SOUTHERN REGIONAL POWER COMMITTEE
BANGALORE
Agenda for the 40th Meeting of
Protection Coordination Sub-Committee
of SRPC to be held on 29.01.2015 (Thursday)
1. Introduction
2. Confirmation of Minutes of last PCSC meeting
Confirmation of minutes of 39th
Protection Coordination Sub-Committee meeting
held on 30.12.2014.
3. Grid Occurrences (w.r.t. SRLDC and NTPC letters)
Grid Disturbance (GD), Grid Incidences (GI), failure of Auto-reclosing (A/R), and
Over-Voltage (O/V) trippings that occurred during the last one month period (Dec, 2014 – Jan, 2015) would be discussed in the PCSC meeting. [Annexure-I]
4. Submission of reports/compliance by Constituents
4.1. Details for Grid Occurrences (to be submitted by 23.1.2015)
The Constituents are requested to send the following information in respect of
Grid Occurrences as given in Sl. no. 3 (also indicated as squared items in Annexure-II) to have fruitful discussions in the PCSC forum.
(a) First Information Report (FIR)
(b) Event Logger (EL) output
(c) Disturbance Recorder (DR) output
(d) Trip event analysis report (possibly with pre and post fault
system conditions)
(e) Single line diagram of the station with switching devices,
CT, PT and relay details
(f) Relay settings adopted
(g) Remedial measures taken/suggested by the
Substation/Utility/SLDC/ SRLDC
4.2 Status of pending PCSC recommendations
Status of the pending protection recommendations (from 30th
PCSC to 37th
PCSC) as circulated vides email dt 01.12.2014 (Annexure-III) may please be
sent latest by 23.01.2015.
4.3 Remedial measures for tripping events of "TL under Forced Outage"
The constituents are requested to send the remedial measures taken by them for the tripping events as circulated vide email. (Annexure-IV)
The trip events are based on the daily report at SRLDC website
Agenda for the 40th Protection Coordination Sub Committee Meeting to be held on 29.01.2015 Page 2
http://srldc.in/DailyReport.aspx under the menu: Reports->Daily-> "TL under
Forced Outage")
4.4 Certificate for Healthiness of Batteries
Ref: Recommendations of Enquiry Committee
(NEW grid disturbance on 30th
& 31st July, 2012)
With reference to the above constituents are required to submit the monthly
certificate for healthiness of batteries, installed at 220 KV and above voltage
level Substations (for power supply to Relays, RTUs and PLCC equipment).
The certificate is being communicated to CEA/MoP.
The constituents are requested to submit the healthiness of batteries certificate
on monthly basis (i.e. on 7th
day of the month).
The following constituents are requested to send the report regularly:
TSGENCO (Hydro), KPTCL, NPCIL(MAPS)
4.5 Compliance measures for orders of Hon’ble CERC
Ref: Petition No. 146/MP/2013 with I.A. 36/2013 Order Dt. 20.02.2014
The constituents are requested to update the implementation status for Phase-I
& Phase-II activities.
The issue would be discussed in the meeting.
4.6 Completed dynamic study data
In the earlier meetings of PCSC, the forum had decided to collect the Dynamic
study data from the utilities to study the Southern Region system. The
dynamic study format was circulated to the constituents to send the Generator,
Excitation system, Governor, HVDC parameters. The forum opined that the
dynamic study details of the IPPs also are necessary to conduct the study of
SR system.
All the SLDCs were requested to direct the embedded IPPs connected at 220
KV and above voltage level to send the completed dynamic study format to
SRPC, Secretariat.
It was requested that the dynamic study data in the stipulated format may be
sent to SRPC at the earliest by email.
4.7 Configuration change details
It was agreed in the PCSC forum that if any change in the system
configuration ( i.e. addition of Generating Units, Capacitors, Reactors, LILO
etc) are to be highlighted and brought to attention of PCSC forum during the
PCSC Meetings.
This would enable utilities to review their protection settings if any change in
the adjoining utilities to have better protection coordination in the Southern
Region.
All the constituents are requested to send the change in the configuration in
their system if any to the PCSC forum on monthly basis.
Agenda for the 40th Protection Coordination Sub Committee Meeting to be held on 29.01.2015 Page 3
5. Other Protection Issues
5.1 Non-Submission of Tripping Reports
Non-furnishing of Tripping details including Disturbance Recorder/Sequential
Event logger output in compliance of Regulations 5.2 (r) of IEGC – as per the
provisions under clause 1.5 of IEGC 2010 would be discussed in the PCSC meeting. Annexure-V
5.2 Quantum of df/dt relief in SR
The issue would be discussed in the meeting.
5.3 Protection Logic checking of Critical Substations
Logic checking of following Critical Substations in the Southern Region had
been approved in the SRPC meeting held on 18.05.2013 at Bangalore.
(i) 400 kV Guttur (vi) 400 kV Kurnool
(ii) 400 kV Ramagundam (vii) 400 kV Almatti
(iii) 400 kV Kalpaka (viii) 220 kV Edamon
(iv) 400 kV Nelamangala (ix) 400 kV VTS
(v) 400 kV Hoody (x) 400 kV Vemagiri
6. Sending Agenda items for the PCSC meetings
As per the Guidelines of CEA/MOP it had been decided to conduct the PCSC
meetings on a monthly basis. It is requested that Agenda Items for the PCSC meetings,
if any, may please be sent latest by 5th
working day of the month to SRPC Secretariat
to compile and circulate the same so as to have fruitful discussions in the PCSC
meetings.
7. Review Meeting to discuss the status of Phase-I & II of DPR
The Status of implementation of Phase-I and II Protection Audit recommendation will
be discussed during the afternoon section of the meeting.
8. Date of next PCSC meeting
The 41st PCSC meeting would be conducted on 26.02.2015 (Thursday) at SRPC,
Bangalore.
*******
ANNEXURE- I
एस.आर. .स 40 –स एए Agenda Points for 40thmeeting of Protection Sub-Committee of SRPC
1. स / स र - Details of Grid Disturbances:
Sr. No.
.स . र /
Details of Event
र / Date &
स य /Time र / Reason
/Remarks
/ Category
1
Complete outage of 220kV Ambewadi station of KPTCL
22-12-2014 at 21:22 hrs
Triggering incident was B-phase to earth fault in 220kV Ambewadi-Nagjheri line-1. B-pole of breake did not open at Ambewadi end. LBB protection not available at Ambewadi end. All elements tripped on Zone-2 from remote ends.
GD-1
2. स / स र - Details of Grid incidents:
Sr. No.
.
स .
र / Details
of Event
र / Date
&
स य /Time
र / Reason /Remarks
/ Category
1
Tripping of 400kV Vijayawada-Gajuwaka line
18-12-2014 at 18:33 hrs
Line tripped due to operation of TEED protection at Gajuwaka end due to opening of jumper of Y phase CT
--
2
Tripping of HVDC Bhadrawati pole-1
22-12-2014 at 15:49 hrs
Mal-operation of the Bucholz relay in Converter Transformer had caused the tripping of Pole-1
GI-2
3
Complete outage of 110kV bus and connected elements at 220/110kV Kalamashery Station of KSEB
30-12-2014 at 10:11 hrs
All connected elements and 220/110kV ICT’s tripped.
GI-1
4
Tripping of 400 kV TALAGUPPA – HASSAN line
01-01-2015 at 13:38 hrs
Line tripped on R-phase to earth fault at hassan end on operation of distance Zone-2 due to non-receipt of carrier. From D.R of Talaguppa end it is observed that fault had occurred in Y-phase.
5
Tripping of 400kV Kayathar-Karaikudi line-2 at ICT-1,2&3 at kayathar
07-01-2015 at 23:25 hrs
B Ph CT of ICT-2 failed resulting in operation of busbar protection of Bus-2 and differential protection of ICT-2
GI-2
6
Tripping of HVDC BHADRAVATHI POLE-2
08-01-2015 at 9:57 hrs
Pole tripped with non valid tap code alarm
GI-2
ANNEXURE- I
7
Tripping of ICT-2 at Vemagiri, 400kV Vemagiri-Konaseema-1 & 400kV Vemagiri-Gautami line-1
09-01-2015 at 11:54 hrs
Tripped on Direct trip receive GI-2
3. Lines tripping due to PLCC mal-operation
Sr. No.
.
स .
र /
Details of Event
र / Date
&
स य /Time
र / Reason /Remarks
/ Category
1
Tripping of 400kV Ghanapur-Mamidapalli line
22-12-2014 at 10:52 hrs And on 24-12-2014 at 11:38hrs & 16:16hrs
Line tripped at Mamidipally end only due to direct trip received from 400kV Ghanapur Substation. Suspected PLCC maloperation had caused tripping of line
--
2
Tripping of 400kV Ramagundam-Ghanapur line-4
31-12-2014 at 15:36 hrs
Line tripped due to suspected PLCC mal-operation at Hyderabad end. Ramagundam end tripped on direct tripreceive
4. Failure or non-operation of Auto reclose during transient fault
Sr. No.
Element Date & Time
Reason
1 220kV Sedam-Tandur line 20-12-2014 at
22:20 hrs Line tripped on Y-phase to earth fault from both the ends
2
400 kV HYDERABAD - KURNOOL 07-01-2015 at 6:17 hrs
Line tripped on R-phase to earth fault. a/R lock out observed in E.L of Hyderabad end
3 220kV Neyveli-Bahoor line 11-01-2015 at
15:42 hrs R-phase to earth fault. Line did not auto reclose
5. NTPC Letter
Sub: DR report of 400KV simhadri vemagiri line-2 Auto reclosure -reg
Dear sir
Please find attached the List of DR reports triggered on 29.12.2014 at 13:19:06
hrs and 13:24:51 hrs due to Auto reclosing of Simihadri/vemagiri Line-2
respectively. Due to this disturbance critical drives of Simhadri station got
affected & voltages gone down to 62.3KV from 230KV (P-N)& fault current gone
upto to 16.1KA from 400A. This is for your information and necessary action at
your end for avoiding the disturbances to happen in future.
With Regards
C MALAKONDAIAH AGM I/C
ELECTRICAL MAINTENANCE DEPT, NTPC SIMHADRI
Meeting No /
Index
Meeting
Sl.NO
Details of
Event
Date Reason PCSC Recommendations Utility Responsible
to implement*
Status of Recommendation Remarks
36/I/9 6 220kV
Srisailam
right bank
station
03-09-2014 It was reported
that trip wire to
circuit breaker of
220kV Dindi-2
was open which
resulted in
operation of LBB
protection and
tripping of all
elements
connected to
220kV Bus-2.
Deliberation &
Recommendation:
a. The issue was discussed
in the Protection System
Analysis Group (PSAG-9)
meeting held at Srisailam
Right Bank Power House
(SRBPH) on 14 &
15.10.2014
b. APGENCO was
requested to inform the steps
/action taken to implement
the PSAG-9 meeting
recommendations during
the next PCSC.
APGENCO Pointwise compliance on PSAG-
9 MOM is furnished to SRPC
partially
completed and
partly
Pending
36/I/10 7 220kV
Srisailam
right bank
station
03-09-2014 Mal-operation of
LBB relay which
resulted in tripping
of all elements
connected to
220kV Bus-1
Deliberation &
Recommendation:
a. The issue was discussed
in the Protection System
Analysis Group (PSAG-9)
held at Srisailam Right Bank
Power House (SRBPH) on
14& 15.10.2014 .
b. APGENCO was
requested to inform the steps
APGENCO Pointwise compliance on PSAG-
9 MOM is furnished to SRPC
partially
completed and
partly
Pending
ANNEXURE - III
35/II/1 4 400 kV
KURNOOL
-
SRISAILAM
29-07-2014 Y-phase to earth
fault. Line did not
auto reclose.
• Old static relay would be
replaced by numerical
relay.
• APTRANSCO informed
the forum that the static
relay would be replaced
with the Numerical realy
with in 3 month’s time.
APTRANCO APTRANSCO informed that
one number of Numerical
distance relay was allotted to
replace the static relay on
Srisailam feeder at Kurnool
Substation as an inteirm
measure.
Rely yet to be commissioned.
Pending
Meeting No /
Index
Meeting S.NO Details of
Event
Date Reason PCSC Recommendations Utility Responsible to
implement*
Status of Recommendation Remarks
30/I/A 1 RTPS
Tripping
incidents and
the Spl
meeting held
at RTPS on
13th and 14th
March 2014
Mar-14 Spl meeting held
at RTPS on 13th
and 14th
March
2014
The PCSC forum recommended for
replacement of existing
electromechanical relays with
Numerical relays.
KPCL (1) e- Tender folated for the retrofit of
existing static relays with Numerical
version for lines M.nagar,M.bad,ICT-
1 & 2 -Technical Bid opened & price
bid yet to be opened.
(2) Retrofit of existing bus bar (CAG-
34) with numerical version -
Budgetetory offers obtained and is
under process.
Pending
33/II/3 9 400kV
Hiriyur-BTPS
line-2
22-05-14 &
23/05/2014
B phase to
ground fault had
occurred in line
and line auto
reclosed at
Hiriyur end but
failed to reclose
at BTPS end.
• KPCL: A/R is not yet enabled at
Raichur plant.
Recommendation:
The PCSC forum requested KPCL to
enable the A/R feature at RTPS end
before next PCSC meeting (i.e. 31st
July, 2014.
KPCL A/R at BTPS end will be enabled
during November 2014 end and needs
LC.
Pending
34/III/1 8 400kV
Raichur-BTPS
line
26-06-2014 Transient fault in
R-phase.
Line did not auto
reclose
Recommendation:
A/R at BTPS end to be made
operational within one month
KPCL A/R at BTPS end will be danbled
during November, 2014End and
needs LC
Pending
ANNEXURE - III
Meeting No /
Index
Meeting S.NO Details of
Event
Date Reason PCSC Recommendations Utility Responsible to
implement*
Status of Recommendation Remarks
ANNEXURE - III
35/I/2 1 220 kV
KAIGA –
KODASALL
Y an 220kV
Kodasalli -
Nagjheri line
19-07-2014 220kV Kaiga-
Kodasalli line
tripped on
operation of over
current
protection.
It was also
reported that 220
kV Kodasalli-
Nagjheri line had
tripped due to
fault.
From D.R of
KAIGA station it
was observed
that the fault
persisted for
around 340 ms.
Recommendations:
a) KPCL was requested to send the
detailed tripping analysis report to
SRLDC and SRPC.
b) The utilities are requested to send
the single Line Diagram / Lay out
plan of the affected Substation/
System.
c) KPTCL /KPCL to review the SOTF
settings for Kodasalli – Nagjheri lines.
d) Resistive reach of the distance
relay shall be reviewed to take care of
the high resistance fault.
KPCL (i) As per the proceeds of the PSAG-
10 relays will be replaced.
Temporarily aranged.
(ii) SOTF setting already reviewed.
(iii) Resistive reach is calculated and
will be uploaded in the seond week of
Dec.2014.
Pending
34/I/6 2 400/220 kV
ICT-1 & 2 at
MUNIRABA
D
16-07-2014 As reported
directional over
current relay of
ICT’s operated
due to snapping
of line jumper
in 220kV
Lingapur line.
Recommendations:
Bus bar protection shall be
provided by asset owner ( i.e KPTCL)
.
Settings for main distance
protection & Overcurrent protection
shall be examined and reviewed.
Time synchronization of the
Substation shall be ensured.
SRLDC for trip analysis.
KPTCL Management approval is obtained for
taking up the work of providing bus
bar protection to 220kV buses at
Guddadahally (Munirabad) Sub
Station along with replacement of 3
core/age old CTs of 220kV bays
belong to KPTCL.
Finalization of scheme/specification is
under process.
Pending
Meeting No /
Index
Meeting S.NO Details of
Event
Date Reason PCSC Recommendations Utility Responsible to
implement*
Status of Recommendation Remarks
ANNEXURE - III
36/I/5 2 ICT -1 & 2 at
Guttur
Substation
26-08-2014 ICT’s tripped
on operation of
Earth fault
relay.
Triggering
incident was
failure of
Jumper in
220kV Guttur-
Neelagunda line.
Recommendations:
a. Protection System Analysis Group
(PSAG-8) was held on 25 &
26.09.2014 at Guttur (400 KV,
KPTCL SS ) to discuss the frequent
tripping of 400KV Kaiga-Guttur lines
on account of over-voltage and
transient faults.
The Minutes of the PSAG-8 Meeting is
enclosed herewith as Annexure – V.
b. KPTCL was requested to send the
steps/action taken to implement the
recommendations of the PSAG-8
meeting held at Guttur on
25&26.09.2014 to the PCSC.
KPTCL Pointwise compliance on PSAG-8
MOM is furnished to SRPC
partially
completed and
partly Pending.
36/I/8 5 Multiple
Tripping at
400 kV
Guttur station
12-09-2014 400kV Kaiga-I,
Hiryur-I,
Narendra-I &
ICT-I tripped at
Guttur station
due to operation
of bus bar
protection of
400kV Bus-1 at
Guttur.
It was reported
that the LBB
protection acted
due to wrong
configuration of
distance relay.
Recommendations:
a. Protection System Analysis Group
(PSAG-8) was held on 25&
26.09.2014 at Guttur (400 KV,
KPTCL SS ) to discuss the frequent
tripping of 400KV Kaiga-Guttur lines
on account of over-voltage and
transient faults.
The Minutes of the PSAG-8 Meeting is
enclosed herewith as Annexure – V.
b. KPTCL was requested to
steps/action taken to implement the
recommendations of the PSAG-8
meeting held at Guttur on
25&26.09.2014 to the PCSC.
KPTCL Pointwise compliance on PSAG-8
MOM is furnished to SRPC
partially
completed and
partly Pending
Meeting No /
Index
Meeting S.NO Details of
Event
Date Reason PCSC Recommendations Utility Responsible to
implement*
Status of Recommendation Remarks
ANNEXURE - III
37/I/5 5 220kV
Ambewadi-
Ponda line
25-09-2014 As per FIR line
was hand tripped
due to
220/110kV Bus
dead.
Reason for bus
de-energization
may be
furnished to
PSC.
Recommendations:
a. A trip analysis report shall be with
the corrective actions for the following
issues shall be sent to PCSC forum.
b. Measures for preventing
Ambewadi – Nagjheri line -1 opening
in case of fault on the Ambewadi –
Nagjheri line -2 and vice versa.
KPTCL Yet to be informed Pending
Meeting No / Index Meeting S.NO Details of
Event
Date Reason PCSC Recommendations Utility Responsible to
implement*
Status of
Recommendation
Remarks
34/I/3 1 Tripping of
HVDC
Bhadravati
Pole-1 & 2
09-07-2014 As reported pole-1&2 tripped
due to auxiliary supply
failure.
Recommendations:
SRTS-I take up the issue with WRTS to submit
the report as per IEGC guidelines.
requested to send a letter to
WRLDC to submit the reports to SR also.
SRPC would take it up with WR and PGCIL if
the issue is not getting resolved.
Complete analysis of the faults and
rectification/remedial action taken to avert
similar occurrence in the HVDC Back to Back
station shall be submitted.
PGCIL Yet to be informed Pending
34/I/7 3 HVDC
BHADRAVA
THI POLE 2
18-07-2014 As reported pole-2 tripped
due on 5th harmonic alarm.
Recommendation :
Complete analysis of the faults and
rectification/remedial action taken to avert
similar occurrence in the HVDC Back to Back
station shall be submitted.
The PCSC forum recommended PGCIL, SRTS-I
take up the issue with WRTS to submit the
report as per IEGC guidelines.
SRLDC is also requested to send a letter to
WRLDC to submit the reports to SR also.
Based on the SRTS/SRLDC correspondences,
SRPC would take it up with WR and PGCIL if
the issue is not getting resolved.
PGCIL Yet to be informed Pending
ANNEXURE - III
Meeting No / Index Meeting S.NO Details of
Event
Date Reason PCSC Recommendations Utility Responsible to
implement*
Status of
Recommendation
Remarks
ANNEXURE - III
36/II/5 11 400kV
Ramagundam-
Chandrapur
line – 1
25-08-2014 Line tripped on B-phase to
earth fault.
As per FIR of chandrapur
station, line did not auto
reclose as auto reclose is kept
out of service.
Recommendation:
PGCIL to take up the issue with OEM in this
regard.
PGCIL Yet to be informed Pending
Meeting
No /
Index
Meeting
S.NO
Details of Event Date Reason PCSC
Recommendations
Utility Responsible
to implement*
Status of
Recommendation
Remarks
30/II/8 4 Tripping of
NCTPS-Alamathy-
1 & NCTPS-
S.V.Chatram-1
26-02-2014 TANTRANSCO
informed that tripping
occurred when the
Almatti CB was charged
at NCTPS end after the
maintenance.
SRLDC enquired about
the commissioning of
DR and EL at NCTPS.
TANTRANSCO
informed that only
standalone DR and EL
are not yet installed, but
relays have built in
DR/EL features.
TANTRANSCO
informed that issue was
taken up with the OEM.
TANTRANSCO TANTRASNCO informed
that DR and EL yet to be
commissioned
Pending
36/II/9 14 400kV Arasur-
Mettur Line I
29-09-2014 Recommendation:
Mettur S/s to Enable
A/R Scheme.
TANTRANSCO During the 38th PCSC
meeting, TANTRANSCO
informed that the Auto
Reclosing facility would
be enabled within 15 days.
Pending
ANNEXURE - III
Meeting
No /
Index
Meeting
S.NO
Details of Event Date Reason PCSC
Recommendations
Utility Responsible
to implement*
Status of
Recommendation
Remarks
ANNEXURE - III
37/II/3 13 400kV Mettur-
Arasur line-1
29-09-2014 Line tripped
due to Y-
Phase to earth
fault.
Line did not
auto reclose as
Auto reclose
scheme is kept
in non-auto
mode.
A/R is not in
service.
TANTRANSCO Yet to be informed Pending
Meeting
No / Index
Meeting S.NO Details of Event Date Reason PCSC Recommendations Utility Responsible
to implement*
Status of
Recommen
dation
Remarks
30/II/1 2 Tripping of 400kV
Srisailam-
Satenapalli line-1&2
17-02-2014 Tripped due to
PLCC mal-
operation.
Status of D.R/ EL
at Satenapalli
TSGENCO informed that the
line tripped at Satenapalli end
due to receipt of continuous
direct trip signal from
Srisailam.
TSGENCO also informed that
the issue has been rectified on
subsequent day and no issues
were observed.
The new relay would be in
place within 1 1/2 months.
TSGENCO Yet to be
informed
Pending
33/II/5 10 400kV VTPS –
Malkaram-1
26-05-2014 400kV VTPS-
Malkaram line-1
tripped on a y-
Phase to ground
fault.
Line auto-reclosed
at Malkaram end.
Recommendation
PCSC forum requested SLDC
of Andhra Pradesh /
Telangana to take up the issue
with the generator ( VTPS) for
attending/ correcting the
problem.
TSGENCO Yet to be
informed
Pending
34/I/5 6 400kV Srisailam-
Mamidapalli line-2
10-07-2014 D.R/ E.L of Srisailam station
were not furnished.
Deliberation:
Discussed in S.No. 4
TSGENCO Yet to be
informed
Pending.
ANNEXURE - III
Meeting
No / Index
Meeting S.NO Details of Event Date Reason PCSC Recommendations Utility Responsible
to implement*
Status of
Recommen
dation
Remarks
ANNEXURE - III
37/III/2 15 400kV Srisailam-
Satenapalli-2
19-09-2014 D.R of Srisailam end not
submitted
TSGENCO Yet to be
informed
Pending.
Meeting
No / Index
Meeting
S.NO
Details of Event Date Reason PCSC
Recommendations
Utility Responsible
to implement*
Status of
Recommendation
Remarks
37/II/5 14 400 kV
NEYVELI TS 2
(EXP) -
PUGALUR
05-10-2014 Y-phase to earth fault
had occurred in line.
Line did not auto
reclose.
DT was received from
Neyveli TS2(EXP)
end
Have to submit
remedial measures.
NLC Yet to be informed Pending
37/I/9 9 Tripping of
400/220kV ICT-
1&2 at UPCL
04-10-2014 ICT-1&2 tripped
during transient fault
in R-phase in 400kV
Hassan-UPCL line-1
Recommendations:
To avoid tripping of
ICTs for line fault,
UPCL is requested to
review the settings of
ICT’s SEF relay and
consider IDMT
setting instead of
existing Definite Time
setting.
UPCL Yet to be informed Pending
ANNEXURE - III
Meeting No / Index Meeting S.NO Details of
Event
Date Reason PCSC Recommendations Utility Responsible to
implement*
Status of Recommendation Remarks
36/II/3 10 400kV
JSW-Guttur
line
21-08-2014 R-phase to earth
fault.
Line did not auto
reclose.
• Decapping of insulator resulted in persisting fault that led to
the tripping of the line.
JSW /
KPTCL
Yet to be informed Pending
37/I/10 10 Tripping of
400kV NPS-
MEPL line
08-10-2014 Line tripped due to
DT receive from
MEPL
Recommendations:
a. The exact reason for receipt of DT signal at NPS end from
MEPL end has to be found out and corrective measures need to
be taken up by both MEPL and NPS to avoid its recurrence.
b. The forum decided to invite MEPL and SEPL whenever there
is a tripping involving their power stations.
MEPL /
PGCIL
Yet to be informed Pending
(MEPL)
33/II/2 8 400kV
Ramagundam-
Hyderabad
line-4
19-05-2014 Transient fault had
occurred in R-phase.
Line auto reclosed at
Ramagundam and
failed to reclose at
Hyderabad due to
direct trip receive.
• NTPC: no PLCC counter has gone up (incremented) at
Ramagundam
• PGCIL: DT was received from Ramagundam, and hence the
tripping of the line.
Recommendation
joint checking of PLCC
system by NTPC and SRTS I, PGCIL .
The report to be sent to PCSC forum at the earliest.
NTPC,
PGCIL
Yet to be informed. Pending.
33/II/10 12 400 kV
RAMAGUN
DAM -
WARANGA
L
13-06-14 B-phase to ground
fault had occurred.
Line failed to
reclose from
Ramagundam end.
NTPC:
Main-I distance protection relay sensed single phase fault and
Main-II relay (RAZFE-ABB) sensed R-Y (line to line) fault
which got priority over single phase fault and the line was given
3-phase tripping.
NTPC,
PGCIL,
APTRANSCO
Yet to be informed Pending
ANNEXURE - III
Meeting No / Index Meeting S.NO Details of
Event
Date Reason PCSC Recommendations Utility Responsible to
implement*
Status of Recommendation Remarks
ANNEXURE - III
32/II/6 6 400kV
Ramagundam-
Chandrapur
line – 1
28-04-2014 R-phase to earth
fault had occurred in
line. Line did not
auto reclose
NTPC:
•Auto reclose feature is not in service on Ramagundam –
Chandrapur line due HVDC back-to-back link at Chandrapur. It
was informed that HVDC link faces problem if there is auto-
reclose feature.
•It was informed that nowhere in the country, 3-phase auto
reclose is implemented for the lines at generating station.
•NTPC informed that sending DT for the earth fault at
Chandrapur end is not a correct operation.
PGCIL:
•Problematic protection coupler is to be replaced for the line.
•3-phase auto reclose feature is implemented on the Gazuwaka-
Jeypore which is having HVDC back-to-back at Gazuwaka.
Synchro check is done and 1-phase auto reclose is converted into
3-phase auto reclose.
SRLDC:
•3-phase auto reclose feature implemented on Gazuwaka-Jeypore
line is not known to SRLDC and it is not clear under what
conditions it was approved. However, SRLDC recommends 1-
phase auto reclose.
MS i/c:
•PGCIL should come back with a plan for implementing auto
reclose feature on Ramagundam – Chandrapur line.
PGCIL /
NTPC
Yet to be informed. Pending
33/I/4 2 Tripping of
400kV
Nellore
pooling station-
MEPL line
23-05-2014 Line tripped at
Nellore pooling end
only due to direct
trip receive from
MEPL end.
FIR:
At NPS end, line tripped after receiving DT.
At MEPL end, there was DC earth fault.
Deliberations:
The issue was noted.
PGCIL /MEPL Yet to be informed. Pending
(MEPL)
36/II/2 9 400kV
Madurai-
Costal
Energy
21-08-2014 B-phase to earth
fault.
Line did not auto
reclose at Coastal
Energy end.
SRLDC:
There was an earth fault on B-phase and subsequently A/R
scheme has been rectified.
TANTRANSCO /
PGCIL /
Coastal Energy
Yet to be informed Pending(Coas
tal Energy),
(TANTRANS
CO)
Meeting No / Index Meeting S.NO Details of
Event
Date Reason PCSC Recommendations Utility Responsible to
implement*
Status of Recommendation Remarks
ANNEXURE - III
37/I/6 6 Tripping of
400KV
Hassan-
UPCL line-2
25-09-2014 High resistance fault
as the fault ampere
was very less i.e.,
0.6kA at Hassan end
and nearly 0.9kA at
UPCL end.
Back up earth fault
protection had
operated at Hassan.
At UPCL end the
high resistance fault
got converted into a
R ph-B-ph fault
which resulted in
operation of
distance protection
Zone-1.
The reason for non-
picking up of Back
up earth fault at
UPCL needs
investigation.
Recommendations:
a. At UPCL end, unused zones of distance protection (probably
zone 5 to 8) shall be disabled.
b. At UPCL end, time synchronization between main-1 and
main-2 relays shall be ensured.
c. UPCL shall ensure time synchronization with Hassan
substation.
d. Reasons for non operation of back up protection at UPCL
for high resistance fault is to be submitted.
e. Reasons for not sending DT to UPCL by Hassan end is to be
submitted.
f. Settings of UPCL are to be reviewed and informed to PCSC
forum.
UPCL /
KPTCL /
Yet to be informed Pending(UPC
L).
Meeting No / Index Meeting S.NO Details of
Event
Date Reason PCSC Recommendations Utility Responsible to
implement*
Status of Recommendation Remarks
ANNEXURE - III
31/I/5 2 400 kV
HASSAN -
UPCL 2
28-Mar-14 From D.R of UPCL
end it is observed
that earth fault
protection of line
got operated which
resulted in tripping
of line.
·It was noted that Hassan – UPCL lines tripped on account of
back up earth fault protection.
UPCL said that more line trippings (usually between 12.00 and
3.00 PM) are due to bamboo/ rubber trees on the right of way.
UPCL said that relays would be tested by M/s Alstom shortly.
Effective patrolling of the line would be carried out as decided
in the meeting held by concerned utility officials.
PGCIL suggested that as many trips are attributed to high
resistance fault, carrier aided directional scheme is required.
UPCL to adopt IDMT characteristics for back up earth fault
protection.
UPCL/
KPTCL /
PGCIL
Yet to be informed. Pending
ANNEXURE- IV
Remedial Measure for the Critical Tripping Incidents
SN Element Name Outage
date/time
Revival
date/time
Reason for Outage Remedial Measure
1 400 Kv HASSAN - UPCL 2 17-07-2014/
16:58:00
17-07-2014/
17:38:00
TRIPPED ON R-N FAULT
2 400 Kv MADURAI - COSTAL
ENERGY
21-08-2014/
14:30:00
21-08-2014/
15:03:00
TRIPPED WHILE
CHECCKING A/R CKT
3 400 Kv MADURAI - NTPL 04-10-2014/
13:41:00
04-10-2014/
14:12:00
R-N FAULT
4 400/220 kV ICT-1 AT TRICHUR 09-11-2014/
19:21:00
09-11-2014/
20:56:00
TRIPPED
5 220 kV YERANDAHALLY - HOSUR 10-11-2014/
11:06:00
10-11-2014/
11:52:00
TRIPPED ON D.E.F.R
INDICATION
6 400 Kv ALM - SVCTM-I 17-11-2014/
16:17:00
17-11-2014/
18:08:00
TRIPPED AT ALM END.
7 400/230 Kv ICT 3AT ALAMATHY 28-11-2014/
14:04:00
28-11-2014/
18:23:00
DC LEAK
8 400/220 kV ICT-1 AT
NEELAMANGALA
30-11-2014/
15:25:00
30-11-2014/
15:52:00
TO ATTEND HOTSPOT &
COMBINATION CHANE
9 220 Kv CHIKKODI - MUDUSHINGI 01-12-2014/
16:17:00
TRIPPED DUE TO FAULT
AT 48KM FROM CHIKKODI
10 220 Kv CHIKKODI - TALANDGE 01-12-2014/
16:17:00
02-12-2014/
03:12:00
TRIPPED DUE TO FAULT
AT 48KM FROM CHIKKODI
11 400/110 kV ICT 1AT ALAMATHY 09-12-2014/
13:24:00
09-12-2014/
17:14:00
TRIPPED DUE FALSE
WINDING TEMP HIGH
ALARM (IDLE CHARGED)
12 HVDC BHADRAVATHI POLE 1 11-12-2014/
08:05:00
11-12-2014/
17:57:00
TRIPPED DUE TO VBE
GATE UNIT FAULTY @
SOUTHSIDE
13 400 Kv KURNOOL - THIRUVALLAM
2
12-12-2014/
01:58:00
12-12-2014/
YB FAULT
14 400 kV NELAMANGALA - HOODY 1 13-12-2014/
09:45:00
13-12-2014/
10:50:00
BUS BAR PROTECTION
OPERATED
15 400 kV NELAMANGALA - HOODY 2 13-12-2014/ 13-12-2014/ BUS BAR PROTECTION
ANNEXURE- IV
09:45:00 10:51:00 OPERATED
16 400/220 kV ICT-2 AT HOODY 13-12-2014/
09:43:00
13-12-2014/
10:54:00
BUS PROTECTION
OPERATED
17 400 Kv NELLORE - TVLLM-1 14-12-2014/
10:55:00
14-12-2014/
11:28:00
SUSPECTED PLCC MAL
OPERATION
18 400 Kv KURNOOL - THIRUVALLAM
1
15-12-2014/
09:15:00
15-12-2014/
10:02:00
REASON AWAITED
19 400 kV VIJAYAWADA - GAZUWAKA
1
18-12-2014/
18:33:00
18-12-2014/
21:09:00
JUMPER CUT AT
GAJUWAKA END
20 400 kV PUGALUR -
KALAIVANTHAPATTU 2
18-12-2014/
18:44:00
DT RECEIVED AT
PUGALUR END
21 220 kV HOSUR - SOOLAGIRI 1 19-12-2014/
17:26:00
RY FAULT
22 400/230 kV ICT-2 AT PUGALUR 20-12-2014/
16:51:00
20-12-2014/
19:29:00
BUCHOLZ RELAY
OPERATED
23 400 kV GHANAPUR - MAMIDIPALLY 22-12-2014/
10:52:00
22-12-2014/
11:11:00
PLCC MALOPERATION
TRIPPED AT MDPLI END
24 HVDC BHADRAVATHI POLE 1 22-12-2014/
15:49:00
22-12-2014/
16:17:00
BUCHHOLZ RELAY
OPERATION IN POLE 1
WEST Y PHASE
25 400 kV GHANAPUR - MAMIDIPALLY 24-12-2014/
11:38:00
24-12-2014/
11:54:00
DT RECEIVED AT MMDPLY
26 400 kV GHANAPUR - MAMIDIPALLY 24-12-2014/
16:16:00
24-12-2014/
16:24:00
MAL OPERATION DT
RECIEVED AT MDPLY
27 400 kV RAMAGUNDAM -
HYDERABAD 4
31-12-2014/
15:36:00
31-12-2014/
16:16:00
PLCC MALOPERATION
28 400 kV TALAGUPPA - HASSAN 01-01-2015/
13:38:00
01-01-2015/
14:38:00
TRIPPED ON R-N FAULT
29 400 kV KAIGA - GUTTUR 2 02-01-2015/
05:14:00
TRIPPED ON B-N FAULT
30 400 Kv KURNOOL - THIRUVALLAM
2
02-01-2015/
17:28:00
02-01-2015/
22:19:00
TRIPPED DUE TO L/R DIFF.
PROTECTION OPERATED
31 220 kV AMBEWADI - PONDA 1 06-01-2015/
12:01:00
06-01-2015/
12:20:00
TRIPPED ON EARTH
FAULT
32 400/110 Kv ICT 1 AT KAYATHAR 07-01-2015/
23:35:00
08-01-2015/
02:52:00
ICT-2 B-PH CT FLASH
OVER AT KAYATHAR.
33 400/230 Kv ICT 3 AT KAYATHAR 07-01-2015/
23:35:00
ICT-2 B-PH CT FLASH
OVER AT KAYATHAR.
ANNEXURE- IV
34 400 kV KAIGA - GUTTUR 1 07-01-2015/
14:35:00
B - N FAULT
35 400 Kv KAYATHAR - KARAIKUDI 1 07-01-2015/
23:35:00
08-01-2015/
02:44:00
ICT-2 B-PH CT FLASH
OVER AT KAYATHAR.
36 400/230 Kv ICT 2 AT KAYATHAR 07-01-2015/
23:35:00
ICT-2 B-PH CT FLASH
OVER AT KAYATHAR.
37 HVDC BHADRAVATHI POLE 2 08-01-2015/
09:57:00
08-01-2015/
10:16:00
NON VALID TAP CODE
38 400 Kv KUDAMKULAM - MADURAI 08-01-2015/
10:20:00
H/T@KKNP DUE TO
SMOKE FOUND FROM B-
PH VT CUBICLE
39 220 Kv UPPERSILURERU -
BALIMELA
08-01-2015/
16:40:00
B - N FAULT
40 400 kV KAIGA - GUTTUR 1 09-01-2015/
10:47:00
09-01-2015/
13:48:00
R - N FAULT
41 400 kV VEMAGIRI - GOUTHAMI
CCCP 1
09-01-2015/
11:54:00
09-01-2015/
13:24:00
DT RECEIVED
42 400 kV VIJAYAWADA - VEMAGIRI 1 09-01-2015/
11:17:00
09-01-2015/
11:38:00
Y - N FAULT
43 400 kV VEMAGIRI - KONASEEMA 1 09-01-2015/
11:44:00
DT RECEIVED
44 220 kV NEYVLI - BAHOOR 11-01-2015/
15:42:00
11-01-2015/
17:26:00
R-N FAULT
45 400 Kv NELLORE - THIRUVALLAM 2 13-01-2015/
12:01:00
13-01-2015/
12:37:00
TRIPPED DUE TO R-N
FAULT
ANNEXURE I
एस.आर.पी.सी40वेंप्रोटेक्शनउप–समितिकीबैठककेमऱएएजेंडे Additional Agenda Points for 40thmeeting of Protection Sub-Committee of
SRPC
1. ग्रिडडडस्टबबन्स / ग्रिडइन्सडन्टकावववरण - Details of Grid incidents:
Sr. No.
क्र.
सं.
घटनाकावववरण / Details
of Event
िारीख/ Date
&
सिय /Time
कारण / Reason टटप्पणी /Remarks
शे्रणी/ Category
1
Tripping of Unit-1 at Kudankulam
14-01-2014 at 19:20 hrs
Y-phase Differential protection of Generating transformer of Unit-1 got operated which resulted in tripping of Unit-1
--
2
Tripping of 400kV Cudappah-Chitoor line
14-01-2014 at 10:03hrs
Line tripped at Cudappah end only
3
Tripping of 220kV Sabarigiri-Theni line
15-01-2015 at hrs
LBB protection got operated at Sabarigiri end.
2. Failure or non-operation of Auto reclose during transient fault
Sr. No.
Element Date & Time
Reason
1
400kV Raichur-Munirabad line 18-01-2015 at 1:39 hrs
Line tripped on R-phase to earth fault. Line did not auto reclose at Raichur
ANNEXURE II
Page 1 of 2
1. Agenda Items from the Record Notes of the Special Meeting regarding
the issues pertaining to Karnataka System and BMRCL- 16-01-2015
ANNEXURE II
Page 2 of 2
2. PGCIL SR-1 Agenda Items
Sub: Over Voltage grading of newly commissioned lines in SR
This is in reference to the minutes of the 39th PCSC meeting forwarded. As
recorded in the minutes, the Grading of Over Voltage settings need to be revised and
recommended after the addition of newly added elements in Southern Region.
Presently the settings recommended by PGCIL (SR-1) CC Engg group forwarded at
the time of commissioning is implemented and put into service.
Subsequent to the receipt of the settings recommended by SRLDC / SRPC /
PCC groups, the same shall be adopted on all the feeders.
Suggestions for providing settings for High set of Earth fault relay on HV side of Generator Transformer (with Star connection on HV side and Delta connection on LV side): Jayarajan.C.N, Executive Engineer, Protection and Monitoring Division, Kerala State Electricity Board, Kerala, India It may be noted that the high set unit of Earth fault relay on HV side of Generator Transformer may un necessarily operate for external fault even though the primary relay corresponding to that fault had operated if the relay relay has not been set properly. For explaining this let us take a bus fault for analysis. A simple diagram is given below. Hope this will suffice for calculations.
See the figure above. Here S represents the Fault MVA source, T is the Generator Transformer and G is the Generator. And let us take a line to ground fault occurs on one phase of 220KV bus. Now, we can assume the following values: Fault MVA source S: Here, 5000MVA has been taken as maximum fault level for calculation. MVA = 5000, Positive Sequence impedance (p.u) Xs1 = 1 Negative Sequence impedance(p.u) Xs2 =1 Zero sequence impedance (p.u) Xs0= 1 Per Unit values are based on 5000 MVA. Resistance values are neglected. Generator Transformer T: MVA = 100 220KV (Star)/ 11KV(Delta)
ANNEXURE-IV
1
p.u reactance = 0.15 Solidly earthed. Generator G: MVA = 100 Positive Sequence Impedance(p.u.) Xg1 = 0.15 Negative Sequence Impedance(p.u) Xg2 = 0.15 Zero sequence Impedance (p.u) Xg0 = 0.05 Resistance earthed with resistance value = R. It may be noted that zero sequence impedance and resistance R will not come into calculations as the same will become clear from following diagrams. Base MVA can be taken as 100MVA, with this p.u. impedances of Fault MVA source can be rewritten as: Positive Sequence impedance (p.u) Xs1 = 1*100/5000 = 0.02 Negative Sequence impedance(p.u) Xs2 =1*100/5000 = 0.02 Zero sequence impedance (p.u) Xs0= 1*100/5000 = 0.02 Positive Sequence Network:
POSTIVE SEQUENCE NETWORK
The above diagram can be simplified using Thevenin's theorem: Equivalent resistance = 0.02*(0.14+0.15)/(0.02+0.14+0.15) = 0.0187 The positive sequence network becomes:
F1
N1
1 p.u. 0.15
0.14 0.02
1 p.u.
ANNEXURE-IV
2
Similarly negative sequence networks becomes:
ZERO SEQUENCE NETWORK
0.02 Fo
No
0.14
0.05
3R
0.0187 F2
N2
0.0187 F1 N1
1 p.u
ANNEXURE-IV
3
For zero sequence network, equivalent resistance = 0.02*0.14/(0.02+0.14) = 0.0175 Zero sequence network becomes:
The total circuit is shown as below:
I1 = I2 = I0 = 1/ (0.0187+0.0187+0.0175) = 18.215 Out of this sequence currents, one portion flows through the GT neutral as shown below:
0.0187 F1
1p.u.
N1
F2
N2
F0 No
0.0187
0.0175
No
0.0175
.
ANNEXURE-IV
4
The per phase sequence current flowing through GT neutral = 18.215 * 0.02/(0.02+0.14) = 2.277 p.u. Total zero sequence current flowing through the transformer = 3*2.277 = 6.831p.u .................(1) Now we can imagine that the generator is out of service but GT is in service as shown in the figure below:
Positive, negative and zero sequence networks are shown below:
POSTIVE SEQUENCE NETWORK
S S
220 kV T
G
R
18.215 p.u.
0.02 0.14
No
Fo
ANNEXURE-IV
5
NEGATIVE SEQUENCE NETWORK
ZERO SEQUENCE NETWORK
0.02 F2
N2
0.14
0.15
0.02 F1
N
1 p.u
0.14
1 p.u
0.15
ANNEXURE-IV
6
And its simplified forms are as given below:
POSITIVE SEQUENCE NETWOK
NEGATIVE SEQUENCE NETWORK
0.02
1 p.u
0.02 Fo
No
0.14
0.05
3R
ANNEXURE-IV
7
Per phase sequence current = 1 / (0.02+0.02+0.0175) = 17.39 p.u. The total zero sequence current through GT neutral = 3*17.39*0.02/(0.02+0.14) = 6.52 p.u. ....(2) It may be noted that the current flowing through GT neutral is almost same even though the generator is in service or not. Now let us see what happens when there is no source and 220KV bus is charged from generator (dead bus charging):
S S
T
G
R F
0.02
1p.u.
0.02
0.0175
ANNEXURE-IV
9
Its positive, negative and zero sequence networks are as shown below: POSITIVE SEQUENCE NETWORK
NEGATIVE SEQUENCE NETWORK
ZERO SEQUENCE NETWORKS
0.05 0.14
No
Fo
3R
N2
0.14 0.15 F2
N1
0.14 0.15 F1
1 p.u.
ANNEXURE-IV
10
which can be simplified and connected to get total network as shown below:
Therefore, per phase sequence current = 1/(0.29+0.29+0.14) = 1.39 p.u . Total zero sequence current through GT neutral = 3*1.39 = 4.16 p.u .................................(3) Conclusion:
1. While comparing the total fault current contributions through Generator Transformer neutral vide equations (1), (2) and (3), it can be seen that the condition (1), i.e., the situation where system, GT and generator are in service, give maximum current. Maximum fault current through GT neutral = 6.831 p.u It may be noted that it is very difficult to get exact sequence network picture. Besides, it offset due to X/R due to actual system conditions to be considered while providing setting. Therefore, minimum setting shall be = 1.3*6.831 p.u = 8.88 p.u. = 9 p.u
Please note that the above value may sometimes be changed to higher value for stability if instantaneous delay is provided for the highest relay operation, if necessary.
However this value can be selected which may suffice for most of applications with 5 cycles delay.
0.29 F1
1p.u.
N1
F2
N2
F0 No
0.29
0.14
ANNEXURE-IV
11
2. In the absence of exact system configuration for analysis, settings have to be provided carefully. For avoiding maloperations due to DC offset in CTs, X/R in systems etc. 100 ms (5 cycles) may be given as delay. This delay is acceptable for the following reasons: a. The protection area of high set unit of earth fault relay is between CTs on HV side of GT
and (including) transformer HV winding. b. This area is normally covered by Restricted Earth Fault protection and Transformer
differential protection which are more sensitive than high set unit earth fault relay. c. For the above reasons in (a) and (b), the function of high set unit of earth fault relay in
HV side of Generator transformer is to act as ‘back up’ of HV side REF and transformer differential relay for faults on HV side of transformer.
3. Please note that this high set protection is effective only when the earth fault relay is located in the residual connection of HV side phase CTs and not on the neutral CT of the transformer.
ANNEXURE-IV
12