39
Spearhead 15/18/21 Park Standard Flail Mower Operator’s Manual & Parts list 5 th Edition – April 2006 Important Note The information contained in this manual is correct at the time of publication. However, in the course of constant development, changes in specification are Inevitable. Should you find the information given in this book different to the Machine it relates to please contact the “After Sales Department” for advice © Spearhead Machinery Limited 2004 Spearhead Please ensure that this manual is handed to the operator before using the machine for the first time. The operator must fully understand the contents of this manual before using this machine. (If the machine is resold the Manual must be given to the new owner.) Parts Department Spearhead A/S Merkurvej 25 DK 6000 Kolding Danmark Tlf: +45 75553644 Fax: +45 75554243 Email: [email protected] http: www.spearhead.eu Park 15/18/21 1

Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Spearhead

15/18/21 Park Standard Flail Mower

Operator’s Manual

& Parts list

5th Edition – April 2006

Important Note The information contained in this manual is correct at the time of publication.

However, in the course of constant development, changes in specification are Inevitable. Should you find the information given in this book different to the Machine it relates to please contact the “After Sales Department” for advice

© Spearhead Machinery Limited 2004

Spearhead

Please ensure that this manual is handed to the operator before using the machine for the first time. The operator must fully understand the contents

of this manual before using this machine. (If the machine is resold the Manual must be given to the new owner.)

Parts Department Spearhead A/S

Merkurvej 25 DK 6000 Kolding

Danmark Tlf: +45 75553644

Fax: +45 75554243 Email: [email protected]

http: www.spearhead.eu

Park 15/18/21 1

Page 2: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Important The purchaser should ensure that this manual is handed to the operator before using the machine for the first time and should be satisfied that the operator fully understands the contents of this manual before being allowed to proceed. If the machine is resold the Operators Manual must be given to the new owner. Fill in the details below, you will find it useful to refer to when ordering spare part. Serial No. Date of Delivery Dealer’s address Telephone No.

Parts Department

Spearhead A/S Merkurvej 25

DK 6000 Kolding Danmark

Tlf: +45 75553644 Fax: +45 75554243

Email: [email protected] http: www.spearhead.eu

Spearhead

Park 15/18/21

2

Page 3: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Content Safety……………………………….……………………………………………….4 EC Declaration…………………….……………………………………………….5 Introduction……………………….…………………………………..…………….6 Safety first……………………….………………………………………..………...6 Tractor requirements………….…………………………………………………...6 Attaching to the tractor……….……………………………………………………7 Setting up and adjustment….……………………………………………………..8 Front linkage mounting…….………………………………………………………9 Operation…………………….……………………………………………………..10 Rotor care………………….……………………………………………………….11 Servicing and maintenance Gearbox…………………..…………………………………………………………12 Flail rotor (Daily)……….….………………………………………………………..12 Greasing……………….……………………………………………………………13 Regular……………….……………………………………………………………..14 Skids………………….……………………………………………………………..14 Storage….…………………………………………………………………………..15 Servicing check list….……………………………………………………………..15 Torque setting……………………………………………………………………...16 Trouble shooting…………………………………………………………………...16 Servicing log………………………………………………………………………..17 Warranty conditions………………………………………………………………..18 Parts list Main body assembly……………………………………………………………….22 Rotor and roller assembly…………………………………………………………26 Headstock assembly May 2000..…………………………………………………28 P.T.O. shaft assembly……………………………………………………………..30 Cross shaft assembly……………………………………………………………...32 Gearbox assembly…………………………………………………………………34 Stickers assembly………………………………………………………………….36

Spearhead

Park 15/18/21

3

Page 4: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

• Never operate the machine with other people present, as it is possible for debris, including stones, to be discharged from the front and rear of the flail hood.

• Always ensure all cab safety guards are in place and all tractor windows closed.

• Never allow an inexperienced person to operate the machine without supervision.

• Never allow children to play on or around the machine at any time. • Never attempt any maintenance or adjustment without first disengaging

the PTO, lowering to the ground, stopping the tractor engine and applying the tractor parking brake.

• Before leaving the tractor cab always ensure that the machine is firmly on the ground, and the rotor has stopped spinning

• Never stop the engine with the PTO engaged. • Always check that all guards are properly fitted, check there are no

damage or loose parts. Particular attention should be given to the flails to ensure they are not damaged, cracked or missing.

• Never operate with flails missing. • Always operate PTO at recommended speed 540 R.P.M. • Always inspect work area for wire, steel posts, large stones and other

dangerous materials and remove before starting work. • Never operate with wire around rotor. Stop immediately. • Never attempt to use the machine for any purpose other than that it

was designed for. • Ensure that all warning labels are always visible and that they are not

damaged, defaced or missing. • Never transport with the PTO engaged. • When parking up always lower to the ground

Spearhead

Safety

Park 15/18/21

4

Page 5: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Spearhead

EC declaration of conformity, Conforming to EEC directive

89/392/EEC, 98/37/EC & 98/38/EC

We Spearhead Machinery Ltd, Green View, Salford Priors, Evesham, Worcestershire, WR11 8SW declare under our sole responsibility that the

Product …..………………………………………………………….. Product Code ………………………………………………………………. Serial No. & date ……………………………………………………………….. Flail head serial No. ………………………………………………………………. Type ………………………………………………………………... Manufactured by the above company complies with the required provisions of the directive 89/392/EEC, 98/37/EC, 98/38/EC, AMD 91/368/EEC, AMD 93/44/EEC and 93/68/EEC, and conforms to European norm. BSEN 292; Part 1: 1991 Safety of machinery – Technical specifications and other national standards associated with its design and construction as listed in the Technical File. Signed…………………………………………………………………………………

On behalf of Spearhead Machinery Ltd

Status General Manager Date…………………………………………………………………………………….

Spearhead

Park 15/18/21

5

Page 6: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Introduction The Spearhead Park 15, Park 18 and Park 21 are robust high capacity flail mowers that are easy to operate and maintain, but to ensure trouble-free operation this manual should be carefully studied. Safety First Do not start the machine until you fully understand operation and safety precaution requirements.

Tractor requirements

• Spearhead strongly recommends using a 25 - 50hp tractor with CATEGORY 1 rear linkage.

• Minimum tractor weight including ballast must be 2500kg. • PTO must be independent live drive to enable continuous PTO drive even

when tractor clutch is pressed down. • Before hitching, ensure position control is selected. Do not attempt to hitch in

draft control. • Check chains and stabilizers must be in good working order to hold the

machine firmly. Do not operate without checking that chains and stabilizers are tight.

• Spearhead particularly recommend ‘turn buckle’ type check chains • Set linkage lift rods to an equal length.

Spearhead

Park 15/18/21

6

Page 7: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Attaching to the tractor Fit the machine to the tractor linkage in the standard way, ensuring the correct match of linkage (CAT 1 pins). Check that the top link is in good order and threads are well lubricated, (as fine adjustment to height of cut is regulated by the top link). Use stabilizers to take any free movement out of lower link arms. Before fitting the machine to the tractor linkage you should ensure there is sufficient front weight to ensure the front wheels are always in contact with the ground. This is most important for safe transport and stability when turning on slopes. Before fitting the PTO for the first time, it may be necessary to adjust the length. There should be maximum engagement of the sliding tubes without bottoming at the shortest operation position. To check, first connect the mower to the tractor. Pull the PTO shaft apart and connect to the tractor PTO output shaft and the gearbox input shaft. Hold the half shafts next to each other in the shortest working position. If necessary, shorten the inner and outer guard tubes equally (Fig. 2). Shorten the inner and outer sliding profiles by the same length as the guard tubes. File all sharp edges and remove burrs. Grease sliding profiles.

Spearhead

To fit the PTO, first clean and grease. Press pins on the yoke and simultaneously push the PTO drive shaft on to PTO shaft of the tractor until pins engage. The PTO shaft is fitted with a non-rotating safety guard. It should be secured to the machine and tractor with the two retaining chains provided.

Warning Fully tighten check chains and linkage stabilisers to hold the machine rigid. There must be no side ways movement, it is dangerous.

Park 15/18/21

Fig 2

7

Page 8: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Setting up and Adjustment Height adjustment To achieve major adjustment to height of cut; reposition the two side plates attached to the rear roller. A finer adjustment to cut can be achieved by lengthening or shortening the top link of the tractor (Fig. 3). Mechanical Offset – The linkage ‘A’ frame (Fig. 4) can be slid along the tube to obtain numerous settings from central to fully offset by simply slackening the clamping bolts, position the ‘A’ frame and re-tighten the bolts. Remember to regularly check that these bolts are tight.

Spearhead

Park 15/18/21

8

Page 9: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Front linkage mounting Simply remove the clamping bolts and revolve the ‘A’ frame through 180 degrees so the linkage mounting pins are facing the rear of the mower. It is recommended the slotted hole in the top link bracket is used when mounting onto the front linkage, this allows the front of the mower to float over obstacles more easily. The tractor front PTO has no standard rotation so it may be necessary to rotate the gearbox through 180 degrees, to compensate for this irregularity. For most conditions it is important the rotor rotates as indicated in Fig. 5a. 540 or 1000 rpm If the tractor has only 1000 rpm. PTO output speed, it is possible to compensate by swapping the top drive pulley onto the rotor and rotor pulley to the top drive shaft i.e. smaller pulley driving the larger pulley will act as a reducer (Fig. 5b). Never operate the PTO at 1000 rpm with the larger pulley driving the smaller rotor pulley. This will drive the rotor at higher speed and will result in severe damage to the machine. Fig. 5a - position of pulleys for 540r.p.m. Fig. 5b - position of pulleys for 1000r.p.m A. Rotation anti-clockwise B. Shaft pulley 150mm C. Shaft pulley 200mm

Spearhead

Park 15/18/21

9

Page 10: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Operation Engage the PTO only when the tractor engine is at low revs to prevent shock damage to machine. Slowly increase the engine revs to achieve the standard 540 rpm PTO speed. If at any time serious vibration occurs, stop the engine immediately and check that no flails are missing, (following all safety precautions). The cause must be found and rectified immediately or other components may be affected. When in work, lower the machine to the ground carrying all its weight on the rear roller, allowing the machine to follow the contours of the ground. Select a sensible forward speed bearing in mind the density of growth, the terrain, and the available horsepower, taking extra care when turning, particularly on slopes. When turning it is not necessary to lift the machine off the ground but instead allow sufficient room to turn in a large radius. The machine only needs to be raised when turning a tight corner, or reversing over dense undergrowth. Quality of finish is determined by the forward speed i.e. a slow speed will produce a high quality of cut, whereas faster forward speeds are used when high output is first priority. When cutting in extreme conditions or when small stumps, stones and other such solid objects are likely to be found it is recommended the operator reduces the engine revs to allow the flails to pivot more easily when striking solid objects, and proceed with caution.

Spearhead

Park 15/18/21

10

Page 11: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Rotor Care Always inspect the condition of flails and bolts on a very regular basis. Always replace bolts and nuts when replacing flails Always use genuine flails, bolts and nuts. The flails and bolts are made to a very high standard from a high tensile steel, being fully heat treated and subjected to rigorous testing in very stringent conditions to comply with our rigid quality control requirements Never operate with bolts loose or flails missing. Never change to a different spec or type of flail, this will immediately put the rotor out of balance. Never engage rotor at high PTO speeds. Remember, the rotor is highly complex and expensive to manufacture, please treat with care and enjoy the benefits of the Spearhead Rotor.

Spearhead

Warning Rotor is balanced to be run at PTO speed, do not operate above or below this speed.

Warning Never carry out any servicing or maintenance work without first disengaging the PTO and stopping the tractor.

Park 15/18/21

11

Page 12: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Servicing and maintenance Gearbox

• Before first use check gearbox oil level, thereafter check every 8 hours. • After the first 50 hours drain and replace the gearbox oil, thereafter annually.

Replace with EP90. • Regularly inspect gearbox seals. If oil is leaking replace immediately. This is

your responsibility to maintain a long and reliable working life. • Check that gearbox bolts are fully tightened.

Flail Rotor (daily)

• Grease all bearings daily.

• Check there is no wrapping of string, plastic, grass or other debris on rotor shaft and rear roller bearing.

• Check the condition of flails and ensure all retaining bolts are tight. When

flails are replaced, care must be taken to maintain balance of the rotor shaft, do not change to a different type.

• Check flail retaining bolt and nut for tightness.

• Never operate with any flails missing. This will cause severe vibration and

lead to rapid bearing wear and quickly cause the hood to crack.

Cont’d

Spearhead

Warning Check that all gearbox bolts are tight. When the machine is new there will be a ‘bedding in’ period when very frequent checking is important.

Warning It is imperative the grub screws are checked on the taper locks (once bedded in, locative glue may prove useful).

Warning Never carry out any servicing or maintenance work without first disengaging the PTO and stopping the tractor..

Park 15/18/21

12

Page 13: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

• Blunt flails leave an untidy finish and absorb excessive power, when re-

sharpening always wear protective clothing and goggles. • When flails are showing severe wear, damage or cracking, they must be

replaced immediately. Never attempt to weld the flails, as this will make them very brittle, thus extremely dangerous. Do not take risks with the cutting flails, if in doubt replace.

• When replacing flails always replace bolts and nuts for new. • Regularly check that all rotor-bearing bolts are tight. • It is imperative the grub screws are checked on the taper locks (once bedded

in locative glue may prove useful). Greasing Daily grease all points shown below.

Spearhead

Fig. 6 Grease point for rotor, cross shaft and rear roller bearings.

Warning Grease rotor bearing and rear roller at least every 8 hours and especially after washing.

Park 15/18/21

Fig 6

Fig 7

Fig. 7 Dismantle and clean PTO sliding surfaces and re-grease universal joints.

13

Page 14: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Regular

• Check the condition of drive belts, ensuring they are aligned and properly tensioned to avoid any unnecessary belt wear.

• Remove both guards for access when tensioning belts, ensure belts are running in line after adjustment.

• Check there is no wrapping of string, plastic, grass or other debris on rear roller.

N.B. The pulleys are fitted with taper locks which have 7 screws to tighten, and 3 holes to aid removal in the pulley centers. Skids When operating on abrasive soils, particularly in stubbles and similar conditions with thin ground cover, excessive skid wear may be expected. To provide extra protection and to prolong life of the skids, special hard facing rods can be used.

Spearhead

Park 15/18/21

14

Page 15: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Storage At the end of the season before storing, thoroughly wash the machine off, removing all traces of grass and dirt. Great care must be taken when washing with high-pressure hoses, do not hold the water jet close to the paintwork. Use steam cleaners with caution and be sure to remove all detergents to avoid any discoloring or damage to paint. Grease all grease points until fresh grease shows. Store PTO shaft and drive belts in a dry place.

Spearhead

Servicing checklist (see relevant sections for full details) Regularly Gearbox: Inspect seals, check bolts for tightness. Flail rotor: check bolts for tightness, check condition of flails, check retaining bolts for tightness, check rotor bearing bolts for tightness. Daily Maintain correct belt tension. Check gearbox oil level. Grease PTO shaft. Grease all points as shown in diagram. Every year Drain and replace gearbox oil with EP90.

Park 15/18/21

15

Page 16: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Torque Settings The torque figures given are recommended maximum settings only

Size: Tensile strength: Description: Torque setting: Nm.

M8 12.9 Pulley clamps 45 M10 8.8 General fasteners 65 M12 8.8 General fasteners 114 M16 8.8 Roller plate bolts 280 M12 10.9 Flail bolts 100 M24 8.8 Head stock bolts 950

Wheel nuts 270 Troubleshooting Problem Cause Solution Gearbox Overheating

Oil level incorrect Oil grade incorrect Implement overloaded Wrong P.T.O. speed

Check oil level Check oil grade Reduce forward speed Ensure tractor P.T.O. speed matches implement.

Excessive Belt Wear Belt and Pulley condition Pulley Alignment Incorrect belt tension Overloading of implement

Replace if necessary Check Alignment Tension belts to spec. Reduce forward speed or increase height of cut.

P.T.O. wear UJ failure Working angle too great Shaft incorrect length i.e. Bottoming out Lack of maintenance

Reduce offset of implement Resize P.T.O. shaft as recommended Grease P.T.O. shaft as recommended.

Cut quality Flails worn Rotor speed/Direction Crop condition.

Replace worn flails Check tractor P.T.O. speed Look for suitable conditions.

Rotor bearing failure Rotor out of balance Wire/string in bearing Lack of maintenance Water in bearing.

See rotor vibration Replace bearings Re-balance/replace rotor Remove debris.

Spearhead

Park 15/18/21

16

Page 17: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Servicing Log Date………………………….. Details …………………………………………………….. ……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………… Date………………………….. Details …………………………………………………….. ……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………… Date………………………….. Details …………………………………………………….. ……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………… Date………………………….. Details …………………………………………………….. ……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………… Date………………………….. Details …………………………………………………….. ……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………… Date………………………….. Details …………………………………………………….. ……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………… Date………………………….. Details …………………………………………………….. ……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………… Date………………………….. Details …………………………………………………….. ……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………… Date………………………….. Details …………………………………………………….. ……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………… Date………………………….. Details …………………………………………………….. ………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………

Spearhead

Park 15/18/21

17

Page 18: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

The Spearhead Warranty Spearhead warrants that the Spearhead machine referred to in the Warranty Registration Form will be free from defects in materials and workmanship for a period of 12 months from the date of sale. This warranty does not affect your statutory rights, but merely adds to them. Should you have a problem within 12 months from the date of sale please contact your original Spearhead dealer, or Spearhead’s Service Department. Any part found to be defective during this period would be replaced or repaired, at Spearhead’s discretion, by the dealer or a Spearhead Service Engineer. Spearhead Warranty Conditions

1. The Warranty Registration Form must be completed and returned to Spearhead within 30 days of the date of sale.

2. This warranty does not cover defects arising from fair wear and tear, willful damage,

negligence, misuse, abnormal working conditions, use in competition, failure to follow Spearhead’s instructions (oral or written, including all instructions and recommendation made in the Operator’s Manual) or alteration or repair of the machinery without Spearhead’s approval.

3. The machinery must have been serviced in accordance with the Operator’s Manual

and the Service Log must have been kept up to date and made available to the dealer should service, repair or warranty work be undertaken.

4. This warranty does not cover claims in respect of wearing parts such as blades, flails,

paintwork, tyres, belts, hydraulic hoses, bearings, bushes, linkage pins, top links, ball ends unless there is a manufacturing or material defect or the cost of normal servicing items such as oils and lubricants.

5. This warranty does not cover any expenses or losses incurred whilst the machinery is

out of use for warranty repairs or parts replacement.

6. This warranty does not extend to parts, materials or equipment not manufactured by Spearhead, for which the Buyer shall only be entitled to the benefit of any such warranty or guarantee given by the manufacturer to Spearhead. Only genuine Spearhead replacement parts will be allowable for warranty claims.

7. All parts replaced by Spearhead under warranty become the property of Spearhead

and must be returned to Spearhead if Spearhead so request. Such parts may only be disposed of after a warranty claim has been accepted and processed by Spearhead.

8. Spearhead is not liable under this warranty for any repairs carried out without

Spearhead’s written consent or without Spearhead being afforded a reasonable opportunity to inspect the machinery the subject of the warranty claim. Spearhead’s written consent must, therefore, be obtained before any repairs are carried out or parts replaced. Use of non-Spearhead parts automatically invalidates the Spearhead Warranty. Failed components must not be dismantled except as specifically authorized by Spearhead and dismantling of any components without authorization from Spearhead will invalidate this warranty.

9. All warranty claims must be submitted to Spearhead on Spearhead Warranty Claim

Forms within 30 days of completion of warranty work. Using the machine implies the knowledge and acceptance of these instructions and the limitations contained in this Manual

Spearhead

Park 15/18/21

18

Page 19: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Spearhead

Park 15/18/21

19

Page 20: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Spearhead

Park 15/18/21

20

Page 21: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Spearhead

15/18/21 Park Standard Flail Mower

Parts list

5th Edition – April 2006

Spearhead

Park 15/18/21

21

Page 22: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Spearhead

Park 15/18/21

22

Main body assembly

Page 23: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Spearhead

Ref. No Part No. English Description

French Description German Description Danish Description

Référence Ref. No Ref. No

Numéro de pièce Teilenummer Reservedelsnummer

Désignation en Anglais Englische beschreibung Engelsk beskrivelse

Désignation en Français Französische beschreibung Fransk beskrivelse

Désignation en Allemand Deutsche beschreibung Tysk beskrivelse

Désignation en Danois Dänische beschreibung Dansk beskrivelse

1 1771532B 1.5m Main body 1.5 m Körper 1.5 m Krop 1771538B 1.8m Main body 1.8 m Körper 1.8 m Krop 1771584B 2.1m Main body 2.1 m Körper 2.1 m Krop

2 5770010 Gearbox Getriebe Gearkasse 3 4770860EC Bearing Lager Leje 4 1771513 Tensioned bracket Justierungs Platte Justeringsplade 5 1771520 Backing plate Hinten Platte Bagplade 6 4770926 Pulley 200mm Riemenscheibe 200 mm Remskive 200 mm 7 4770927 Pulley 150mm Riemenscheibe 150 mm Remskive 150 mm 8 4770922 Clamping element Easy-lock Easy-lock 9 4770923 Clamping element Easy-lock Easy-lock

10 4770870 Drive belt Riemen Rem 11 1772211 Lay shaft Welle Aksel 12 4772229 Key Nut Not 13 5770066 Cross shaft 1.5 &

1.8m Gelenkwelle 1.5 & 1.8 m Kardan 1.5 & 1.8 m

5770115 Cross shaft 2.1m Gelenkwelle 2.1 m Kardan 2.1 m 14 2770436 Washer Scheibe Skive 15 2770434 Washer Scheibe Skive 17 2770419 Bolt Bolz Bolt 18 2770443 Bolt Bolz Bolt 19 2770396 Screw Schraube Skrue 20 2770535 Screw Schraube Skrue 21 2770393 Bolt Bolz Bolt 22 2770418 Screw Schraube Skrue 23 24 2772283 Bolt Bolz Bolt 25 2770417 Nut Mutter Møtrik 26 2770412 Nut Mutter Møtrik 28 2770442 Washer Scheibe Skive 29 2770469 Spring washer Scheibe Skive 30 1771511A Cross shaft guard 1.5

& 1.8m Deckel 1.5 & 1.8 m Låg 1.5 & 1.8 m

1771511L Cross shaft guard 2.1m

Deckel 2.1 m Låg 2.1 m

31 2770536 Nut Mutter Møtrik 32 8550130 Rubber flap 1.5m Gummi 1.5 m Gummi 1.5 m

8400205 Rubber flap 1.8m Gummi 1.8 m Gummi 1.8 m 8400209 Rubber flap 2.1m Gummi 2.1 m Gummi 2.1 m

33 5770107 Guard Plastik Kegel Plastik kegle 34 1771514C Belt guard Riemen Deckel Remlåg 35 1771534 Retaining strip 1.5m Halter für Gummi 1.5 m Fladjern 1.5 m

Park 15/18/21

23

Main body assembly

Page 24: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Spearhead

Park 15/18/21

24

Main body assembly

Page 25: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Ref. No Part No. English Description

French Description German Description Danish Description

Référence Ref. No Ref. No

Numéro de pièce Teilenummer Reservedelsnummer

Désignation en Anglais Englische beschreibung Engelsk beskrivelse

Désignation en Français Französische beschreibung Fransk beskrivelse

Désignation en Allemand Deutsche beschreibung Tysk beskrivelse

Désignation en Danois Dänische beschreibung Dansk beskrivelse

1771531 Retaining strip 1.8m Halter für Gummi 1.8 m Fladjern 1.8 m

1771572 Retaining strip 2.1m Halter für Gummi 2.1 m Fladjern 2.1 m

36 1771530 Skid Verschleiss Schiene Slæbesko

37 2770509 Screw Maschin Schraube Maskinskrue

41 8777516 End cap Deckel Låg

42 1771509R Ram guard RH Zylinder Schütz RH Cyl. beskyttelse RH

1771509L Ram guard LH Zylinder Schütz LH Cyl. beskyttelse LH

43 1778063 Adjustable stop plate Stop Platte Stopplade

Spearhead

Park 15/18/21

25

Main body assembly

Page 26: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Spearhead

32

33

Park 15/18/21

34

26

Rotor and roller assembly

Page 27: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Spearhead

Ref. No Part No. English Description

French Description German Description Danish Description

Référence Ref. No Ref. No

Numéro de pièce Teilenummer Reservedelsnummer

Désignation en Anglais Englische beschreibung Engelsk beskrivelse

Désignation en Français Französische beschreibung Fransk beskrivelse

Désignation en Allemand Deutsche beschreibung Tysk beskrivelse

Désignation en Danois Dänische beschreibung Dansk beskrivelse

1 SA00092 Rotor assay 1.5m Rotor Kpl. 1.5 m Rotor kpl. 1.5 m SA00102 Rotor assay 1.8m Rotor Kpl. 1.8 m Rotor kpl. 1.8 m SA00103 Rotor assay 2.1m Rotor Kpl. 2.1 m Rotor kpl. 2.1 m 2 7770715 Twisted flail Multi Schlegel Multislagle 3 1777310 Bearing housing Lagerhaus Lejehus 4 1771529 Bearing housing Lagerhaus Lejehus 5 4770891 Bearing Lager Leje 6 1777207 Retaining washer Scheibe Skive 7 4771123 Seal Dichtung Pakdåse 8 1777312 End cover Deckel Låg 9 2770467 Grease nipple Schmiernippel Smørenippel

10 1771526BR Roller bracket RH Walse Halter RH Bagrulleholder RH 11 1771526B Roller bracket LH Walse Halter LH Bagrulleholder LH 12 1777719 Rotor shield Schütz Ring Beskyttelsesring 13 3580664 Ram Zylinder Cylinder

3580664W Seal kit Dichtungssatz Pakningssæt 14 040000D Clamp Halter Overfald 15 2772309 Ram pin Zylinder Bolz Cylinderbolt 16 2770344 Nut Mutter Møtrik 17 1778062 Bush Buchse Bøsning 18 2772308 Ram pin Zylinder Bolz Cylinderbolt 19 1771533 Roller Hinter Walse 1.5 m Bagrulle 1.5 m

1771527 Roller Hinter Walse 1.8 m Bagrulle 1.8 m 1771582 Roller Hinter Walse 2.1 m Bagrulle 2.1 m

20 4771604 Bearing Lager Leje 21 1777314A Shaft Welle Aksel 22 2770468 Grease nipple Schmiernippel Smørenippel 23 1777231A Hub cover Stahl Ring Stålring 24 2771610 Circlip Lock Ring Låsering 25 2771108 Circlip Lock Ring Låsering 26 2770506 Screw US Bolz US Bolt 27 2770364 Bolt Bolz Bolt 28 2770574 Lock nut Mutter Møtrik 29 2770436 Washer Scheibe Skive 30 2770397 Bolt Bolz Bolt 31 2777519 Circlip Lock Ring Låsering 32 SA02015 Roller Assay Hinter Walse Kpl. 1.5 m Bagrulle kpl. 1.5 m

SA02018 Roller Assay Hinter Walse Kpl. 1.8 m Bagrulle kpl. 1.8 m SA02021 Roller Assay Hinter Walse Kpl. 2.1 m Bagrulle kpl. 2.1 m

33 6770933 Scraper wire Wire Wire 6770932 Scraper wire Wire Wire

34 2770259 Cup square bolt Not found

Park 15/18/21

27

Rotor and roller assembly

Page 28: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Spearhead

Park 15/18/21

28

Headstock assembly May 2000

Page 29: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Ref. No Part No. English Description

French Description German Description Danish Description

Référence Ref. No Ref. No

Numéro de pièce Teilenummer Reservedelsnummer

Désignation en Anglais Englische beschreibung Engelsk beskrivelse

Désignation en Français Französische beschreibung Fransk beskrivelse

Désignation en Allemand Deutsche beschreibung Tysk beskrivelse

Désignation en Danois Dänische beschreibung Dansk beskrivelse

1 1771524A Headstock – Post May 2000

3-Punkt Rahme von 2000

3-Punktsramme fra 2000

2 1771573 Headstock rear link 3-Punkt Rahme Halter 3-punktsrammeholder

3 1771503A Headstock clamp Halter Holder

4 2770517 Flat washer Scheibe Skive

5 2770409 Nut Mutter Møtrik

6 8777516 End cap Plastik Plastik

7 2770454 Flat washer Scheibe Skive

8 2770456 Spring washer Scheibe Skive

9 2770425 Bolt Bolz Bolt

10 6310229 Lower link pin Bolz Pløk

11 6310202 Top link pin Bolz Pløk

12 6310206 Pin Klapsplint Ringsplit

13 2770549 Bolt Bolz Bolt

Spearhead

Park 15/18/21

29

Headstock assembly May 2000

Page 30: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Spearhead

Park 15/18/21

30

P.T.O. shaft assembly

Page 31: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Ref. No Part No. English Description

French Description German Description Danish Description

Référence Ref. No Ref. No

Numéro de pièce Teilenummer Reservedelsnummer

Désignation en Anglais Englische beschreibung Engelsk beskrivelse

Désignation en Français Französische beschreibung Fransk beskrivelse

Désignation en Allemand Deutsche beschreibung Tysk beskrivelse

Désignation en Danois Dänische beschreibung Dansk beskrivelse

5770069 P.T.O shaft assembly Gelenkwelle Kpl. Kardan kpl.

1 5772259 Complete guard Schutz Kpl. Beskyttelse kpl.

2 5771020 Retaining chain Kette Kæde

3 5770112 Yoke Gabel Gaffel

4 5771023 Release button Drückknopf Kpl. Trykknap kpl.

5 5770113 Cross journal Kreuz Kryds

6 5772273 Inner tube yoke Gabel Innen Gaffel inderst

7 5772274 Outer tube yoke Gabel Aussen Gaffel yderst

8 2770515 Roll pin Splint Rørstift

9 5772270 Outer profile tube Profil Rohr Aussen Profilrør yderst

10 5772269 Inner profile tube Profil Rohr Innen Profilrør inderst

11 5771336 Outer bearing Lager Aussen Leje yderst

12 5771337 Inner bearing Lager Innen Leje inderst

Spearhead

Park 15/18/21

31

P.T.O. shaft assembly

Page 32: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Spearhead

Park 15/18/21

32

Cross shaft assembly

Page 33: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Ref. No Part No. English Description

French Description German Description Danish Description

Référence Ref. No Ref. No

Numéro de pièce Teilenummer Reservedelsnummer

Désignation en Anglais Englische beschreibung Engelsk beskrivelse

Désignation en Français Französische beschreibung Fransk beskrivelse

Désignation en Allemand Deutsche beschreibung Tysk beskrivelse

Désignation en Danois Dänische beschreibung Dansk beskrivelse

1 5772279 6 Spline yoke 6 Nut Gabel 6 Splin Gaffel

2 2770467 Grease nipple

3 5770113 Cross journal Kreuz Kryds

4 5772274 Tube yoke Gabel an Profil Gaffel på profil

5 2770527 Pin Splint Rørstift

6 5772275 Outer profile tube – 150mm

Profil Rohr Aussen 150 mm

Profilrør yderst 150 mm

7 5772271 Clamp yoke – 35mm Gabel Festspannung 35 mm

Gaffel Fastspænding 35 mm

2770424 Bolt Bolz Bolt

8 2770417 Nyloc nut Mutter Møtrik

2770436 Flat washer Scheibe Skive

Spearhead

Park 15/18/21

33

Cross shaft assembly

Page 34: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Spearhead

Park 15/18/21

34

Gearbox assembly

Page 35: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Ref. No Part No. English Description

French Description German Description Danish Description

Référence Ref. No Ref. No

Numéro de pièce Teilenummer Reservedelsnummer

Désignation en Anglais Englische beschreibung Engelsk beskrivelse

Désignation en Français Französische beschreibung Fransk beskrivelse

Désignation en Allemand Deutsche beschreibung Tysk beskrivelse

Désignation en Danois Dänische beschreibung Dansk beskrivelse

1 5770010 Gearbox assembly Getriebe Kpl. Gearkasse kpl.

2 5777201 Cover Deckel Låg

3 N/A Gasket - -

4 2770402 Cover bolt Deckel Bolz Bolt til låg

5 N/A Shaft Welle Aksel

6 4777205 Bearing Lager Leje

7 4771620 Bearing Lager Leje

8 4771506 Oil seal Öldichtung Olietætning

9 4777201 Bearing Lager Leje

10 4771600 Bearing Lager Leje

11 4771124 Oil seal Öldichtung Olietætning

12 N/A Gearwheel & pinion Ritzel und Ritzelwelle Krone / Spidshjul

13 1777602 Rear shaft guard Welle Schutz Akselbeskyttelse

14 5777208 Plug Ablassschraube Aftapningsskrue

15 2771129 Circlip Lockring Låsering

16 2771108 Circlip Lockring Låsering

17 2771107 Circlip Lockring Låsering

18 2770407 Bolt Bolz Bolt

19 2770434 Washer Scheibe Skive

Spearhead

Park 15/18/21

35

Gearbox assembly

Page 36: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Spearhead

Park 15/18/21

36

Stickers assembly

Page 37: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Ref. No Part No. English Description

French Description German Description Danish Description

Référence Ref. No Ref. No

Numéro de pièce Teilenummer Reservedelsnummer

Désignation en Anglais Englische beschreibung Engelsk beskrivelse

Désignation en Français Französische beschreibung Fransk beskrivelse

Désignation en Allemand Deutsche beschreibung Tysk beskrivelse

Désignation en Danois Dänische beschreibung Dansk beskrivelse

1 8770357 ‘Keep safe distance when machine is running’ Sticker

- - -

2 8770356 ‘Do not remove/open guard’ Sticker

- - -

3 8770358 ‘Shut off engine, remove key’ Sticker

- - -

4 8770360 ‘Stay clear of mower flails’ Sticker

- - -

5 8770363 ‘Read manual’ Sticker - - -

6 8770306 ‘Keep bolt tight’ Sticker

- - -

7 8770322 ‘Grease point’ Sticker - - -

Spearhead

Park 15/18/21

37

Stickers assembly

Page 38: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Spearhead

Park 15/18/21

38

Page 39: Spearhead - GreenTec A/S · for debris, including stones, to be discharged from the front and rear of ... Check chains and stabilizers must be in good working order to hold the machine

Ref. No Part No. English Description

French Description German Description Danish Description

Référence Ref. No Ref. No

Numéro de pièce Teilenummer Reservedelsnummer

Désignation en Anglais Englische beschreibung Engelsk beskrivelse

Désignation en Français Französische beschreibung Fransk beskrivelse

Désignation en Allemand Deutsche beschreibung Tysk beskrivelse

Désignation en Danois Dänische beschreibung Dansk beskrivelse

1 8770346 ‘Check – chains’ Sticker

- - -

2 8770307 ‘Manufactured in Great Britain’ Sticker

- - -

3 8770340 ‘Read manual’ Sticker - - -

4 8770305 ‘Recommended PTO speed 540 rpm’

Sticker

- - -

5 8770341 ‘Belt tension’ Sticker - - -

Spearhead

Park 15/18/21

39