Upload
lindsey
View
22
Download
0
Tags:
Embed Size (px)
DESCRIPTION
s. ARLINGTON COUNTY CAPITAL BIKESHARE TDP. Bikeshare as Transit: Strategic Expansion Through Advanced Data Visualization United States Department of Transportation Data Palooza May 9, 2013. source: miabirk.com, 2011. What is Bikeshare?. Project Purpose. - PowerPoint PPT Presentation
Citation preview
source: miabirk.com, 2011
S
Bikeshare as Transit: Strategic Expansion Through Advanced Data VisualizationUnited States Department of Transportation Data Palooza May 9, 2013
ARLINGTON COUNTY CAPITAL BIKESHARE TDP
1
2
What is Bikeshare?
2
3
Develop a six year strategic growth plan for CaBi
Project capital and operating costs to develop funding needs support adequate budgeting and identify funding sources
Project Purpose
3
The Arlington County Transit Development Plan (TDP) for Capital Bikeshare (CaBi) will be the first of its kind, including a comprehensive review of the existing and planned CaBi service and plans for the next six years.
4
Data Sources: System Data
4
5
Data Sources: System Data
5
66
Trip Patterns Q4 2011
7
Top Neighborhood Pairs Q4 2011
7
8
Data Sources: User Survey
8
9
Data Sources: Crowdsourcing Map
9
10
Data Sources: Online Comment Forum
10
Top Ten Comments(Ranked by the number of concurring votes received.) 1. Locate a station at Penrose Square on Columbia
Pike (41 votes)2. Go to Shirlington (41 votes)3. Place stations along Arlington Boulevard
including at 10th, Pershing, Glebe, George Mason, Park, and Carlin Spring (29 votes)
4. Provide helmet rentals (18 votes)5. The bikes need better gears for hills because of
Arlington’s topography (15 votes)6. Connect Crystal City to Shirlington (14 votes)7. Implement Scenario 3 [expand along Lee
Highway and Columbia Pike] (14 votes)8. Locate a station at the Lyon Village Shopping
Center along Lee Highway (14 votes)9. Locate a station at the Lee Heights Shopping
Center (14 votes)10. Take the best of Scenario 2, 3 and 4: Add
stations along the Lee Highway and Columbia Pike, while placing stations along S Washington Boulevard to connect the RB-Corridor with South Arlington (11 votes).
11
Two methods of estimating demand Demand map based on existing usage data Spot analysis estimating station coverage at
build out
Estimating Bikeshare Demand
11
1212
dra
ft scen
ario
s