952.445.5135 | 877.632.0503 | aquatix.playlsi.com © 2016 Splash Pad Tutorial Final Splash Pad Clearing and Leveling Area Digging for Water Vault Placement Water Vault Deliver, Install and backfill Determine Elevations of pad Form Splash Pad Perimeter Dig Plumbing Trenches and Set Drain Boxes Setting & Plumbing Collector Boxes Plumb Collector Boxes to Tank 1 2 3 4 5 8 7 6 Page 1

Splash Pad Tutorial

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Splash Pad Tutorial

952.445.5135 | 877.632.0503 | aquatix.playlsi.com© 2016

Splash Pad Tutorial

Final Splash Pad

Clearing and Leveling Area Digging for Water Vault Placement

Water Vault Deliver, Install and backfill Determine Elevations of pad Form Splash Pad Perimeter

Dig Plumbing Trenches and Set Drain Boxes Setting & Plumbing Collector

BoxesPlumb Collector Boxes to Tank

1 2

3 4 5

876

Page 1

Page 2: Splash Pad Tutorial

952.445.5135 | 877.632.0503 | aquatix.playlsi.com© 2016

12

13 15

17 18

9 10

11

14

Page 2

Back Fill Pipe TrenchesSetting & Plumbing Embeds

Plumb to Embeds & Verify Elevation & Levels

Plumb to Structure Feed Locations & Extend of Piping to

Above Pad Surface

Plumb to Equipment System Lo-cations

Back Fill & Level Area, Allow for Thickened Slab Where

Structures are Mounted & Embeds to be Encapsulated in Concrete

Section Concrete Pad Area for Mul-tiple Pours as Needed

Install Rebar Pour Concrete

16

Slope to Collector Boxes

Splash Pad Tutorial

Page 3: Splash Pad Tutorial

952.445.5135 | 877.632.0503 | aquatix.playlsi.com© 2016

24 25

22

Page 3

Mount Structures

Install Mechanical SystemOutfit Water Vault with Inlet

Loop, Sump Pump & Associated Plumbing

Install Studs & Anchors

21

Drill in for Stud Locators

23

Final Splash Pad

19 20

Medium Broom Finish Allow Concrete to Cure