RURAL WATER SUPPLY AND SANITATION PROJECT –LOW INCOME STATES
(RWSSP-LIS)NEER NIRMAL PARIYOJANA
SPMU, ASSAM
PRESENTATION ON PROJECT PROGRESS
1.2.2018
2
BATCH IPHYSICAL PROGRESS OF SCHEMES
Status SVS MVS Total
No. of schemes planned 3 3
Work Order drawn 3 3
Not started Nil Nil
0-25 % completed Nil Nil
26-50% completed 2 2
51-75 % completed 1 1
76-100 % completed
Under Testing Nil Nil
Schemes Commissioned Nil Nil
3
PHYSICAL PROGRESS ON INFRASTRUCTURE DEVELOPMENT - MVS
DistrictNo. of
SchemesBids
AwardedContract
signed
Work Started
Progress ofWork
0-25 % 26-50% 51-75% 76-100% Comm. 100%
Kamrup 1 1 Yes Yes
Jorhat 1 1 Yes Yes
Hailakandi 1 1 Yes Yes
PHYSICAL PROGRESS ON INFRASTRUCTURE DEVELOPMENT – MVS
District Project start Date Size of WTPAchievement till last
Review Meeting held on 30.10.2017
Achievement as on January 2018
Kamrup (Chandrapur)
10.02.2015 5 .0 MLD 52.00% 66%
Kamrup(Dimoria)
10.02.2015 17.8 MLD 32.00% 42%
Jorhat 10.02.2015 28.2 MLD 31.50% 38%
Hailakandi 7.10.2015 8.4 MLD 37.00% 41%
5
INSTITUTIONAL & SOCIAL DEVELOPMENT(BATCH – I +BATCH – II)
No. DetailsNo of Approved
Positions% of Staff available % of Vacancies Critical observations
A SPMU 24 80% 20%Positions will be advertised
within January 2018
B DPMU (All DPMUs of the State) 97 85% 15%Positions already advertised
and interview planned
Total (A+B) 121 83% 17%
Support SystemsTotal Required
Positions
Total Available
Positions% of Vacancies
A SO- Support Organization
B DPMC
C Community Mobilizers 258 81% 19%Instruction given to DPMUs to
fill up vacancies
Technical Support Systems
A TPQA 3 100% 0%
B CQSCs
Total (A+B) 3 100% 0%
A GPWSCs 129 100%
Total No. of
MVWSCs required
Total No. of
MVWSCs Formed
and available
B MVWSC 6 3
PROJECT FINANCIAL PROGRESS
6
7
(Rs. In Crore)
Fund source
FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17 FY 2017-18Total till 30 Sep,
2017S
an
ctio
ne
d
Re
ceiv
ed
Sa
nct
ion
ed
Re
ceiv
ed
Sa
nct
ion
ed
Re
ceiv
ed
Sa
nct
ion
ed
Re
ceiv
ed
Sa
nct
ion
ed
Re
ceiv
ed
Sa
nct
ion
ed
Re
ceiv
ed
EAP 9.99 0.00 39.45 9.99 70.00 54.45 32.50 87.50 0.00 0.00 151.94 151.94
Central share 8.89 0.00 35.10 0.00 62.30 36.02 28.93 53.54 0.00 45.66 135.22 135.22
State share 0.90 0.00 3.55 0.00 6.30 5.08 2.92 8.59 0.00 0.00 13.67 13.67
Total 19.78 0.00 78.10 9.99 138.60 95.55 64.35 149.63 0.00 45.66 300.83 300.83
YEAR WISE RELEASE (EAP ,GOI& STATE SHARE)
8
FINANCIAL PROGRESS UPTO 31ST DECEMBER, 2017
TOTAL FUND SANCTIONED TILL DATE
Particulars Amount (in Rs. Crore)
World Bank Share 151.94
Govt. of India (NRDWP) Share 135.22
Govt. of Assam (State) Share 13.67
Total 300.83
FUND RECEIVED (in SPMU)
Particulars Amount (in Rs. Crore)
World Bank Share 151.94
Govt. of India (NRDWP) Share 135.22
Govt. of Assam (State) Share 13.67
Total 300.83
9
STATEMENT SHOWING EXPENDITURE INCURRED
UNDER NNP, ASSAM TILL 31ST DECEMBER, 2017
(Rs. In Crore)
Component Amount
A-Capacity Building & Sector
Development5.18
B-Infrastructure Development 286.76
C-Project Management 8.15
Total 300.10
Percentage of Expenditure against
total fund received in SPMU99.76%
10
STATUS OF COMMUNITY CONTRIBUTION (BATCH – I)
(AS ON 31ST DECEMBER, 2017)
Sl no District Target of CC as per
baseline survey in Rs. Total Collection in
Rs. % of Collection
A B C D E
1 Kamrup 1,14,79,050 56,93,488 49.60%
2 Jorhat 2,14,99,200 1,37,80,000 64.10%
3 Hailakandi 76,89,375 32,50,125 42.27%
Total 4,06,67,625 2,27,23,613 55.88%
11
STATUS OF COMMUNITY CONTRIBUTION (BATCH – II)
(AS ON 31ST DECEMBER, 2017)
Sl no District Target of CC as per baseline
survey in Rs. Total Collection in Rs. % of Collection
A B C D E
1 Morigaon 1,17,00,675 6,25,050 5.34%
2 Sivsagar 1,05,99,975 2,39,850 2.26%
3 Bongaigaon 1,91,68,875 4,83,750 2.52%
Total 4,14,69,525 13,48,650 3.25%
12
Batch-I
Baseline Survey at Batch-I Districts completed and a report has been submitted
to WB & NPMU on 10th Apr’17.
Batch-II
Baseline Survey at Batch-II Districts completed. The verification of survey forms
are in process.
PROGRESS OF BASELINE SURVEY
INDICATOR Estimated (census 2011) Actual a per BLS %
Household 1,06,203 1,16,786 110%
Population 5,89,283 554435 94%
INDICATOR Estimated (census 2011) Actual as per BLS %
Household 1,29,661 1,17,832 91%
Population 6,66,869 5,54,244 83%
CAPACITY BUILDING REPORT (CUMULATIVE)
13
FYNumber of Training
Events
No. of Participants Person Days
Trained Male Female Total
2015-16 514 14524 9734 24258 18249
2016-17 1810 32942 21766 54708 30450
2017-18(Till July-17)
1556 24188 17668 41903 12317.3
2017-18(July-Dec 17)
4677 53370 52302 105672 23849
TOTAL 8557 125024 101470 226541 84865.3
O&M PREPAREDNESS
14
15
O&M PREPAREDNESS
- Draft O&M policy Prepared
- Draft NNP water regulatory Authority framework prepared
- Unit cost of Water per KL derived for Kamrup and Jorhat MVS
- Draft Tariff Structure for Kamrup & Jorhat MVS has been formulated
- Financial Sustainability analysis carried out for Kamrup and Jorhat MVS
- Structure of MVS cell (Manpower requirement in the O&M phase) has been prepared for
Kamrup and Jorhat MVS
- Draft Institutional Model for MVS for handing over the scheme to community has been
framed and shared with the State Government.
- Framework for O&M software prepared for Kamrup MVS
16
STATUS OF IHHL
District No of Households (BLS 2012)
No of Households with
access to Toilets as on Jan.’
2018
Sanitation Coverage
As on Jan’2018
(as per BLS 12)
Batch 1
GPsBatch 2 GPs
HH with toilet
(SBM (G))
HH
without
toilet
Total Proj
GPs
Batch 1
GPs
Batch 2 GPs(nos) (%)
Hailakandi 29565 14698 14867 14 12784 27482 92.95
Jorhat 58115 27489 30626 33 20001 47490 81.71
Kamrup (M) 35138 20280 14858 16 35138 35138 100
Sibsagar 43972 23541 20431 25 20431 43972 100
Morigaon 27535 16432 11103 15 6691 23123 83.97
Bongaigaon 45958 6310 39648 26 27482 33792 73.52
All project
districts (Total)240283 108750 111532 129 122527 210997 87.81
STATUS OF IHHL
17
45958
58115
27535
29565
35138
43972
33792
47490
23123
27482
35138
43972
1216610625
4412
2083
0 0
0
10000
20000
30000
40000
50000
60000
Bongaigaon Jorhat Morigaon Hailakandi Kamrup Sibsagar
Target Sanitation Coverage Without Sanitation
18
STATUS ON ODF
DistrictNo of Project GPs No of ODF GPs as of December, 2017
Batch 1 Batch 2 Total Batch 1 Batch 2 Total
Hailakandi 14 1 GP
Jorhat 33 1 GP
Kamrup 16 16
Sibsagar 25 25
Morigaon 15 3
Bongaigaon 26 3
All project districts
129
49 nos of GPs & 240
nos of villages
19
STATUS OF SOLID AND LIQUID WASTE MANAGEMENT
District
SLWM initiated
(No. of GPs) as
of Jan’2018
Details of the project
areas
Financial progress
on SLWM as on
Jan’2018 (in INR)
Hailakandi 1 GP Syedbond
22,46,001.00
Jorhat 1 vill & 1 GP.
Dhekelia Borsaikia
Village & Madhya
Khongia GP
Kamrup 1 vill & 1 GP. Tatimara & Khetri
Morigaon 1 GP Bhagaragaon
Sibsagar 1 GP
Singi Bil Village
under Momai Tamuli
G.P
Bongaigaon 1 vill
20
STATUS OF SOLID AND LIQUID WASTE MANAGEMENT
a. Gaon Sabhas, Community consultations, FGDs, Social Mapping have been completed in the
districts.
b. Survey has been completed in each pilot GP preceded with training cum orientation programme
for CMs, SwachhaGrahis, Surveyors and District officials at district level.
c. A pilot project is being implemented in Tatimara vill under Chandrapur block of Kamrup (M)
district under NNP.
d. The draft DPRs for Dhekelia Borsaikia Village of Madhya Khongia GP in Jorhat ,
Bhagaragaon under Morigaon district and Khetri GP, Kamrup (M) whereas a SWM Plan for
Singi Bil Village under Momai Tamuli G.P of Sibsagar dist has been prepared and shared with
the technical cell of SBM (G) cell concerned DWSC.
21
STATUS OF SOLID AND LIQUID WASTE MANAGEMENT
e. ToR for a Technical Cell for SLWM has been approved to be established in
SPMU, NNP, Assam.
f. Impact study on Tatimara SLWM Project has been done by DPMU, Kamrup (M).
g. EOI has been floated for standardisation of rates of containerised Tricycles,
Handcarts and Digital Weighing Machine (50 kg). Technical Evaluation has
been completed.
h. Draft DPRs of additional 4 nos on SLWM has been prepared and submitted to the
technical cell of SBM (G), for review.
i. Draft GP Sanitation Plan has been prepared by the DPMUs which is under
review.
PROGRESS IN BATCH - II
22
• Notification for MVWSC and GPWSC completed
• DPMUs have been established
• Baseline survey has been completed
• Community contribution collection started (3.25% achieved)
• Topographic survey is completed
• Orientation of GPWSCs have completed
• Community Mobilizer trained and deployed
• Ward level orientation programmes taken up
• Signing of agree to do completed
• GPWSC Bank Account opening completed
• Preparation of DPR for Morigaon completed (Final submitted), Sivsagar is ongoing and
Bongaigaon to start shortly
23
PHOTO GALLERY
JORHAT
Clariflocculator 2 Chemical House
CWR and Pump house CWR Deck Slab Pipe Laying
Clariflocculator 1
KAMRUP
Chemical House Dimoria WTP Clariflocculator
BargeClarifloculator Pump House
HAILAKANDI
Clariffloculator Flash Mixture & Sludge Sump
DI Pipe laying Chemical House
Electrical Sub Station
COMMUNITY PARTICIPATION
27
COMMUNITY PARTICIPATION
28
SOME SNAP SHOTS ON SLWM PROJECT UNDER NNP AREA.
During field survey on SLWM
HABITATION/WARD LEVELAWARENESS GENERATION ONSLWM.
ORIENTATION PROGRAMME ON SLWM AT GP FOR THE SURVEYORS.Day Long Orientation programme on SLWM at GP
for the surveyors
Training on Plastic craft from plastic waste products.
MINISTERIAL VISITS FROM MODWS
IEC MATERIALS
35
36
CONSUMER CARD
37
Household sticker
38
Hording on NNP (15x10ft)
39
GP information board
40
Leaflet
41
Quarterly Newsletter (Vol-I ,Issue-I)
42
Public Notice
(Leaflet)
THANK YOU