 100% quality.Correct Answer TrueYour Answer True
Select The BlankQuestion ________ used to detect drop in air pressure.Correct Answer Buzzers / alarmsYour Answer Buzzers / alarms
Multiple Choice Multiple AnswerQuestion Breakdown problem may be stratified by :-Correct Answer Sections , Machines , Type of breakdown (e.g mech. Or
electrical)Your Answer Sections , Machines , Type of breakdown (e.g mech. Or
electrical)
Multiple Choice Multiple AnswerQuestion Advantages of JIT :-Correct Answer Reduce inventory , Lower per unit cost , Reduce incoming
inspectionYour Answer Reduce inventory , Lower per unit cost , Reduce incoming
inspection
Multiple Choice Single AnswerQuestion Assignable causes :-Correct Answer Can be eliminatedYour Answer Can be eliminated
Multiple Choice Multiple AnswerQuestion If 'Inventory investment' is managing point, then checking point
will be :-Correct Answer Stores inventory , Vendor stock , WIPYour Answer WIP , Stores inventory , Vendor stock
True/FalsePage 16
TechniquesForOperationsEfficiency_8Question Globalization of trade and industrial operations have forced
Indian companies to become more & more competitive and customer driven.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Flow charts are used to train new employees by :-Correct Answer Providing a documented description of the tasks involvedYour Answer Providing a documented description of the tasks involved
True/FalseQuestion To achieve quality, it has to be designed into the product.Correct Answer TrueYour Answer True
Match The FollowingQuestion Correct Answer Your Answer
Review your efforts & success achieved Check Check
Act about the causes found out Do Act
Collect the initial data for the problem Plan Plan
Actions further after reviewing the progress Act Repeat
Select The BlankQuestion Create as many ________ system as possible for better Seiketsu.Correct Answer Visual controlYour Answer Visual control
Multiple Choice Single AnswerQuestion A flow chart is a pictorial representation of the steps in a :-Correct Answer ProcessYour Answer Process
Multiple Choice Multiple AnswerQuestion Few steps in construction of Pie chart are :-Correct Answer Express value of each category as percentage of total of all
categories & calculate the degree of angle form by each category by equationdegree = Value of groups/Total value * 360 , Draw the circle & segment the
Page 17
TechniquesForOperationsEfficiency_8circle into angles calculated in step one , Colour different segments & enter thepercentage of each category into pie chartYour Answer Express value of each category as percentage of total of all
categories & calculate the degree of angle form by each category by equationdegree = Value of groups/Total value * 360 , Draw the circle & segment thecircle into angles calculated in step one , Colour different segments & enter thepercentage of each category into pie chart
Multiple Choice Single AnswerQuestion List of customers, to carry out parato analysis to identify
customers who gives business includes :-Correct Answer Present & past customersYour Answer Present & past customers
Multiple Choice Single AnswerQuestion Benefits of Seiton meansCorrect Answer Easy irretrievability of materialYour Answer Cost saving in unwanted items
Multiple Choice Multiple AnswerQuestion As benchmark in Japan seiso activities means :-Correct Answer Everyone, clerk to officer does cleaning his area , No
sweeper or cleaner employees , Every family does cleaning of pavement oftheir residenceYour Answer Everyone, clerk to officer does cleaning his area , Every
family does cleaning of pavement of their residence , Separate department forcleaning supervision
True/FalseQuestion Six sigma process requires 100 % inspectionCorrect Answer FalseYour Answer False
True/FalseQuestion Graph is a tabulated representation of the data which is easily
understandable at a glance.Correct Answer FalseYour Answer True
Multiple Choice Multiple AnswerQuestion What are the steps in deciding the benchmarking partner?Correct Answer Decide level of benchmarking , List down a few prospective
Page 18
TechniquesForOperationsEfficiency_8candidates of partnership , Collect information of short listed partnersYour Answer Decide level of benchmarking , List down a few prospective
candidates of partnership , Collect information of short listed partners
Select The BlankQuestion ________feel that quality circle cause erosion of their control
over workmen.Correct Answer SupervisorsYour Answer Supervisors
True/FalseQuestion Errors are inevitable but can be eliminated.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion According to Seiketsu Standardization means :-Correct Answer To develop easy to follow standards , Evolve standard
operating procedure , Better visual managementYour Answer To develop easy to follow standards , Evolve standard
operating procedure , Better visual management
Select The BlankQuestion Ford, general electric & Motorola are word class benchmarking
for ________Correct Answer TrainingYour Answer Training
Select The BlankQuestion Cpk for six sigma process is ________Correct Answer 1.5Your Answer 1.5
Multiple Choice Single AnswerQuestion 5 'S rating after audit is check point for :-Correct Answer Work place improvementYour Answer Work place improvement
True/FalseQuestion Process capability index Cp is a measure of capability of the
process to meet the specification limits.Correct Answer True
Page 19
TechniquesForOperationsEfficiency_8Your Answer True
Select The BlankQuestion ________ should be used to exercise control on the process.Correct Answer Control chartYour Answer Control chart
Select The BlankQuestion Flow chart helps to dissect a process for better understanding &
________ of process.Correct Answer AnalysisYour Answer Analysis
Select The BlankQuestion ________ is benefit of TPM.Correct Answer Low production costYour Answer Low production cost
Multiple Choice Multiple AnswerQuestion Example of mechanizations are :-Correct Answer Use of fork-lifts / cranes for die - movements , Using
moving bolster , Using roller die cartsYour Answer Use of fork-lifts / cranes for die - movements , Using moving
bolster , Using roller die carts
Multiple Choice Single AnswerQuestion To maintain smoothness in production :-Correct Answer Elimination of buffer stock is recommendedYour Answer Maintenance of buffer stock is recommended.
Match The FollowingQuestion Correct Answer Your Answer
Monthly meeting Discussion for capital expenditure & customer outstanding.Discussion for capital expenditure & customer outstanding.
Shift begining & shift end / change meeting Discussion on production in lastshift & plan for next shift Discussion on production in last shift & plan for nextshift
Daily work management meeting Discussion on gap analysis for productionmaintenance, dispatch Discussion on gap analysis for production
Page 20
TechniquesForOperationsEfficiency_8maintenance, dispatch
Weekly meeting Discussion for customer complaints Discussion for customercomplaints
True/FalseQuestion TQM improves manufacturing as well as clerical activities.Correct Answer TrueYour Answer True
Select The BlankQuestion To find out root cause ________usedCorrect Answer Why-why TechniqueYour Answer Why-why Technique
Multiple Choice Single AnswerQuestion Percentage of gross revenues spent on correcting mistakes,
checking & rechecking and things which do not add values, by manufacturingcompany is:-Correct Answer 20-30%Your Answer 0.6
True/FalseQuestion U-Line layout is better than straight lime layout.Correct Answer TrueYour Answer True
Select The BlankQuestion In traditional purchasing ________ inventory is required.Correct Answer Plenty ofYour Answer Plenty of
Select The BlankQuestion The process capability of the process =________(where sigma is
the standard deviation of the population / lot.Correct Answer 6 sigmaYour Answer 2 sigma
True/FalseQuestion A radar chart is combination of a circle & line graphCorrect Answer True
Page 21
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion Inspection activity for semi finished & finished component
should be ________ to reduce muda of transport .Correct Answer Decentralized
Your Answer Carry out in QA department
True/FalseQuestion Concept of six sigma is not applicable for non
manufacturing sectors.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Few main steps to construct a Histogram after deciding
classes, class width & class boundaries are :-Correct Answer Compute mid-point of the class (cell) & fill up the tally
sheet determining the cell or class into which each valuefalls , Count the tally marks i.e. frequency in each class &construct a histogram by plotting a bar graph for eachclass , Analyze & conclude whether process is is meetingthe requirement or not & take connective actions ifneeded.
Your Answer Compute mid-point of the class (cell) & fill up the tallysheet determining the cell or class into which each valuefalls , Count the tally marks i.e. frequency in each class &construct a histogram by plotting a bar graph for eachclass , Analyze & conclude whether process is is meetingthe requirement or not & take connective actions ifneeded.
Multiple Choice Single AnswerQuestion A drive for people involved should start with the :-
Correct Answer Study of staff attitudes
Your Answer Staff empowerment
Multiple Choice Single AnswerQuestion Poka-yoke for employee not performing work as per
established method is :-
Correct Answer Implement work standard
Your Answer Implement work standard
Multiple Choice Multiple AnswerQuestion Implementation of TPM in Indian industries is difficult due
to :-Correct Answer Lack of knowledge of the TPM , Resistance to change ,
Fear to loss of jobYour Answer Lack of knowledge of the TPM , Resistance to change ,
Fear to loss of job
Multiple Choice Single AnswerQuestion Identifying key preventive operational functions and
comparing these operational functions within the firm'sown division & branches comes under :-
Correct Answer Internal benchmarking
Your Answer Functional benchmarking
True/FalseQuestion "Display of safety posture & slogans" is an essential step
of TPM.Correct Answer False
Your Answer True
Multiple Choice Single AnswerQuestion Errors by armatures is :-
Correct Answer Lack of experience
Your Answer Lack of experience
Multiple Choice Multiple AnswerQuestion The purpose of Shitsuke is especially for :-
Correct Answer Maintaining the 4-S consistently , Develop disciplineattitude in everyone , Any day throughout the yearsustain the discipline
Your Answer Maintaining the 4-S consistently , Develop disciplineattitude in everyone , Any day throughout the yearsustain the discipline
True/FalseQuestion Change of job titles can help to raise employee's morale.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Few steps to construct a flow chart are :-
Correct Answer Identify steps in the process & construct a draft of theflowchart , Review the draft & connect the changes asper review & name it & put the data & use it as 'Record' ,Decide on the objective of flowchart & define boundariesof the process
Your Answer Decide on the objective of flowchart & define boundariesof the process , Identify steps in the process & constructa draft of the flowchart , Review the draft & connect thechanges as per review & name it & put the data & use itas 'Record'
Select The BlankQuestion In scatter diagram "________" relationship is said to exist
when value of 'y' decreases as the value of 'x' increases.Correct Answer Strong negative
Your Answer Strong negative
Multiple Choice Single AnswerQuestion Whatever you are doing you can do better by :-
Correct Answer Kaizen
Your Answer Kaizen
Multiple Choice Single AnswerQuestion Frequencies, values, tabulated in the frequency table,
can be represented pictorially in the form of bar graph &this graph of frequency is called as :-
Correct Answer Histogram
Your Answer Histogram
True/FalseQuestion Exercise to identify MURA, MUDA & MURI is not helpful
to identify problems.Correct Answer False
Your Answer False
Select The BlankQuestion Kaizen projects are managed by ________
Correct Answer Cross functional team
Your Answer Management
Multiple Choice Single AnswerQuestion Number of Kaizen projects suggested and implemented
is checking point for :-Correct Answer Continual Improvement
Your Answer Continual Improvement
Match The FollowingQuestion Correct Answer Your Answer
Flow chart are drawn toeffect improvement inthe process by
Identifying non-valueadded activities
Providing a documenteddescription of the tasksinvolved
Flow chart are drawn todocument a process by
charting the tasksperformed & thesequence in whichtasks are performed
Steps in a process bypictorial representation
Flow chart are preparedto enhance theemployeesunderstanding of theprocess by
Indicatinginterrelationship withinprocess
charting the tasksperformed & thesequence in which tasksare performed
Flow charts are drawnto identify deviations by
Observing actual &comparing withdocumented process
Indicatinginterrelationship withinprocess
Multiple Choice Single AnswerQuestion Quality is the responsibility of :-
Correct Answer Everyone in the organization
Your Answer Everyone in the organization
Select The BlankQuestion ________is serve as a stepping stone to TQM
Correct Answer ISO-9000 quality standard
Your Answer ISO-9000 quality standard
True/FalseQuestion Generally time interval should be proportional to the
average frequency of out of control conditions.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Advantages of JIT :-
Correct Answer Reduce inventory , Lower per unit cost , Reduceincoming inspection
Your Answer Reduce inventory , Lower per unit cost
Multiple Choice Multiple AnswerQuestion Flow chart is prepared when :-
Correct Answer Defining the problem , Trying to know the activitiesinvolved in the process , Identifying the root causes
Your Answer Defining the problem , Trying to know the activitiesinvolved in the process , Identifying the root causes
Multiple Choice Single AnswerQuestion Difference between the specification limits is called as :-
Correct Answer Design tolerance
Your Answer Design tolerance
Match The FollowingQuestion Correct Answer Your Answer
Productivityperformancemeasurement
Turnover employee Turnover employee
Financial performancemeasurement
Sales of the months Sales of the months
Customer satisfactionmeasurement
Customer complaintsper period
Customer complaintsper period
Staff attitudemeasurement
Employee satisfactionindex
Employee satisfactionindex
True/False
Question Shitsuke is most difficult out of all 5-S because it meansto sustain all the first 4-S throughout the year.
Correct Answer True
Your Answer True
Select The BlankQuestion Graphs convey a situation more ________ than summary
of data or figures.Correct Answer Effectively & clearly
Your Answer Effectively & clearly
True/FalseQuestion Key element of JIT is continuous improvement.
Correct Answer True
Your Answer False
Select The BlankQuestion Histogram is a diagrammatic presentation of the
________ distribution of characteristics such as strength,diameter, etc.
Correct Answer Frequency
Your Answer Frequency
Multiple Choice Single AnswerQuestion Control chart indicates :-
Correct Answer Trend of process
Your Answer Control on process
Select The BlankQuestion Shitsuke means ________ all the previous 4-S
throughout the month/year.Correct Answer Sustaining
Your Answer Sustaining
Multiple Choice Single AnswerQuestion Competitive benchmarking is usually conducted :-
Correct Answer Through third party research
Your Answer Through third party research
Multiple Choice Single AnswerQuestion Ishikawa diagram is also known as :-
Correct Answer Cause & effect diagram
Your Answer Cause & effect diagram
Select The BlankQuestion JIT helps to ________ the waste in the purchasing
process.Correct Answer Eliminates
Your Answer Eliminates
Select The BlankQuestion To assess effectiveness of training ________ is
essential.Correct Answer Evaluation
Your Answer Evaluation
Multiple Choice Multiple AnswerQuestion Types of meetings held in DWM are :-
Correct Answer Daily PDCA meeting , Weekly PDCA meeting , MonthlyPDCA meeting
Your Answer Daily PDCA meeting , Weekly PDCA meeting , MonthlyPDCA meeting
Select The BlankQuestion A 'Radar chart' is a combination of circle & ________
Graph.Correct Answer Line
Your Answer Line
True/FalseQuestion Kaizen looks at process as a part of quality & quantity as
a part of processCorrect Answer False
Your Answer True
True/FalseQuestion TQM improves manufacturing as well as clerical
activities.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion "Cause & effect" diagram was developed by :-
Correct Answer DR.Kaoru Ishikawa
Your Answer DR.Kaoru Ishikawa
Multiple Choice Single AnswerQuestion Japanese concept of good house keeping is for:
Correct Answer Good environment for quality products
Your Answer To reduce waste
Select The BlankQuestion The process capability of the process =________(where
sigma is the standard deviation of the population / lot.Correct Answer 6 sigma
Your Answer 6 sigma
Multiple Choice Multiple AnswerQuestion 3M' is world class benchmarking ' candidates in the field
of :-Correct Answer Product development , Technology transfer ,
Environmental ManagementYour Answer Product development , Environmental Management ,
Billing & collection
Multiple Choice Multiple AnswerQuestion Poka-Yoke devices which can help to avoid the defects
are :-Correct Answer Guide pins , Limit switches , Checklist
Your Answer Guide pins , Limit switches , Checklist
True/False
Question Gap analysis for production & dispatches is discussed inmonthly meeting.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Actions to be taken to help staff to develop their careers
are :-Correct Answer Job rotation exercise , Preference to be given to
employees during job vacancies , Encourage employeesto improve their qualification
Your Answer Job rotation exercise , Preference to be given toemployees during job vacancies , Encourage employeesto improve their qualification
1. SMED 1. To eliminate MUDA oftransport
2. VMI ( Vendor ManagementInventory) system
2. To eliminate MUDA ofprocessing
3. Flow / string diagram 3. To eliminate MUDA ofdefect
4. Value analysis / valueengineering
4. To eliminate MUDA of stock
5. To eliminate MUDA of overproduction6. To eliminate MUDA of office
1. Control chart is agraphical method ofchecking
1. How much variability in the process is dueto random causes & how much is due toassignable causes
2. Control chart can beused to determine
2. As process monitoring tool
3. Control chart is a chartwith UCL & LCL placed
3. For quality monitoring
4. Control chart can beused
4. At 6 Sigma distance on either side of theprocess average
5. At 3 Sigma distance on either side of theprocess average
6. Stability of the process
1. UCLp 1. n p + 3 ( sq.root( n p ( 1- p )))
2. LCLp 2. p + 3 ( sq.root( n p ( 1- p )))
3. UCLnp 3. p - 3 ( sq.root( n p( 1- p )))
4. LCLnp 4. p + 3 ( sq.root( p ( 1 - p ) / n ))
5. p - 3 ( sq.root( p ( 1- p ) / n))6. n p - 3 ( sq.root( n p( 1- p )))
1. Histogram is a graphical display ofdistribution of measurements and
1. Tapering away on the bothsides from average value
2. Histogram is a diagrammaticpresentation of
2. The frequency distribution ofdefects in the process
3. The shape of histogram can 3. The frequency distribution ofa characteristics
4. Ideally the histogram will have a bellshape
4. Provide a clue about thequality of the lot5. Reveals the amount ofvariation within the process
6. Provides the clue about theprocess information
1. Shift begining & shift end /change meeting
1. Discussion for customer complaints
2. Daily work managementmeeting
2. Discussion on performance of sistercompany.
3. Weekly meeting 3. Discussion for capital expenditure &customer outstanding.
4. Monthly meeting 4. Discussion on production in last shift &plan for next shift5. Discussion on Competitors progress6. Discussion on gap analysis forproduction maintenance, dispatch
1. World class benchmarking company inmarketing
1. Ford
2. World class benchmarking company in quality 2. Motorola
3. World class benchmarking company in training 3. General Electric
4. World class benchmarking company in assemblyautomation
4. British airways
5. Microsoft
6. AmericanExpress
1. Early management 1. To achieve zero defect by ensuringdefect free equipment
2. Quality management 2. To achieve zero breakdown.
3. Safety, hygiene andenvironment
3. To improve product features
4. Planned maintenance 4. To achieve zero accident &zerocontamination5. To ensure easy to manufacture productdevelopment6. To manage breakdown
15. The area enclosed under normal distribution curve between mean +3standarddeviation is :-
a)
b)
c)
d)
0.9973
0.9545
0.6826
1
37. If 'Annual saving in procurement expenses is managing point', then checkingpoints will be :-
a)
b)
c)
Price revision
Credit period
Transport expenses
d)Productivity improvement
After finding out the solution & working on it, theequally important job is:-Prepare for the presentation of your workExplain the progress by presentation to steeringcommitteeConvince committee for your next projectConvince committee for financial help for runningthe project
TechniquesForOperationsEfficiency_9
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Advantages of JIT :-Correct Answer Reduce incoming inspection , Reduce inventory , Lower
per unit costYour Answer Reduce incoming inspection , Reduce inventory , Lower
per unit cost
Multiple Choice Multiple AnswerQuestion Benefits from the standardized containers areCorrect Answer Minimization of transit damages , Ease in verification of
quantity of parts , Automatic signal to supplier to replenish stockYour Answer Minimization of transit damages , Ease in verification of
quantity of parts , Automatic signal to supplier to replenish stock
Multiple Choice Multiple AnswerQuestion Benefits from SMED are :-Correct Answer Reduce work in process , Better average daily
production , Increase capacityYour Answer Reduce work in process , Increase capacity
Multiple Choice Single AnswerQuestion Competitive benchmarking involves identifying key
competitive product, services or processes & comparing with those of :-Correct Answer Main competitorYour Answer Main competitor
Multiple Choice Multiple AnswerQuestion Benefits of stratification are :-Correct Answer It helps to separate data into groups so that you can
draw connect & meaningful inference , It helps to diagnose & localize problem, It helps to identify the influencing factorsYour Answer It helps to separate data into groups so that you can
draw connect & meaningful inference , It helps to diagnose & localize problem, Finding out different reasons
Multiple Choice Multiple AnswerQuestion Quality maintenance & pillar focuses on following
production inputs :-Correct Answer Men , Machine , Material
Page 1
TechniquesForOperationsEfficiency_9Your Answer Men , Machine , Management
Multiple Choice Single AnswerQuestion The success indicators in quality, cost, delivery &
product development are :-Correct Answer Managing pointsYour Answer Accountability
Multiple Choice Multiple AnswerQuestion Steps in setup time reduction are :-Correct Answer Team formation , Training , Recoding of activities on
multiple activity chartsYour Answer Team formation , Recoding of activities on multiple
activity charts , Convert external setups in to internal setups
Multiple Choice Multiple AnswerQuestion POM essentially consists of :-Correct Answer Time management , Team participation and
performance , Moral boostingYour Answer Time management , Team participation and
performance , Cost Management
Multiple Choice Single AnswerQuestion Activity under quality management is :-Correct Answer Use team approach to track down root causes of the
problemYour Answer Maintenance of equipment condition by eliminating
lubricant leakage.
True/FalseQuestion Every department should make their own rules of
standardization.Correct Answer FalseYour Answer True
Multiple Choice Multiple AnswerQuestion Histogram is an important diagnostic tool. Analysis of
the histogram gives :-Correct Answer It shows cause which affects the process , An idea of
what is happening to the process , Whether the process is capable of meetingprocess or not i.e. around correct average & within specific limitsYour Answer It shows cause which affects the process , An idea of
Page 2
TechniquesForOperationsEfficiency_9what is happening to the process , Whether the process is capable of meetingprocess or not i.e. around correct average & within specific limits
Match The FollowingQuestion Correct Answer Your Answer
Productivity performance measurement Turnover employee Sales of themonths
Financial performance measurement Sales of the months Cash savingper department
Customer satisfaction measurement Customer complaints per periodCustomer complaints per period
Staff attitude measurement Employee satisfaction index Employeesatisfaction index
Multiple Choice Single AnswerQuestion TPM helps to reduce down time due to:-Correct Answer Breakdown of machineYour Answer Breakdown of machine
Multiple Choice Single AnswerQuestion Kaizen emphasizes :-Correct Answer Implementation of ideasYour Answer Collection of ideas
Select The BlankQuestion Create as many ________ system as possible for better
Seiketsu.Correct Answer Visual controlYour Answer Visual control
True/FalseQuestion Inadequate maintenance of machine leads to muda of
defectsCorrect Answer TrueYour Answer False
Select The BlankPage 3
TechniquesForOperationsEfficiency_9Question The shape of histogram can provide a clue about the
________ of the lot.Correct Answer QualityYour Answer Distribution
Multiple Choice Single AnswerQuestion Customer's return is an indicators of the MUDA of :-Correct Answer DefectYour Answer Defect
Multiple Choice Single AnswerQuestion In bar graph the interval (gap) between the bars is :-Correct Answer EqualYour Answer Symmetrical
True/FalseQuestion Inspection is poor method of assuring 100% quality.Correct Answer TrueYour Answer False
True/FalseQuestion A radar chart is combination of a circle & line graphCorrect Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion A workshop is to be treated as :-Correct Answer Place where one's creativity can be appliedYour Answer Place where one's creativity can be applied
True/FalseQuestion Customer wise outstanding is discussed in daily work
management meeting by operations head.Correct Answer FalseYour Answer True
True/FalseQuestion Number of operation can change according to
production requirement in U-Line arrangement.Correct Answer FalseYour Answer True
Page 4
TechniquesForOperationsEfficiency_9True/FalseQuestion Automation can correct the basic faults of a improper
setup process.Correct Answer FalseYour Answer True
Select The BlankQuestion Cp for six sigma process is ________Correct Answer 2Your Answer 1.66
Select The BlankQuestion Range ( R ) is obtained as the difference between the
highest and ________ measurement of a sample.Correct Answer LowestYour Answer Second highest
Select The BlankQuestion ________is an important step toward successful JIT
purchasing.Correct Answer JIT ContractYour Answer JIT Contract
True/FalseQuestion U-Line layout is better than straight lime layout.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion TQM applicable to :-Correct Answer Marketing, design & manufacturingYour Answer Quality Control department
Select The BlankQuestion Bar graph is display of data that facilitates ________
of quality.Correct Answer ComparisonYour Answer Performance
Multiple Choice Single AnswerQuestion Production kanban is presented by :-Correct Answer P-kanban
Page 5
TechniquesForOperationsEfficiency_9Your Answer R-kanban
Multiple Choice Single AnswerQuestion Check sheet are also used as :-Correct Answer Data gathering & interpretation toolYour Answer Cause finding & effect finding tool
Select The BlankQuestion Japanese believe that when they are ________ they
are cleaning there minds too.Correct Answer CleaningYour Answer Repairing machines
Select The BlankQuestion Poka-Yoke devices under category use ________ to
distinguish between similar parts which may be assembled in wrong position.Correct Answer Color codingYour Answer Counting device
Select The BlankQuestion Shitsuke means ________ all the previous 4-S
throughout the month/year.Correct Answer SustainingYour Answer Implementing
Multiple Choice Multiple AnswerQuestion Types of meetings held in DWM are :-Correct Answer Daily PDCA meeting , Weekly PDCA meeting , Monthly
PDCA meetingYour Answer Weekly PDCA meeting , Monthly PDCA meeting , Yearly
PDCA meeting
True/FalseQuestion By TPM, consumption of electrical energy can be
reduced.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion According to Seiketsu Standardization means :-Correct Answer To develop easy to follow standards , Evolve standard
operating procedure , Better visual managementPage 6
TechniquesForOperationsEfficiency_9Your Answer To develop easy to follow standards , Evolve standard
operating procedure , Reduction of wastage
True/FalseQuestion Flow chart helps to stop an old process.Correct Answer FalseYour Answer True
Multiple Choice Multiple AnswerQuestion Training related to Quality includes:-Correct Answer Quality measures , Quality failureYour Answer Quality measures , Quality failure , Goal of business
Multiple Choice Single AnswerQuestion Total area under the normal curve isCorrect Answer UnityYour Answer Six
Multiple Choice Multiple AnswerQuestion Cpk =Correct Answer (x - USL)/3 sigma , (x - LSL)/3 sigmaYour Answer (x - USL)/6 sigma
Select The BlankQuestion A histogram is a graphical display of distribution of
measurements & reveals the amounts of ________ within the process.Correct Answer VariationYour Answer Percentage defects
Match The FollowingQuestion Correct Answer Your Answer
Value analysis / value engineering To eliminate MUDA of processingTo eliminate MUDA of over production
SMED To eliminate MUDA of over production To eliminate MUDA ofdefect
VMI ( Vendor Management Inventory) system To eliminate MUDA ofstock To eliminate MUDA of stock
Flow / string diagram To eliminate MUDA of transport ToPage 7
TechniquesForOperationsEfficiency_9eliminate MUDA of processing
Select The BlankQuestion A 'Radar chart' is used to portray ________ strength
or weakness of the activity.Correct Answer RelativeYour Answer Comparative
------------------------------------------------------------
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Performance benchmarking does not involves
comparison of financial ratios at the aggregate level.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Few steps to construct a flow chart are :-Correct Answer Decide on the objective of flowchart & define boundaries
of the process , Identify steps in the process & construct a draft of theflowchart , Review the draft & connect the changes as per review & name it &put the data & use it as 'Record'Your Answer Decide on the objective of flowchart & define boundaries
of the process , Identify steps in the process & construct a draft of theflowchart , Review the draft & connect the changes as per review & name it &put the data & use it as 'Record'
Select The BlankQuestion In PDCA cycle for benchmarking 'Identification of
performance gap' is done in ________.Correct Answer CheckingYour Answer Checking
Select The BlankQuestion 5 S audit result is discussed in ________ meeting.Correct Answer MonthlyYour Answer Shift beginning
Page 8
TechniquesForOperationsEfficiency_9
Select The BlankQuestion In scatter diagram "________" relationship is said to
exist when value of 'y' decreases as the value of 'x' increases.Correct Answer Strong negativeYour Answer Strong negative
Select The BlankQuestion Kaizen projects are managed by ________Correct Answer Cross functional teamYour Answer Management
Multiple Choice Single AnswerQuestion Poka-yoke for employee not performing work as per
established method is :-Correct Answer Implement work standardYour Answer Implement work standard
Multiple Choice Multiple AnswerQuestion Typical examples of process benchmark are :-Correct Answer Procurement procedures , Budgeting , RecruitmentYour Answer Procurement procedures , Budgeting , Recruitment
Multiple Choice Multiple AnswerQuestion What are the steps in deciding the benchmarking
partner?Correct Answer Decide level of benchmarking , List down a few
prospective candidates of partnership , Collect information of short listedpartnersYour Answer Decide level of benchmarking , Collect information of
short listed partners
Multiple Choice Single AnswerQuestion Errors by armatures is :-Correct Answer Lack of experienceYour Answer Absent mindedness
True/FalseQuestion Control chart is also called as run-chart.Correct Answer TrueYour Answer True
Page 9
TechniquesForOperationsEfficiency_9Match The FollowingQuestion Correct Answer Your Answer
Reduce clamping & declamping time Use U-shaped washer UseU-shaped washer
Reduce time of external setup Improve work aids positioning methodImprove work aids positioning method
Convert internal setup into external setup Preparation of tools / dies as offline activity Preparation of tools / dies as off line activity
Eliminate adjustment Pre setting of tool Pre setting of tool
Multiple Choice Single AnswerQuestion Muda of defect is very serious in case of:-Correct Answer High speed automatic machinesYour Answer High speed automatic machines
Multiple Choice Multiple AnswerQuestion To reduce clamping & declamping time, following
actions are desirable :-Correct Answer Standardize clamping bolts / screws , Cut off
unnecessary threads , Use quick clamping deviceYour Answer Standardize clamping bolts / screws , Cut off
unnecessary threads , Use quick clamping device
Multiple Choice Single AnswerQuestion Requirement of more machines, is an example of :-Correct Answer Muda of overproductionYour Answer Muda of waiting
Multiple Choice Single AnswerQuestion In India quality circle was first launched by :-Correct Answer Hyderabad unit of BHELYour Answer Hyderabad unit of BHEL
Multiple Choice Multiple AnswerQuestion 3M' is world class benchmarking ' candidates in the field
of :-Correct Answer Product development , Technology transfer ,
Page 10
TechniquesForOperationsEfficiency_9Environmental ManagementYour Answer Product development , Technology transfer ,
Environmental Management
Multiple Choice Single AnswerQuestion Responsibility for Quality should rest on:-Correct Answer Who produce the productYour Answer Quality control department
True/FalseQuestion Increase in defect rate is an example of 'Deviation from
an established norms'Correct Answer TrueYour Answer True
Select The BlankQuestion ________ are implemented for defect detection &
prevention.Correct Answer Poka-YokesYour Answer Poka-Yokes
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-Correct Answer Improve qualityYour Answer Improve quality
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-Correct Answer Gap in performanceYour Answer Lower efficiency
True/FalseQuestion Presentation of graphs in pictorial form of data
collection are for easy understanding.Correct Answer TrueYour Answer True
Select The BlankQuestion ________ waste is probably the biggest waste in most
of the organizations.Correct Answer TimeYour Answer Labor
Page 11
TechniquesForOperationsEfficiency_9
True/FalseQuestion Globalization of trade and industrial operations have
forced Indian companies to become more & more competitive and customerdriven.Correct Answer TrueYour Answer True
True/FalseQuestion TQM improves the quality by improving processes.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion An erratic patterns falling above & below the control
limits indicates :-Correct Answer Poorly trained operators , Defect in materials , Frequent
adjustment of machinesYour Answer Defect in materials , Frequent adjustment of machines ,
Poorly trained operators
Multiple Choice Single AnswerQuestion Defects per million for the process at six sigma level are
:-Correct Answer 3.4Your Answer 6210
Multiple Choice Single AnswerQuestion To provide flexibility to supervisors in allocation of task,
JIT emphasizes :-Correct Answer Multiskilled operatorsYour Answer Multiskilled operators
Multiple Choice Single AnswerQuestion To maintain smoothness in production :-Correct Answer Elimination of buffer stock is recommendedYour Answer Maintenance of buffer stock is recommended.
Select The BlankQuestion ________ should be used to exercise control on the
process.Correct Answer Control chart
Page 12
TechniquesForOperationsEfficiency_9Your Answer Latest checking instruments
Match The FollowingQuestion Correct Answer Your Answer
Ideally the histogram will have a bell shape Tapering away on theboth sides from average value Tapering away on the both sides fromaverage value
Histogram is a graphical display of distribution of measurements andReveals the amount of variation within the process Reveals the amount ofvariation within the process
Histogram is a diagrammatic presentation of The frequencydistribution of a characteristics The frequency distribution of a characteristics
The shape of histogram can Provide a clue about the quality of the lotProvide a clue about the quality of the lot
True/FalseQuestion In single card kanban system production greater than
quantity withdrawn is permitted.Correct Answer FalseYour Answer False
True/FalseQuestion Flow chart are drawn to document a process charting
the tasks performed & the sequence in which tasks are performed.Correct Answer TrueYour Answer True
Select The BlankQuestion Cpk for six sigma process is ________Correct Answer 1.5Your Answer 1.5
True/FalseQuestion Seiso prevents the potential problems by discovering
abnormalities while cleaning your own area.Correct Answer TrueYour Answer True
Page 13
TechniquesForOperationsEfficiency_9
Multiple Choice Multiple AnswerQuestion Some steps for stratification are :-Correct Answer Define the problem & identify the stratification variables
, Sort out data into categories & summarise information in each category ,Present the information in graphical form & study, decide if furtherstratification is required?Your Answer Define the problem & identify the stratification variables
, Sort out data into categories & summarise information in each category ,Present the information in graphical form & study, decide if furtherstratification is required?
True/FalseQuestion Processing cost of a product is mainly decided by
conversion process.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Work standards enable management to minimize
variation in :-Correct Answer Output , Quality , CostYour Answer Output , Quality , Cost
Multiple Choice Multiple AnswerQuestion Process can be made capable by :-Correct Answer Reducing process variability , Bringing target & average
to fall at the same point , Examine possibility of relaxing specificationYour Answer Reducing process variability , Bringing target & average
to fall at the same point , Use of less precision machine
Multiple Choice Multiple AnswerQuestion Few steps in construction of Pie chart are :-Correct Answer Express value of each category as percentage of total of
all categories & calculate the degree of angle form by each category byequation degree = Value of groups/Total value * 360 , Draw the circle &segment the circle into angles calculated in step one , Colour differentsegments & enter the percentage of each category into pie chartYour Answer Express value of each category as percentage of total of
all categories & calculate the degree of angle form by each category byequation degree = Value of groups/Total value * 360 , Draw the circle &segment the circle into angles calculated in step one , Colour different
Page 14
TechniquesForOperationsEfficiency_9segments & enter the percentage of each category into pie chart
Multiple Choice Multiple AnswerQuestion As benchmark in Japan seiso activities means :-Correct Answer Everyone, clerk to officer does cleaning his area , No
sweeper or cleaner employees , Every family does cleaning of pavement oftheir residenceYour Answer Everyone, clerk to officer does cleaning his area , No
sweeper or cleaner employees , Every family does cleaning of pavement oftheir residence
Select The BlankQuestion Poka Yoke designed to help operators to know
immediately ________ of the defeat called detection type Poka-Yoke.Correct Answer On occurrenceYour Answer Before Occurrence
Select The BlankQuestion Flow chart helps to dissect a process for better
understanding & ________ of process.Correct Answer AnalysisYour Answer Analysis
Multiple Choice Single AnswerQuestion Small groups forming a circle should consist of :-Correct Answer Employees of different department related to the
problemYour Answer Employees of same department
Select The BlankQuestion Graphs convey a situation more ________ than
summary of data or figures.Correct Answer Effectively & clearlyYour Answer Effectively & clearly
Multiple Choice Single AnswerQuestion Number of Kaizen projects suggested and implemented
is checking point for :-Correct Answer Continual ImprovementYour Answer Continual Improvement
Page 15
TechniquesForOperationsEfficiency_9--------------------------------------------------------------------
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Quality maintenance & pillar focuses on following
production inputs :-Correct Answer Material , Men , MachineYour Answer Material , Men , Machine
Multiple Choice Multiple AnswerQuestion Histograms are useful to :-Correct Answer Measure the current pattern & extent of variation ,
Assess current conformance to specification & scope of improvement ,Determine whether or not the process is in the state of controlYour Answer Measure the current pattern & extent of variation ,
Assess current conformance to specification & scope of improvement ,Determine whether or not the process is in the state of control
Multiple Choice Single AnswerQuestion In problem solving the best alternative is that :-Correct Answer Which best meets the criteriaYour Answer Which best meets the criteria
Multiple Choice Single AnswerQuestion "Cause & effect" diagram was developed by :-Correct Answer DR.Kaoru IshikawaYour Answer DR.Kaoru Ishikawa
Multiple Choice Single AnswerQuestion Identifying key preventive operational functions and
comparing these operational functions within the firm's own division &branches comes under :-Correct Answer Internal benchmarkingYour Answer Internal benchmarking
Select The BlankQuestion JIT advocates the philosophy at elimination of waste
from system which occurs due to ________.Correct Answer Over ProductionYour Answer Over Production
Page 16
TechniquesForOperationsEfficiency_9Select The BlankQuestion In scatter diagram "________" relationship is said to
exist when there is positive relationship upto certain level & negativethereafter or negative relationship upto certain level & positive thereafter.Correct Answer CurvilinearYour Answer Curvilinear
True/FalseQuestion Kanban signals are required when assembly work,
subassembly work and manufacturing at parts is carried out at differentlocations.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Customers complaints may be segregated by :-Correct Answer Nature of compliant i.e. defective product , Delayed
delivery , Short/excess quantityYour Answer Nature of compliant i.e. defective product , Delayed
delivery , Short/excess quantity
True/FalseQuestion In case of more than one quality characteristics,
separate chart is made for each quality characteristics.Correct Answer TrueYour Answer True
True/FalseQuestion Safety, hygiene and environment control is one of the
pillar of TPM.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion 5-S technique is useful to:Correct Answer To all places including homesYour Answer To all places including homes
Match The FollowingQuestion Correct Answer Your Answer
Reduce time of external setup Improve work aids positioning methodPage 17
TechniquesForOperationsEfficiency_9Improve work aids positioning method
Convert internal setup into external setup Preparation of tools / dies as offline activity Preparation of tools / dies as off line activity
Eliminate adjustment Pre setting of tool Pre setting of tool
Reduce clamping & declamping time Use U-shaped washer UseU-shaped washer
Multiple Choice Single AnswerQuestion The facilitator should be normally :-Correct Answer Senior officer /Shop inchargeYour Answer Senior officer /Shop incharge
Match The FollowingQuestion Correct Answer Your Answer
Parato diagram always indicates Magnitude of defects Philosophy of20% of the activity causes 80% of the effect
Parato analysis underlines & operates on Philosophy of "vital few:trivialmany" Philosophy of "vital few:trivial many"
Parato analysis is technique of identifying vital causes by Arrangingdata according to the descending order of their frequency of occurrenceArranging data according to the descending order of their frequency ofoccurrence
Parato diagram is a Bar graph with height or value drawn by Arrangingdata in descending order Magnitude of defects
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-Correct Answer Improve qualityYour Answer Make work easy
True/FalseQuestion Pie chart is also called as angular diagram.Correct Answer True
Page 18
TechniquesForOperationsEfficiency_9Your Answer True
Select The BlankQuestion In scatter diagram "________" relationship is said to
exist when value of 'y' somewhat decreases as the value of 'x' increases.Correct Answer Weak negativeYour Answer Weak negative
Multiple Choice Single AnswerQuestion From scatter diagram the strength of relationship
between two variables or associated set of data can be inferred from theexamination of the shape of :-Correct Answer CloudYour Answer Cloud
Multiple Choice Multiple AnswerQuestion Product benchmarking requires, comparison of product
:-Correct Answer Performance , Features , CostYour Answer Performance , Features , Cost
Multiple Choice Multiple AnswerQuestion Steps in construction of scatter diagram :-Correct Answer Collect paired data (X,Y) from two variables who's
relationship is to be studied , Find out max & min values for both X & Y andthese values to scale X & Y axis & plot the paired data , Examine the shape ofthe cloud of points & discover type & strength of relationshipYour Answer Collect paired data (X,Y) from two variables who's
relationship is to be studied , Find out max & min values for both X & Y andthese values to scale X & Y axis & plot the paired data , Examine the shape ofthe cloud of points & discover type & strength of relationship
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-Correct Answer Gap in performanceYour Answer Gap in performance
Select The BlankQuestion Each quality characteristic has permitted variation & is
equal to ________.Correct Answer USL - LSLYour Answer USL - LSL
Page 19
TechniquesForOperationsEfficiency_9
Select The BlankQuestion Kaizen is ________ supported process.Correct Answer ManagementYour Answer Management
True/FalseQuestion The flow charts are prepared to enhance the employees
understanding of the process by indicating interrelationship within theprocess.Correct Answer TrueYour Answer False
True/FalseQuestion Gap analysis for production & dispatches is discussed in
monthly meeting.Correct Answer FalseYour Answer False
Select The BlankQuestion In scatter diagram "________" relationship is said to
exist when value of 'y' decreases as the value of 'x' increases.Correct Answer Strong negativeYour Answer Strong negative
Select The BlankQuestion ________ is most difficult 'S' to implement & achieve.Correct Answer ShitsukeYour Answer Shitsuke
True/FalseQuestion Presentation of graphs in pictorial form of data
collection are for easy understanding.Correct Answer TrueYour Answer True
Select The BlankQuestion Graphs convey a situation more ________ than
summary of data or figures.Correct Answer Effectively & clearlyYour Answer Effectively & clearly
Page 20
TechniquesForOperationsEfficiency_9Multiple Choice Single AnswerQuestion Errors by armatures is :-Correct Answer Lack of experienceYour Answer Lack of experience
Multiple Choice Multiple AnswerQuestion While preparing scatter diagram following precautions
are to be taken :-Correct Answer Data should be properly stratified & should be collected
for full range , Scale selected should be right to avoid wrong conclusions ,Data should be free from bias or undue importanceYour Answer Data should be properly stratified & should be collected
for full range , Scale selected should be right to avoid wrong conclusions ,Data should be free from bias or undue importance
True/FalseQuestion Globalization of trade and industrial operations have
forced Indian companies to become more & more competitive and customerdriven.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion If 'Annual saving in procurement expenses is managing
point', then checking points will be :-Correct Answer Price revision , Credit period , Transport expensesYour Answer Price revision , Credit period , Transport expenses
Multiple Choice Single AnswerQuestion Number of kaizen in Group kaizen categories are :-Correct Answer Two to three per yearYour Answer Two to three per year
True/FalseQuestion Flow chart is pictorial representation of the steps in
production control.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion It is essential to convey customer's expectations to :-Correct Answer Top Management
Page 21
TechniquesForOperationsEfficiency_9Your Answer Supervisors & workmen
Multiple Choice Single AnswerQuestion Check sheet is easy to use because it is :-Correct Answer Simplest toolYour Answer Simplest tool
Select The BlankQuestion Identification of non-value added operations & their
elimination is the first step to eliminate muda of ________.Correct Answer ProcessingYour Answer Processing
Select The BlankQuestion A 'Radar chart' is used to portray ________ strength
or weakness of the activity.Correct Answer RelativeYour Answer Relative
Multiple Choice Single AnswerQuestion Pareto's analysis underlines & operates philosophy of :-Correct Answer Vital few = trivial manyYour Answer Vital few = trivial many
True/FalseQuestion In single card kanban system production greater than
quantity withdrawn is permitted.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Benefits of planned maintenance are :-Correct Answer Improved reliability mean time between failures ,
Improved maintainability mean time to repair , Improvement in breakdownYour Answer Improved reliability mean time between failures ,
Improved maintainability mean time to repair
Multiple Choice Multiple AnswerQuestion Gap analysis & problem identification is done during
converting internal setups into external setups in the areas like :-Correct Answer Equipment , Method , HumanYour Answer Equipment , Method , Human
Page 22
TechniquesForOperationsEfficiency_9
Multiple Choice Single AnswerQuestion Some quantity in stock of item, is desirable if :-Correct Answer Manufacturing lead time is moreYour Answer Manufacturing lead time is more
Multiple Choice Single AnswerQuestion Sorting of usable items should beCorrect Answer Planned storage based on frequency of useYour Answer Within visual reach method
Multiple Choice Multiple AnswerQuestion Benefits of Quality maintenance are :-Correct Answer Reduction in customer quality complaints , Reduction in
inspection timeYour Answer Reduction in customer quality complaints , Reduction in
inspection time
Page 23
TechniquesForOperationsEfficiency_10LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Advantages of JIT :-Correct Answer Reduce incoming inspection , Reduce inventory , Lower
per unit costYour Answer Reduce incoming inspection , Reduce inventory , Lower
per unit cost
Multiple Choice Multiple AnswerQuestion Benefits from the standardized containers areCorrect Answer Minimization of transit damages , Ease in verification of
quantity of parts , Automatic signal to supplier to replenish stockYour Answer Minimization of transit damages , Ease in verification of
quantity of parts , Automatic signal to supplier to replenish stock
Multiple Choice Multiple AnswerQuestion Benefits from SMED are :-Correct Answer Reduce work in process , Better average daily
production , Increase capacityYour Answer Reduce work in process , Increase capacity
Multiple Choice Single AnswerQuestion Competitive benchmarking involves identifying key
competitive product, services or processes & comparing with those of :-Correct Answer Main competitorYour Answer Main competitor
Multiple Choice Multiple AnswerQuestion Benefits of stratification are :-Correct Answer It helps to separate data into groups so that you can
draw connect & meaningful inference , It helps to diagnose & localize problem, It helps to identify the influencing factorsYour Answer It helps to separate data into groups so that you can
draw connect & meaningful inference , It helps to diagnose & localize problem, Finding out different reasons
Multiple Choice Multiple AnswerQuestion Quality maintenance & pillar focuses on following
production inputs :-Correct Answer Men , Machine , MaterialYour Answer Men , Machine , Management
Page 1
TechniquesForOperationsEfficiency_10
Multiple Choice Single AnswerQuestion The success indicators in quality, cost, delivery &
product development are :-Correct Answer Managing pointsYour Answer Accountability
Multiple Choice Multiple AnswerQuestion Steps in setup time reduction are :-Correct Answer Team formation , Training , Recoding of activities on
multiple activity chartsYour Answer Team formation , Recoding of activities on multiple
activity charts , Convert external setups in to internal setups
Multiple Choice Multiple AnswerQuestion POM essentially consists of :-Correct Answer Time management , Team participation and
performance , Moral boostingYour Answer Time management , Team participation and
performance , Cost Management
Multiple Choice Single AnswerQuestion Activity under quality management is :-Correct Answer Use team approach to track down root causes of the
problemYour Answer Maintenance of equipment condition by eliminating
lubricant leakage.
True/FalseQuestion Every department should make their own rules of
standardization.Correct Answer FalseYour Answer True
Multiple Choice Multiple AnswerQuestion Histogram is an important diagnostic tool. Analysis of
the histogram gives :-Correct Answer It shows cause which affects the process , An idea of
what is happening to the process , Whether the process is capable of meetingprocess or not i.e. around correct average & within specific limitsYour Answer It shows cause which affects the process , An idea of
what is happening to the process , Whether the process is capable of meetingPage 2
TechniquesForOperationsEfficiency_10process or not i.e. around correct average & within specific limits
Match The FollowingQuestion Correct Answer Your Answer
Productivity performance measurement Turnover employee Sales of themonths
Financial performance measurement Sales of the months Cash savingper department
Customer satisfaction measurement Customer complaints per periodCustomer complaints per period
Staff attitude measurement Employee satisfaction index Employeesatisfaction index
Multiple Choice Single AnswerQuestion TPM helps to reduce down time due to:-Correct Answer Breakdown of machineYour Answer Breakdown of machine
Multiple Choice Single AnswerQuestion Kaizen emphasizes :-Correct Answer Implementation of ideasYour Answer Collection of ideas
Select The BlankQuestion Create as many ________ system as possible for better
Seiketsu.Correct Answer Visual controlYour Answer Visual control
True/FalseQuestion Inadequate maintenance of machine leads to muda of
defectsCorrect Answer TrueYour Answer False
Select The BlankQuestion The shape of histogram can provide a clue about the
Page 3
TechniquesForOperationsEfficiency_10________ of the lot.Correct Answer QualityYour Answer Distribution
Multiple Choice Single AnswerQuestion Customer's return is an indicators of the MUDA of :-Correct Answer DefectYour Answer Defect
Multiple Choice Single AnswerQuestion In bar graph the interval (gap) between the bars is :-Correct Answer EqualYour Answer Symmetrical
True/FalseQuestion Inspection is poor method of assuring 100% quality.Correct Answer TrueYour Answer False
True/FalseQuestion A radar chart is combination of a circle & line graphCorrect Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion A workshop is to be treated as :-Correct Answer Place where one's creativity can be appliedYour Answer Place where one's creativity can be applied
True/FalseQuestion Customer wise outstanding is discussed in daily work
management meeting by operations head.Correct Answer FalseYour Answer True
True/FalseQuestion Number of operation can change according to
production requirement in U-Line arrangement.Correct Answer FalseYour Answer True
True/FalsePage 4
TechniquesForOperationsEfficiency_10Question Automation can correct the basic faults of a improper
setup process.Correct Answer FalseYour Answer True
Select The BlankQuestion Cp for six sigma process is ________Correct Answer 2Your Answer 1.66
Select The BlankQuestion Range ( R ) is obtained as the difference between the
highest and ________ measurement of a sample.Correct Answer LowestYour Answer Second highest
Select The BlankQuestion ________is an important step toward successful JIT
purchasing.Correct Answer JIT ContractYour Answer JIT Contract
True/FalseQuestion U-Line layout is better than straight lime layout.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion TQM applicable to :-Correct Answer Marketing, design & manufacturingYour Answer Quality Control department
Select The BlankQuestion Bar graph is display of data that facilitates ________
of quality.Correct Answer ComparisonYour Answer Performance
Multiple Choice Single AnswerQuestion Production kanban is presented by :-Correct Answer P-kanbanYour Answer R-kanban
Page 5
TechniquesForOperationsEfficiency_10
Multiple Choice Single AnswerQuestion Check sheet are also used as :-Correct Answer Data gathering & interpretation toolYour Answer Cause finding & effect finding tool
Select The BlankQuestion Japanese believe that when they are ________ they
are cleaning there minds too.Correct Answer CleaningYour Answer Repairing machines
Select The BlankQuestion Poka-Yoke devices under category use ________ to
distinguish between similar parts which may be assembled in wrong position.Correct Answer Color codingYour Answer Counting device
Select The BlankQuestion Shitsuke means ________ all the previous 4-S
throughout the month/year.Correct Answer SustainingYour Answer Implementing
Multiple Choice Multiple AnswerQuestion Types of meetings held in DWM are :-Correct Answer Daily PDCA meeting , Weekly PDCA meeting , Monthly
PDCA meetingYour Answer Weekly PDCA meeting , Monthly PDCA meeting , Yearly
PDCA meeting
True/FalseQuestion By TPM, consumption of electrical energy can be
reduced.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion According to Seiketsu Standardization means :-Correct Answer To develop easy to follow standards , Evolve standard
operating procedure , Better visual managementYour Answer To develop easy to follow standards , Evolve standard
Page 6
TechniquesForOperationsEfficiency_10operating procedure , Reduction of wastage
True/FalseQuestion Flow chart helps to stop an old process.Correct Answer FalseYour Answer True
Multiple Choice Multiple AnswerQuestion Training related to Quality includes:-Correct Answer Quality measures , Quality failureYour Answer Quality measures , Quality failure , Goal of business
Multiple Choice Single AnswerQuestion Total area under the normal curve isCorrect Answer UnityYour Answer Six
Multiple Choice Multiple AnswerQuestion Cpk =Correct Answer (x - USL)/3 sigma , (x - LSL)/3 sigmaYour Answer (x - USL)/6 sigma
Select The BlankQuestion A histogram is a graphical display of distribution of
measurements & reveals the amounts of ________ within the process.Correct Answer VariationYour Answer Percentage defects
Match The FollowingQuestion Correct Answer Your Answer
Value analysis / value engineering To eliminate MUDA of processingTo eliminate MUDA of over production
SMED To eliminate MUDA of over production To eliminate MUDA ofdefect
VMI ( Vendor Management Inventory) system To eliminate MUDA ofstock To eliminate MUDA of stock
Flow / string diagram To eliminate MUDA of transport Toeliminate MUDA of processing
Page 7
TechniquesForOperationsEfficiency_10
Select The BlankQuestion A 'Radar chart' is used to portray ________ strength
or weakness of the activity.Correct Answer RelativeYour Answer Comparative
------------------------------------------------------------
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Performance benchmarking does not involves
comparison of financial ratios at the aggregate level.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Few steps to construct a flow chart are :-Correct Answer Decide on the objective of flowchart & define boundaries
of the process , Identify steps in the process & construct a draft of theflowchart , Review the draft & connect the changes as per review & name it &put the data & use it as 'Record'Your Answer Decide on the objective of flowchart & define boundaries
of the process , Identify steps in the process & construct a draft of theflowchart , Review the draft & connect the changes as per review & name it &put the data & use it as 'Record'
Select The BlankQuestion In PDCA cycle for benchmarking 'Identification of
performance gap' is done in ________.Correct Answer CheckingYour Answer Checking
Select The BlankQuestion 5 S audit result is discussed in ________ meeting.Correct Answer MonthlyYour Answer Shift beginning
Page 8
TechniquesForOperationsEfficiency_10Select The BlankQuestion In scatter diagram "________" relationship is said to
exist when value of 'y' decreases as the value of 'x' increases.Correct Answer Strong negativeYour Answer Strong negative
Select The BlankQuestion Kaizen projects are managed by ________Correct Answer Cross functional teamYour Answer Management
Multiple Choice Single AnswerQuestion Poka-yoke for employee not performing work as per
established method is :-Correct Answer Implement work standardYour Answer Implement work standard
Multiple Choice Multiple AnswerQuestion Typical examples of process benchmark are :-Correct Answer Procurement procedures , Budgeting , RecruitmentYour Answer Procurement procedures , Budgeting , Recruitment
Multiple Choice Multiple AnswerQuestion What are the steps in deciding the benchmarking
partner?Correct Answer Decide level of benchmarking , List down a few
prospective candidates of partnership , Collect information of short listedpartnersYour Answer Decide level of benchmarking , Collect information of
short listed partners
Multiple Choice Single AnswerQuestion Errors by armatures is :-Correct Answer Lack of experienceYour Answer Absent mindedness
True/FalseQuestion Control chart is also called as run-chart.Correct Answer TrueYour Answer True
Match The FollowingPage 9
TechniquesForOperationsEfficiency_10Question Correct Answer Your Answer
Reduce clamping & declamping time Use U-shaped washer UseU-shaped washer
Reduce time of external setup Improve work aids positioning methodImprove work aids positioning method
Convert internal setup into external setup Preparation of tools / dies as offline activity Preparation of tools / dies as off line activity
Eliminate adjustment Pre setting of tool Pre setting of tool
Multiple Choice Single AnswerQuestion Muda of defect is very serious in case of:-Correct Answer High speed automatic machinesYour Answer High speed automatic machines
Multiple Choice Multiple AnswerQuestion To reduce clamping & declamping time, following
actions are desirable :-Correct Answer Standardize clamping bolts / screws , Cut off
unnecessary threads , Use quick clamping deviceYour Answer Standardize clamping bolts / screws , Cut off
unnecessary threads , Use quick clamping device
Multiple Choice Single AnswerQuestion Requirement of more machines, is an example of :-Correct Answer Muda of overproductionYour Answer Muda of waiting
Multiple Choice Single AnswerQuestion In India quality circle was first launched by :-Correct Answer Hyderabad unit of BHELYour Answer Hyderabad unit of BHEL
Multiple Choice Multiple AnswerQuestion 3M' is world class benchmarking ' candidates in the field
of :-Correct Answer Product development , Technology transfer ,
Environmental ManagementPage 10
TechniquesForOperationsEfficiency_10Your Answer Product development , Technology transfer ,
Environmental Management
Multiple Choice Single AnswerQuestion Responsibility for Quality should rest on:-Correct Answer Who produce the productYour Answer Quality control department
True/FalseQuestion Increase in defect rate is an example of 'Deviation from
an established norms'Correct Answer TrueYour Answer True
Select The BlankQuestion ________ are implemented for defect detection &
prevention.Correct Answer Poka-YokesYour Answer Poka-Yokes
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-Correct Answer Improve qualityYour Answer Improve quality
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-Correct Answer Gap in performanceYour Answer Lower efficiency
True/FalseQuestion Presentation of graphs in pictorial form of data
collection are for easy understanding.Correct Answer TrueYour Answer True
Select The BlankQuestion ________ waste is probably the biggest waste in most
of the organizations.Correct Answer TimeYour Answer Labor
Page 11
TechniquesForOperationsEfficiency_10True/FalseQuestion Globalization of trade and industrial operations have
forced Indian companies to become more & more competitive and customerdriven.Correct Answer TrueYour Answer True
True/FalseQuestion TQM improves the quality by improving processes.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion An erratic patterns falling above & below the control
limits indicates :-Correct Answer Poorly trained operators , Defect in materials , Frequent
adjustment of machinesYour Answer Defect in materials , Frequent adjustment of machines ,
Poorly trained operators
Multiple Choice Single AnswerQuestion Defects per million for the process at six sigma level are
:-Correct Answer 3.4Your Answer 6210
Multiple Choice Single AnswerQuestion To provide flexibility to supervisors in allocation of task,
JIT emphasizes :-Correct Answer Multiskilled operatorsYour Answer Multiskilled operators
Multiple Choice Single AnswerQuestion To maintain smoothness in production :-Correct Answer Elimination of buffer stock is recommendedYour Answer Maintenance of buffer stock is recommended.
Select The BlankQuestion ________ should be used to exercise control on the
process.Correct Answer Control chartYour Answer Latest checking instruments
Page 12
TechniquesForOperationsEfficiency_10
Match The FollowingQuestion Correct Answer Your Answer
Ideally the histogram will have a bell shape Tapering away on theboth sides from average value Tapering away on the both sides fromaverage value
Histogram is a graphical display of distribution of measurements andReveals the amount of variation within the process Reveals the amount ofvariation within the process
Histogram is a diagrammatic presentation of The frequencydistribution of a characteristics The frequency distribution of a characteristics
The shape of histogram can Provide a clue about the quality of the lotProvide a clue about the quality of the lot
True/FalseQuestion In single card kanban system production greater than
quantity withdrawn is permitted.Correct Answer FalseYour Answer False
True/FalseQuestion Flow chart are drawn to document a process charting
the tasks performed & the sequence in which tasks are performed.Correct Answer TrueYour Answer True
Select The BlankQuestion Cpk for six sigma process is ________Correct Answer 1.5Your Answer 1.5
True/FalseQuestion Seiso prevents the potential problems by discovering
abnormalities while cleaning your own area.Correct Answer TrueYour Answer True
Page 13
TechniquesForOperationsEfficiency_10Multiple Choice Multiple AnswerQuestion Some steps for stratification are :-Correct Answer Define the problem & identify the stratification variables
, Sort out data into categories & summarise information in each category ,Present the information in graphical form & study, decide if furtherstratification is required?Your Answer Define the problem & identify the stratification variables
, Sort out data into categories & summarise information in each category ,Present the information in graphical form & study, decide if furtherstratification is required?
True/FalseQuestion Processing cost of a product is mainly decided by
conversion process.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Work standards enable management to minimize
variation in :-Correct Answer Output , Quality , CostYour Answer Output , Quality , Cost
Multiple Choice Multiple AnswerQuestion Process can be made capable by :-Correct Answer Reducing process variability , Bringing target & average
to fall at the same point , Examine possibility of relaxing specificationYour Answer Reducing process variability , Bringing target & average
to fall at the same point , Use of less precision machine
Multiple Choice Multiple AnswerQuestion Few steps in construction of Pie chart are :-Correct Answer Express value of each category as percentage of total of
all categories & calculate the degree of angle form by each category byequation degree = Value of groups/Total value * 360 , Draw the circle &segment the circle into angles calculated in step one , Colour differentsegments & enter the percentage of each category into pie chartYour Answer Express value of each category as percentage of total of
all categories & calculate the degree of angle form by each category byequation degree = Value of groups/Total value * 360 , Draw the circle &segment the circle into angles calculated in step one , Colour differentsegments & enter the percentage of each category into pie chart
Page 14
TechniquesForOperationsEfficiency_10
Multiple Choice Multiple AnswerQuestion As benchmark in Japan seiso activities means :-Correct Answer Everyone, clerk to officer does cleaning his area , No
sweeper or cleaner employees , Every family does cleaning of pavement oftheir residenceYour Answer Everyone, clerk to officer does cleaning his area , No
sweeper or cleaner employees , Every family does cleaning of pavement oftheir residence
Select The BlankQuestion Poka Yoke designed to help operators to know
immediately ________ of the defeat called detection type Poka-Yoke.Correct Answer On occurrenceYour Answer Before Occurrence
Select The BlankQuestion Flow chart helps to dissect a process for better
understanding & ________ of process.Correct Answer AnalysisYour Answer Analysis
Multiple Choice Single AnswerQuestion Small groups forming a circle should consist of :-Correct Answer Employees of different department related to the
problemYour Answer Employees of same department
Select The BlankQuestion Graphs convey a situation more ________ than
summary of data or figures.Correct Answer Effectively & clearlyYour Answer Effectively & clearly
Multiple Choice Single AnswerQuestion Number of Kaizen projects suggested and implemented
is checking point for :-Correct Answer Continual ImprovementYour Answer Continual Improvement
--------------------------------------------------------------------Page 15
TechniquesForOperationsEfficiency_10
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Quality maintenance & pillar focuses on following
production inputs :-Correct Answer Material , Men , MachineYour Answer Material , Men , Machine
Multiple Choice Multiple AnswerQuestion Histograms are useful to :-Correct Answer Measure the current pattern & extent of variation ,
Assess current conformance to specification & scope of improvement ,Determine whether or not the process is in the state of controlYour Answer Measure the current pattern & extent of variation ,
Assess current conformance to specification & scope of improvement ,Determine whether or not the process is in the state of control
Multiple Choice Single AnswerQuestion In problem solving the best alternative is that :-Correct Answer Which best meets the criteriaYour Answer Which best meets the criteria
Multiple Choice Single AnswerQuestion "Cause & effect" diagram was developed by :-Correct Answer DR.Kaoru IshikawaYour Answer DR.Kaoru Ishikawa
Multiple Choice Single AnswerQuestion Identifying key preventive operational functions and
comparing these operational functions within the firm's own division &branches comes under :-Correct Answer Internal benchmarkingYour Answer Internal benchmarking
Select The BlankQuestion JIT advocates the philosophy at elimination of waste
from system which occurs due to ________.Correct Answer Over ProductionYour Answer Over Production
Select The BlankPage 16
TechniquesForOperationsEfficiency_10Question In scatter diagram "________" relationship is said to
exist when there is positive relationship upto certain level & negativethereafter or negative relationship upto certain level & positive thereafter.Correct Answer CurvilinearYour Answer Curvilinear
True/FalseQuestion Kanban signals are required when assembly work,
subassembly work and manufacturing at parts is carried out at differentlocations.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Customers complaints may be segregated by :-Correct Answer Nature of compliant i.e. defective product , Delayed
delivery , Short/excess quantityYour Answer Nature of compliant i.e. defective product , Delayed
delivery , Short/excess quantity
True/FalseQuestion In case of more than one quality characteristics,
separate chart is made for each quality characteristics.Correct Answer TrueYour Answer True
True/FalseQuestion Safety, hygiene and environment control is one of the
pillar of TPM.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion 5-S technique is useful to:Correct Answer To all places including homesYour Answer To all places including homes
Match The FollowingQuestion Correct Answer Your Answer
Reduce time of external setup Improve work aids positioning methodImprove work aids positioning method
Page 17
TechniquesForOperationsEfficiency_10
Convert internal setup into external setup Preparation of tools / dies as offline activity Preparation of tools / dies as off line activity
Eliminate adjustment Pre setting of tool Pre setting of tool
Reduce clamping & declamping time Use U-shaped washer UseU-shaped washer
Multiple Choice Single AnswerQuestion The facilitator should be normally :-Correct Answer Senior officer /Shop inchargeYour Answer Senior officer /Shop incharge
Match The FollowingQuestion Correct Answer Your Answer
Parato diagram always indicates Magnitude of defects Philosophy of20% of the activity causes 80% of the effect
Parato analysis underlines & operates on Philosophy of "vital few:trivialmany" Philosophy of "vital few:trivial many"
Parato analysis is technique of identifying vital causes by Arrangingdata according to the descending order of their frequency of occurrenceArranging data according to the descending order of their frequency ofoccurrence
Parato diagram is a Bar graph with height or value drawn by Arrangingdata in descending order Magnitude of defects
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-Correct Answer Improve qualityYour Answer Make work easy
True/FalseQuestion Pie chart is also called as angular diagram.Correct Answer TrueYour Answer True
Page 18
TechniquesForOperationsEfficiency_10
Select The BlankQuestion In scatter diagram "________" relationship is said to
exist when value of 'y' somewhat decreases as the value of 'x' increases.Correct Answer Weak negativeYour Answer Weak negative
Multiple Choice Single AnswerQuestion From scatter diagram the strength of relationship
between two variables or associated set of data can be inferred from theexamination of the shape of :-Correct Answer CloudYour Answer Cloud
Multiple Choice Multiple AnswerQuestion Product benchmarking requires, comparison of product
:-Correct Answer Performance , Features , CostYour Answer Performance , Features , Cost
Multiple Choice Multiple AnswerQuestion Steps in construction of scatter diagram :-Correct Answer Collect paired data (X,Y) from two variables who's
relationship is to be studied , Find out max & min values for both X & Y andthese values to scale X & Y axis & plot the paired data , Examine the shape ofthe cloud of points & discover type & strength of relationshipYour Answer Collect paired data (X,Y) from two variables who's
relationship is to be studied , Find out max & min values for both X & Y andthese values to scale X & Y axis & plot the paired data , Examine the shape ofthe cloud of points & discover type & strength of relationship
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-Correct Answer Gap in performanceYour Answer Gap in performance
Select The BlankQuestion Each quality characteristic has permitted variation & is
equal to ________.Correct Answer USL - LSLYour Answer USL - LSL
Page 19
TechniquesForOperationsEfficiency_10Select The BlankQuestion Kaizen is ________ supported process.Correct Answer ManagementYour Answer Management
True/FalseQuestion The flow charts are prepared to enhance the employees
understanding of the process by indicating interrelationship within theprocess.Correct Answer TrueYour Answer False
True/FalseQuestion Gap analysis for production & dispatches is discussed in
monthly meeting.Correct Answer FalseYour Answer False
Select The BlankQuestion In scatter diagram "________" relationship is said to
exist when value of 'y' decreases as the value of 'x' increases.Correct Answer Strong negativeYour Answer Strong negative
Select The BlankQuestion ________ is most difficult 'S' to implement & achieve.Correct Answer ShitsukeYour Answer Shitsuke
True/FalseQuestion Presentation of graphs in pictorial form of data
collection are for easy understanding.Correct Answer TrueYour Answer True
Select The BlankQuestion Graphs convey a situation more ________ than
summary of data or figures.Correct Answer Effectively & clearlyYour Answer Effectively & clearly
Multiple Choice Single AnswerPage 20
TechniquesForOperationsEfficiency_10Question Errors by armatures is :-Correct Answer Lack of experienceYour Answer Lack of experience
Multiple Choice Multiple AnswerQuestion While preparing scatter diagram following precautions
are to be taken :-Correct Answer Data should be properly stratified & should be collected
for full range , Scale selected should be right to avoid wrong conclusions ,Data should be free from bias or undue importanceYour Answer Data should be properly stratified & should be collected
for full range , Scale selected should be right to avoid wrong conclusions ,Data should be free from bias or undue importance
True/FalseQuestion Globalization of trade and industrial operations have
forced Indian companies to become more & more competitive and customerdriven.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion If 'Annual saving in procurement expenses is managing
point', then checking points will be :-Correct Answer Price revision , Credit period , Transport expensesYour Answer Price revision , Credit period , Transport expenses
Multiple Choice Single AnswerQuestion Number of kaizen in Group kaizen categories are :-Correct Answer Two to three per yearYour Answer Two to three per year
True/FalseQuestion Flow chart is pictorial representation of the steps in
production control.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion It is essential to convey customer's expectations to :-Correct Answer Top ManagementYour Answer Supervisors & workmen
Page 21
TechniquesForOperationsEfficiency_10
Multiple Choice Single AnswerQuestion Check sheet is easy to use because it is :-Correct Answer Simplest toolYour Answer Simplest tool
Select The BlankQuestion Identification of non-value added operations & their
elimination is the first step to eliminate muda of ________.Correct Answer ProcessingYour Answer Processing
Select The BlankQuestion A 'Radar chart' is used to portray ________ strength
or weakness of the activity.Correct Answer RelativeYour Answer Relative
Multiple Choice Single AnswerQuestion Pareto's analysis underlines & operates philosophy of :-Correct Answer Vital few = trivial manyYour Answer Vital few = trivial many
True/FalseQuestion In single card kanban system production greater than
quantity withdrawn is permitted.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Benefits of planned maintenance are :-Correct Answer Improved reliability mean time between failures ,
Improved maintainability mean time to repair , Improvement in breakdownYour Answer Improved reliability mean time between failures ,
Improved maintainability mean time to repair
Multiple Choice Multiple AnswerQuestion Gap analysis & problem identification is done during
converting internal setups into external setups in the areas like :-Correct Answer Equipment , Method , HumanYour Answer Equipment , Method , Human
Page 22
TechniquesForOperationsEfficiency_10Multiple Choice Single AnswerQuestion Some quantity in stock of item, is desirable if :-Correct Answer Manufacturing lead time is moreYour Answer Manufacturing lead time is more
Multiple Choice Single AnswerQuestion Sorting of usable items should beCorrect Answer Planned storage based on frequency of useYour Answer Within visual reach method
Multiple Choice Multiple AnswerQuestion Benefits of Quality maintenance are :-Correct Answer Reduction in customer quality complaints , Reduction in
inspection timeYour Answer Reduction in customer quality complaints , Reduction in
inspection time
Page 23
Sem – 3rd Techniques for Operations Efficiency 3
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Performance benchmarking does not involves comparison of financial ratios at the aggregate
level.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion Setup time includes :-
Correct Answer Internal setup time & External setup time
Your Answer Internal setup time & External setup time
Multiple Choice Single AnswerQuestion Participants of the groups for quality circles should be decided by :-
Correct Answer Employees coming together by their own enthusiasm
Your Answer Employees coming together by their own enthusiasm
Multiple Choice Single AnswerQuestion Check sheet are also used as :-
Correct Answer Data gathering & interpretation tool
Your Answer Data gathering & interpretation tool
Multiple Choice Single AnswerQuestion SMED means :-
Correct Answer Single minute exchange of dies
Your Answer Single minute exchange of dies
Match The FollowingQuestion Correct Answer Your Answer
Productivity performancemeasurement
Turnover employee Cost of quality
Financial performancemeasurement
Sales of the months Sales of the months
Customer satisfaction measurement Customer complaints per period Customer complaints per period
Staff attitude measurement Employee satisfaction index Employee satisfaction index
Select The BlankQuestion ________ is an effect due to the muda of defect.
Sem – 3rd Techniques for Operations Efficiency 4
Correct Answer Wear & tear of parts while disassembling
Your Answer Poor production planning & control
Select The BlankQuestion If some defective parts are discovered by the subsequent process they should be returned to
the ________ to prevent reoccurrence.Correct Answer Preceding process
Your Answer Return to stores
Multiple Choice Multiple AnswerQuestion The results oriented efforts of the quality circle should also include :-
Correct Answer Efforts to avoid the problem permanently , Ultimate aim of the customers satisfaction ,Attacking the real root causes & all possibilities
Your Answer Efforts to avoid the problem permanently , Publication or advertisement of your contribution ,Attacking the real root causes & all possibilities
Match The FollowingQuestion Correct Answer Your Answer
Parato diagram always indicates Magnitude of defects Philosophy of 20% of the activitycauses 80% of the effect
Parato analysis underlines &operates on
Philosophy of "vital few:trivial many" Philosophy of "vital few:trivial many"
Parato analysis is technique ofidentifying vital causes by
Arranging data according to thedescending order of their frequencyof occurrence
Arranging data according to thedescending order of their frequencyof occurrence
Parato diagram is a Bar graph withheight or value drawn by
Arranging data in descending order Magnitude of defects
Multiple Choice Multiple AnswerQuestion Few steps in construction in Radar chart are :-
Correct Answer Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divideit into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then drawvertical line & calibrate it equal to the number of levels required , Draw concentric circles fromeach gradiation using 'o' point as centre
Your Answer Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divideit into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then drawvertical line & calibrate it equal to the number of levels required , Draw concentric circles fromeach gradiation using 'o' point as centre
Select The BlankQuestion 5 S audit result is discussed in ________ meeting.
Correct Answer Monthly
Your Answer Monthly
True/FalseQuestion Fishbone analysis is used both in analysis & planning.
Sem – 3rd Techniques for Operations Efficiency 5
Correct Answer True
Your Answer False
Multiple Choice Single AnswerQuestion One Green Belt may head a team of :-
Correct Answer 20 employees
Your Answer 20 employees
Multiple Choice Multiple AnswerQuestion Role of champions are :-
Correct Answer Approve six sigma projects , Remove road block in the path of six sigma implementation ,Monitor progress of six sigma projects
Your Answer Monitor progress of six sigma projects , Approve six sigma projects , Remove road block inthe path of six sigma implementation
Multiple Choice Multiple AnswerQuestion To draw control charts, sample must be representative of homogeneous segment of
production for which :-Correct Answer The items of the sample should be from the same machine setting , The items should be of
the same batch , Items should be made from the same raw material batchYour Answer The items of the sample should be from the same machine setting , The items should be of
the same batch , Items should be made from the same raw material batch
Multiple Choice Single AnswerQuestion Failure mode and effect analysis (FMEA) establish
Correct Answer Process failure and minimize frequency
Your Answer Process failure and minimize frequency
Multiple Choice Multiple AnswerQuestion What are the steps in deciding the benchmarking partner?
Correct Answer Decide level of benchmarking , List down a few prospective candidates of partnership , Collectinformation of short listed partners
Your Answer Decide level of benchmarking , List down a few prospective candidates of partnership , Collectinformation of short listed partners
Multiple Choice Single AnswerQuestion One Master Black Belt may head a team of :-
Correct Answer 15-20 Black Belts
Your Answer 15-20 Black Belts
Multiple Choice Single AnswerQuestion Competitive benchmarking involves identifying key competitive product, services or processes
& comparing with those of :-Correct Answer Main competitor
Sem – 3rd Techniques for Operations Efficiency 6
Your Answer Main competitor
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-
Correct Answer Gap in performance
Your Answer Gap in performance
Select The BlankQuestion Number of defects in an individual component, like gear, shaft, wheel etc can be monitored
through ________ type of control chart.Correct Answer c-chart
Your Answer c-chart
True/FalseQuestion Non-availability of files /document in time is a problem to be addressed by office TPM.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Check sheet is easy to use because it is :-
Correct Answer Simplest tool
Your Answer Simplest tool
Multiple Choice Single AnswerQuestion Benchmarking helps to identify the gap between the current performance of the organization
and the :-Correct Answer Performance of the best organization
Your Answer Performance of the best organization
True/FalseQuestion Flow chart is pictorial representation of the steps in production control.
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Breakdown problem may be stratified by :-
Correct Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Your Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Sem – 3rd Techniques for Operations Efficiency 7
Select The BlankQuestion A control chart to exhibit counted data on number of defect is called ________.
Correct Answer c-chart
Your Answer c-chart
Select The BlankQuestion Procedure for implementation of TPM consists of ________ numbers of steps.
Correct Answer 12
Your Answer 8
Select The BlankQuestion Capability index Cp = ________
Correct Answer Specification width/process width
Your Answer Specification width/process width
Multiple Choice Single AnswerQuestion Pareto's analysis underlines & operates philosophy of :-
Correct Answer Vital few = trivial many
Your Answer Vital few = trivial many
True/FalseQuestion Kanban signals are required when assembly work, subassembly work and manufacturing at
parts is carried out at different locations.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion To reduce clamping & declamping time, following actions are desirable :-
Correct Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clampingdevice
Your Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clampingdevice
Select The BlankQuestion Benchmarking allows exchange of ________ between the benchmarking partners.
Correct Answer Information
Your Answer Information
Multiple Choice Multiple AnswerQuestion TQM can never flourish if the staff are:-
Sem – 3rd Techniques for Operations Efficiency 8
Correct Answer Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of theirbosses
Your Answer Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of theirbosses
True/FalseQuestion In bar graph each bar is of same height.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion During SMED implementation, primary study consists of :-
Correct Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method)analysis
Your Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method)analysis
True/FalseQuestion Daily work management can also be extended to non manufacturing areas like procurement,
QA, HRD etc.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Types of Poka-Yoke are :-
Correct Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Save time
True/FalseQuestion Along with problem solving tools experience and judgment is also used.
Correct Answer True
Your Answer False
Select The BlankQuestion JIT advocates the philosophy at elimination of waste from system which occurs due to
________.Correct Answer Over Production
Sem – 3rd Techniques for Operations Efficiency 9
Your Answer Over Production
True/FalseQuestion Without measuring initial performance, target can't be set.
Correct Answer True
Your Answer False
Multiple Choice Multiple AnswerQuestion An erratic patterns falling above & below the control limits indicates :-
Correct Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators
Your Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators
True/FalseQuestion Sample size for the construction of p-chart are larger than X bar-R chart.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Histogram is an important diagnostic tool. Analysis of the histogram gives :-
Correct Answer It shows cause which affects the process , An idea of what is happening to the process ,Whether the process is capable of meeting process or not i.e. around correct average & withinspecific limits
Your Answer An idea of what is happening to the process , Whether the process is capable of meetingprocess or not i.e. around correct average & within specific limits , A bird's eye view of thevariation
Multiple Choice Single AnswerQuestion Productivity improves by :-
Correct Answer Voluntary participants of everyone
Your Answer Voluntary participants of everyone
2nd Copy
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Training related to Quality includes:-Correct Answer Quality measures , Quality failureYour Answer Negotiation skill , Goal of business , Quality measures , Quality failure
Multiple Choice Single AnswerQuestion If defects found at own process, the cost to the company is :-Correct Answer Very littleYour Answer Very high
Sem – 3rd Techniques for Operations Efficiency 10
Multiple Choice Multiple AnswerQuestion Histogram is an important diagnostic tool. Analysis of the histogram gives :-Correct Answer It shows cause which affects the process , An idea of what is happening to the process ,
Whether the process is capable of meeting process or not i.e. around correct average & within specific limitsYour Answer It shows cause which affects the process , An idea of what is happening to the process ,
Whether the process is capable of meeting process or not i.e. around correct average & within specific limits, A bird's eye view of the variation
True/FalseQuestion In bar graph each bar is of same height.Correct Answer FalseYour Answer False
Select The BlankQuestion Basic objective of control chart is to ________ the variation due to chance & assignable cause.Correct Answer Separate outYour Answer Separate out
Multiple Choice Multiple AnswerQuestion Benefits of stratification are :-Correct Answer It helps to separate data into groups so that you can draw connect & meaningful
inference , It helps to diagnose & localize problem , It helps to identify the influencing factorsYour Answer It helps to separate data into groups so that you can draw connect & meaningful inference ,
It helps to diagnose & localize problem , It helps to identify the influencing factors , Finding out differentreasons
Multiple Choice Single AnswerQuestion For 'Timely clearance of GRR's', checking point will be :-Correct Answer Number of GRRs pending beyond 1 dayYour Answer Number of GRRs pending beyond 1 day
Multiple Choice Single AnswerQuestion Organizing the place is not enough , what is required is :Correct Answer Planning storage based on Frequency of useYour Answer Planning storage based on Frequency of use
Select The BlankQuestion JIT helps to ________ the waste in the purchasing process.Correct Answer EliminatesYour Answer Eliminates
Multiple Choice Single AnswerQuestion In cellular manufacturing system, the cells are designed so that the material flow within the cell
and between the cells are :-Correct Answer MinimizedYour Answer Minimized
True/FalseQuestion Kanban signals are required when assembly work, subassembly work and manufacturing at
parts is carried out at different locations.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Causes of Muda of transport are :-Correct Answer Faulty layout , Over productionYour Answer Faulty layout , Over production , Proper material handling equipment , Low rejection /
rework
Sem – 3rd Techniques for Operations Efficiency 11
Multiple Choice Multiple AnswerQuestion Types of meetings held in DWM are :-Correct Answer Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meetingYour Answer Monthly PDCA meeting , Daily PDCA meeting , Weekly PDCA meeting
Multiple Choice Multiple AnswerQuestion Customers complaints may be segregated by :-Correct Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantityYour Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity ,
Payment problem
Multiple Choice Multiple AnswerQuestion Cleaning your own area/equipments gives benefits of :-Correct Answer You know your self how to avoid dust , When you touch while cleaning you may find a
fault , Saving of further failure due to dustYour Answer You know your self how to avoid dust , When you touch while cleaning you may find a fault ,
Saving of further failure due to dust , Utilization of spare time
Multiple Choice Multiple AnswerQuestion Role of champions are :-Correct Answer Approve six sigma projects , Remove road block in the path of six sigma implementation
, Monitor progress of six sigma projectsYour Answer Approve six sigma projects , Remove road block in the path of six sigma implementation ,
Monitor progress of six sigma projects , Deliver presentation to teams on six sigma projects
Select The BlankQuestion Benchmarking shows how an organization is ________ in comparison to its competitors.Correct Answer PerformingYour Answer Performing
True/FalseQuestion Inspection is poor method of assuring 100% quality.Correct Answer TrueYour Answer False
Multiple Choice Multiple AnswerQuestion Benefits of TQM are :-Correct Answer Greater customer satisfaction , Lower manufacturing costYour Answer Greater customer satisfaction , Lower manufacturing cost
Select The BlankQuestion ________ ensures that communication is simple & effective.Correct Answer Visual ManagementYour Answer Visual Management
True/FalseQuestion Daily work management develops problem finding & solving attitude.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Key principles of TQM :-Correct Answer Continuous improvement , People involvement , Cost of qualityYour Answer Continuous improvement , People involvement , Cost of quality , Competitor focus
Select The Blank
Sem – 3rd Techniques for Operations Efficiency 12
Question A histogram is a graphical display of distribution of measurements & reveals the amounts of________ within the process.Correct Answer VariationYour Answer Variation
Select The BlankQuestion To assess effectiveness of training ________ is essential.Correct Answer EvaluationYour Answer Evaluation
Select The BlankQuestion ________ are implemented for defect detection & prevention.Correct Answer Poka-YokesYour Answer TPM
True/FalseQuestion To achieve quality, it has to be designed into the product.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion Setting & maintaining optimal process condition to get quality product is the aim of :-Correct Answer Quality maintenanceYour Answer Quality maintenance
Match The FollowingQuestion Correct Answer Your Answer
Productivity performance measurement Turnover employee Cost of quality
Financial performance measurement Sales of the months Sales of the months
Customer satisfaction measurement Customer complaints per period Customer complaints per period
Staff attitude measurement Employee satisfaction index Employee satisfaction index
Multiple Choice Single AnswerQuestion Recording of the entire setup operators focusing on hand, eye and body movements of the
person doing the setting is done through :-Correct Answer Video recordingYour Answer Video recording
Match The FollowingQuestion Correct Answer Your Answer
In scatter diagram, the strength of relationship can be determined By "correlation coefficient" By"correlation coefficient"
The scatter diagram provides the technique to establish The possible relationship between a pair ofvariables The possible dependency between a pair of variables
The scatter diagram displays The pair of data as a cloud of points The possible relationship between a pairof variables
The scatter is also known as Correlation diagram Correlation diagram
Sem – 3rd Techniques for Operations Efficiency 13
Multiple Choice Single AnswerQuestion What is to be done before selecting benchmarking partner?Correct Answer level of benchmarking is to be decidedYour Answer level of benchmarking is to be decided
True/FalseQuestion Flow chart helps to stop an old process.Correct Answer FalseYour Answer False
Select The BlankQuestion Create as many ________ system as possible for better Seiketsu.Correct Answer Visual controlYour Answer Labeling
Multiple Choice Single AnswerQuestion Allowing worker's to stop machine / assembly line if they believe that product quality is below
standard' is an example of :-Correct Answer EmpowermentYour Answer Empowerment
Multiple Choice Single AnswerQuestion Kanban Signals are required when :-Correct Answer Set up time on the feeding operation is higher then the receiving operation.Your Answer Set up time on the feeding operation is higher then the receiving operation.
Multiple Choice Single AnswerQuestion Kanban system isCorrect Answer 1. Pull SystemYour Answer 1. Pull System
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-Correct Answer Improve qualityYour Answer Improve quality
Multiple Choice Single AnswerQuestion To avoid short receipt of items to customers, provide the dispatch clerk with :Correct Answer The check list for verificationYour Answer The check list for verification
True/FalseQuestion Control chart is also called as 'Mean -Range or X-chart'.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Flow chart is required :-Correct Answer When trying to improve the process , At the time of review of the process , To
understand steps in a process by pictorial presentationYour Answer When trying to improve the process , At the time of review of the process , To understand
steps in a process by pictorial presentation , For defects finding of the products
Select The BlankQuestion ________ is the critical element of TQM.Correct Answer Focus on customerYour Answer Focus on customer
Sem – 3rd Techniques for Operations Efficiency 14
Multiple Choice Multiple AnswerQuestion Management skill includes :-Correct Answer Leadership , Motivation , Performance appraisalsYour Answer Leadership , Motivation , Performance appraisals , Quality measurement
Multiple Choice Single AnswerQuestion 5-S technique is useful to:Correct Answer To all places including homesYour Answer To all places including homes
True/FalseQuestion Safety, hygiene and environment control is one of the pillar of TPM.Correct Answer TrueYour Answer True
Select The BlankQuestion Inspection activity for semi finished & finished component should be ________ to reduce muda
of transport .Correct Answer DecentralizedYour Answer Decentralized
True/FalseQuestion Flow chart is pictorial representation of the steps in production control.Correct Answer FalseYour Answer True
Select The BlankQuestion Good ________ is the asset to acquire the success of quality circle.Correct Answer TeamworkYour Answer Teamwork
3rd Copy
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Advantages of JIT :-
Correct Answer Reduce incoming inspection , Reduce inventory , Lower per unit cost
Your Answer Reduce incoming inspection , Reduce inventory , Lower per unit cost
Multiple Choice Multiple AnswerQuestion Benefits from the standardized containers are
Correct Answer Minimization of transit damages , Ease in verification of quantity of parts , Automaticsignal to supplier to replenish stock
Your Answer Minimization of transit damages , Ease in verification of quantity of parts , Automaticsignal to supplier to replenish stock
Multiple Choice Multiple AnswerQuestion Benefits from SMED are :-
Correct Answer Reduce work in process , Better average daily production , Increase capacity
Sem – 3rd Techniques for Operations Efficiency 15
Your Answer Reduce work in process , Increase capacity
Multiple Choice Single AnswerQuestion Competitive benchmarking involves identifying key competitive product, services or
processes & comparing with those of :-Correct Answer Main competitor
Your Answer Main competitor
Multiple Choice Multiple AnswerQuestion Benefits of stratification are :-
Correct Answer It helps to separate data into groups so that you can draw connect & meaningfulinference , It helps to diagnose & localize problem , It helps to identify the influencingfactors
Your Answer It helps to separate data into groups so that you can draw connect & meaningfulinference , It helps to diagnose & localize problem , Finding out different reasons
Multiple Choice Multiple AnswerQuestion Quality maintenance & pillar focuses on following production inputs :-
Correct Answer Men , Machine , Material
Your Answer Men , Machine , Management
Multiple Choice Single AnswerQuestion The success indicators in quality, cost, delivery & product development are :-
Correct Answer Managing points
Your Answer Accountability
Multiple Choice Multiple AnswerQuestion Steps in setup time reduction are :-
Correct Answer Team formation , Training , Recoding of activities on multiple activity charts
Your Answer Team formation , Recoding of activities on multiple activity charts , Convert externalsetups in to internal setups
Multiple Choice Multiple AnswerQuestion POM essentially consists of :-
Correct Answer Time management , Team participation and performance , Moral boosting
Your Answer Time management , Team participation and performance , Cost Management
Multiple Choice Single AnswerQuestion Activity under quality management is :-
Correct Answer Use team approach to track down root causes of the problem
Your Answer Maintenance of equipment condition by eliminating lubricant leakage.
Sem – 3rd Techniques for Operations Efficiency 16
True/FalseQuestion Every department should make their own rules of standardization.
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Histogram is an important diagnostic tool. Analysis of the histogram gives :-
Correct Answer It shows cause which affects the process , An idea of what is happening to the process, Whether the process is capable of meeting process or not i.e. around correct average& within specific limits
Your Answer It shows cause which affects the process , An idea of what is happening to the process, Whether the process is capable of meeting process or not i.e. around correct average& within specific limits
Match The FollowingQuestion Correct Answer Your Answer
Productivity performancemeasurement
Turnover employee Sales of the months
Financial performancemeasurement
Sales of the months Cash saving per department
Customer satisfactionmeasurement
Customer complaints per period Customer complaints per period
Staff attitude measurement Employee satisfaction index Employee satisfaction index
Multiple Choice Single AnswerQuestion TPM helps to reduce down time due to:-
Correct Answer Breakdown of machine
Your Answer Breakdown of machine
Multiple Choice Single AnswerQuestion Kaizen emphasizes :-
Correct Answer Implementation of ideas
Your Answer Collection of ideas
Select The BlankQuestion Create as many ________ system as possible for better Seiketsu.
Correct Answer Visual control
Your Answer Visual control
True/FalseQuestion Inadequate maintenance of machine leads to muda of defects
Sem – 3rd Techniques for Operations Efficiency 17
Correct Answer True
Your Answer False
Select The BlankQuestion The shape of histogram can provide a clue about the ________ of the lot.
Correct Answer Quality
Your Answer Distribution
Multiple Choice Single AnswerQuestion Customer's return is an indicators of the MUDA of :-
Correct Answer Defect
Your Answer Defect
Multiple Choice Single AnswerQuestion In bar graph the interval (gap) between the bars is :-
Correct Answer Equal
Your Answer Symmetrical
True/FalseQuestion Inspection is poor method of assuring 100% quality.
Correct Answer True
Your Answer False
True/FalseQuestion A radar chart is combination of a circle & line graph
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion A workshop is to be treated as :-
Correct Answer Place where one's creativity can be applied
Your Answer Place where one's creativity can be applied
True/FalseQuestion Customer wise outstanding is discussed in daily work management meeting by
operations head.Correct Answer False
Your Answer True
Sem – 3rd Techniques for Operations Efficiency 18
True/FalseQuestion Number of operation can change according to production requirement in U-Line
arrangement.Correct Answer False
Your Answer True
True/FalseQuestion Automation can correct the basic faults of a improper setup process.
Correct Answer False
Your Answer True
Select The BlankQuestion Cp for six sigma process is ________
Correct Answer 2
Your Answer 1.66
Select The BlankQuestion Range ( R ) is obtained as the difference between the highest and ________
measurement of a sample.Correct Answer Lowest
Your Answer Second highest
Select The BlankQuestion ________is an important step toward successful JIT purchasing.
Correct Answer JIT Contract
Your Answer JIT Contract
True/FalseQuestion U-Line layout is better than straight lime layout.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion TQM applicable to :-
Correct Answer Marketing, design & manufacturing
Your Answer Quality Control department
Select The Blank
Sem – 3rd Techniques for Operations Efficiency 19
Question Bar graph is display of data that facilitates ________ of quality.
Correct Answer Comparison
Your Answer Performance
Multiple Choice Single AnswerQuestion Production kanban is presented by :-
Correct Answer P-kanban
Your Answer R-kanban
Multiple Choice Single AnswerQuestion Check sheet are also used as :-
Correct Answer Data gathering & interpretation tool
Your Answer Cause finding & effect finding tool
Select The BlankQuestion Japanese believe that when they are ________ they are cleaning there minds too.
Correct Answer Cleaning
Your Answer Repairing machines
Select The BlankQuestion Poka-Yoke devices under category use ________ to distinguish between similar parts
which may be assembled in wrong position.Correct Answer Color coding
Your Answer Counting device
Select The BlankQuestion Shitsuke means ________ all the previous 4-S throughout the month/year.
Correct Answer Sustaining
Your Answer Implementing
Multiple Choice Multiple AnswerQuestion Types of meetings held in DWM are :-
Correct Answer Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meeting
Your Answer Weekly PDCA meeting , Monthly PDCA meeting , Yearly PDCA meeting
True/FalseQuestion By TPM, consumption of electrical energy can be reduced.
Correct Answer True
Sem – 3rd Techniques for Operations Efficiency 20
Your Answer True
Multiple Choice Multiple AnswerQuestion According to Seiketsu Standardization means :-
Correct Answer To develop easy to follow standards , Evolve standard operating procedure , Bettervisual management
Your Answer To develop easy to follow standards , Evolve standard operating procedure , Reductionof wastage
True/FalseQuestion Flow chart helps to stop an old process.
Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Training related to Quality includes:-
Correct Answer Quality measures , Quality failure
Your Answer Quality measures , Quality failure , Goal of business
Multiple Choice Single AnswerQuestion Total area under the normal curve is
Correct Answer Unity
Your Answer Six
Multiple Choice Multiple AnswerQuestion Cpk =
Correct Answer (x - USL)/3 sigma , (x - LSL)/3 sigma
Your Answer (x - USL)/6 sigma
Select The BlankQuestion A histogram is a graphical display of distribution of measurements & reveals the
amounts of ________ within the process.Correct Answer Variation
Your Answer Percentage defects
Match The FollowingQuestion Correct Answer Your Answer
Value analysis / valueengineering
To eliminate MUDA of processing To eliminate MUDA of overproduction
SMED To eliminate MUDA of overproduction
To eliminate MUDA of defect
Sem – 3rd Techniques for Operations Efficiency 21
VMI ( Vendor ManagementInventory) system
To eliminate MUDA of stock To eliminate MUDA of stock
Flow / string diagram To eliminate MUDA of transport To eliminate MUDA of processing
Select The BlankQuestion A 'Radar chart' is used to portray ________ strength or weakness of the activity.
Correct Answer Relative
Your Answer Comparative
4th Copy
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Performance benchmarking does not involves comparison of financial ratios at the
aggregate level.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Few steps to construct a flow chart are :-
Correct Answer Decide on the objective of flowchart & define boundaries of the process , Identify stepsin the process & construct a draft of the flowchart , Review the draft & connect thechanges as per review & name it & put the data & use it as 'Record'
Your Answer Decide on the objective of flowchart & define boundaries of the process , Identify stepsin the process & construct a draft of the flowchart , Review the draft & connect thechanges as per review & name it & put the data & use it as 'Record'
Select The BlankQuestion In PDCA cycle for benchmarking 'Identification of performance gap' is done in
________.Correct Answer Checking
Your Answer Checking
Select The BlankQuestion 5 S audit result is discussed in ________ meeting.
Correct Answer Monthly
Your Answer Shift beginning
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when value of 'y' decreases
as the value of 'x' increases.Correct Answer Strong negative
Sem – 3rd Techniques for Operations Efficiency 22
Your Answer Strong negative
Select The BlankQuestion Kaizen projects are managed by ________
Correct Answer Cross functional team
Your Answer Management
Multiple Choice Single AnswerQuestion Poka-yoke for employee not performing work as per established method is :-
Correct Answer Implement work standard
Your Answer Implement work standard
Multiple Choice Multiple AnswerQuestion Typical examples of process benchmark are :-
Correct Answer Procurement procedures , Budgeting , Recruitment
Your Answer Procurement procedures , Budgeting , Recruitment
Multiple Choice Multiple AnswerQuestion What are the steps in deciding the benchmarking partner?
Correct Answer Decide level of benchmarking , List down a few prospective candidates of partnership ,Collect information of short listed partners
Your Answer Decide level of benchmarking , Collect information of short listed partners
Multiple Choice Single AnswerQuestion Errors by armatures is :-
Correct Answer Lack of experience
Your Answer Absent mindedness
True/FalseQuestion Control chart is also called as run-chart.
Correct Answer True
Your Answer True
Match The FollowingQuestion Correct Answer Your Answer
Reduce clamping & declampingtime
Use U-shaped washer Use U-shaped washer
Reduce time of external setup Improve work aids positioningmethod
Improve work aids positioningmethod
Sem – 3rd Techniques for Operations Efficiency 23
Convert internal setup intoexternal setup
Preparation of tools / dies as offline activity
Preparation of tools / dies as offline activity
Eliminate adjustment Pre setting of tool Pre setting of tool
Multiple Choice Single AnswerQuestion Muda of defect is very serious in case of:-
Correct Answer High speed automatic machines
Your Answer High speed automatic machines
Multiple Choice Multiple AnswerQuestion To reduce clamping & declamping time, following actions are desirable :-
Correct Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quickclamping device
Your Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quickclamping device
Multiple Choice Single AnswerQuestion Requirement of more machines, is an example of :-
Correct Answer Muda of overproduction
Your Answer Muda of waiting
Multiple Choice Single AnswerQuestion In India quality circle was first launched by :-
Correct Answer Hyderabad unit of BHEL
Your Answer Hyderabad unit of BHEL
Multiple Choice Multiple AnswerQuestion 3M' is world class benchmarking ' candidates in the field of :-
Correct Answer Product development , Technology transfer , Environmental Management
Your Answer Product development , Technology transfer , Environmental Management
Multiple Choice Single AnswerQuestion Responsibility for Quality should rest on:-
Correct Answer Who produce the product
Your Answer Quality control department
True/FalseQuestion Increase in defect rate is an example of 'Deviation from an established norms'
Correct Answer True
Sem – 3rd Techniques for Operations Efficiency 24
Your Answer True
Select The BlankQuestion ________ are implemented for defect detection & prevention.
Correct Answer Poka-Yokes
Your Answer Poka-Yokes
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Improve quality
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-
Correct Answer Gap in performance
Your Answer Lower efficiency
True/FalseQuestion Presentation of graphs in pictorial form of data collection are for easy understanding.
Correct Answer True
Your Answer True
Select The BlankQuestion ________ waste is probably the biggest waste in most of the organizations.
Correct Answer Time
Your Answer Labor
True/FalseQuestion Globalization of trade and industrial operations have forced Indian companies to
become more & more competitive and customer driven.Correct Answer True
Your Answer True
True/FalseQuestion TQM improves the quality by improving processes.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Sem – 3rd Techniques for Operations Efficiency 25
Question An erratic patterns falling above & below the control limits indicates :-
Correct Answer Poorly trained operators , Defect in materials , Frequent adjustment of machines
Your Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators
Multiple Choice Single AnswerQuestion Defects per million for the process at six sigma level are :-
Correct Answer 3.4
Your Answer 6210
Multiple Choice Single AnswerQuestion To provide flexibility to supervisors in allocation of task, JIT emphasizes :-
Correct Answer Multiskilled operators
Your Answer Multiskilled operators
Multiple Choice Single AnswerQuestion To maintain smoothness in production :-
Correct Answer Elimination of buffer stock is recommended
Your Answer Maintenance of buffer stock is recommended.
Select The BlankQuestion ________ should be used to exercise control on the process.
Correct Answer Control chart
Your Answer Latest checking instruments
Match The FollowingQuestion Correct Answer Your Answer
Ideally the histogram will have abell shape
Tapering away on the both sidesfrom average value
Tapering away on the both sidesfrom average value
Histogram is a graphical displayof distribution of measurementsand
Reveals the amount of variationwithin the process
Reveals the amount of variationwithin the process
Histogram is a diagrammaticpresentation of
The frequency distribution of acharacteristics
The frequency distribution of acharacteristics
The shape of histogram can Provide a clue about the qualityof the lot
Provide a clue about the quality ofthe lot
True/FalseQuestion In single card kanban system production greater than quantity withdrawn is permitted.
Correct Answer False
Sem – 3rd Techniques for Operations Efficiency 26
Your Answer False
True/FalseQuestion Flow chart are drawn to document a process charting the tasks performed & the
sequence in which tasks are performed.Correct Answer True
Your Answer True
Select The BlankQuestion Cpk for six sigma process is ________
Correct Answer 1.5
Your Answer 1.5
True/FalseQuestion Seiso prevents the potential problems by discovering abnormalities while cleaning your
own area.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Some steps for stratification are :-
Correct Answer Define the problem & identify the stratification variables , Sort out data into categories& summarise information in each category , Present the information in graphical form &study, decide if further stratification is required?
Your Answer Define the problem & identify the stratification variables , Sort out data into categories& summarise information in each category , Present the information in graphical form &study, decide if further stratification is required?
True/FalseQuestion Processing cost of a product is mainly decided by conversion process.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Work standards enable management to minimize variation in :-
Correct Answer Output , Quality , Cost
Your Answer Output , Quality , Cost
Multiple Choice Multiple AnswerQuestion Process can be made capable by :-
Correct Answer Reducing process variability , Bringing target & average to fall at the same point ,Examine possibility of relaxing specification
Sem – 3rd Techniques for Operations Efficiency 27
Your Answer Reducing process variability , Bringing target & average to fall at the same point , Useof less precision machine
Multiple Choice Multiple AnswerQuestion Few steps in construction of Pie chart are :-
Correct Answer Express value of each category as percentage of total of all categories & calculate thedegree of angle form by each category by equation degree = Value of groups/Totalvalue * 360 , Draw the circle & segment the circle into angles calculated in step one ,Colour different segments & enter the percentage of each category into pie chart
Your Answer Express value of each category as percentage of total of all categories & calculate thedegree of angle form by each category by equation degree = Value of groups/Totalvalue * 360 , Draw the circle & segment the circle into angles calculated in step one ,Colour different segments & enter the percentage of each category into pie chart
Multiple Choice Multiple AnswerQuestion As benchmark in Japan seiso activities means :-
Correct Answer Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees ,Every family does cleaning of pavement of their residence
Your Answer Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees ,Every family does cleaning of pavement of their residence
Select The BlankQuestion Poka Yoke designed to help operators to know immediately ________ of the defeat
called detection type Poka-Yoke.Correct Answer On occurrence
Your Answer Before Occurrence
Select The BlankQuestion Flow chart helps to dissect a process for better understanding & ________ of process.
Correct Answer Analysis
Your Answer Analysis
Multiple Choice Single AnswerQuestion Small groups forming a circle should consist of :-
Correct Answer Employees of different department related to the problem
Your Answer Employees of same department
Select The BlankQuestion Graphs convey a situation more ________ than summary of data or figures.
Correct Answer Effectively & clearly
Your Answer Effectively & clearly
Multiple Choice Single AnswerQuestion Number of Kaizen projects suggested and implemented is checking point for :-
Sem – 3rd Techniques for Operations Efficiency 28
Correct Answer Continual Improvement
Your Answer Continual Improvement
5th Copy
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Quality maintenance & pillar focuses on following production inputs :-
Correct Answer Material , Men , Machine
Your Answer Material , Men , Machine
Multiple Choice Multiple AnswerQuestion Histograms are useful to :-
Correct Answer Measure the current pattern & extent of variation , Assess current conformance tospecification & scope of improvement , Determine whether or not the process is in thestate of control
Your Answer Measure the current pattern & extent of variation , Assess current conformance tospecification & scope of improvement , Determine whether or not the process is in thestate of control
Multiple Choice Single AnswerQuestion In problem solving the best alternative is that :-
Correct Answer Which best meets the criteria
Your Answer Which best meets the criteria
Multiple Choice Single AnswerQuestion "Cause & effect" diagram was developed by :-
Correct Answer DR.Kaoru Ishikawa
Your Answer DR.Kaoru Ishikawa
Multiple Choice Single AnswerQuestion Identifying key preventive operational functions and comparing these operational
functions within the firm's own division & branches comes under :-Correct Answer Internal benchmarking
Your Answer Internal benchmarking
Select The BlankQuestion JIT advocates the philosophy at elimination of waste from system which occurs due to
________.Correct Answer Over Production
Sem – 3rd Techniques for Operations Efficiency 29
Your Answer Over Production
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when there is positive
relationship upto certain level & negative thereafter or negative relationship uptocertain level & positive thereafter.
Correct Answer Curvilinear
Your Answer Curvilinear
True/FalseQuestion Kanban signals are required when assembly work, subassembly work and
manufacturing at parts is carried out at different locations.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Customers complaints may be segregated by :-
Correct Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity
Your Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity
True/FalseQuestion In case of more than one quality characteristics, separate chart is made for each
quality characteristics.Correct Answer True
Your Answer True
True/FalseQuestion Safety, hygiene and environment control is one of the pillar of TPM.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion 5-S technique is useful to:
Correct Answer To all places including homes
Your Answer To all places including homes
Match The FollowingQuestion Correct Answer Your Answer
Reduce time of external setup Improve work aids positioningmethod
Improve work aids positioningmethod
Convert internal setup intoexternal setup
Preparation of tools / dies as offline activity
Preparation of tools / dies as offline activity
Sem – 3rd Techniques for Operations Efficiency 30
Eliminate adjustment Pre setting of tool Pre setting of tool
Reduce clamping & declampingtime
Use U-shaped washer Use U-shaped washer
Multiple Choice Single AnswerQuestion The facilitator should be normally :-
Correct Answer Senior officer /Shop incharge
Your Answer Senior officer /Shop incharge
Match The FollowingQuestion Correct Answer Your Answer
Parato diagram always indicates Magnitude of defects Philosophy of 20% of the activitycauses 80% of the effect
Parato analysis underlines &operates on
Philosophy of "vital few:trivialmany"
Philosophy of "vital few:trivialmany"
Parato analysis is technique ofidentifying vital causes by
Arranging data according to thedescending order of theirfrequency of occurrence
Arranging data according to thedescending order of theirfrequency of occurrence
Parato diagram is a Bar graphwith height or value drawn by
Arranging data in descendingorder
Magnitude of defects
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Make work easy
True/FalseQuestion Pie chart is also called as angular diagram.
Correct Answer True
Your Answer True
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when value of 'y' somewhat
decreases as the value of 'x' increases.Correct Answer Weak negative
Your Answer Weak negative
Multiple Choice Single AnswerQuestion From scatter diagram the strength of relationship between two variables or associated
set of data can be inferred from the examination of the shape of :-Correct Answer Cloud
Your Answer Cloud
Sem – 3rd Techniques for Operations Efficiency 31
Multiple Choice Multiple AnswerQuestion Product benchmarking requires, comparison of product :-
Correct Answer Performance , Features , Cost
Your Answer Performance , Features , Cost
Multiple Choice Multiple AnswerQuestion Steps in construction of scatter diagram :-
Correct Answer Collect paired data (X,Y) from two variables who's relationship is to be studied , Findout max & min values for both X & Y and these values to scale X & Y axis & plot thepaired data , Examine the shape of the cloud of points & discover type & strength ofrelationship
Your Answer Collect paired data (X,Y) from two variables who's relationship is to be studied , Findout max & min values for both X & Y and these values to scale X & Y axis & plot thepaired data , Examine the shape of the cloud of points & discover type & strength ofrelationship
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-
Correct Answer Gap in performance
Your Answer Gap in performance
Select The BlankQuestion Each quality characteristic has permitted variation & is equal to ________.
Correct Answer USL - LSL
Your Answer USL - LSL
Select The BlankQuestion Kaizen is ________ supported process.
Correct Answer Management
Your Answer Management
True/FalseQuestion The flow charts are prepared to enhance the employees understanding of the process
by indicating interrelationship within the process.Correct Answer True
Your Answer False
True/FalseQuestion Gap analysis for production & dispatches is discussed in monthly meeting.
Correct Answer False
Your Answer False
Sem – 3rd Techniques for Operations Efficiency 32
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when value of 'y' decreases
as the value of 'x' increases.Correct Answer Strong negative
Your Answer Strong negative
Select The BlankQuestion ________ is most difficult 'S' to implement & achieve.
Correct Answer Shitsuke
Your Answer Shitsuke
True/FalseQuestion Presentation of graphs in pictorial form of data collection are for easy understanding.
Correct Answer True
Your Answer True
Select The BlankQuestion Graphs convey a situation more ________ than summary of data or figures.
Correct Answer Effectively & clearly
Your Answer Effectively & clearly
Multiple Choice Single AnswerQuestion Errors by armatures is :-
Correct Answer Lack of experience
Your Answer Lack of experience
Multiple Choice Multiple AnswerQuestion While preparing scatter diagram following precautions are to be taken :-
Correct Answer Data should be properly stratified & should be collected for full range , Scale selectedshould be right to avoid wrong conclusions , Data should be free from bias or undueimportance
Your Answer Data should be properly stratified & should be collected for full range , Scale selectedshould be right to avoid wrong conclusions , Data should be free from bias or undueimportance
True/FalseQuestion Globalization of trade and industrial operations have forced Indian companies to
become more & more competitive and customer driven.Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Sem – 3rd Techniques for Operations Efficiency 33
Question If 'Annual saving in procurement expenses is managing point', then checking points willbe :-
Correct Answer Price revision , Credit period , Transport expenses
Your Answer Price revision , Credit period , Transport expenses
Multiple Choice Single AnswerQuestion Number of kaizen in Group kaizen categories are :-
Correct Answer Two to three per year
Your Answer Two to three per year
True/FalseQuestion Flow chart is pictorial representation of the steps in production control.
Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion It is essential to convey customer's expectations to :-
Correct Answer Top Management
Your Answer Supervisors & workmen
Multiple Choice Single AnswerQuestion Check sheet is easy to use because it is :-
Correct Answer Simplest tool
Your Answer Simplest tool
Select The BlankQuestion Identification of non-value added operations & their elimination is the first step to
eliminate muda of ________.Correct Answer Processing
Your Answer Processing
Select The BlankQuestion A 'Radar chart' is used to portray ________ strength or weakness of the activity.
Correct Answer Relative
Your Answer Relative
Multiple Choice Single AnswerQuestion Pareto's analysis underlines & operates philosophy of :-
Correct Answer Vital few = trivial many
Sem – 3rd Techniques for Operations Efficiency 34
Your Answer Vital few = trivial many
True/FalseQuestion In single card kanban system production greater than quantity withdrawn is permitted.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Benefits of planned maintenance are :-
Correct Answer Improved reliability mean time between failures , Improved maintainability mean time torepair , Improvement in breakdown
Your Answer Improved reliability mean time between failures , Improved maintainability mean time torepair
Multiple Choice Multiple AnswerQuestion Gap analysis & problem identification is done during converting internal setups into
external setups in the areas like :-Correct Answer Equipment , Method , Human
Your Answer Equipment , Method , Human
Multiple Choice Single AnswerQuestion Some quantity in stock of item, is desirable if :-
Correct Answer Manufacturing lead time is more
Your Answer Manufacturing lead time is more
Multiple Choice Single AnswerQuestion Sorting of usable items should be
Correct Answer Planned storage based on frequency of use
Your Answer Within visual reach method
Multiple Choice Multiple AnswerQuestion Benefits of Quality maintenance are :-
Correct Answer Reduction in customer quality complaints , Reduction in inspection time
Your Answer Reduction in customer quality complaints , Reduction in inspection time
5th Copy
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Advantages of JIT :-Correct Answer Reduce incoming inspection , Reduce inventory , Lower per unit costYour Answer Reduce incoming inspection , Reduce inventory , Lower per unit cost
Sem – 3rd Techniques for Operations Efficiency 35
Multiple Choice Multiple AnswerQuestion Benefits from the standardized containers areCorrect Answer Minimization of transit damages , Ease in verification of quantity of parts , Automatic
signal to supplier to replenish stockYour Answer Minimization of transit damages , Ease in verification of quantity of parts , Automatic
signal to supplier to replenish stock
Multiple Choice Multiple AnswerQuestion Benefits from SMED are :-Correct Answer Reduce work in process , Better average daily production , Increase capacityYour Answer Reduce work in process , Increase capacity
Multiple Choice Single AnswerQuestion Competitive benchmarking involves identifying key competitive product, services or processes
& comparing with those of :-Correct Answer Main competitorYour Answer Main competitor
Multiple Choice Multiple AnswerQuestion Benefits of stratification are :-Correct Answer It helps to separate data into groups so that you can draw connect & meaningful
inference , It helps to diagnose & localize problem , It helps to identify the influencing factorsYour Answer It helps to separate data into groups so that you can draw connect & meaningful
inference , It helps to diagnose & localize problem , Finding out different reasons
Multiple Choice Multiple AnswerQuestion Quality maintenance & pillar focuses on following production inputs :-Correct Answer Men , Machine , MaterialYour Answer Men , Machine , Management
Multiple Choice Single AnswerQuestion The success indicators in quality, cost, delivery & product development are :-Correct Answer Managing pointsYour Answer Accountability
Multiple Choice Multiple AnswerQuestion Steps in setup time reduction are :-Correct Answer Team formation , Training , Recoding of activities on multiple activity chartsYour Answer Team formation , Recoding of activities on multiple activity charts , Convert external
setups in to internal setups
Multiple Choice Multiple AnswerQuestion POM essentially consists of :-Correct Answer Time management , Team participation and performance , Moral boostingYour Answer Time management , Team participation and performance , Cost Management
Multiple Choice Single AnswerQuestion Activity under quality management is :-Correct Answer Use team approach to track down root causes of the problemYour Answer Maintenance of equipment condition by eliminating lubricant leakage.
True/FalseQuestion Every department should make their own rules of standardization.Correct Answer FalseYour Answer True
Multiple Choice Multiple Answer
Sem – 3rd Techniques for Operations Efficiency 36
Question Histogram is an important diagnostic tool. Analysis of the histogram gives :-Correct Answer It shows cause which affects the process , An idea of what is happening to the process
, Whether the process is capable of meeting process or not i.e. around correct average & within specificlimitsYour Answer It shows cause which affects the process , An idea of what is happening to the process
, Whether the process is capable of meeting process or not i.e. around correct average & within specificlimits
Match The FollowingQuestion Correct Answer Your Answer
Productivity performance measurement Turnover employee Sales of the months
Financial performance measurement Sales of the months Cash saving per department
Customer satisfaction measurement Customer complaints per period Customer complaints perperiod
Staff attitude measurement Employee satisfaction index Employee satisfaction index
Multiple Choice Single AnswerQuestion TPM helps to reduce down time due to:-Correct Answer Breakdown of machineYour Answer Breakdown of machine
Multiple Choice Single AnswerQuestion Kaizen emphasizes :-Correct Answer Implementation of ideasYour Answer Collection of ideas
Select The BlankQuestion Create as many ________ system as possible for better Seiketsu.Correct Answer Visual controlYour Answer Visual control
True/FalseQuestion Inadequate maintenance of machine leads to muda of defectsCorrect Answer TrueYour Answer False
Select The BlankQuestion The shape of histogram can provide a clue about the ________ of the lot.Correct Answer QualityYour Answer Distribution
Multiple Choice Single AnswerQuestion Customer's return is an indicators of the MUDA of :-Correct Answer DefectYour Answer Defect
Multiple Choice Single AnswerQuestion In bar graph the interval (gap) between the bars is :-Correct Answer EqualYour Answer Symmetrical
True/FalseQuestion Inspection is poor method of assuring 100% quality.
Sem – 3rd Techniques for Operations Efficiency 37
Correct Answer TrueYour Answer False
True/FalseQuestion A radar chart is combination of a circle & line graphCorrect Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion A workshop is to be treated as :-Correct Answer Place where one's creativity can be appliedYour Answer Place where one's creativity can be applied
True/FalseQuestion Customer wise outstanding is discussed in daily work management meeting by operations
head.Correct Answer FalseYour Answer True
True/FalseQuestion Number of operation can change according to production requirement in U-Line arrangement.Correct Answer FalseYour Answer True
True/FalseQuestion Automation can correct the basic faults of a improper setup process.Correct Answer FalseYour Answer True
Select The BlankQuestion Cp for six sigma process is ________Correct Answer 2Your Answer 1.66
Select The BlankQuestion Range ( R ) is obtained as the difference between the highest and ________ measurement of
a sample.Correct Answer LowestYour Answer Second highest
Select The BlankQuestion ________is an important step toward successful JIT purchasing.Correct Answer JIT ContractYour Answer JIT Contract
True/FalseQuestion U-Line layout is better than straight lime layout.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion TQM applicable to :-Correct Answer Marketing, design & manufacturingYour Answer Quality Control department
Select The BlankQuestion Bar graph is display of data that facilitates ________ of quality.Correct Answer Comparison
Sem – 3rd Techniques for Operations Efficiency 38
Your Answer Performance
Multiple Choice Single AnswerQuestion Production kanban is presented by :-Correct Answer P-kanbanYour Answer R-kanban
Multiple Choice Single AnswerQuestion Check sheet are also used as :-Correct Answer Data gathering & interpretation toolYour Answer Cause finding & effect finding tool
Select The BlankQuestion Japanese believe that when they are ________ they are cleaning there minds too.Correct Answer CleaningYour Answer Repairing machines
Select The BlankQuestion Poka-Yoke devices under category use ________ to distinguish between similar parts which
may be assembled in wrong position.Correct Answer Color codingYour Answer Counting device
Select The BlankQuestion Shitsuke means ________ all the previous 4-S throughout the month/year.Correct Answer SustainingYour Answer Implementing
Multiple Choice Multiple AnswerQuestion Types of meetings held in DWM are :-Correct Answer Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meetingYour Answer Weekly PDCA meeting , Monthly PDCA meeting , Yearly PDCA meeting
True/FalseQuestion By TPM, consumption of electrical energy can be reduced.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion According to Seiketsu Standardization means :-Correct Answer To develop easy to follow standards , Evolve standard operating procedure , Better
visual managementYour Answer To develop easy to follow standards , Evolve standard operating procedure , Reduction
of wastage
True/FalseQuestion Flow chart helps to stop an old process.Correct Answer FalseYour Answer True
Multiple Choice Multiple AnswerQuestion Training related to Quality includes:-Correct Answer Quality measures , Quality failureYour Answer Quality measures , Quality failure , Goal of business
Multiple Choice Single AnswerQuestion Total area under the normal curve isCorrect Answer Unity
Sem – 3rd Techniques for Operations Efficiency 39
Your Answer Six
Multiple Choice Multiple AnswerQuestion Cpk =Correct Answer (x - USL)/3 sigma , (x - LSL)/3 sigmaYour Answer (x - USL)/6 sigma
Select The BlankQuestion A histogram is a graphical display of distribution of measurements & reveals the amounts of
________ within the process.Correct Answer VariationYour Answer Percentage defects
Match The FollowingQuestion Correct Answer Your Answer
Value analysis / value engineering To eliminate MUDA of processing To eliminate MUDA of overproduction
SMED To eliminate MUDA of over production To eliminate MUDA of defect
VMI ( Vendor Management Inventory) system To eliminate MUDA of stock To eliminate MUDA of stock
Flow / string diagramTo eliminate MUDA of transport To eliminate MUDA of processing
Select The BlankQuestion A 'Radar chart' is used to portray ________ strength or weakness of the activity.Correct Answer RelativeYour Answer Comparative
------------------------------------------------------------
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion Performance benchmarking does not involves comparison of financial ratios at the aggregate
level.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Few steps to construct a flow chart are :-Correct Answer Decide on the objective of flowchart & define boundaries of the process , Identify steps
in the process & construct a draft of the flowchart , Review the draft & connect the changes as per review &name it & put the data & use it as 'Record'Your Answer Decide on the objective of flowchart & define boundaries of the process , Identify steps
in the process & construct a draft of the flowchart , Review the draft & connect the changes as per review &name it & put the data & use it as 'Record'
Select The BlankQuestion In PDCA cycle for benchmarking 'Identification of performance gap' is done in ________.Correct Answer CheckingYour Answer Checking
Select The Blank
Sem – 3rd Techniques for Operations Efficiency 40
Question 5 S audit result is discussed in ________ meeting.Correct Answer MonthlyYour Answer Shift beginning
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when value of 'y' decreases as the
value of 'x' increases.Correct Answer Strong negativeYour Answer Strong negative
Select The BlankQuestion Kaizen projects are managed by ________Correct Answer Cross functional teamYour Answer Management
Multiple Choice Single AnswerQuestion Poka-yoke for employee not performing work as per established method is :-Correct Answer Implement work standardYour Answer Implement work standard
Multiple Choice Multiple AnswerQuestion Typical examples of process benchmark are :-Correct Answer Procurement procedures , Budgeting , RecruitmentYour Answer Procurement procedures , Budgeting , Recruitment
Multiple Choice Multiple AnswerQuestion What are the steps in deciding the benchmarking partner?Correct Answer Decide level of benchmarking , List down a few prospective candidates of partnership ,
Collect information of short listed partnersYour Answer Decide level of benchmarking , Collect information of short listed partners
Multiple Choice Single AnswerQuestion Errors by armatures is :-Correct Answer Lack of experienceYour Answer Absent mindedness
True/FalseQuestion Control chart is also called as run-chart.Correct Answer TrueYour Answer True
Match The FollowingQuestion Correct Answer Your Answer
Reduce clamping & declamping time Use U-shaped washer Use U-shaped washer
Reduce time of external setup Improve work aids positioning method Improve work aids positioningmethod
Convert internal setup into external setup Preparation of tools / dies as off line activity Preparation oftools / dies as off line activity
Eliminate adjustmentPre setting of tool Pre setting of tool
Multiple Choice Single AnswerQuestion Muda of defect is very serious in case of:-Correct Answer High speed automatic machines
Sem – 3rd Techniques for Operations Efficiency 41
Your Answer High speed automatic machines
Multiple Choice Multiple AnswerQuestion To reduce clamping & declamping time, following actions are desirable :-Correct Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick
clamping deviceYour Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick
clamping device
Multiple Choice Single AnswerQuestion Requirement of more machines, is an example of :-Correct Answer Muda of overproductionYour Answer Muda of waiting
Multiple Choice Single AnswerQuestion In India quality circle was first launched by :-Correct Answer Hyderabad unit of BHELYour Answer Hyderabad unit of BHEL
Multiple Choice Multiple AnswerQuestion 3M' is world class benchmarking ' candidates in the field of :-Correct Answer Product development , Technology transfer , Environmental ManagementYour Answer Product development , Technology transfer , Environmental Management
Multiple Choice Single AnswerQuestion Responsibility for Quality should rest on:-Correct Answer Who produce the productYour Answer Quality control department
True/FalseQuestion Increase in defect rate is an example of 'Deviation from an established norms'Correct Answer TrueYour Answer True
Select The BlankQuestion ________ are implemented for defect detection & prevention.Correct Answer Poka-YokesYour Answer Poka-Yokes
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-Correct Answer Improve qualityYour Answer Improve quality
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-Correct Answer Gap in performanceYour Answer Lower efficiency
True/FalseQuestion Presentation of graphs in pictorial form of data collection are for easy understanding.Correct Answer TrueYour Answer True
Select The BlankQuestion ________ waste is probably the biggest waste in most of the organizations.Correct Answer TimeYour Answer Labor
Sem – 3rd Techniques for Operations Efficiency 42
True/FalseQuestion Globalization of trade and industrial operations have forced Indian companies to become more
& more competitive and customer driven.Correct Answer TrueYour Answer True
True/FalseQuestion TQM improves the quality by improving processes.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion An erratic patterns falling above & below the control limits indicates :-Correct Answer Poorly trained operators , Defect in materials , Frequent adjustment of machinesYour Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators
Multiple Choice Single AnswerQuestion Defects per million for the process at six sigma level are :-Correct Answer 3.4Your Answer 6210
Multiple Choice Single AnswerQuestion To provide flexibility to supervisors in allocation of task, JIT emphasizes :-Correct Answer Multiskilled operatorsYour Answer Multiskilled operators
Multiple Choice Single AnswerQuestion To maintain smoothness in production :-Correct Answer Elimination of buffer stock is recommendedYour Answer Maintenance of buffer stock is recommended.
Select The BlankQuestion ________ should be used to exercise control on the process.Correct Answer Control chartYour Answer Latest checking instruments
Match The FollowingQuestion Correct Answer Your Answer
Ideally the histogram will have a bell shape Tapering away on the both sides from average valueTapering away on the both sides from average value
Histogram is a graphical display of distribution of measurements and Reveals the amount of variationwithin the process Reveals the amount of variation within the process
Histogram is a diagrammatic presentation of The frequency distribution of a characteristics Thefrequency distribution of a characteristics
The shape of histogram can Provide a clue about the quality of the lot Provide a clue about the quality ofthe lot
True/FalseQuestion In single card kanban system production greater than quantity withdrawn is permitted.Correct Answer FalseYour Answer False
Sem – 3rd Techniques for Operations Efficiency 43
True/FalseQuestion Flow chart are drawn to document a process charting the tasks performed & the sequence in
which tasks are performed.Correct Answer TrueYour Answer True
Select The BlankQuestion Cpk for six sigma process is ________Correct Answer 1.5Your Answer 1.5
True/FalseQuestion Seiso prevents the potential problems by discovering abnormalities while cleaning your own
area.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Some steps for stratification are :-Correct Answer Define the problem & identify the stratification variables , Sort out data into categories
& summarise information in each category , Present the information in graphical form & study, decide iffurther stratification is required?Your Answer Define the problem & identify the stratification variables , Sort out data into categories
& summarise information in each category , Present the information in graphical form & study, decide iffurther stratification is required?
True/FalseQuestion Processing cost of a product is mainly decided by conversion process.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Work standards enable management to minimize variation in :-Correct Answer Output , Quality , CostYour Answer Output , Quality , Cost
Multiple Choice Multiple AnswerQuestion Process can be made capable by :-Correct Answer Reducing process variability , Bringing target & average to fall at the same point ,
Examine possibility of relaxing specificationYour Answer Reducing process variability , Bringing target & average to fall at the same point , Use
of less precision machine
Multiple Choice Multiple AnswerQuestion Few steps in construction of Pie chart are :-Correct Answer Express value of each category as percentage of total of all categories & calculate the
degree of angle form by each category by equation degree = Value of groups/Total value * 360 , Draw thecircle & segment the circle into angles calculated in step one , Colour different segments & enter thepercentage of each category into pie chartYour Answer Express value of each category as percentage of total of all categories & calculate the
degree of angle form by each category by equation degree = Value of groups/Total value * 360 , Draw thecircle & segment the circle into angles calculated in step one , Colour different segments & enter thepercentage of each category into pie chart
Multiple Choice Multiple AnswerQuestion As benchmark in Japan seiso activities means :-Correct Answer Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees ,
Every family does cleaning of pavement of their residence
Sem – 3rd Techniques for Operations Efficiency 44
Your Answer Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees ,Every family does cleaning of pavement of their residence
Select The BlankQuestion Poka Yoke designed to help operators to know immediately ________ of the defeat called
detection type Poka-Yoke.Correct Answer On occurrenceYour Answer Before Occurrence
Select The BlankQuestion Flow chart helps to dissect a process for better understanding & ________ of process.Correct Answer AnalysisYour Answer Analysis
Multiple Choice Single AnswerQuestion Small groups forming a circle should consist of :-Correct Answer Employees of different department related to the problemYour Answer Employees of same department
Select The BlankQuestion Graphs convey a situation more ________ than summary of data or figures.Correct Answer Effectively & clearlyYour Answer Effectively & clearly
Multiple Choice Single AnswerQuestion Number of Kaizen projects suggested and implemented is checking point for :-Correct Answer Continual ImprovementYour Answer Continual Improvement
--------------------------------------------------------------------
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion Quality maintenance & pillar focuses on following production inputs :-Correct Answer Material , Men , MachineYour Answer Material , Men , Machine
Multiple Choice Multiple AnswerQuestion Histograms are useful to :-Correct Answer Measure the current pattern & extent of variation , Assess current conformance to
specification & scope of improvement , Determine whether or not the process is in the state of controlYour Answer Measure the current pattern & extent of variation , Assess current conformance to
specification & scope of improvement , Determine whether or not the process is in the state of control
Multiple Choice Single AnswerQuestion In problem solving the best alternative is that :-Correct Answer Which best meets the criteriaYour Answer Which best meets the criteria
Multiple Choice Single AnswerQuestion "Cause & effect" diagram was developed by :-Correct Answer DR.Kaoru IshikawaYour Answer DR.Kaoru Ishikawa
Multiple Choice Single Answer
Sem – 3rd Techniques for Operations Efficiency 45
Question Identifying key preventive operational functions and comparing these operational functionswithin the firm's own division & branches comes under :-Correct Answer Internal benchmarkingYour Answer Internal benchmarking
Select The BlankQuestion JIT advocates the philosophy at elimination of waste from system which occurs due to
________.Correct Answer Over ProductionYour Answer Over Production
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when there is positive relationship
upto certain level & negative thereafter or negative relationship upto certain level & positive thereafter.Correct Answer CurvilinearYour Answer Curvilinear
True/FalseQuestion Kanban signals are required when assembly work, subassembly work and manufacturing at
parts is carried out at different locations.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion Customers complaints may be segregated by :-Correct Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantityYour Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity
True/FalseQuestion In case of more than one quality characteristics, separate chart is made for each quality
characteristics.Correct Answer TrueYour Answer True
True/FalseQuestion Safety, hygiene and environment control is one of the pillar of TPM.Correct Answer TrueYour Answer True
Multiple Choice Single AnswerQuestion 5-S technique is useful to:Correct Answer To all places including homesYour Answer To all places including homes
Match The FollowingQuestion Correct Answer Your Answer
Reduce time of external setup Improve work aids positioning method Improve work aids positioningmethod
Convert internal setup into external setup Preparation of tools / dies as off line activity Preparation oftools / dies as off line activity
Eliminate adjustmentPre setting of tool Pre setting of tool
Reduce clamping & declamping time Use U-shaped washer Use U-shaped washer
Sem – 3rd Techniques for Operations Efficiency 46
Multiple Choice Single AnswerQuestion The facilitator should be normally :-Correct Answer Senior officer /Shop inchargeYour Answer Senior officer /Shop incharge
Match The FollowingQuestion Correct Answer Your Answer
Parato diagram always indicates Magnitude of defects Philosophy of 20% of the activity causes 80% ofthe effect
Parato analysis underlines & operates on Philosophy of "vital few:trivial many" Philosophy of "vitalfew:trivial many"
Parato analysis is technique of identifying vital causes byArranging data according to the descending orderof their frequency of occurrence Arranging data according to the descending order of their frequency ofoccurrence
Parato diagram is a Bar graph with height or value drawn by Arranging data in descending orderMagnitude of defects
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-Correct Answer Improve qualityYour Answer Make work easy
True/FalseQuestion Pie chart is also called as angular diagram.Correct Answer TrueYour Answer True
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when value of 'y' somewhat
decreases as the value of 'x' increases.Correct Answer Weak negativeYour Answer Weak negative
Multiple Choice Single AnswerQuestion From scatter diagram the strength of relationship between two variables or associated set of
data can be inferred from the examination of the shape of :-Correct Answer CloudYour Answer Cloud
Multiple Choice Multiple AnswerQuestion Product benchmarking requires, comparison of product :-Correct Answer Performance , Features , CostYour Answer Performance , Features , Cost
Multiple Choice Multiple AnswerQuestion Steps in construction of scatter diagram :-Correct Answer Collect paired data (X,Y) from two variables who's relationship is to be studied , Find
out max & min values for both X & Y and these values to scale X & Y axis & plot the paired data , Examinethe shape of the cloud of points & discover type & strength of relationshipYour Answer Collect paired data (X,Y) from two variables who's relationship is to be studied , Find
out max & min values for both X & Y and these values to scale X & Y axis & plot the paired data , Examinethe shape of the cloud of points & discover type & strength of relationship
Sem – 3rd Techniques for Operations Efficiency 47
Multiple Choice Single AnswerQuestion Implication of Quality problem is:-Correct Answer Gap in performanceYour Answer Gap in performance
Select The BlankQuestion Each quality characteristic has permitted variation & is equal to ________.Correct Answer USL - LSLYour Answer USL - LSL
Select The BlankQuestion Kaizen is ________ supported process.Correct Answer ManagementYour Answer Management
True/FalseQuestion The flow charts are prepared to enhance the employees understanding of the process by
indicating interrelationship within the process.Correct Answer TrueYour Answer False
True/FalseQuestion Gap analysis for production & dispatches is discussed in monthly meeting.Correct Answer FalseYour Answer False
Select The BlankQuestion In scatter diagram "________" relationship is said to exist when value of 'y' decreases as the
value of 'x' increases.Correct Answer Strong negativeYour Answer Strong negative
Select The BlankQuestion ________ is most difficult 'S' to implement & achieve.Correct Answer ShitsukeYour Answer Shitsuke
True/FalseQuestion Presentation of graphs in pictorial form of data collection are for easy understanding.Correct Answer TrueYour Answer True
Select The BlankQuestion Graphs convey a situation more ________ than summary of data or figures.Correct Answer Effectively & clearlyYour Answer Effectively & clearly
Multiple Choice Single AnswerQuestion Errors by armatures is :-Correct Answer Lack of experienceYour Answer Lack of experience
Multiple Choice Multiple AnswerQuestion While preparing scatter diagram following precautions are to be taken :-Correct Answer Data should be properly stratified & should be collected for full range , Scale selected
should be right to avoid wrong conclusions , Data should be free from bias or undue importanceYour Answer Data should be properly stratified & should be collected for full range , Scale selected
should be right to avoid wrong conclusions , Data should be free from bias or undue importance
Sem – 3rd Techniques for Operations Efficiency 48
True/FalseQuestion Globalization of trade and industrial operations have forced Indian companies to become more
& more competitive and customer driven.Correct Answer TrueYour Answer True
Multiple Choice Multiple AnswerQuestion If 'Annual saving in procurement expenses is managing point', then checking points will be :-Correct Answer Price revision , Credit period , Transport expensesYour Answer Price revision , Credit period , Transport expenses
Multiple Choice Single AnswerQuestion Number of kaizen in Group kaizen categories are :-Correct Answer Two to three per yearYour Answer Two to three per year
True/FalseQuestion Flow chart is pictorial representation of the steps in production control.Correct Answer FalseYour Answer False
Multiple Choice Single AnswerQuestion It is essential to convey customer's expectations to :-Correct Answer Top ManagementYour Answer Supervisors & workmen
Multiple Choice Single AnswerQuestion Check sheet is easy to use because it is :-Correct Answer Simplest toolYour Answer Simplest tool
Select The BlankQuestion Identification of non-value added operations & their elimination is the first step to eliminate
muda of ________.Correct Answer ProcessingYour Answer Processing
Select The BlankQuestion A 'Radar chart' is used to portray ________ strength or weakness of the activity.Correct Answer RelativeYour Answer Relative
Multiple Choice Single AnswerQuestion Pareto's analysis underlines & operates philosophy of :-Correct Answer Vital few = trivial manyYour Answer Vital few = trivial many
True/FalseQuestion In single card kanban system production greater than quantity withdrawn is permitted.Correct Answer FalseYour Answer False
Multiple Choice Multiple AnswerQuestion Benefits of planned maintenance are :-Correct Answer Improved reliability mean time between failures , Improved maintainability mean time
to repair , Improvement in breakdown
Sem – 3rd Techniques for Operations Efficiency 49
Your Answer Improved reliability mean time between failures , Improved maintainability mean timeto repair
Multiple Choice Multiple AnswerQuestion Gap analysis & problem identification is done during converting internal setups into external
setups in the areas like :-Correct Answer Equipment , Method , HumanYour Answer Equipment , Method , Human
Multiple Choice Single AnswerQuestion Some quantity in stock of item, is desirable if :-Correct Answer Manufacturing lead time is moreYour Answer Manufacturing lead time is more
Multiple Choice Single AnswerQuestion Sorting of usable items should beCorrect Answer Planned storage based on frequency of useYour Answer Within visual reach method
Multiple Choice Multiple AnswerQuestion Benefits of Quality maintenance are :-Correct Answer Reduction in customer quality complaints , Reduction in inspection timeYour Answer Reduction in customer quality complaints , Reduction in inspection time
6th Copy
1) What are the basics steps in the problem solving process? Explain them briefly.Ans:INTRODUCTION: Systematic problem solving provides a structured approach toproblem solving. Depending upon the nature of problem (i.e. maintenance orimprovement problem), some steps may be different.
SOLVING A MAINTENANCE PROBLEM: Maintenance problems as mentionedearlier, surface when the status quo is distributed and decision make needs torecommend/take measures to restore and maintain the status quo.
Fig: Steps to solve a maintenance problem.
(a) Diagnose (define) the problem:Sound diagnosis is the crucial step in the problem solving process. Defining the problemsets the boundaries for that follows. Decision maker, like a doctor, must take into accountall symptoms before prescribing the medicines (i.e. recommending the decision). PeterDrucker rightly states, “The books and articles on leadership are full of advice on how tomake fast, forceful and useful decisions, but there is no more foolish and no more timewasting advice than to decide quickly what a problem really is. Defining the problem inmost instances is a time-consuming task, but it is time well spent.”
Identify a maintenance problem
Collect data on “causes”
Perform Pareto Analysis
Identify root causes
Evolve alternatives & select(Brain storming)
Implement best alternative
Monitor effect
Is the problemresolved?
End
No
Sound diagnosis requires
(i) Measurement of the gap between the desired performance and the actualperformance.
(ii) Identification of the root cause for the gap.
(iii) Identification of the restraints in the decision making process.
(b) Secure and analyse pertinent facts:Once the problem has been diagnosed (defined), the next step is to collect data. Datacollection implies collecting background material, pertinent facts, decision taken in thepast and their outcome, previous solutions to similar problems etc.
General rules are:
(i) The information should be collected from the most reliable source.
(ii) All relevant facts, regardless of how disorganized or unrelated they seem atthe time of data gathering, should be recorded.
(iii) The information should be subjected to checks and cross checks. Theconflicting data must be resolved. The temptation to accept first response toinquiries should be avoided.
(iv) The facts wherever possible should be supported by tangible evidence in theform of copies of the appropriate documents. Facts when cannot be supportedby documentary evidence (i.e. facts which are bases on opinion of theindividuals) should carry the names of the contributors so that they(individuals) can be contacted later if required.
Facts are next analysed to establish:
(i) The length of time to which the decision should apply.(ii) Effect of the decision on other functional areas.(iii) Qualitative considerations to take overall view of the business.
(c) Develop alternative solutions:This step concerns looking for the possible solutions and listing them down. Mostcommon sources of collecting and listing of alternatives include experience, superiors,juniors, consultants, research, creativity, brain storming, critical examination, literatureetc.
It is also the most important step and therefore good amount of time, effort and moneyshould be spent /invested to get good alternative solutions.
Generally, for every problem, alternative solutions exist and efforts need to put to unearththese alternatives. Usually, a brain storming or interaction session with those, concernedwith the problem can highlight several alternatives. For example, the company wasconsidering purchase of a CNC machine. The general manager held a series of brainstorming session of his engineers and following alternatives got identified:
(a) continue to make the part by present method, or
(b) buy the proposed CNC machine, or
(c) buy a machine other than the proposed one, or
(d) improvise the current method of making part (e.g retrofitting the existingmachine improves tooling and gauging method etc.), or
(e) subcontract CNC – compatible operations to a good quality vendor, or
(f) discontinue manufacturing the part at company’s own plant and buy thepart from an outside source.
After evaluating all the alternatives for their merits and demerits, the general manageropted for alternatives ‘d’, ‘e’ and ‘f’ and got the best results.
(d) Evaluate alternatives:Once all the alternative solutions have been enumerated, they are next evaluated. This isusually done by testing each alternative against a set of objectives or specified criteriawhich the solution must meet. The steps involved are:
(i) Each alternative is analysed to see whether or not it meets the “must”objectives. An alternative which does not meet the “must” objective isimmediately removed from further study.
(ii) Alternatives which meet the “must” objectives are next checked for “want”objectives and those which are good in terms of “want” objectives areexamined for adverse consequences. Since each alternative usually entailssome risk, the decision maker next assesses the risk, the probability of risk,the probability or risk, and /or seriousness of the risk.
(iii) Every attempt is made to eliminate or minimize risk (or disadvantages). Tchart analysis is usually helpful.
(iv) Alternatives are next weighed for their effectiveness by identifying their longterm and short term consequences. The advantages of the alternatives arequantified in terms of common denominator, usually the money.
(e) Select the best alternative:
The alternative cleared at the evaluation stage are ranked according to their worth. Finalselection is then made of the alternative which provides the maximum advantages whileentailing acceptance risk (i.e. the alternative that best meets the solution criteria isselected)
(f) Implement the selected decision:Once the final choice has been made the next step is to implement the decision andfollow up for verification of the consequences (or effect of the decision)
Though the steps mentioned above are sequential and separate but usually there isrecycling among the steps. For example, while trying to evaluate alternatives, thedecision maker may have to ho back to data collection step if he finds that he does nothave all the information.
STEPS FOR SOLVING AN IMPROVEMENT PROBLEM:
The Japanese have provided a structured methodology for solving “improvement”problem. The methodology is also known as QC story and it comprises of the followingsix steps based on famous Deming Plan-Do-Check-Act (PDCA) cycle.
Fig: Steps to solve an improvement problem
Define improvement problem
Measure current status
Decide on desired level
Find gap in performance
Set Target
Prepare action plan(counter measure)
Implement countermeasure
Measure /analyseachievement
Satisfactoryperformance?
New target
Stabilize/standardize (SDCA)
Maintain status quo
End
Plan (P)
Do (D)
Check (C)
No
Yes
No
Yes
2. (a) What is “Cause and effect” diagram? How is it useful in analyzing a problem?How is it constructed?Ans: INTRODUCTION: Every organization has contributory causes. The causes need tobe identified to eliminate problems or minimize the effect of the problems. All causesincluding probable causes (i.e. which have not occurred earlier) should be identified sothat preventive action can be taken (After all, prevention is better than cure)
After the causes have been identified, they should be put into a systematic form thatfacilitates presentation and analysis.
Cause and effect diagram is also called as “Ishikawa Diagram” or a fishbone diagram(due to its shape) – an effective tool for diagnosis to a problem – was developed by Dr.Kaoru Ishikawa, a professor of Tokyo University.
The diagram lists out in a classified and systematic manner all causes which areresponsible for the problem (called effect). The diagram consists of a main line torepresent the actual problem and few lines to represent the major causes – materials, men,methods and machines – and horizontal or slanting arrows to represent sub-causes undrelying each main cause.
Procedure:
Step1 : Specify the problem to be solvedFor eg:
(i) Accidents(ii) Process defectives(iii) Employer – employee relations(iv) Delayed delivery(v) Defective bills(vi) Labour efficiency
Step2: Brain storm to find all possible causes of the problem.
Step3: Organize/ arrange these causes in few major themes (i.e. rational categories)
Step4: Construct a cause and effect diagram that accurately displays the relationship ofall data in each category. Steps in the construction of the diagram are as follows:
(a) Draw a box on the far right hand side of a large sheet of paper and write inside thebox the description of the problem to be solved. Also draw a thick arrow thatpoints to the box and look up on this as a main trunk of a tree.
Problem
(b) Enter the titles of the categories (also called themes) above and below thehorizontal line and connect them to horizontal line by vertical or standing arrows.Think of these as branches of the main truck of the tree.
(c) Enter the detailed cause data for each category / theme by arrows meeting thehorizontal or slanting lines (i.e. lines representing the main theme). Look uponthese as limbs or twigs of the branches.
(d) Review diagram drawn above to ensure that no cause has been missed.
Problem
Man Machine
Method Materials
Cause A
Cause B
Cause B
Cause D
Cause A
Cause C
Cause A
Cause C
Cause A
Cause C
Cause C
Cause B Cause B
Cause D
Problem
Man Machine
MaterialsMethod
A cross function team constituted to study problem of employees’ poor morale haveconducted on following probable causes. Draw a “cause and effect” diagram fromthe given data…Ans:
Poor Management selection
Lack of communication
Improper management training
EMPLOYEE
HIRING REWARD/RECOGNITION
MANAGEMENT WORKING CONDITIONS
Poor selection
Incomplete job description
Recruiting errors
Poor Management selection
Low pay level
Wage differentials
Poor benefits
Favoritism
Lack of discipline methods
Public reprimands
Unclear company goals
Faulty working assignment
Bad Lighting
Noise
Temperature
Long working hours
Excessive Criticism
3. a) What is Pie-Chart? How is it constructed?Ans: INTRODUCTION: Pie chart is also called an angular diagram. It is the graph ofpercentage breakdown of data.
Steps in Construction of a PIE CHART:
i. Express value of each category of component group as a percentage of total ofall categories or components or groups.
ii. Calculate degree of the angle formed by each category/component/group asunder
Degree of particular category = Value of the group X 360Total Value
iii. Draw a circle of a suitable diameter (say diameter of 3”)iv. Segment the circle into angles calculated in step 2 with the help of a protractor
v. Shade or color different segments suitable to make distinction betweendifferent categories.
vi. Enter the percentage of each category in to the pie chart.
b) Draw a Pie Chart to represent the following population in a village.
Males Females Girls Boys Total2000 1800 4200 2000 10000
Sol:
S.No Gender Population Population % Degree1. Males 2000 20% 72o
2. Females 1800 18% 64.8o
3. Girls 4200 42% 151.2o
4. Boys 2000 20% 72o
Total 10000 100%
POPULATION
Girls42%
Females18%
Males20%
Boys20%
Males Females Girls Boys
4. a) What is Pareto’s analysis? How is it used for problem solving?Ans: Introduction: Every problem is the result of few causes and all causes are notequally important. Some causes are more significant than others. Pareto’s analysisunderlines and operates his philosophy of “vital few: trivial many”. It is a technique ofidentifying vital causes by arranging the data according to the descending order of theirfrequency of occurrence.
Pareto’s diagram is the outcome of the study conducted by Vilfredo Pareto to study thephenomenon of wealth in his country. Pareto observed that in his native country 80% ofthe wealth was held by 20% of the population. He eventually realized that he haddiscovered a universal law – around 20% of the activity causes 80% of the effect.
For Example: 80% to 90% of the Italy’s wealth lay in the hands of 10% to 20% of the
population. 80% of the accidents occur on 20% of the roads (i.e. some roads are more
dangerous than others) 80% of the shopping that takes place is done in 20% of the time of the store are
open.(i.e. people try to shop at the same time). 80% of the absenteeism in a company is generally on account of 20% of the work
force. 20% of the machines are responsible for 80% of the total down time. 20% of the end products generate 80% of sales revenue. 20% of the clerks make 80% of the clerical errors. 20% of the employees create 80% of the troubles.
20% of the customers are responsible for 80% of the bad debts. 20% of the total items in the stock account for 80% of the annual expenditure on
materials.
U.S Economist M.C. Lorenz presented this lop sided distribution in the form oftheoretical curve, called Lorenz’s curve. Dr. J. M. Juran observed similar phenomenon inmany other fields including quality. He names this phenomenon as Pareto Analysis inhonor of the originator of the concept.
We need to follow few steps in order to solve the problems using Pareto’s Chart. Theyare listed as follows:
1) Select the problem and identify causes into a handful of categories. For example,for a problem of “late coming to works”, possible categories of causes may beheavy traffic oversleeping, sickness, vehicle problem, family problem etc.
2) Select the standard unit for measurement (e.g. frequency, cost, sales etc.)3) Select the time period over which data will be collected (e.g. 8 hours, 5 days, 2
weeks, etc.)4) Collect necessary data on each category and summarize results.
It is generally convenient to create a three-column-table having heading as “errorcategory”. “frequency (or cost)”, and “percentage of total”. This information canbe directly taken from the check sheet.
5) Rearrange the data in the descending order of the frequency or cost.6) Organize the Pareto’s chart
(a) Draw two vertical axis, one on either side of a horizontal side axis (leavingenough space on the horizontal axis to list the problem categories). Markthe frequency of occurrence of the problem along left vertical axis andpercentage along right vertical axis.
(b) Divide the horizontal axis into intervals equal to the number of categories.(c) List down the categories from left to right in their order of decreasing
frequency or cost.(d) Construct a bar or rectangle above each category with height equal to
frequency or cost.
7) Draw the cumulative line /curve (Pareto’s curve) by plotting each point at theright hand corner of each bar and them connecting these points.
8) Write all necessary information concerning the diagram.
b) Shrivastive, an administrative officer, working with Dattatreya Chemicals Ltd.has been receiving frequent complaints from internal customers regarding late andwrong receipt of mail delivered by his department. In order to correct the problem,he called a meeting of a small group of his internal customers and with their helpidentified five error categories, namely mail behind schedule, wrong deliveries, andlate delivery of outgoing mail to post office, rude clerks and incorrect charges.
The administrative officer then started tracking complaints. The data collected byhim in a 30-day span in the form of a check-sheet reproduced below.
Error Category Tally Mark FrequencyBehind schedule mail lllll ll 7Wrong delivery of mail lllll lllll lllll 20Late delivery of outgoing mail to P.O lllll lllll ll 12Rude clerks l 1Incorrect charges lllll 5
Total 45Draw a Pareto’s Chart.Sol:
1. Collect the data concerning the problem under study.2. Rearrange the data in the descending order.
Error Category Frequency %of Error to total Cumulative%Wrong delivery of mail 20 44.44 44.44Late delivery… 12 26.67 72.1Behind schedule mail 7 15.55 86.65Incorrect charges 5 11.11 97.76Rude clerks 1 2.22 100.00
PARETO's DIAGRAM
2012 7 5 1
44.44
26.6715.55 11.11
2.22
44.44
72.1
86.6597.76 100
0
20
40
60
80
100
120
0 2 4 6
Frequency
%of Error to total
Cumulative%
Log. (Cumulative%)
5. What are the quality circles? How are they formed? Explain briefly theorganization of quality circles.Ans:Introduction: Quality circle is basically a small group of employees – who volunteer tomeet regularly to undertake work related projects – quality, productivity, safety,efficiency, cost, working conditions, etc., - and evolve recommendations to improveeffectiveness in the selected functional area.
The size of quality circle is important. Too big a size 9 (too many members) may notprovide enough time to each member to effectively participate and too small a size maymake a circle dormant. An ideal size of the circle is eight to ten members but in any caseit should not exceed fifteen members.
More than one circle may be formed if too many employees in a particular work area arewilling to participate in the quality circle activities. For example, if there are 25 clerks inthe organization doing identical jobs, 2 to 3 circles may be formed.
Participation in the circle activities is absolutely voluntary. Members are not selected/nominated. They are not elected or rotated either. Employees, however, are encouragedto form circles.Ideally, members of a particular circle should be from the same area or who do similarwork so that problems that they select /analyse / discuss will be familiar to all of them.
Brief History: Japanese Union of Scientists and Engineers (JUSE) was established in1946 after the World War II in which Japanese industries were completely destroyed.JUSE worked for growth and development of quality and in 1950 it invited Dr. EdwardDeming, a renowned American expert on quality to visit Japan. Dr. Deming delivered aseries of lectures on various aspects of quality control to the top management of severalcompanies of Japan.These circles have lifted war-ravaged Japan to its present dominant position and haveendangered even the very existence of American industry. A quality circle in Japan onthe average saves $56, 000. All this is achieved without any monetary incentives. Around25% of the profitability of the Japanese industries is attributed to the quality circles.Nissan motor, for example works with 57,000 employees, has 4,200 quality circles whichhave helped the company to double its productivity in ten years.
Quality circles in India were first launched in the Hyderabad unit of BHEL in 1980 whichhas now around 100 quality circles in its various branches throughout India. Qualitycircles forum of India was formed in 1982 to propagate concept. The concept of qualitycircles is gaining momentum and quite a few firms in the private and public sector –Kirloskars, Alwayns, Tata’s, H.A., Bharat Forge, Balaji Auto, Vulcan Laval, RourkelaSteel plant etc., have instituted quality circles.
Organization for quality circles: The Organization of circles consists of:
i. Steering Committee: Steering committee is the apex body at the highest level
of the plant which is made up of heads of the major departments likeProduction, Finance, Materials, Marketing, Engineering, Quality Assurance,etc, and is headed by the Chief Executive of the plant. The committee meetperiodically and it-o Evolves policies and guidelines for the formation, functioning and growth
of quality circles.o Appoints facilitators and a co-coordinator.o Identifies overall quality and productivity problems in the organization.o Authorizes budget for quality circle activitieso Takes part in top management presentation and annual get-togetherso Demonstrates, in visible manner, management commitment and supporto Reviews performance of the quality circles regularly on the basis of
reports from the coordinator and facilitators.o Evolves guidelines for recognizing the good performance of quality
circles.
The head of the Quality Assurance department takes the responsibility of convening themeeting of the committee.
ii. Facilitators: The facilitators are selected by the steering committee tosupervise the activities of two, three or more circles. Facilitator is usually asenior officer nominated by the management who is incharge of shop ordepartment. The facilitator acts as a teacher, a promoter, a catalyst, and aguide to the quality circles. The responsibilities of the facilitators include:o To co-ordinate the activities of quality circles under their supervision and
guidanceo To train QC leaders and lend help in training QC members.o To interface between circleso To render support and assistance to the circles under his control.o To encourage employees to form more QC’so To demonstrate support of the management.
iii. Leaders: A leader acts as an integral part of the quality circle. The leadersshould have good knowledge of statistical methods and approaches to be usedto identify and analysis problems. The leaders also, like other regularmembers, participate in the discussions. The leader should preferably be thefirst line supervisor but it not essential. Supervisors taking over the task ofleaders ensure some leadership quality inputs are already available.
Responsibilities of the leader are:o To conduct training of members of the circle with the help of facilitator
and other agencies.o To prepare agenda for the meetings.o To organize and conduct meetingo To evolve action plans and milestone charts to compare actual progress
with targets by periodic reviews and take mid-course correction.
o To assign roles to members and to guide them for effective contributiontowards the achievement of goals.
o To ensure participation and involvement of all members in the activities ofthe circle.
o To ensure records and liaison with other agencies to obtain help in solvingthe problem
o To catalyse attitudinal changes in his own and other related areas.o To make management presentationso To take sincere interest individually by active involvement in the progress
of quality circle movement.o To endeavour to promote quality circles as a way of life in the
organization.
iv. Members: Members form hard core of the quality circles; Members areselected on “purely voluntarily basis” and are from the same or similarfunctional areas. The group should basically be small, between 8 to 10members. The members should have adequate education and experience in theconcerned field and should have the ability to express clearly and freely.
v. Co-ordinator: In a large manufacturing organization, some agency – usuallyQuality Assurance – is required to co-ordinate the activities of the qualitycircles. The responsibility of the coordinating department includes:o Rendering assistance as request by circleso Disseminating literature relating to circle activities elsewhereo Organizing training programmeso Publishing newsletter to communicate circle activitieso Providing circles with necessary facilities for the meetingo Organizing social get-together for circle members and senior executives
6. “5-S is an excellent technique to achieve good house-keeping”. Discuss.Ans: Introduction: Good housekeeping is the foundation for and first step towardsquality achievement in a manufacturing organization. It boosts employee morale andinspires customer confidence.
Good quality of work place is essential as –1. Good environment has a strong influence on the people and the quality of product
they produce.2. A customer visiting the plant sees in a quality work place a guarantee for the
product quality.3. Good housekeeping helps to eliminate waste by identifying non-value added
activities, such as searching for tools, time lost in reaching out to retrieve items,over production, etc.
4. Housekeeping reflects management’s general attitude towards work in theorganization.
Housekeeping is measured the way- Factory floor are swept and machines are cleaned- Tools are stored- Scarp and chips from machines are handled- Work tables are organized- Personal items are stored- Records are maintained- Targets and achievements are displayed or communicated to employees.
Good housekeeping is simply the basic to a better workplace and to –
- Reduce cost of products and service- Achieve discipline in manufacturing- Bring improvement in quality and productivity
5-S (Seiri, Seiton, Seiso, Seiketsu and Shitsuke) are considered in Japan the basics of anyjob. 5-S principles have been practiced in Japan the basics of any job. 5-S principles havebeen practiced in Japan to establish and maintain quality environment in the organization.Japanese managements are of the view that if the housekeeping in a plant is weak, nofurther diagnosis is needed to know as to why that plant produces poor quality products.5-S technique has been defined as –
“A systematic and rational approach to work place organization and methodicalhousekeeping with a sense of purpose”
Relationship between 5-S’s:
Japanese English Meaning How to apply it to the work place?
Seiri Structurise Sorting Classify items into necessary and unnecessary,retain only those which are required anddispose off others. (i.e. those not needed)
Seiton Systematise Re-organise Store things systematically to ensure safety,quality and efficiency. Storage methods mustpermit efficient use of space-accident freestage, long shelf and easy retrievability ofitems within pre-fixed target retrieval time.
Seiso Sanitise Cleanup Maintain work place free of dirt/ dust andgarbage by fixing individuals’ cleaningresponsibility.
Seiketsu Standardize Standardization Maintain cleanliness through Seiri, Seiton andSeiso by ensuring transparency and uniformlyof everything that is done in the organization.
Shitsuke Self-discipline Sustain Make a habit of doing things the way they aresupposed to be done (i.e. developing habit offollowing rules/ practices) including 5-Spractices.
SEIRI(Organisation
)
SEIKETSU(Standardisation)
SHITSUKE(Discipline)
SEITON(Maintenance)
SEISO(Clean Up)
7. What is SMED? How is it used to reduce setup time of an operation?Ans: Introduction: Every organization must increase line of its products, accept lowvolume orders, shorten delivery lead time, and keep its cost low to maintain its marketshare in a competitive market. The organization must cut production lead time anddecrease production batch sizes. It should also reduce inventory levels in the productionand inventory systems. Since small batches require frequent changeovers, productioncapacity is expected to shrink unless setup times are reduced. Set up time reduction,therefore, is the key to developing or monitoring a company’s competitiveness in today’smarket where more diversified products are desired at short production lead time.
Quick Die/ set up change is not restricted to set-up reduction of press shop alone, it canbe extended to all areas of manufacturing wherever there is requirement of tool change/set up on a machine prior to manufacturing.
i. Pressesii. Multi-spindle automatsiii. Lathes, turret lathesiv. Milling machinesv. Drilling machinesvi. Broaching machines.vii. Forging machinesviii. Paint manufacturing equipmentix. Powder coating machinesx. Oil extracting mill
Meaning:Set up time is the time required to prepare a machine or a group of machines tochangeover from one job to another. Time of a conventional set up consists of followingtasks.
(a) The time to study blue print , including time spent on receiving instructions fromsupervisor or foreman.
(b) The time to go to tool crib to get necessary tools and gauges, etc and to return thetools used to previous job.
(c) The time to select fixture (Vice, mandrel, suitable sized collets, face plate, etc)and secure it to the bed of the machines.
(d) The time to install/ mount necessary tools on to the machine, make adjustments,set longitudinal or traverse feed stoppers wherever necessary to ensure that eachtool cuts properly and to dimensions.
(e) The time to call the inspector and get inspection done (pilot piece inspection).Alternatively it is the time necessary to deliver the part to the inspection booth forinspection. Inspection time, however, does not include time to manufacture thepart.
(f) The time spent by the operative, over and above the unit standard time, to producefirst few pieces.
(g) The time to physically count the jobs produced, including time to sign thecompleted work-order.
(h) The time to remove tools from their tool-holders after required quantity has beenmanufactured, clean each tool and put it away in proper place.
(i) The time to clean measuring instruments and put them away in proper places.(j) The time to release and remove fixture blow or brush it clean and keep it aside.(k) The time to remove borings, turning, drilling etc, from the bed of the machine.
Normally, turnings/ drillings/ borings should be removed by a helper (even whenthe production is in progress) when these gather in large quantity. However, burnsremoval, would have to be considered part of set up operation if different materialis required on the next job (e.g. Steel for the job just completed and brass for thejob to be loaded).
Traditional set up operations involve several kinds of waste and SMED technique wasdeveloped to eliminate waste and to reduce set up time from hours to minutes. SMEDalso has interesting history of development.
Reduction in set up time results in the following benefits:o Reduction in batch sizeso Lowering of manufacturing lead timeso Drop in inventory levelso Reduction in set-up scrapo Increase in machine efficiencyo Increased flexibility to respond to changes.
The firm desiring to reduce change-over time may not achieve its target figure in oneattempt, but after a series of improvements. From its current level of set up time ofdouble digit on a particular machine, it may be able to reduce to single digit hours. Andsubsequently on the same machine from single digit hours to double digit minutes, stilllater from double digit minutes to single-digit ones and finally in to few extremesituations one touch change over.
Step-by-step reduction of set-up time
8 a) What is meaning of MUDA? What are the various types of MUDAS?Ans:Introduction: MUDA is a Japanese word for waste and waste means anything (or anyactivity) which does not add value to the product.
o A worker looking, even though affectionately, at an automatic machine does notadd any value while machine does (MUDA of Waiting)
o A maintenance engineer who walks over a long distance with tool in his hand,does not add any value (value is added when he uses the tool to fix the machine) (MUDA of Transport)
o Piles of material lying in racks in the stores don’t add any value but add to cost(MUDA of Stock)
o A material handler while pushing a heavy trolley full of parts, even thoughperspiring, adds no value (MUDA of Transport)
o An assembly operator, overstretching his hand to pick up parts for assembly, addsno value but causes fatigue to himself (MUDA of Motion)
o A welding operation, performed to join metal parts of assembly constituent, doesadd value but the welding operation performed to repair weld a blowhole in job isa non-value added activity (MUDA of Processing)
Waste (MUDA) is the major element of company’s product cost and must becontinually identified and eliminated from its processes to stay competitive.
Since labour cost is hardly 8-10% of total cost (which also is on the decline due torecent advances in manufacturing technologies), we also need to look at various otherhidden wastages, besides human waste, to improve productivity.
Elimination of sampleruns, inspection,adjustments
Comp.A run
Studyblueprint
Removeexisting
Replacetoo at thecrib store
Install toolsfor the newjob
Samplerun
Adjust
Run forcomponentA
SETUP Run forcomponentB
ComponentB
ComponentA
Setup
Samplerun
Types of MUDA:
There are seven types of MUDA in manufacturing:
1. MUDA of Over Production.
2. MUDA of Stock (inventory)
3. MUDA of Waiting
4. MUDA of Transport
5. MUDA of Defects
6. MUDA of Motion
7. MUDA of Processing
b) What Causes MUDA of “Motions”? How can it be eliminated?Ans: Introduction: A workman while performing a task makes use of a number ofmotions. The scrutiny of these motions may reveal that some of these motions –
o Are unnecessary and can be eliminatedo Can be combined / modified by changing their sequenceo Can be simplified by effecting changes in work bench layouto Can be performed efficiently by other members of the body.
In the absence of the above mentioned actions, the workman makes motions which don’tadd any value. Typical examples are –
o Walking to reach objects/ parts. Toolso Lifting or carrying objectso Picking up and putting down a work pieceo Transferring objects from one hand to anothero Searching to find the required object
While dealing with MUDA of motion it is recommended to get rid of operations that aredifficult dirty and / or dangerous (3D’s). such actions include –
o Work that makes and employee move over long distanceso Work that causes physical strain (i.e. use of undue physical effort)o Work that causes mental strain (e.g. work that needs memorizing lot of details)o Work that involves search or unnecessary sorting.
Tools and techniques to eliminate MUDA of Motion:
i) Improvement in layout: Lifting or carrying a heavy object is undesirable ontwo counts, firstly because it represents MUDA and secondly it causesphysical exertion. The need for the operator to carry a heavy object can beeliminated by rearranging the work place.
ii) Motion economy principles: Motions of the hands/ legs can be shortened andsome of them can be eliminated by rearranging the parts on work table anddevelopment of tools and jigs.
iii) Effective supervision: Finding workmen busy with their jobs may givesupervisor satisfaction but it may do no good to the company. A supervisormust watch closely his people to find as to –- What are they doing?- How are they doing?- Do they need to do what they are doing?- Are they doing the right way?- Are they doing work which adds value?- Are they using motions of the lowest classification?
List down different kinds of human errors. How can they be eliminated? How isPokaYoke technique useful to eliminate human errors?
Ans:Description of the
errorTypical examples Remedial action
Forgetting to do athing
3. Operator skipping anoperation.
4. Operator forgetting totighten bolts
5. station master forgetting tolower the crossing gate
6.Misunderstanding
Jumping to thewrong conclusiondue to poorfamiliarity with thesituation
1. Putting foot on clutchthinking it is brake
1. Training2. Checking in advance3. Standardizing work
procedures.
Mistakenidentity
Misjudging asituation
1. Mistaking Rs.500 note asRs.100 note
1. Improving attentiveness.
Errors byamateurs
Lack of experience 1. Improper welding2. Wrong measurements
1. On-the-job training2. Work Standardisation
Willful errors Ignoring rules/deliberate wrongactions
1. Ignoring safety rules2. Crossing a street against
a red light just becausethere are no vehicles insight at the moment.
3. Not replacing blunt toolon time
1. Attitude change.2. Education
Inadvertenterrors
Absent mindednessi.e. not knowing howthe problem / errorhas occurred
1. Removing job beforecompleting drilling of allholes
2. Crossing street withoutnoticing that the light is red
1. Improving attentiveness2. Work standardization
Judgmentalerrors
Errors due to absenceof instructions ofwork standards
1. Difference in method ofmeasurement used byvendor and by buyer’sinspection
2. Operator deciding his own
1. Works instructions2. Work standardization.
Errors due toabsence ofstandards
Lack of instructionsor absence of workinstructions
Measurements left to thediscretion of the workman
1. Works instructions2. Work standardization.
Type ofError
Forgetfulness 1. Altering operator in advance
2. Checking at regular intervals
3. Verification by anotheremployee
1.
“Poka-Yoke” is a combination of two Japanese words, “Poka” meaning “inadvertenterrors” and “Yoke” (derived from Japanese word Yokerie) meaning “to avoid” andtogether they translate as “Error/ mistake proofing” or “Fool proofing” or “Failsafing” awork process system to eliminate inadvertent errors.
Poka-Yoke is a powerful and comprehensive tool for identification, measurement andanalysis of mistakes/ defects at the Gemba (real piece of work) and implementation ofmeasure that prevent the activity from being incorrectly performed, thereby ensuringproduction of quality goods and services.
Errors are inevitable but can be eliminated, using Poka-Yoke technique. This is thetechnique that can help to analyse the kinds of mistakes employees make and to eliminatethese mistakes by implementing / installing simple Poka-Yoke devices.
Poka-Yoke Devices:Poka-Yoke may be designed either to help the operator to recognize the defect before it isabout to occur called “Prevention type Poka-Yoke” or to help the operator to knowimmediately on occurrence of the defect called “Detection type Poka-Yoke”.
Some of the Poka-Yoke devices which can help to avoid defects are –
1. Guide Pins / locators2. Error detection buzzers/ alarms and blinking lights3. Limit switches4. Counters5. Color coding6. Checklist
9.a) What is Kaizen? What are different types of Kaizen?Ans: Introduction: Kaizen is a combination of two Japanese words, “Kai” and “Zen”,Kai means “to change or modify” and Zen means “to improve or make better” andtogether they translate as “improvement”. Kaizen when used in the context of amanagement process, has come to mean as continual and slow improvement in everyaspect of management (i.e. improvement in whatever company does and the way it doesthings) through the active involvement of all company’s employees. Kaizen does not justmerely mean doing things better but it is an unending process to eliminate muda, improvequality, cost and delivery, thereby creating more and more customers.
Few Definitions:
Kaizen is a management supported, employee driven process, where employees seekdevelopment of their own capabilities by challenging existing system and findingimprovement in them - R.R. Asawa & Dr. D. R. Baheti
Kaizen is a program, a philosophy and a strategy to improve quality of goods andservices or an organization - Samuel KHO
Kaizen means making a great number of continuous lasting improvements by discoveringsmall problems and eliminating them permanently (attacking root causes of theproblems) thereby helping the organization in setting and reaching higher standards ofperformance. - Surindra Narang
The Spirit of kaizen is that whatever you are doing, you can do better. Kaizen thus helpsin setting and reaching higher standards of performance.
The word “Kaizen” was used for the first time by Maasaki Imai, who wrote a look ofsame name. although a registered name of Kaizen Institute, the work is now widely usedand understood all over the world to mean “continuous improvement”. The word“Kaizen” also now appears in the English dictionary. Recently, Imai has elaborated onKaizen in his book titled “Gemba Kaizen”
Types of Kaizen:Kaizen depending upon the complexity and level, can be placed into one of threecategories
1) Management Kaizen2) Group Kaizen3) Individual Kaizen
1) Management oriented Kaizen: Concentrates on strategic issues and ofteninvolves people from different departments working together on cross-functionalproblems as project teams. Typical examples of management oriented Kaizen are:
Identification and elimination of waste in workers motions Charges in plant layout for better efficienvy Reduction in buffer stocks Just-in-time production System improvement
2) Group oriented Kaizen: Concentrates on improvement within the sameworkplace or department brought about by employees working in small groups,called quality circles. Typical areas of group Kaizen generally include –
Productivity improvement Defect prevention Accident prevention Absenteeism
3) Individual oriented Kaizen: Concentrates on issues concerning worker’s ownwork area and improvements are brought about through worker’s ownsuggestions. Problems solved through individual Kaizen generally include –
Improvement in machines and processes
Improvement in jigs and fixtures Reduction in defect level Customer service and customer complaints Improvements in working environment.
b) Discuss in brief the Kaizen process and its steps.
Ans: Introduction:Kaizen process provides a disciplined and analytical approach, sometimes called thekaizen story to problems solving. It consists of a series of sequential steps that can beused to guide a group (say an improvement team) for the process of identifying andfixing problems. The Kaizen story (or Kaizen process) is built on PDCA mnemonic –Plan, Do, Check and Act. The Kaizen process is a seven step basic procedure whichallows any individual or team to solve problems scientifically, rationally, effectively andefficiently. These seven steps are –
1. Defining the problem
2. Understanding/ assessing the current status
3. Finding the root cause.
4. Planning counter measures
5. Implementing counter measure
6. Verifying results
7. Standardising and establishing control.
A brief of each of the steps in the Kaizen process is given.
Fig: Problem definition phase
When Deming cycle is used as a tool for systematic problem solving (improvement), thePDCA activities take the form as shown below…
Poka-yoke forfailsafing
Model machineexercises in TPM
Exercises to identify MURA,MUDA and MURI
Spotting abnormalities atGemba
Internal customer’scomplaints
External customer’scomplaints
Cost of Quality
SMED/ JITTargets
5-S Audits
ISO-9000, QS-9000and ISO-14000 non-conformities
Problems
Define Problems
Enlist problems
Prioritize problems
Select topics for Kaizen
Assign themes toKaizen teams
problems
Conduct PDCA-SDCAimprovement cycles
Process Steps Objective Element of PDCAcycle
Defining the problem Identification of the problem The “PLAN” element
Understanding /Assessing Current status
Establishing the base from whichyou are trying to improve
The “PLAN” element
Finding the root cause Identifying underlying causes ofthe problem
The “PLAN” element
The “PLAN” elementPlanning countermeasures
Preparing action plan to fix theproblem
The “DO” elementImplementing countermeasures
Verifying results
Standardizing andestablishing control
Implementing the action plan
Confirming the effect ofimplementation
Consolidating the change
The “CHECK” element
The “ACT” element ofPDCA and / or + theSTANDARDIZEelement of SDCA
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion Due to SMED, ________ time cuts down.
Correct Answer Waiting
Your Answer Operation
Multiple Choice Multiple AnswerQuestion Actions that can be thought for the process having process
capability is smaller than specification tolerance are:-Correct Answer Use of less precision machine , Possibility of squeezing
tolerances , Reduction in inspectionYour Answer Possibility of squeezing tolerances , Reduction in inspection ,
100% inspection , Use of less precision machine
Multiple Choice Single AnswerQuestion A control chart is also called as :-
Correct Answer Run chart
Your Answer Flow chart
Select The BlankQuestion Ideally the histogram will have a symmetrical ( i.e. also called as
bell) shape tapering away on both sides from ________ value.Correct Answer Average
Your Answer Maximum
Select The BlankQuestion Capability index Cp = ________
Correct Answer Specification width/process width
Your Answer Specification width/process width
Multiple Choice Single AnswerQuestion Customer's return is an indicators of the MUDA of :-
Correct Answer Defect
Your Answer Defect
Multiple Choice Multiple Answer
Question Customers complaints may be segregated by :-
Correct Answer Nature of compliant i.e. defective product , Delayed delivery ,Short/excess quantity
Your Answer Nature of compliant i.e. defective product , Delayed delivery ,Short/excess quantity , Payment problem
Select The BlankQuestion JIT helps to ________ the waste in the purchasing process.
Correct Answer Eliminates
Your Answer Eliminates
True/FalseQuestion Pie chart is also called as angular diagram.
Correct Answer True
Your Answer False
True/FalseQuestion Review is important step in problem solving.
Correct Answer True
Your Answer True
Select The BlankQuestion To assess effectiveness of training ________ is essential.
Correct Answer Evaluation
Your Answer Re training
Select The BlankQuestion Quality improvement team consists of departmental head with a
chairperson who has easy access to the ________.Correct Answer Top management
Your Answer Workmen
Multiple Choice Single AnswerQuestion The area enclosed under normal distribution curve between
mean +3standard deviation is :-Correct Answer 0.9973
Your Answer 0.9545
Multiple Choice Single AnswerQuestion In autonomus modules or cells, rate of production increases :-
Correct Answer Number of operators increases
Your Answer Number of operators increases
Multiple Choice Multiple AnswerQuestion Histograms are useful to :-
Correct Answer Measure the current pattern & extent of variation , Assesscurrent conformance to specification & scope of improvement ,Determine whether or not the process is in the state of control
Your Answer Measure the current pattern & extent of variation , Assesscurrent conformance to specification & scope of improvement ,Determine whether or not the process is in the state of control ,Do the analysis as per "parato diagram"
Multiple Choice Single AnswerQuestion DOE stands for
Correct Answer Design of Experiments
Your Answer Degree of Evaluation
True/FalseQuestion Automation can correct the basic faults of a improper setup
process.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Limitation of quality circles are :-
Correct Answer Problems headed by worker group must be simple & within theirlimit , Unions in India are reluctant , Management is also notopen for union
Your Answer Problems headed by worker group must be simple & within theirlimit , Unions in India are reluctant , Management is also notopen for union , Worker attitude only for financial benefit
True/FalseQuestion Kanban signals are required when assembly work, subassembly
work and manufacturing at parts is carried out at differentlocations.
Correct Answer True
Your Answer True
True/FalseQuestion Safety, hygiene and environment control is one of the pillar of
TPM.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion During the steps of Deming cycle of PDCA what is important?
Correct Answer Plan unitedly for the target within reach , Make plan active by"doing it" i.e. everyone working , After some time check theresults for success
Your Answer Plan unitedly for the target within reach , Make plan active by"doing it" i.e. everyone working , After some time check theresults for success , Make your own methods for individualsuccess
Multiple Choice Multiple AnswerQuestion Initial list of prospective partners can be drawn on feedback
information gathered from :-Correct Answer Winners of excellence award , Top rated companies in industry
survey , ConsultantYour Answer Winners of excellence award , Top rated companies in industry
survey , Consultant , Employees
Multiple Choice Single AnswerQuestion For customer satisfaction, checking point will be :-
Correct Answer Obtaining feedback from concerned department
Your Answer Obtaining feedback from concerned department
True/FalseQuestion Graph is a tabulated representation of the data which is easily
understandable at a glance.Correct Answer False
Your Answer True
Multiple Choice Multiple AnswerQuestion Examples of Muda are :-
Correct Answer Muda of over production , Muda of stock , Muda of defeat
Your Answer Muda of over production , Muda of stock , Muda of defeat ,Muda of competition
Multiple Choice Multiple AnswerQuestion Causes of Muda of transport are :-
Correct Answer Faulty layout , Over production
Your Answer Faulty layout , Over production , Proper material handlingequipment , Low rejection / rework
True/FalseQuestion Process capability refers to ability of the process to meet the
design specification for a product or a service.Correct Answer True
Your Answer True
Select The BlankQuestion ________ is the root cause of the problems.
Correct Answer Variation
Your Answer Duplicating
Multiple Choice Single AnswerQuestion Seiri means :-
Correct Answer Destroying unwanted items after classifying the necessity
Your Answer Destroying unwanted items after classifying the necessity
Select The BlankQuestion Poka Yoke is ________.
Correct Answer Simple technique
Your Answer Simple technique
Multiple Choice Single AnswerQuestion Kaizen process is built on PDCA cycle, where P represents :-
Correct Answer PLAN
Your Answer PLAN
Multiple Choice Single AnswerQuestion For normal distribution curve, skewness & kurtosis are :-
Correct Answer Zero
Your Answer One
Multiple Choice Single AnswerQuestion "Cause & effect" diagram was developed by :-
Correct Answer DR.Kaoru Ishikawa
Your Answer DR.Kaoru Ishikawa
Multiple Choice Single AnswerQuestion The concept of quality circle was mooted by :-
Correct Answer Prof. Kaoishikawa
Your Answer Japanese unit of scientist & engineers(JVSE)
True/FalseQuestion Seiso prevents the potential problems by discovering
abnormalities while cleaning your own area.Correct Answer True
Your Answer True
Match The FollowingQuestion Correct Answer Your Answer
Kanban Pull system Statistical process control
Work standards Best way of doing job Best way of doing job
TPM Reducing breakdown ofmachines
Reducing breakdown ofmachines
JIT Waste elimination Waste elimination
Select The BlankQuestion Basic objective of control chart is to ________ the variation due
to chance & assignable cause.Correct Answer Separate out
Your Answer Separate out
Multiple Choice Multiple AnswerQuestion Benefits from SMED are :-
Correct Answer Reduce work in process , Better average daily production ,Increase capacity
Your Answer Reduce work in process , Better average daily production ,Increase capacity , Reduce productivity
Multiple Choice Multiple AnswerQuestion Quality problems may be segregated by & regrouped by :-
Correct Answer Machines , Workers , Materials
Your Answer Machines , Workers , Materials , Suggestion
Select The BlankQuestion Histogram is a diagrammatic presentation of the ________
distribution of characteristics such as strength, diameter, etc.Correct Answer Frequency
Your Answer Frequency
True/FalseQuestion A radar chart is combination of a circle & line graph
Correct Answer True
Your Answer False
Select The BlankQuestion Kaizen is ________ supported process.
Correct Answer Management
Your Answer Customer
Multiple Choice Single AnswerQuestion Theoretically, the normal curve can extend :-
Correct Answer From - Infinity to + Infinity
Your Answer From 0 to+ infinity
Match The FollowingQuestion Correct Answer Your Answer
Control chart can be used As process monitoringtool
Stability of the process
Control chart is agraphical method ofchecking
Stability of the process For quality monitoring
Control chart can be used How much variability in How much variability in the
to determine the process is due torandom causes & howmuch is due to assignablecauses
process is due to randomcauses & how much is dueto assignable causes
Control chart is a chartwith UCL & LCL placed
At 3 Sigma distance oneither side of the processaverage
At 6 Sigma distance oneither side of the processaverage
Multiple Choice Multiple AnswerQuestion Few main steps to construct a Histogram after deciding classes,
class width & class boundaries are :-Correct Answer Compute mid-point of the class (cell) & fill up the tally sheet
determining the cell or class into which each value falls , Countthe tally marks i.e. frequency in each class & construct ahistogram by plotting a bar graph for each class , Analyze &conclude whether process is is meeting the requirement or not &take connective actions if needed.
Your Answer Compute mid-point of the class (cell) & fill up the tally sheetdetermining the cell or class into which each value falls , Countthe tally marks i.e. frequency in each class & construct ahistogram by plotting a bar graph for each class , Analyze &conclude whether process is is meeting the requirement or not &take connective actions if needed. , Do the Parato analysis asper 80%=20% rule
True/FalseQuestion Exercise to identify MURA, MUDA & MURI is not helpful to
identify problems.Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion Few steps to construct a flow chart are :-
Correct Answer Decide on the objective of flowchart & define boundaries of theprocess , Identify steps in the process & construct a draft of theflowchart , Review the draft & connect the changes as perreview & name it & put the data & use it as 'Record'
Your Answer Decide on the objective of flowchart & define boundaries of theprocess , Identify steps in the process & construct a draft of theflowchart , Review the draft & connect the changes as perreview & name it & put the data & use it as 'Record' , Circulateflowchart
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion ________ is management skill.
Correct Answer Delegation
Your Answer Delegation
Multiple Choice Multiple AnswerQuestion While preparing scatter diagram following precautions are to be
taken :-Correct Answer Data should be properly stratified & should be collected for full
range , Scale selected should be right to avoid wrongconclusions , Data should be free from bias or undue importance
Your Answer Data should be properly stratified & should be collected for fullrange
True/FalseQuestion In cellular manufacturing system cell may consist of a single
machine or more than one machine arranged in line.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Check sheet is easy to use because it is :-
Correct Answer Simplest tool
Your Answer Simplest tool
True/FalseQuestion Kanban signals are required when assembly work, subassembly
work and manufacturing at parts is carried out at differentlocations.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion Histogram always indicates :-
Correct Answer Only height
Your Answer Only height
Multiple Choice Single AnswerQuestion Flow charts are drawn to document a process by charting the
task performed and :-Correct Answer The sequence in which tasks are performed
Your Answer The sequence in which tasks are performed
Multiple Choice Multiple AnswerQuestion Best practices for standardization in implementing Seiketsu are
:-Correct Answer Create as many visual control systems as possible , Use colour
code system for easy control , Fix one colour (e.g. Red) fordanger zones/out of controls
Your Answer Create as many visual control systems as possible , Use colourcode system for easy control , Display warning notices
Multiple Choice Single AnswerQuestion Empowerment means making best use of the firm's most
valuable resource, namely:-Correct Answer Human
Your Answer Human
Multiple Choice Multiple AnswerQuestion Process can be made capable by :-
Correct Answer Examine possibility of relaxing specification , Reducing processvariability , Bringing target & average to fall at the same point
Your Answer Reducing process variability , Bringing target & average to fall atthe same point , Examine possibility of relaxing specification
Multiple Choice Multiple AnswerQuestion Role of champions are :-
Correct Answer Approve six sigma projects , Remove road block in the path ofsix sigma implementation , Monitor progress of six sigmaprojects
Your Answer Approve six sigma projects , Remove road block in the path ofsix sigma implementation , Monitor progress of six sigmaprojects
Multiple Choice Single AnswerQuestion A workshop is to be treated as :-
Correct Answer Place where one's creativity can be applied
Your Answer Place of maximum physical labour
Select The Blank
Question By improving layout MUDA, due to ________ can be eliminated.
Correct Answer Motion
Your Answer Over production
Multiple Choice Multiple AnswerQuestion Remedial actions for error of misunderstanding is :-
Correct Answer Training , Checking in advance , Standardizing work procedures
Your Answer Training , Checking in advance , Standardizing work procedures
Multiple Choice Single AnswerQuestion JIT manufacturing emphasizes workplace improvement through
:-Correct Answer 5 'S'
Your Answer 5 'S'
True/FalseQuestion Without review PDCA cycle not completed.
Correct Answer True
Your Answer True
Select The BlankQuestion To eliminate muda of processing, ________ exercise is
essential.Correct Answer ECRS
Your Answer ECRS
True/FalseQuestion Control limits of control charts should be revised from time to
time as additional data is accumulated.Correct Answer True
Your Answer True
Select The BlankQuestion ________ participants in monthly meeting(MRM)
Correct Answer GM, operation heads, corporate functional heads
Your Answer GM, operation heads, corporate functional heads
Select The BlankQuestion Suppliers may________ their prices to cover for cost of delivery,
small production run etc.Correct Answer Raise
Your Answer Raise
True/FalseQuestion Create as many visual controls as possible to achieve visual
management is the principle of "Shitsuke"Correct Answer True
Your Answer False
True/FalseQuestion Flow charts are used to train new employees by providing
documented description of the task involved.Correct Answer True
Your Answer True
Select The BlankQuestion Poka-Yoke devices under category use ________ to distinguish
between similar parts which may be assembled in wrongposition.
Correct Answer Color coding
Your Answer Color coding
Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Improve quality
Match The FollowingQuestion Correct Answer Your Answer
Any thing misplacedshould be visualimmediately
Seiketsu Display Colour codesmeanings
Unrepairable tool orequipments
To be scrapped underSeiri
To be scrapped under Seiri
Colour coding essentialthroughout but
Display Colour codesmeanings
Colour codes as perdepartments
Surprise Audit any timeshould shout consistentgood housekeeping
Shitsuke for maintenanceof 4-S
Seiketsu
Multiple Choice Single AnswerQuestion 5-S technique is useful to:
Correct Answer To all places including homes
Your Answer To all places including homes
Multiple Choice Single AnswerQuestion Zero loss concept means :-
Correct Answer Zero accident, zero defect, zero breakdown
Your Answer Zero accident, zero defect, zero breakdown
Select The BlankQuestion Kaizen is ________ supported process.
Correct Answer Management
Your Answer Management
True/FalseQuestion By cutting the cost of quality, profitability decreases.
Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion The area enclosed under normal distribution curve between
mean +3standard deviation is :-Correct Answer 0.9973
Your Answer 0.9973
Select The BlankQuestion Poka Yoke is ________.
Correct Answer Simple technique
Your Answer Simple technique
Multiple Choice Single Answer
Question The JIT Philosophy recommends attainment of flexibility by :-
Correct Answer Contracting all lead times
Your Answer Contracting all lead times
Multiple Choice Multiple AnswerQuestion Causes of Muda of transport are :-
Correct Answer Faulty layout , Over production
Your Answer Faulty layout , Over production
Multiple Choice Multiple AnswerQuestion For the presentation of the quality circle project what is required
is :-Correct Answer Presentation skills , Graphical data , Progressive efforts of the
team workYour Answer Presentation skills , Graphical data
Select The BlankQuestion ________ is responsible for effective implementation of action
plan's under TPM.Correct Answer Steering committee
Your Answer Steering committee
Match The FollowingQuestion Correct Answer Your Answer
4 th level in six sigmaorganization
Green Belts Green Belts
1 st level in six sigmaorganization
Champions Champions
2 nd level in six sigmaorganization
Master Black Belts Master Black Belts
3 rd level in six sigmaorganization
Black Belts Black Belts
Multiple Choice Multiple AnswerQuestion Benefits of TQM are :-
Correct Answer Greater customer satisfaction , Lower manufacturing cost
Your Answer Greater customer satisfaction , Lower manufacturing cost
Multiple Choice Single AnswerQuestion Vilfredo Pareto had discovered a universal law as :-
Correct Answer "around 20% of the activity causes 80% of the effect"
Your Answer "around 20% of the activity causes 80% of the effect"
Multiple Choice Multiple AnswerQuestion Implementation of TPM in Indian industries is difficult due to :-
Correct Answer Lack of knowledge of the TPM , Resistance to change , Fear toloss of job
Your Answer Lack of knowledge of the TPM , Resistance to change , Fear toloss of job
Multiple Choice Multiple AnswerQuestion Some steps for stratification are :-
Correct Answer Define the problem & identify the stratification variables , Sort outdata into categories & summarise information in each category ,Present the information in graphical form & study, decide iffurther stratification is required?
Your Answer Define the problem & identify the stratification variables , Sort outdata into categories & summarise information in each category ,Present the information in graphical form & study, decide iffurther stratification is required?
Select The BlankQuestion Each quality characteristic has permitted variation & is equal to
________.Correct Answer USL - LSL
Your Answer USL - LSL
Select The BlankQuestion Flow chart helps to provide clarity of the ________ without
visiting actual spot.Correct Answer Process
Your Answer Process
True/FalseQuestion Automation can correct the basic faults of a improper setup
process.Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question In problem solving the best alternative is that :-
Correct Answer Which best meets the criteria
Your Answer Which best meets the criteria
True/FalseQuestion Benefits of DWN is faster response to customer needs.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion Types of Poka-Yoke are :-
Correct Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
True/FalseQuestion Daily work management can also be extended to non
manufacturing areas like procurement, QA, HRD etc.Correct Answer True
Your Answer True
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer Question Quality maintenance & pillar focuses on following production
inputs :- Correct Answer Material , Men , Machine
Your Answer Material , Men , Machine
Multiple Choice Multiple Answer Question Histograms are useful to :-
Correct Answer Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control
Your Answer Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control
Multiple Choice Single Answer Question In problem solving the best alternative is that :-
Correct Answer Which best meets the criteria
Your Answer Which best meets the criteria
Multiple Choice Single Answer Question "Cause & effect" diagram was developed by :-
Correct Answer DR.Kaoru Ishikawa
Your Answer DR.Kaoru Ishikawa
Multiple Choice Single Answer Question Identifying key preventive operational functions and comparing
these operational functions within the firm's own division & branches comes under :-
Correct Answer Internal benchmarking
Your Answer Internal benchmarking
Select The Blank Question JIT advocates the philosophy at elimination of waste from
system which occurs due to ________. Correct Answer Over Production
Your Answer Over Production
Select The Blank Question In scatter diagram "________" relationship is said to exist when
there is positive relationship upto certain level & negative thereafter or negative relationship upto certain level & positive thereafter.
Correct Answer Curvilinear
Your Answer Curvilinear
True/False Question Kanban signals are required when assembly work, subassembly
work and manufacturing at parts is carried out at different locations.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer Question Customers complaints may be segregated by :-
Correct Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity
Your Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity
True/False Question In case of more than one quality characteristics, separate chart
is made for each quality characteristics. Correct Answer True
Your Answer True
True/False Question Safety, hygiene and environment control is one of the pillar of
TPM. Correct Answer True
Your Answer True
Multiple Choice Single Answer Question 5-S technique is useful to:
Correct Answer To all places including homes
Your Answer To all places including homes
Match The Following
Question Correct Answer Your Answer Reduce time of external setup
Improve work aids positioning method
Improve work aids positioning method
Convert internal setup into external setup
Preparation of tools / dies as off line activity
Preparation of tools / dies as off line activity
Eliminate adjustment Pre setting of tool Pre setting of tool Reduce clamping & declamping time
Use U-shaped washer Use U-shaped washer
Multiple Choice Single Answer Question The facilitator should be normally :-
Correct Answer Senior officer /Shop incharge
Your Answer Senior officer /Shop incharge
Match The Following Question Correct Answer Your Answer Parato diagram always indicates
Magnitude of defects Philosophy of 20% of the activity causes 80% of the effect
Parato analysis underlines & operates on
Philosophy of "vital few:trivial many"
Philosophy of "vital few:trivial many"
Parato analysis is technique of identifying vital causes by
Arranging data according to the descending order of their frequency of occurrence
Arranging data according to the descending order of their frequency of occurrence
Parato diagram is a Bar graph with height or value drawn by
Arranging data in descending order
Magnitude of defects
Multiple Choice Single Answer Question Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Make work easy
True/False Question Pie chart is also called as angular diagram.
Correct Answer True
Your Answer True
Select The Blank Question In scatter diagram "________" relationship is said to exist when
value of 'y' somewhat decreases as the value of 'x' increases. Correct Answer Weak negative
Your Answer Weak negative
Multiple Choice Single Answer Question From scatter diagram the strength of relationship between two
variables or associated set of data can be inferred from the examination of the shape of :-
Correct Answer Cloud
Your Answer Cloud
Multiple Choice Multiple Answer Question Product benchmarking requires, comparison of product :-
Correct Answer Performance , Features , Cost
Your Answer Performance , Features , Cost
Multiple Choice Multiple Answer Question Steps in construction of scatter diagram :-
Correct Answer Collect paired data (X,Y) from two variables who's relationship is to be studied , Find out max & min values for both X & Y and these values to scale X & Y axis & plot the paired data , Examine the shape of the cloud of points & discover type & strength of relationship
Your Answer Collect paired data (X,Y) from two variables who's relationship is to be studied , Find out max & min values for both X & Y and these values to scale X & Y axis & plot the paired data , Examine the shape of the cloud of points & discover type & strength of relationship
Multiple Choice Single Answer Question Implication of Quality problem is:-
Correct Answer Gap in performance
Your Answer Gap in performance
Select The Blank Question Each quality characteristic has permitted variation & is equal to
________. Correct Answer USL - LSL
Your Answer USL - LSL
Select The Blank Question Kaizen is ________ supported process.
Correct Answer Management
Your Answer Management
True/False Question The flow charts are prepared to enhance the employees
understanding of the process by indicating interrelationship within the process.
Correct Answer True
Your Answer False
True/False Question Gap analysis for production & dispatches is discussed in monthly
meeting. Correct Answer False
Your Answer False
Select The Blank Question In scatter diagram "________" relationship is said to exist when
value of 'y' decreases as the value of 'x' increases. Correct Answer Strong negative
Your Answer Strong negative
Select The Blank Question ________ is most difficult 'S' to implement & achieve.
Correct Answer Shitsuke
Your Answer Shitsuke
True/False Question Presentation of graphs in pictorial form of data collection are for
easy understanding. Correct Answer True
Your Answer True
Select The Blank
Question Graphs convey a situation more ________ than summary of data or figures.
Correct Answer Effectively & clearly
Your Answer Effectively & clearly
Multiple Choice Single Answer Question Errors by armatures is :-
Correct Answer Lack of experience
Your Answer Lack of experience
Multiple Choice Multiple Answer Question While preparing scatter diagram following precautions are to be
taken :- Correct Answer Data should be properly stratified & should be collected for full
range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance
Your Answer Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance
True/False Question Globalization of trade and industrial operations have forced
Indian companies to become more & more competitive and customer driven.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer Question If 'Annual saving in procurement expenses is managing point',
then checking points will be :- Correct Answer Price revision , Credit period , Transport expenses
Your Answer Price revision , Credit period , Transport expenses
Multiple Choice Single Answer Question Number of kaizen in Group kaizen categories are :-
Correct Answer Two to three per year
Your Answer Two to three per year
True/False Question Flow chart is pictorial representation of the steps in production
control.
Correct Answer False
Your Answer False
Multiple Choice Single Answer Question It is essential to convey customer's expectations to :-
Correct Answer Top Management
Your Answer Supervisors & workmen
Multiple Choice Single Answer Question Check sheet is easy to use because it is :-
Correct Answer Simplest tool
Your Answer Simplest tool
Select The Blank Question Identification of non-value added operations & their elimination is
the first step to eliminate muda of ________. Correct Answer Processing
Your Answer Processing
Select The Blank Question A 'Radar chart' is used to portray ________ strength or
weakness of the activity. Correct Answer Relative
Your Answer Relative
Multiple Choice Single Answer Question Pareto's analysis underlines & operates philosophy of :-
Correct Answer Vital few = trivial many
Your Answer Vital few = trivial many
True/False Question In single card kanban system production greater than quantity
withdrawn is permitted. Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Benefits of planned maintenance are :-
Correct Answer Improved reliability mean time between failures , Improved maintainability mean time to repair , Improvement in breakdown
Your Answer Improved reliability mean time between failures , Improved maintainability mean time to repair
Multiple Choice Multiple Answer Question Gap analysis & problem identification is done during converting
internal setups into external setups in the areas like :- Correct Answer Equipment , Method , Human
Your Answer Equipment , Method , Human
Multiple Choice Single Answer Question Some quantity in stock of item, is desirable if :-
Correct Answer Manufacturing lead time is more
Your Answer Manufacturing lead time is more
Multiple Choice Single Answer Question Sorting of usable items should be
Correct Answer Planned storage based on frequency of use
Your Answer Within visual reach method
Multiple Choice Multiple Answer Question Benefits of Quality maintenance are :-
Correct Answer Reduction in customer quality complaints , Reduction in inspection time
Your Answer Reduction in customer quality complaints , Reduction in inspection time
1. TPM
1. Waste elimination
2. JIT
2. Visual management
3. Kanban
3. Best way of doing job
4. Work standards
4. Reducing breakdown of machines
5. Pull system 6. Statistical process control
1. Parato analysis underlines & operates on
1. Arranging data according to the descending order of their frequency of occurrence
2. Parato analysis is technique of identifying vital causes by
2. Philosophy of 20% of the activity causes 80% of the effect
3. Parato diagram is a Bar graph with height or value drawn by
3. Magnitude of defects
4. Parato diagram always indicates
4. Arranging data in ascending order
5. Arranging data in descending order 6. Philosophy of "vital few:trivial many"
27. Total area under the normal curve is
a)
b)
c)
d)
Unity
Zero
Infinity
Six
U shape arrangement of layout provides the operator degree of mobility. 48. Quality problems may be segregated by & regrouped by :-
a)
b)
c)
Machines
Workers
Materials
d)
Suggestion LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer Question TQM can never flourish if the staff are:-
Correct Answer Scared of their bosses , Worried about losing jobs , Afraid of being reprimanded if there are mistakes
Your Answer Scared of their bosses , Worried about losing jobs , Afraid of being reprimanded if there are mistakes
Multiple Choice Single Answer Question Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Improve quality
Multiple Choice Single Answer Question The concept of quality circle was mooted by :-
Correct Answer Prof. Kaoishikawa
Your Answer Prof. Kaoishikawa
Match The Following Question Correct Answer Your Answer SMED Setup time reduction Setup time reduction 5 'S Cleanliness Total productive
maintenance Muda elimination Waste elimination Waste elimination Poka-Yoke Error proofing Error proofing
Multiple Choice Single Answer Question Allowing worker's to stop machine / assembly line if they believe
that product quality is below standard' is an example of :- Correct Answer Empowerment
Your Answer Involvement
Select The Blank Question Kaizen is ________ supported process.
Correct Answer Management
Your Answer Workmen
Select The Blank Question Ratio of ________ to the number of pieces inspected is called
fraction defectives. Correct Answer Number of item rejected
Your Answer Number of item rejected
Multiple Choice Single Answer Question Histogram always indicates :-
Correct Answer Only height
Your Answer Percentage defect
Multiple Choice Single Answer Question List of customers, to carry out parato analysis to identify
customers who gives business includes :- Correct Answer Present & past customers
Your Answer Present & past customers
Multiple Choice Single Answer Question Implication of Quality problem is:-
Correct Answer Gap in performance
Your Answer Gap in performance
Multiple Choice Multiple Answer Question Steps to six sigma process consists of :-
Correct Answer Identify the work you do , Identify your customers , Map the process
Your Answer Identify the work you do , Identify your customers , Map the process
Multiple Choice Single Answer Question From scatter diagram the strength of relationship between two
variables or associated set of data can be inferred from the examination of the shape of :-
Correct Answer Cloud
Your Answer Cloud
True/False Question Non-availability of files /document in time is a problem to be
addressed by office TPM. Correct Answer True
Your Answer True
Select The Blank Question ________ used to detect drop in air pressure.
Correct Answer Buzzers / alarms
Your Answer Locators
Multiple Choice Single Answer Question TQM is a way to improve quality of product and service :-
Correct Answer Continuously
Your Answer Continuously
Multiple Choice Multiple Answer Question The aim of education & training under TPM is :-
Correct Answer To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction
Your Answer To develop abilities to respond quickly to abnormalities , To develop abilities to discover analyze malfunction , To have multiskilled employees in all departments
Match The Following Question Correct Answer Your Answer In scatter diagram, the strength of relationship can be determined
By "correlation coefficient" By "correlation coefficient"
The scatter diagram provides the technique to establish
The possible relationship between a pair of variables
The possible relationship between a pair of variables
The scatter diagram displays
The pair of data as a cloud of points
The pair of data as a cloud of points
The scatter is also known as
Correlation diagram Correlation diagram
True/False Question Flow chart is pictorial representation of the steps in production
control. Correct Answer False
Your Answer True
Multiple Choice Single Answer Question Pareto's analysis underlines & operates philosophy of :-
Correct Answer Vital few = trivial many
Your Answer Vital few = trivial many
Multiple Choice Single Answer Question Pareto diagram always indicate magnitude of :-
Correct Answer Defect
Your Answer Influence of defect
True/False Question By cutting the cost of quality, profitability decreases.
Correct Answer False
Your Answer False
Multiple Choice Single Answer Question Check sheet is easy to use because it is :-
Correct Answer Simplest tool
Your Answer Simplest tool
True/False Question The flow charts are prepared to enhance the employees
understanding of the process by indicating interrelationship within the process.
Correct Answer True
Your Answer True
Multiple Choice Single Answer Question Abnormal variations can occur if :-
Correct Answer There are assignable causes
Your Answer There are assignable causes
Multiple Choice Multiple Answer Question Types of Poka-Yoke are :-
Correct Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer Prevention type Poka-Yoke , Detection type Poka-Yoke , Standards type Poka-Yoke
True/False Question Control limits of control charts should be revised from time to
time as additional data is accumulated. Correct Answer True
Your Answer True
Select The Blank Question Kaizen is an excellent method to involve ________ to unearth &
eliminate hidden waste. Correct Answer Employees
Your Answer Employers
Multiple Choice Multiple Answer Question To reduce Muda of transport, techniques used are :-
Correct Answer Cellular layout , Method study , 5 'S
Your Answer Cellular layout , Method study , 5 'S
Select The Blank Question Cp for six sigma process is ________
Correct Answer 2
Your Answer 2
Select The Blank Question ________ participants in monthly meeting(MRM)
Correct Answer GM, operation heads, corporate functional heads
Your Answer Department heads & supervisors
True/False
Question Processing cost of a product is mainly decided by conversion process.
Correct Answer True
Your Answer True
Select The Blank Question Production in last shift & production plan for next shift is
discussed during ________. Correct Answer Shift beginning & shift end/change meeting
Your Answer Shift beginning & shift end/change meeting
Multiple Choice Multiple Answer Question Material Supply on DSL basis helps :-
Correct Answer To eliminate handling , To reduce transporting , To reduce inspection
Your Answer To eliminate handling , To reduce transporting , To reduce inspection
True/False Question Inadequate maintenance of machine leads to muda of defects
Correct Answer True
Your Answer True
True/False Question Most of the external setups are treated as internal setup.
Correct Answer True
Your Answer False
Multiple Choice Multiple Answer Question Benefits from SMED are :-
Correct Answer Reduce work in process , Better average daily production , Increase capacity
Your Answer Reduce work in process , Better average daily production , Increase capacity
Multiple Choice Multiple Answer Question Typical examples of process benchmark are :-
Correct Answer Procurement procedures , Budgeting , Recruitment
Your Answer Procurement procedures , Budgeting , Recruitment
True/False Question Low level of delegation is an example of muda in office.
Correct Answer True
Your Answer False
Multiple Choice Multiple Answer Question Histograms are useful to :-
Correct Answer Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control
Your Answer Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control
Multiple Choice Multiple Answer Question While preparing scatter diagram following precautions are to be
taken :- Correct Answer Data should be properly stratified & should be collected for full
range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance
Your Answer Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance
Multiple Choice Single Answer Question Through continuous improvement in the process & procedures,
kobetsu-kaizen is continuously improve utilization of :- Correct Answer Worker, equipment & material
Your Answer Workers & materials
True/False Question Every department should make their own rules of
standardization. Correct Answer False
Your Answer False
Multiple Choice Single Answer Question Quality circle should consist adequate experienced members
between :- Correct Answer 8 to 10
Your Answer 8 to 10
Multiple Choice Single Answer Question Number of kaizen in Group kaizen categories are :-
Correct Answer Two to three per year
Your Answer As many as management decides
Select The Blank Question Flow chart helps to provide clarity of the ________ without
visiting actual spot. Correct Answer Process
Your Answer Process
Multiple Choice Single Answer Question Gap in performance = Ideal situation minus :-
Correct Answer Current situation
Your Answer Current situation
Select The Blank Question Seminar talks and video show are organized to introduce TPM
concept to ________ Correct Answer General employees
Your Answer General employees