Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM Hourly Analysis Program v4.51 Page 1 of 31 CHANGING & LOCKERS ROOM 1. General Details: Floor Area ............................................................. 14.1 Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule 2.4. People: Occupancy ............................................................... 1.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule 2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None 2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None 2.3. Electrical Equipment: Wattage ................................................................. 0.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors: Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty. SE 20.1 0 0 0 3.1. Construction Types for Exposure SE Wall Type ........................................ Default Wall Assembly 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ............................................................. 14.1 Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter .................................................. 3.5 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: (No partition data).

Space

Embed Size (px)

DESCRIPTION

space data for ac calculations

Citation preview

Page 1: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 1 of 31

CHANGING & LOCKERS ROOM 1. General Details: Floor Area ............................................................. 14.1 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 1.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ................................................................. 0.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

SE 20.1 0 0 0 3.1. Construction Types for Exposure SE Wall Type ........................................ Default Wall Assembly 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ............................................................. 14.1 m² Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter .................................................. 3.5 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: (No partition data).

Page 2: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 2 of 31

CORRIDOR 1. General Details: Floor Area ............................................................. 26.1 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 1.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ................................................................. 0.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

SE 14.6 1 0 0 3.1. Construction Types for Exposure SE Wall Type ........................................ Default Wall Assembly 1st Window Type ............................... CORRIDOR WINDOW 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ............................................................. 26.1 m² Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter .................................................. 2.6 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: 7.1. 1st Partition Details: Partition Type ........................................ Wall Partition Area ....................................................................... 33.0 m² U-Value ............................................................... 2.800 W/(m²-°K) Uncondit. Space Max Temp .................................. 40.0 °C Ambient at Space Max Temp ................................ 40.0 °C Uncondit. Space Min Temp ................................... 23.9 °C Ambient at Space Min Temp ................................. 12.8 °C

7.2. 2nd Partition Details: (No partition data).

Page 3: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 3 of 31

DINNING HALL 1. General Details: Floor Area ............................................................. 27.1 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................. 12.0 People Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ................................................................. 0.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors: (No Wall, Window, Door data). 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ............................................................. 27.1 m² Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter .................................................. 0.0 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: 7.1. 1st Partition Details: Partition Type ........................................ Wall Partition Area ....................................................................... 62.1 m² U-Value ............................................................... 2.800 W/(m²-°K) Uncondit. Space Max Temp .................................. 40.0 °C Ambient at Space Max Temp ................................ 40.0 °C Uncondit. Space Min Temp ................................... 23.9 °C Ambient at Space Min Temp ................................. 12.8 °C

7.2. 2nd Partition Details: (No partition data).

Page 4: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 4 of 31

ELECTRICAL & REPAIR ROOM 1. General Details: Floor Area ............................................................. 16.7 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 3.5 L/s/person OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 2.0 People Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ............................................................... 800.0 Watts Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

NW 17.9 0 0 0

W 11.9 0 0 0 3.1. Construction Types for Exposure NW Wall Type ........................................ Default Wall Assembly 3.2. Construction Types for Exposure W Wall Type ........................................ Default Wall Assembly 4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.

H 16.7 0 0 4.1. Construction Types for Exposure H Roof Type ....................................... Default Roof Assembly 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ............................................................. 16.7 m² Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter .................................................. 5.2 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: 7.1. 1st Partition Details: Partition Type ........................................ Wall Partition Area ....................................................................... 37.5 m² U-Value ............................................................... 2.800 W/(m²-°K) Uncondit. Space Max Temp .................................. 40.0 °C Ambient at Space Max Temp ................................ 40.0 °C Uncondit. Space Min Temp ................................... 23.9 °C

Ambient at Space Min Temp ................................. 12.8 °C

Page 5: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 5 of 31

7.2. 2nd Partition Details: (No partition data).

Page 6: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 6 of 31

ENGINE OVER HAUL 1. General Details: Floor Area ............................................................. 37.6 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 3.5 L/s/person OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 4.0 People Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ............................................................. 1500.0 Watts Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

NW 24.0 0 0 0 3.1. Construction Types for Exposure NW Wall Type ........................................ Default Wall Assembly 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ............................................................. 37.6 m² Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter .................................................. 4.2 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: 7.1. 1st Partition Details: Partition Type ........................................ Wall Partition Area ..................................................................... 129.8 m² U-Value ............................................................... 2.800 W/(m²-°K) Uncondit. Space Max Temp .................................. 40.0 °C Ambient at Space Max Temp ................................ 40.0 °C Uncondit. Space Min Temp ................................... 23.9 °C Ambient at Space Min Temp ................................. 12.8 °C

7.2. 2nd Partition Details: Partition Type ................................... Ceiling Partition Area ....................................................................... 37.6 m² U-Value ................................................................ 2.800 W/(m²-°K) Uncondit. Space Max Temp .................................. 40.0 °C Ambient at Space Max Temp ................................ 40.0 °C Uncondit. Space Min Temp ................................... 23.9 °C Ambient at Space Min Temp ................................. 12.8 °C

Page 7: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 7 of 31

FILING AREA M 1. General Details: Floor Area ............................................................. 34.7 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 2.0 People Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ................................................................. 0.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

NE 15.6 1 0 0 3.1. Construction Types for Exposure NE Wall Type ........................................ Default Wall Assembly 1st Window Type ................................. PRAYER WINDOW-1 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type ....................... Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data).

Page 8: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 8 of 31

HRW 1. General Details: Floor Area ............................................................... 1.0 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .............................................. 350.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ................................................................. 0.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule ............................................................. None

2.4. People: Occupancy ............................................................... 0.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule .............................................................. None

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None 3. Walls, Windows, Doors: (No Wall, Window, Door data). 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type ....................... Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data).

Page 9: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 9 of 31

LOBBY 1. General Details: Floor Area ............................................................. 31.3 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 1.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ................................................................. 0.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

NE 30.0 0 0 0

SE 17.4 0 0 0 3.1. Construction Types for Exposure NE Wall Type ........................................ Default Wall Assembly 3.2. Construction Types for Exposure SE Wall Type ........................................ Default Wall Assembly 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ............................................................. 31.3 m² Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter .................................................. 8.3 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: (No partition data).

Page 10: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 10 of 31

LOBBY M 1. General Details: Floor Area ............................................................. 72.2 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 1.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ................................................................. 0.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

NE 19.6 2 0 0 3.1. Construction Types for Exposure NE Wall Type ........................................ Default Wall Assembly 1st Window Type ............................... M LOBBY WINDOW-1 4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.

H 72.2 0 0 4.1. Construction Types for Exposure H Roof Type ....................................... Default Roof Assembly 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type ....................... Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: 7.1. 1st Partition Details: Partition Type ........................................ Wall Partition Area ....................................................................... 73.1 m² U-Value ............................................................... 2.800 W/(m²-°K) Uncondit. Space Max Temp .................................. 40.0 °C Ambient at Space Max Temp ................................ 40.0 °C Uncondit. Space Min Temp ................................... 23.9 °C Ambient at Space Min Temp ................................. 12.8 °C

7.2. 2nd Partition Details: (No partition data).

Page 11: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 11 of 31

LV ROOM 1. General Details: Floor Area ............................................................. 18.4 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 3.5 L/s/person OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 2.0 People Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ............................................................. 100.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

SE 15.4 0 0 0

SW 17.5 0 0 0

NE 17.5 0 0 0 3.1. Construction Types for Exposure SE Wall Type ........................................ Default Wall Assembly 3.2. Construction Types for Exposure SW Wall Type ........................................ Default Wall Assembly 3.3. Construction Types for Exposure NE Wall Type ........................................ Default Wall Assembly 4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.

H 18.4 0 0 4.1. Construction Types for Exposure H Roof Type ....................................... Default Roof Assembly 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ............................................................. 18.4 m² Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter .................................................. 4.4 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: 7.1. 1st Partition Details: Partition Type ........................................ Wall Partition

Area ....................................................................... 15.4 m² U-Value ................................................................ 2.800 W/(m²-°K)

Page 12: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 12 of 31

Uncondit. Space Max Temp .................................. 40.0 °C Ambient at Space Max Temp ................................ 40.0 °C Uncondit. Space Min Temp ................................... 23.9 °C Ambient at Space Min Temp ................................. 12.8 °C

7.2. 2nd Partition Details: (No partition data).

Page 13: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 13 of 31

OFFICE M 1. General Details: Floor Area ........................................................... 342.5 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................. 36.0 People Activity Level ............................................. Office Work Sensible ................................................................. 71.8 W/person Latent ..................................................................... 60.1 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ............................................................... 30.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

NE 101.4 2 2 0

SE 38.5 1 0 0 3.1. Construction Types for Exposure NE Wall Type ........................................ Default Wall Assembly 1st Window Type ............................... M OFFICE WINDOW-1 2nd Window Type ............................ M OFFICE WINDOW -2 3.2. Construction Types for Exposure SE Wall Type ........................................ Default Wall Assembly 1st Window Type ................................. PRAYER WINDOW-1 4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.

H 342.5 0 0 4.1. Construction Types for Exposure H Roof Type ....................................... Default Roof Assembly 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type ....................... Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: 7.1. 1st Partition Details: Partition Type ........................................ Wall Partition Area ....................................................................... 64.3 m² U-Value ............................................................... 2.800 W/(m²-°K) Uncondit. Space Max Temp .................................. 40.0 °C Ambient at Space Max Temp ................................ 40.0 °C Uncondit. Space Min Temp ................................... 23.9 °C

Ambient at Space Min Temp ................................. 12.8 °C

Page 14: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 14 of 31

7.2. 2nd Partition Details: (No partition data).

Page 15: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 15 of 31

PANTRY M 1. General Details: Floor Area ............................................................... 8.8 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 1.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ................................................................. 0.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

SE 8.1 0 0 0 3.1. Construction Types for Exposure SE Wall Type ........................................ Default Wall Assembly 4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.

H 8.8 0 0 4.1. Construction Types for Exposure H Roof Type ....................................... Default Roof Assembly 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type ....................... Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data).

Page 16: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 16 of 31

PRAYER ROOM 1. General Details: Floor Area ............................................................. 24.4 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 8.0 People Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ................................................................. 0.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

NE 25.3 1 1 0

SE 35.8 2 1 0 3.1. Construction Types for Exposure NE Wall Type ........................................ Default Wall Assembly 1st Window Type ........................... RECEPTION WINDOW-2 2nd Window Type ......................... RECEPTION WINDOW-3 3.2. Construction Types for Exposure SE Wall Type ........................................ Default Wall Assembly 1st Window Type ................................. PRAYER WINDOW-1 2nd Window Type ............................... PRAYER WINDOW-1 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ............................................................. 24.4 m² Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter ................................................ 10.8 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: (No partition data).

Page 17: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 17 of 31

RECEP/JOB CARD CLERKS 1. General Details: Floor Area ............................................................. 39.9 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 3.5 L/s/person OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................. 10.0 People Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ............................................................... 600.0 Watts Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

SW 18.9 0 0 0

NW 13.6 0 0 0 3.1. Construction Types for Exposure SW Wall Type ........................................ Default Wall Assembly 3.2. Construction Types for Exposure NW Wall Type ........................................ Default Wall Assembly 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ............................................................. 39.9 m² Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter .................................................. 3.3 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: 7.1. 1st Partition Details: Partition Type ........................................ Wall Partition Area ....................................................................... 51.1 m² U-Value ............................................................... 2.800 W/(m²-°K) Uncondit. Space Max Temp .................................. 40.0 °C Ambient at Space Max Temp ................................ 40.0 °C Uncondit. Space Min Temp ................................... 23.9 °C Ambient at Space Min Temp ................................. 12.8 °C

7.2. 2nd Partition Details: (No partition data).

Page 18: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 18 of 31

RECEPTION LOUNGE & STORE 1. General Details: Floor Area ........................................................... 160.1 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 8.0 People Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ............................................................. 1000.0 Watts Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

NE 98.1 1 0 0

NW 17.4 0 0 0

NE 32.3 1 1 0 3.1. Construction Types for Exposure NE Wall Type ........................................ Default Wall Assembly 1st Window Type ........................... RECEPTION WINDOW-1 3.2. Construction Types for Exposure NW Wall Type ........................................ Default Wall Assembly 3.3. Construction Types for Exposure NE Wall Type ........................................ Default Wall Assembly 1st Window Type ........................... RECEPTION WINDOW-2 2nd Window Type ......................... RECEPTION WINDOW-3 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ........................................................... 160.1 m² Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter ................................................ 26.3 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: 7.1. 1st Partition Details: Partition Type ........................................ Wall Partition Area ..................................................................... 119.2 m² U-Value ............................................................... 2.800 W/(m²-°K) Uncondit. Space Max Temp .................................. 40.0 °C Ambient at Space Max Temp ................................ 40.0 °C

Uncondit. Space Min Temp ................................... 23.9 °C Ambient at Space Min Temp ................................. 12.8 °C

Page 19: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 19 of 31

7.2. 2nd Partition Details: (No partition data).

Page 20: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 20 of 31

SECURITY ROOM 1. General Details: Floor Area ............................................................... 4.9 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 3.5 L/s/person OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 2.0 People Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ............................................................... 250.0 Watts Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

SW 10.2 0 0 0

NW 7.7 0 0 0 3.1. Construction Types for Exposure SW Wall Type ........................................ Default Wall Assembly 3.2. Construction Types for Exposure NW Wall Type ........................................ Default Wall Assembly 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ............................................................... 4.9 m² Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter .................................................. 1.8 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: (No partition data).

Page 21: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 21 of 31

SERVER & UPS ROOM M 1. General Details: Floor Area ............................................................. 10.5 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 1.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ............................................................. 100.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors: (No Wall, Window, Door data). 4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.

H 10.5 0 0 4.1. Construction Types for Exposure H Roof Type ....................................... Default Roof Assembly 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type ....................... Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: 7.1. 1st Partition Details: Partition Type ........................................ Wall Partition Area ......................................................................... 8.1 m² U-Value ............................................................... 2.800 W/(m²-°K) Uncondit. Space Max Temp .................................. 40.0 °C Ambient at Space Max Temp ................................ 40.0 °C Uncondit. Space Min Temp ................................... 23.9 °C Ambient at Space Min Temp ................................. 12.8 °C

7.2. 2nd Partition Details: (No partition data).

Page 22: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 22 of 31

STAIRS & LOBBY M 1. General Details: Floor Area ............................................................. 13.3 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 0.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ................................................................. 0.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

SE 9.9 1 0 0 3.1. Construction Types for Exposure SE Wall Type ........................................ Default Wall Assembly 1st Window Type ............................... CORRIDOR WINDOW 4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.

H 13.3 0 0 4.1. Construction Types for Exposure H Roof Type ....................................... Default Roof Assembly 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type ....................... Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: 7.1. 1st Partition Details: Partition Type ........................................ Wall Partition Area ....................................................................... 22.2 m² U-Value ............................................................... 2.800 W/(m²-°K) Uncondit. Space Max Temp .................................. 40.0 °C Ambient at Space Max Temp ................................ 40.0 °C Uncondit. Space Min Temp ................................... 23.9 °C Ambient at Space Min Temp ................................. 12.8 °C

7.2. 2nd Partition Details: (No partition data).

Page 23: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 23 of 31

TEL ROOM 1. General Details: Floor Area ............................................................... 5.4 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 1.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ............................................................... 50.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors: (No Wall, Window, Door data). 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ............................................................... 5.4 m² Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter .................................................. 0.0 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: 7.1. 1st Partition Details: Partition Type ........................................ Wall Partition Area ....................................................................... 15.7 m² U-Value ............................................................... 2.800 W/(m²-°K) Uncondit. Space Max Temp .................................. 40.0 °C Ambient at Space Max Temp ................................ 40.0 °C Uncondit. Space Min Temp ................................... 23.9 °C Ambient at Space Min Temp ................................. 12.8 °C

7.2. 2nd Partition Details: (No partition data).

Page 24: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 24 of 31

TEL ROOM M 1. General Details: Floor Area ............................................................... 4.7 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 1.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ............................................................... 50.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors: (No Wall, Window, Door data). 4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.

H 4.7 0 0 4.1. Construction Types for Exposure H Roof Type ....................................... Default Roof Assembly 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type ....................... Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: (No partition data).

Page 25: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 25 of 31

TOILET A 1. General Details: Floor Area ............................................................... 2.6 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 1.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ................................................................. 0.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors: (No Wall, Window, Door data). 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ............................................................... 2.6 m² Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter .................................................. 0.0 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: (No partition data).

Page 26: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 26 of 31

TOILET F 1. General Details: Floor Area ............................................................... 2.5 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 1.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ................................................................. 0.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors: (No Wall, Window, Door data). 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ............................................................... 2.5 m² Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter .................................................. 0.0 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: (No partition data).

Page 27: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 27 of 31

TOILET M 1. General Details: Floor Area ............................................................... 2.5 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 1.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ................................................................. 0.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors: (No Wall, Window, Door data). 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ............................................................... 2.5 m² Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter .................................................. 0.0 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: (No partition data).

Page 28: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 28 of 31

TOILETS GF 1. General Details: Floor Area ............................................................. 19.5 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 1.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ................................................................. 0.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

SE 29.7 0 0 0 3.1. Construction Types for Exposure SE Wall Type ........................................ Default Wall Assembly 4. Roofs, Skylights: (No Roof or Skylight data). 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type .......................................... Slab Floor On Grade Floor Area ............................................................. 19.5 m² Total Floor U-Value ............................................. 1.000 W/(m²-°K) Exposed Perimeter .................................................. 5.3 m Edge Insulation R-Value ....................................... 1.00 (m²-°K)/W 7. Partitions: (No partition data).

Page 29: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 29 of 31

TOILETS M 1. General Details: Floor Area ............................................................... 9.2 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 0.0 L/s OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 1.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ................................................................. 0.00 W/m² Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors: (No Wall, Window, Door data). 4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.

H 9.2 0 0 4.1. Construction Types for Exposure H Roof Type ....................................... Default Roof Assembly 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type ....................... Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: 7.1. 1st Partition Details: Partition Type ........................................ Wall Partition Area ....................................................................... 26.2 m² U-Value ............................................................... 2.800 W/(m²-°K) Uncondit. Space Max Temp .................................. 40.0 °C Ambient at Space Max Temp ................................ 40.0 °C Uncondit. Space Min Temp ................................... 23.9 °C Ambient at Space Min Temp ................................. 12.8 °C

7.2. 2nd Partition Details: (No partition data).

Page 30: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 30 of 31

WATCHMANS ROOM M 1. General Details: Floor Area ............................................................. 12.6 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 3.5 L/s/person OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 1.0 Person Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ............................................................... 300.0 Watts Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

SW 11.6 0 0 0

SE 16.1 0 0 0 3.1. Construction Types for Exposure SW Wall Type ........................................ Default Wall Assembly 3.2. Construction Types for Exposure SE Wall Type ........................................ Default Wall Assembly 4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.

H 12.6 0 0 4.1. Construction Types for Exposure H Roof Type ....................................... Default Roof Assembly 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type ....................... Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: 7.1. 1st Partition Details: Partition Type .................................... Ceiling Partition Area ....................................................................... 12.2 m² U-Value ............................................................... 2.800 W/(m²-°K) Uncondit. Space Max Temp .................................. 40.0 °C Ambient at Space Max Temp ................................ 40.0 °C Uncondit. Space Min Temp ................................... 23.9 °C Ambient at Space Min Temp ................................. 12.8 °C

7.2. 2nd Partition Details: (No partition data).

Page 31: Space

Space Input Data UNITED MOTORS 12/31/2012 TECHNOZONE 04:19PM

Hourly Analysis Program v4.51 Page 31 of 31

WORKERS REST ROOM M 1. General Details: Floor Area ............................................................. 24.4 m² Avg. Ceiling Height .................................................. 3.0 m Building Weight ................................................... 341.8 kg/m² 1.1. OA Ventilation Requirements: Space Usage .......................................... User-Defined OA Requirement 1 .................................................. 3.5 L/s/person OA Requirement 2 .................................................. 0.0 L/s Space Usage Defaults ........................... User-Defined 2. Internals: 2.1. Overhead Lighting: Fixture Type ............................. Recessed (Unvented) Wattage ............................................................... 20.00 W/m² Ballast Multiplier .................................................... 1.00 Schedule .................................... Fractional Schedule

2.4. People: Occupancy ............................................................... 4.0 People Activity Level ......................................... Medium Work Sensible ................................................................. 86.5 W/person Latent ................................................................... 133.3 W/person Schedule ..................................... Fractional Schedule

2.2. Task Lighting: Wattage ................................................................. 0.00 W/m² Schedule ............................................................. None

2.5. Miscellaneous Loads: Sensible ...................................................................... 0 W Schedule .............................................................. None Latent .......................................................................... 0 W Schedule .............................................................. None

2.3. Electrical Equipment: Wattage ............................................................... 300.0 Watts Schedule .................................... Fractional Schedule 3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.

SW 16.5 0 0 0

NW 21.4 0 0 0 3.1. Construction Types for Exposure SW Wall Type ........................................ Default Wall Assembly 3.2. Construction Types for Exposure NW Wall Type ........................................ Default Wall Assembly 4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.

H 24.4 0 0 4.1. Construction Types for Exposure H Roof Type ....................................... Default Roof Assembly 5. Infiltration: Design Cooling ...................................................... 0.00 L/s Design Heating ...................................................... 0.00 L/s Energy Analysis .................................................... 0.00 L/s Infiltration occurs only when the fan is off. 6. Floors: Type ....................... Floor Above Conditioned Space (No additional input required for this floor type). 7. Partitions: 7.1. 1st Partition Details: Partition Type ........................................ Wall Partition Area ....................................................................... 16.8 m² U-Value ............................................................... 2.800 W/(m²-°K) Uncondit. Space Max Temp .................................. 40.0 °C Ambient at Space Max Temp ................................ 40.0 °C Uncondit. Space Min Temp ................................... 23.9 °C Ambient at Space Min Temp ................................. 12.8 °C

7.2. 2nd Partition Details: (No partition data).