Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
Segment A: Inner Portland
Map ID Project Name Recommendation
A Broadway and Caruthers Street sidewalks and bikeway Do not study in DEIS; reconstructs existing sidewalk
B 1st Avenue bikeway Study in DEIS
C Naito Parkway to Hooley Bridge bikeway Study in DEIS
D Hamilton Street/Terrace bikeway and sidewalks Study in DEIS
1
Segment B: Outer Portland
Map ID Project Name Recommendation
A Chestnut Street bikeway Study in DEIS
B Terwilliger Parkway bikeway gap Study in DEIS
C Custer Drive sidewalks Study in DEIS
D Pedestrian/bicycle bridge over I-5 near Custer Street Study in DEIS
E Capitol Hill Road sidewalks and bikeway Study in DEIS
F 19th Avenue bikeway Study in DEIS
G Troy Street bikeway Study in DEIS
H Spring Garden Street and Dolph Court sidewalks and bikeway Study in DEIS
I 24th Avenue sidewalks and bikeway Study in DEIS
J 26th Avenue sidewalks and bikeway Study in DEIS
K 30th Avenue/Hume Street/31st Avenue sidewalks Study in DEIS
2
Map ID Project Name Recommendation
L Capitol Highway sidewalks and bike lanes Study in DEIS
M Taylors Ferry Road sidewalks and bikeway Study in DEIS
N 40th Avenue sidewalks Study in DEIS
O Outer Capitol Highway pedestrian improvements Study in DEIS
P Pedestrian/bicycle bridge over I-5 near Luradel or 53rd Study in DEIS
Q Pomona Street sidewalks and bike lanes Study in DEIS
R Pasadena Drive sidewalks and bike lanes Study in DEIS
S Barbur Boulevard - Tigard Triangle walk/bike connection Study in DEIS with revised scope: on-street connection via Lesser
T Tigard Triangle - PCC Sylvania walk/bike connection Study in DEIS with revised scope: connection via Lesser
3
Segment C: Tigard and Tualatin
4
Map ID Project Name Recommendation
A 72nd Avenue sidewalks and bikeway: 99W to Dartmouth Street Study in DEIS
B Atlanta Street roadway extension Do not study in DEIS (instead, study project #1 below)
C 72nd Avenue sidewalks and bikeway: Dartmouth Street to Hunziker Street
Study in DEIS
D Hall Boulevard, Scoffins Street and Hunziker Street intersection alignment
Do not study in DEIS: Could occur as mitigation
E Hall Boulevard sidewalk infill Study in DEIS with revised scope: Knoll Drive to Bonita Road
F 72nd Avenue sidewalks and bikeway: Hunziker Street to Bonita Road
Study in DEIS
G Bonita Road bikeway: 72nd Avenue to I-5 Study in DEIS
H Bonita Road sidewalks and bikeway: I-5 to Windfield Way Study in DEIS
I Pedestrian/bicycle path along I-5 between Bonita Road and Cardinal Lane
Study in DEIS
J 72nd Avenue sidewalks and bikeway: Bonita Road to Upper Boones Ferry Road
Study in DEIS
K Carman Drive sidewalks and bikeway Study in DEIS
L 72nd Avenue sidewalks and bikeway: Upper Boones Ferry Road to Durham Road
Study in DEIS
M 72nd Avenue sidewalks and bikeway: Durham Road to Lower Boones Ferry Road
Study in DEIS
N Pedestrian/bicycle path along I-5 between Bridgeport Village and Tualatin River Greenway
Do not study in DEIS (instead, study project #2 below)
1 Baylor Street sidewalks and bikeway New project: Study in DEIS
2 Walk/bike improvements on Lower Boones Ferry Road and Boones Ferry Road
New project: Study in DEIS
Selected Projects Suggested During Scoping
Map ID Project Name Recommendation
A Improve the SW Urban Trail route (SW 19th from SW Barbur to SW Capitol Hill Road-paved pedestrian pathway and improved lighting)
Do not study in DEIS: Reviewed by PBOT, Capitol Hill Rd improvements and Barbur sidewalks will serve this area
B Shift bicycle/pedestrian improvement on Barbur Boulevard to a one-sided multi-use pathway (South of Naito to Burlingame
Design consideration in DEIS
5
Avenue)
C Fix Condor Avenue- slow traffic, and provide one safe connection between Barbur and Terwilliger
Do not study in DEIS: Redundant with Hamilton St. bikeway
D 19th Avenue bikeway: Extend south to Taylor’s Ferry and north to SW Capitol Hill Road
Do not study in DEIS: Redundant with Capitol Hill Rd improvements
E Improvements to trail 4 which runs parallel to I-5; including a new bicycle connection from SW Baird to SW 12th
Do not study in DEIS: Beyond the scope of this project
F Add increased bicycle access on SW Custer Street, south of I-5, to the east.
Do not study in DEIS: Connections from new bridge may be studied during design
G No widening of Chestnut to add bike lanes and sidewalks No widening anticipated: Design consideration for DEIS
H Red Electric Do not study in DEIS: Remains in Shared Investment Strategy
I Other suggested expansions to existing projects Do not study in DEIS
J Other suggested projects too far away from stations Do not study in DEIS
6