1
Vasco Rd. Install Boulder Weirs to Create In-channel Ponds Locations TBD Armstrong Rd. Remove Culvert Proposed Trail 0 150 300 75 Feet ¯ Spoils Project Boundary Phase I Boulder Weir Bank Layback and Revegetate Pond Creation Seasonal Wetland Restoration/Creation Road to Be Removed/Revegetated Proposed Stream Existing Stream Phase II Channel Restoration Phase III Staging Area Proposed Trail Souza II Restoration Project: Schematic of Restoration Design

Souza II Restoration Project: Schematic of Restoration Design · Channel Restoration Phase III Staging Area Proposed Trail Souza II Restoration Project: Schematic of Restoration Design

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Souza II Restoration Project: Schematic of Restoration Design · Channel Restoration Phase III Staging Area Proposed Trail Souza II Restoration Project: Schematic of Restoration Design

Vasco Rd.

Install Boulder Weirsto Create In-channel

PondsLocations TBD

Arms

trong

Rd.

Remove Culvert

Proposed Trail

0 150 30075Feet

¯

Spoils

Project Boundary

Phase I

Boulder Weir

Bank Laybackand Revegetate

Pond Creation

Seasonal Wetland Restoration/Creation

Road to Be Removed/Revegetated

Proposed Stream

Existing Stream

Phase II

Channel Restoration

Phase III

Staging Area

Proposed Trail

Souza II Restoration Project: Schematic of Restoration Design