SPE 89632 Further advances in coiled tubing floater operations Alastair Buchanan Schlumberger Well Services North Sea Coiled Tubing Services Geomarket Engineer

SPE 89632 Further advances in coiled tubing floater operations...SPE 89632 Further advances in coiled tubing floater operations Alastair Buchanan Schlumberger Well Services North Sea

  • Upload
    others

  • View
    13

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SPE 89632 Further advances in coiled tubing floater operations...SPE 89632 Further advances in coiled tubing floater operations Alastair Buchanan Schlumberger Well Services North Sea

SPE 89632 Further advances

in coiled tubing floater operations Alastair Buchanan

Schlumberger Well Services North Sea Coiled Tubing Services Geomarket Engineer

Page 2: SPE 89632 Further advances in coiled tubing floater operations...SPE 89632 Further advances in coiled tubing floater operations Alastair Buchanan Schlumberger Well Services North Sea

2 28.09.16

n  Norwegian Continental Shelf Activity n  Conventional Approach n  Issues and Strategies n  Equipment Developments

–  Advanced Tension Frame (ATF) –  Riser Slip Joint

n  Impact n  Conclusions

Agenda

Page 3: SPE 89632 Further advances in coiled tubing floater operations...SPE 89632 Further advances in coiled tubing floater operations Alastair Buchanan Schlumberger Well Services North Sea

3 28.09.16

Norwegian Continental Shelf Subsea Activity n  420 active wells n  Increasing 10% p.a. n  60% Statoil production n  Severe weather and

sea conditions n  Demand for

intervention with CT increasing

n  Available installations semi-sumbersible rigs

Page 4: SPE 89632 Further advances in coiled tubing floater operations...SPE 89632 Further advances in coiled tubing floater operations Alastair Buchanan Schlumberger Well Services North Sea

4 28.09.16

Conventional Scenario n  Injector suspended from

winch n  Multiple degrees of freedom

of movement n  Influenced by heave, pitch,

roll and reel tension

Page 5: SPE 89632 Further advances in coiled tubing floater operations...SPE 89632 Further advances in coiled tubing floater operations Alastair Buchanan Schlumberger Well Services North Sea

5 28.09.16

Conventional Scenario n  Injector suspended from

winch n  Multiple degrees of freedom

of movement n  Influenced by heave, pitch,

roll and reel tension n  Tension frame coupled to

riser n  Multiple transfers between

motion frame of reference

Page 6: SPE 89632 Further advances in coiled tubing floater operations...SPE 89632 Further advances in coiled tubing floater operations Alastair Buchanan Schlumberger Well Services North Sea

6 28.09.16

Conventional Scenario n  Injector suspended from

winch n  Multiple degrees of freedom

of movement n  Influenced by heave, pitch,

roll and reel tension n  Tension frame coupled to

riser n  Multiple transfers between

motion frame of reference

Page 7: SPE 89632 Further advances in coiled tubing floater operations...SPE 89632 Further advances in coiled tubing floater operations Alastair Buchanan Schlumberger Well Services North Sea

7 28.09.16

Issues and Strategies

EFFICIENCY

SAFETY

RELIABILITY

ACTIVITY

Page 8: SPE 89632 Further advances in coiled tubing floater operations...SPE 89632 Further advances in coiled tubing floater operations Alastair Buchanan Schlumberger Well Services North Sea

8 28.09.16

Advanced Tension Frame n  Injector head is constrained at

all times – motion is controlled

Page 9: SPE 89632 Further advances in coiled tubing floater operations...SPE 89632 Further advances in coiled tubing floater operations Alastair Buchanan Schlumberger Well Services North Sea

9 28.09.16

Slip joint n  Influence of heave isolated

below rig floor

Page 10: SPE 89632 Further advances in coiled tubing floater operations...SPE 89632 Further advances in coiled tubing floater operations Alastair Buchanan Schlumberger Well Services North Sea

10 28.09.16

Slip joint

Page 11: SPE 89632 Further advances in coiled tubing floater operations...SPE 89632 Further advances in coiled tubing floater operations Alastair Buchanan Schlumberger Well Services North Sea

11 28.09.16

Impact 1 – Safety and Efficiency

Conven - ATF Conv . +slip - joint

ATF + slip - joint

Transfer 2 crew up Install BOP + BHA 1 Install injector Transfer 2 crew down Transfer 2 crew up Change to BHA 2 Transfer 2 crew down Transfer 2 crew up Remove injector head Remove BOP Transfer 2 crew down Total HEL count

Operation stage Scenario

Conventional ATF Conventional +slip-joint

ATF + slip - joint

Transfer 2 crew up Install BOP + BHA 1 Install injector Transfer 2 crew down Transfer 2 crew up Change to BHA 2 Transfer 2 crew down Transfer 2 crew up Remove injector head Remove BOP Transfer 2 crew down Total hazard level

2 0 0 2 2 0 2 2 0 0 2

12

2 0 0 2 2 0 2 2 0 0 2

12

Operation stage Scenario

2 12 12

2 2

12 2 2

12 12

2

2 12 12

2 2

12 2 2

12 12

2 72 186 186

6 30 30

6 6

30 6 6

30 30

6

6 30 30

6 6

30 6 6

30 30

6

6

2 6 6 2 6 6 2

30 6

102

6

2 6 6 2 6 6 2

6

30

Page 12: SPE 89632 Further advances in coiled tubing floater operations...SPE 89632 Further advances in coiled tubing floater operations Alastair Buchanan Schlumberger Well Services North Sea

12 28.09.16

Impact 2 – Reliability vs Weather

0 10 20 30 40 50 60 70 80 90

100

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Available days

% of total

Conventional Slip-joint

Page 13: SPE 89632 Further advances in coiled tubing floater operations...SPE 89632 Further advances in coiled tubing floater operations Alastair Buchanan Schlumberger Well Services North Sea

13 28.09.16

Conclusions

n  Field tested technology is available which is demonstrated to improve reliability and safety

RELIABILITY

SAFETY

EFFICIENCY RELIABILITY EFFICIENCY

SAFETY

ACTIVITY ACTIVITY