SORCER

Coordinators meeting. October 22, 2012

SORCER

Stimulating Obtaining Results in Communities in relation to

Energy-efficiency and Renewables

Integrated ProjectCall FP6-2005-TREN-4

CONCERTO II

Contract nr:TREN/07/FP6EN/S07.70576/038588

SORCER

Sorcer content

ApeldoornSewage digester, with poultry sludge (1.5 MWe)District heating Zuidbroek (2500 dwellings)EPC (shell based) of 0.82.65 GJ/dwelling*year additional energy saving (e.g. 400 Wp PV/dwelling)Woodchips peak boiler

HillerødLow temperature district heatingSolar collectors6000 m2 Class 1 Ecobuildings (-50%)20000 m2 Class 2 Ecobuildings (-25%)Biomass gasifierRenovated buildingsPV

Zuidbroek 66 months highlights

About 950 dwellings deliveredBiogas CHP completePV: about 44 kWp done on dwellings, 70 kWp on company buildings, 220 kWp on refurbished buildings, agreement on 68 kWp for housing corporationsMonitoring gives valuable results both for dwellings as for district heating system2.8 MW woodchips boiler in operation since september 2012

Dwelling monitoring results

Average consumption is close to predicted (49 kWh/m2)No significant difference between small and large dwellingsLarge spread (about factor of 5)

0

10

20

30

40

50

60

70

80

90

0 50 100 150 200 250 300 350 400 450 500

GJ p

er y

ear

for

spac

e he

ating

plu

s D

HW

Every dot is one dwelling

Annual heat consumption (May 2011-April 30 2012) degree days corrected (Deelen)

Average is 27.6 GJ

0

10

20

30

40

50

60

70

80

90

100

0 50 100 150 200 250 300

Annu

al e

nerg

y co

nsum

ption

(kW

h/m

2]

Dwelling gross floor area [m2]

Energy consumpion (heat) May2011-April2012May2011-april2012

Average is 50.7 kWh/m2

Hillerød 66 months highlights

3800 m2 solar thermal field completeBiomass boiler finished and in operationClass 1 buildings completedNew buildings added to WP8. These include town hall, city college, office administration building, conference centre, dormitory1500 m2 of low energy class 2 buildings reporting measurementsPV plants on Town Hall, Klaverfabrikken, Hillerød Varme head quarter completedGasifier being testedControl of low temperature district heating nearly implemented

KEMA
check

Some impressions

KEMA
check

Yet to do

Complete PV plans in Zuidbroek and HillerødComplete refurbishment activities in HillerødMonitoring district heating system

End date April 30, 2013

KEMA
check with peter

Progress summary

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Duration

Budget

RES el.

RES thermal

Solar space

New buildings

Refurb. buildings

Poly-generation

Other

~ 7.7Mio.

~ 2300 kW

~ 5650 kW

~ 0 m²

~ 186900 m²

~ 3000 m²

750 kW

100%

SORCER

72 months

data as of: October 2012, after acceptance of 60 month amendment