    South Capitol Street CorridorProject Update

    ANC 6D Meeting

    October 21, 2013

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    2/25

    2

    Agenda

    South Capitol Street Corridor Overview Project Update and Features

    Next Steps

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    3/25

    3

    Project Planning Process Key element of Anacostia Waterfront

    Initiative Program (AWI) forcreating a World-Class Waterfront

    Project goals of improving:

    o Multi-modal Transportation

    o Community Access

    o Economic and Residential Development

    o Safety

    Final Environmental Impact

    Statement (FEIS) approved in

    Spring 2011

    Supplemental EIS underway

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    4/25

    4

    South Capitol Street Corridor

    Creating a

    Grand UrbanBoulevard

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    5/25

    5

    South Capitol Street Improvements Phase 1 = $600 Million (Segments 1, 2 and demolition)

    Phase 2 = $300 Million (Segments 3/4/5)

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    6/25

    6

    Major Environmental Commitments

    Consult with Section 106 Signatory Agencies and Key

    Stakeholders Avoid, Minimize and Mitigate Adverse Effects on Plan of

    the City of Washington

    Design to Visually Maintain Historic LEnfant Plan

    Minimize Effects on Suitland Parkway

    Account for U.S. Department of Interior Standards for

    Historic Properties

    Salvage and Re-use Original Historic Materials

    Make a Good-faith Effort in Any Design Modifications to

    Avoid Historic Properties

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    7/257

    Key Stakeholders Local Communities and

    Residents

    Businesses

    Motorists, bicyclist and

    pedestrians

    Federal Highway

    Administration

    U.S. Coast Guard

    U.S. Navy (JBAB)

    Army Corps of Engineers National Capital Planning

    Commission

    Commission on Fine Arts

    Nationals Ball Club

    Advisory Council on

    Historic Preservation

    National Park Service

    Washington Metropolitan

    Area Transit Authority

    DC Water

    U.S. Environmental

    Protection Agency

    District Department of theEnvironment

    State Historic Preservation

    Office

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    8/258

    Project Update

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    9/259

    Project Features

    New Frederick Douglass Memorial Bridge(FDMB)

    New traffic ovals at west and east ends of FDMB

    Upgraded I-295 and Suitland Parkwayinterchange

    Improved bikeway and pedestrian facilities

    New drainage and stormwater management Significant landscaping and streetscape

    Demolition of existing FDMB

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    10/2510

    Frederick Douglass Memorial Bridge

    63-years-old, end of

    useful life Replacement due to:

    o Age and condition

    o Functional limitations

    o Importance to theDistricts transportation

    network

    Deterioration requires

    repairs with

    increasing frequency,

    cost and traffic

    impacts

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    11/2511

    FEIS Bridge Alignment

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    12/2512

    New Parallel Alignment

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    13/2513

    Traffic Oval West of Bridge

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    14/2514

    New Frederick Douglass

    Memorial Bridge

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    15/2515

    East Oval and I-295 Interchange

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    16/2516

    Bicycle and Pedestrian Facilities

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    17/2517

    Stormwater Management Features

    Mayor Gray: In one generation, DC will be

    the healthiest, greenest and most livable city inU.S.

    New DDOE regulations in now effect

    Strategies mimic natural hydrologic systems

    South Capitol Street design uses 3 strategies

    o Streetscape bioretention in planting strips

    o Open bioretention cells and landscaping

    o Pervious pavements allow pavement infiltration

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    18/25

    18

    Cross Section: South Capitol Street and Traffic Oval East of the Anacostia River

    Streetscape Bioretention Permeable Pavement Open Bioretention Area

    Stormwater/Sustainability Features

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    19/25

    19

    Next Steps

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    20/25

    20

    Statement Of Qualifications August 1, 2013Received

    Notification of Short List 4th Quarter 2013

    Issue Request for Proposals 4th

    Quarter 2013 Receive Proposals 1st Quarter 2014

    Select Design-Build Team 3rd Quarter 2014

    Notice to Proceed 4

    th

    Quarter 2014 Final Completion 4th Quarter 2018

    Project Phase 1 Schedule

    (Segments 1 and 2)

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    21/25

    21

    Disadvantaged Business

    Enterprise (DBE) Goals

    DBE goal is 25% of total design/construction contract

    DBE Plan will be submitted by the DB contractor and

    approved by DDOT

    DBE Goals will be monitored and audited

    For DBE Certification questions contact:

    Ms. Glenda Payne

    Office of Civil Rights

    202-673-6813

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    22/25

    22

    Workforce Development

    Employee Training Requirements will beincluded in the construction contract

    On-the-Job Training and Apprenticeship

    Positions will be available

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    23/25

    23

    Construction Traffic Management

    Lanes open during peak periods

    Advance portable message signs inform drivers

    Pedestrian route protections or detours

    Signed detours for I-295 ramp reconstruction

    and closures

    Community outreach:

    o Meetings

    o Informational materials

    o Website updates

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    24/25

    2424

    Good-neighbor construction

    Limit impacts to neighbors

    Maximize accessibility and mobility

    River delivery of materials

    Water truck controlling dust

    SAFETY AT ALL TIMES

    Designated haul routes

    Dust control

    No construction worker

    parking in neighborhoods

    Maintaining access during construction

    Minimizing Construction Impacts

  • 7/27/2019 South Capitol Street Corridor Project Update - ANC 6D Meeting, October 21, 2013

    25/25

    25

    Thank You