13
source: miabirk.com, 2011 S Bikeshare as Transit: Strategic Expansion Through Advanced Data Visualization United States Department of Transportation Data Palooza May 9, 2013 ARLINGTON COUNTY CAPITAL BIKESHARE TDP 1

source: miabirk, 2011

  • Upload
    lindsey

  • View
    22

  • Download
    0

Embed Size (px)

DESCRIPTION

s. ARLINGTON COUNTY CAPITAL BIKESHARE TDP. Bikeshare as Transit: Strategic Expansion Through Advanced Data Visualization United States Department of Transportation Data Palooza May 9, 2013. source: miabirk.com, 2011. What is Bikeshare?. Project Purpose. - PowerPoint PPT Presentation

Citation preview

Page 1: source: miabirk, 2011

source: miabirk.com, 2011

S

Bikeshare as Transit: Strategic Expansion Through Advanced Data VisualizationUnited States Department of Transportation Data Palooza May 9, 2013

ARLINGTON COUNTY CAPITAL BIKESHARE TDP

1

Page 2: source: miabirk, 2011

2

What is Bikeshare?

2

Page 3: source: miabirk, 2011

3

Develop a six year strategic growth plan for CaBi

Project capital and operating costs to develop funding needs support adequate budgeting and identify funding sources

Project Purpose

3

The Arlington County Transit Development Plan (TDP) for Capital Bikeshare (CaBi) will be the first of its kind, including a comprehensive review of the existing and planned CaBi service and plans for the next six years.

Page 4: source: miabirk, 2011

4

Data Sources: System Data

4

Page 5: source: miabirk, 2011

5

Data Sources: System Data

5

Page 6: source: miabirk, 2011

66

Trip Patterns Q4 2011

Page 7: source: miabirk, 2011

7

Top Neighborhood Pairs Q4 2011

7

Page 8: source: miabirk, 2011

8

Data Sources: User Survey

8

Page 9: source: miabirk, 2011

9

Data Sources: Crowdsourcing Map

9

Page 10: source: miabirk, 2011

10

Data Sources: Online Comment Forum

10

Top Ten Comments(Ranked by the number of concurring votes received.) 1. Locate a station at Penrose Square on Columbia

Pike (41 votes)2. Go to Shirlington (41 votes)3. Place stations along Arlington Boulevard

including at 10th, Pershing, Glebe, George Mason, Park, and Carlin Spring (29 votes)

4. Provide helmet rentals (18 votes)5. The bikes need better gears for hills because of

Arlington’s topography (15 votes)6. Connect Crystal City to Shirlington (14 votes)7. Implement Scenario 3 [expand along Lee

Highway and Columbia Pike] (14 votes)8. Locate a station at the Lyon Village Shopping

Center along Lee Highway (14 votes)9. Locate a station at the Lee Heights Shopping

Center (14 votes)10. Take the best of Scenario 2, 3 and 4: Add

stations along the Lee Highway and Columbia Pike, while placing stations along S Washington Boulevard to connect the RB-Corridor with South Arlington (11 votes).

Page 11: source: miabirk, 2011

11

Two methods of estimating demand Demand map based on existing usage data Spot analysis estimating station coverage at

build out

Estimating Bikeshare Demand

11

Page 12: source: miabirk, 2011

1212

dra

ft scen

ario

s

Page 13: source: miabirk, 2011

THANK YOU

13

Shana [email protected]

Andrew [email protected]

301-774-4566

www.foursquareitp.com