Southwood/Fargo Country Club Flood Risk Management Project
Neighborhood MeetingsJuly 20, 2011
2
Southwood/Fargo Country Club HOW WE GOT HERE
PETITION RECEIVED THIS PAST WINTER FROM NEIGHBORHOOD REQUESTING A LEVEE PROJECT IN REAR YARDS
EMERGENCY LEVEE CONSTRUCTED PRIOR TO THIS PAST SPRING’S FLOOD
3
Southwood/Fargo Country Club Emergency Levee – As Built
BUILT TO AN ELEVATION OF 44-FEET
4
Southwood/Fargo Country Club – Across Course Levee
ALIGNMENT DESIGNED BY FARGO COUNTRY CLUB’S ARCHITECT
ONLY POSSIBLE ALIGNMENT ACROSS THE COURSE THAT WILL NOT RESULT IN SAFETY ISSUES FOR THE COURSE
PORTION OF SOUTHERN END WITHIN THE FLOODWAY
5
Southwood/Fargo Country Club – Across the Course Levee
GEOTECHNICAL STUDY COMPLETED
STUDY SHOWED THAT THE FACTOR OF SAFETY FOR THE LONG TERM STABILITY WOULD NOT BE MET
ANALYSIS DID NOT FACTOR IRRIGATION OF DRIVING RANGE INTO IT
6
Southwood/Fargo Country Club – Permanent Levee Option
CLOSELY FOLLOWS EMERGENCY LEVEE ALIGNMENT
ACTUAL ALIGNMENT WILL BE REVIEWED FURTHER
CENTERED ON PROPERTY LINES FROM 521 TO APPROXIMATELY 909 SOUTHWOOD DRIVE
BUILT TO AN ELEVATION OF 42.5-FEET PLUS 1-FOOT
7
Southwood/Fargo Country Club – Schedule
JULY 20, 2011 – PUBLIC MEETING
JULY 27, 2011 – BACKYARD WALKTHROUGH
AUGUST 22, 2011 – CALL FOR BIDS
SEPTEMBER 14, 2011 – OPEN BIDS
SEPTEMBER 19, 2011 – AWARD BIDS
OCTOBER 3, 2011 – CONTRACT AWARD, CONSTRUCTION BEGINS SHORTLY AFTER
SPRING 2012 – FINAL COMPLETION
FALL 2012 – PHASE 2 CONSTRUCTION FUTURE NEIGHBORHOOD MEETINGS WILL BE HELD
8
Questions?