View
215
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Portfolio of sports related project design
Citation preview
CHRISTO
PHER T
. STA
GG
S S
PO
RTS
WO
RK
1997-2
009
MUIDATS YRTNEVOC 1002
99-01 WEMBLEY STADIUM
98 GUANGZHOU OLYMPIC VILLAGE
MUI
SA
NM
YG
ECI
TC
AR
P A
NAI
DNI
FO
YTI
SR
EVI
NU
99
2001 SAN SIRO STADIUM IMPROVEMENTS
AZALP SEITINE
MA/EK
OC
KR
AP T&
TA
00
02
KR
APLLA
B N
ACI
RE
MA
TA
ER
G 8
9
MUIDATS LLABESAB EGELL
OC HT
UO
MT
RA
D 2
00
2
RET
NE
C S
TN
EV
E A
WOI
99-
89
ITANNICNIC FO YTISREVINU-EGALLIV YTI
SR
AV
99-
89
SPND O A RA TN SE CR OA MN PE LK EXOBOH 99ANERA SPILLIHP 89-79
CHRISTO
PHER T
. STA
GG
S S
PO
RTS
WO
RK
1997-2
009
TDI EDE -MRC ULC TA I PD LE EE LL EED PROJECTS
TI YS , R PE OV MI ON NU ACINHCETYLOP AINROFILAC @ NGISED LATNEMN
ORIVNE F
O E
GELL
OC-
ER
UT
CE
TIH
CR
A F
O R
OL
EH
CA
B
ECNEIREPXE LANOITANRET
NI ’D
NU
OR
G E
HT
NO‘
A, RA TL IC NU S , TY IT TI US TR EEVINU YRUBDOOW-ECNEIREPXE G
NIHC
AET
EC
NEIR
EPX
E S
EIG
OL
ON
HC
ET
OC
E D
EZI
LAI
CE
PS
DN
A E
UQI
NU
MUIDATS YRTNEVOC 1002
99-01 WEMBLEY STADIUM
98 GUANGZHOU OLYMPIC VILLAGE
2001 SAN SIRO STADIUM IMPROVEMENTS
AZALP SEITINE
MA/EK
OC
KR
AP T&
TA
00
02
KR
APLLA
B N
ACI
RE
MA
TA
ER
G 8
9
MUIDATS LLABESAB EGELL
OC HT
UO
MT
RA
D 2
00
2
RET
NE
C S
TN
EV
E A
WOI
99-
89
ITANNICNIC FO YTISREVINU-EGALLIV YTI
SR
AV
99-
89
SPND O A RA TN SE CR OA MN PE LK EXOBOH 99ANERA SPILLIHP 89-79
REMM OIU DD ELA T PS R ON PA OIL SA AT LI-AILATI IDATS 7002
Phillips Arena, Atlanta (Christopher Staggs-Project Design and Documents (Exterior/Skin/Details) w/HOK Sport)
DATA 18,000 SEAT ARENA, ONE OF KIND ENTRY/TICKET AREA/UNIQUE BOWL (ALL SUITES STACKED TO ONE SIDE)
NARRATIVE AS THE EXTERIOR SKIN ARCHITECT, RESPONSIBILITIES INCLUDED COORDINATION WITH ASSOCIATE ARCHITECT, CURTAINWALL SPECIALISTS, ENGINEERING TEAM AND INTERNAL TEAM OF DESIGNERS TO WORK THROUGH THE COMPLEXITIES OF VARIOUS GEOMETRIES AND SYSTEMS. THESE CHALLENGES INCLUDED DETAILING INTERFACE, RESEARCH AND CHOICE OF MATERIALS, AND COORDINATION FOR A GMP PACKAGE OF DOCUMENTS.
South Elevations/Entry Perspective Birdseye Perspective
97-98
MUIDATS YRTNEVOC 1002
99-01 WEMBLEY STADIUM
98 GUANGZHOU OLYMPIC VILLAGE
2001 SAN SIRO STADIUM IMPROVEMENTS
AZALP SEITINE
MA/EK
OC
KR
AP T&
TA
00
02
KR
APLLA
B N
ACI
RE
MA
TA
ER
G 8
9
MUIDATS LLABESAB EGELL
OC HT
UO
MT
RA
D 2
00
2
RET
NE
C S
TN
EV
E A
WOI
99-
89
ITANNICNIC FO YTISREVINU-EGALLIV YTI
SR
AV
99-
89
SPND O A RA TN SE CR OA MN PE LK EXOBOH 99ANERA SPILLIHP 89-79
REMM OIU DD ELA T PS R ON PA OIL SA AT LI-AILATI IDATS 7002
Coventry Stadium, Birmingham, UK (Christopher Staggs-Project Designer w/ HOK Sport, London)
DATA LANDSCAPE PLAZA SPACE | 50,000 SEATS | 120 SUITES | REMOVABLE PITCH ON TRACKS
NARRATIVE AS A DYNAMIC FEATURE IN THE CENTRAL ENGLISH FLAT LANDS, THE NEW STADIUM SIGNIFIES A NEW ERA IN AMENITIES ORIENTED FOOTBALL. THE STADIUM IS DIRECTLY LINKED WITH PUBLIC TRAIN TRANSPORTATION, FEATURES COVERED SEATING AND FULL VIP AMENITIES INCLUDING RESTAURANTS
2001
MUIDATS YRTNEVOC 1002
99-01 WEMBLEY STADIUM
98 GUANGZHOU OLYMPIC VILLAGE
MUI
SA
NM
YG
ECI
TC
AR
P A
NAI
DNI
FO
YTI
SR
EVI
NU
99
2001 SAN SIRO STADIUM IMPROVEMENTS
AZALP SEITINE
MA/EK
OC
KR
AP T&
TA
00
02
KR
APLLA
B N
ACI
RE
MA
TA
ER
G 8
9
MUIDATS LLABESAB EGELL
OC HT
UO
MT
RA
D 2
00
2
RET
NE
C S
TN
EV
E A
WOI
99-
89
ITANNICNIC FO YTISREVINU-EGALLIV YTI
SR
AV
99-
89
SPND O A RA TN SE CR OA MN PE LK EXOBOH 99ANERA SPILLIHP 89-79
Varsity Village, University of Cincinnati (Christopher Staggs-Project Planner, Designer, Coordination and Design of promotional film; w/ HOK Sport)
Terraced Football Fields Fieldhouse Administration Building
DATA 25 ACRES; ADMINISTRATION, FIELDHOUSE, GYMNASIUM, COMPETITION TENNIS STADIUM, ATHLETE HOUSING, WELLNESS CENTER, BASEBALL STADIUM
NARRATIVE THE VARSITY VILLAGE WAS CONCEIVED AS A COLLECTIVE LOCATION FOR ALL CAMPUS SPORTS ACTIVITIES INTO ONE CENTRAL PLACE. PLANNED AT THE LINK BETWEEN THE EAST AND WEST CAMPUS THE NEW VILLAGE WOULD CONTINUE THE CAMPUS “BRAID” AND SIGNIFICANTLY ENHANCE THE ATHLETICS
PROGRAM IN ITS CONFERENCE. RESPONSIBLE FOR OVERALL MASTER PLANNING, BUILDING DESIGN, CONSTRUCTION COST COORDINATION, PROMOTIONALMATERIAL.
99
Varsity Village, University of Cincinnati (Christopher Staggs-Project Planner, Programming, Designer w/ HOK Sport, London)
Schematic Watercolor Rendering Birdseye Perspective
Concept Entry View
Existing EPA Building
Entry Plaza
Tennis Center
Administration|Hall of Champions
Gymnasium
2000 Seat Baseball Stadium
Fieldhouse
Wellness CenterBurnett Woods
MUIDATS YRTNEVOC 1002
99-01 WEMBLEY STADIUM
98 GUANGZHOU OLYMPIC VILLAGE
MUI
SA
NM
YG
ECI
TC
AR
P A
NAI
DNI
FO
YTI
SR
EVI
NU
99
2001 SAN SIRO STADIUM IMPROVEMENTS
AZALP SEITINE
MA/EK
OC
KR
AP T&
TA
00
02
KR
AP
LL
AB
NA
CI
RE
MA
TA
ER
G 8
9
MUIDATS LLABESAB EGELL
OC HT
UO
MT
RA
D 2
00
2
RETN
EC
ST
NE
VE
AW
OI 9
9-8
9
ITANNICNIC FO YTISREVINU-EGALLIV YTIS
RA
V 9
9-8
9
SPND O A RA TN SE CR OA MN PE LK EO XBOH 99ANERA SPILLIHP 89-79
Great American Ballpark, Cincinnati (Christopher Staggs-Project Master Planning w/ HOK Sport)
Main Concourse View Bowl View
Bowl View
DATA 42,000 Seats; URBAN PLAZA/FAN ZONE; 20 SUITES
NARRATIVE AN URBAN STADIUM WITH CONNECTIONS TO DOWNTOWN CINCINNATI AND THE RIVERFRONT, THE PARK WAS PLANNED TOPRESERVE IMPORTANT CIVIC VIEWS.
98
MUIDATS YRTNEVOC 1002
99-01 WEMBLEY STADIUM
98 GUANGZHOU OLYMPIC VILLAGE
MUI
SA
NM
YG
ECI
TC
AR
P A
NA
ID
NI
FO
YT
IS
RE
VI
NU
99
2001 SAN SIRO STADIUM IMPROVEMENTS
AZALP SEITINE
MA/EK
OC
KR
AP T&
TA
00
02
KR
APLLA
B N
ACI
RE
MA
TA
ER
G 8
9
MUIDATS LLABESAB EGELL
OC HT
UO
MT
RA
D 2
00
2
RET
NE
C S
TN
EV
E A
WOI
99-
89
ITANNICNIC FO YTISREVINU-EGALLIV YTI
SR
AV
99-
89
SPND O A RA TN SE CR OA MN PE LK EXOBOH 99ANERA SPILLIHP 89-79
University of Indiana Practice Gymnasium (Christopher Staggs-Project Planner, Programming, Design w/ HOK Sport, Kansas City)
Entry Plaza View South Entry South Entry
South Entry
DATA COMPETITION SIZE PRACTICE GYMNASIUM; TEAM STORE; LOCKER ROOMS AND SPORTS TRAINING FACILITIES; BELOW GRADECONNECTION BETWEEN ARENA AND FIELDHOUSE.
NARRATIVE AS A CONNECTOR THE NEW GYM BRINGS TOGETHER THREE BUILDINGS YET PRESERVES IMPORTANT VIEWSTHROUGH CAMPUS THROUGH A LOW PROFILE AND TRANSPARENCY, WHILE BUILDING ON THE EXISTING INDIANA LIMESTONEBEDROCK.
99
MUIDATS YRTNEVOC 1002
99-01 WEMBLEY STADIUM
98 GUANGZHOU OLYMPIC VILLAGE
MUI
SA
NM
YG
ECI
TC
AR
P A
NAI
DNI
FO
YTI
SR
EVI
NU
99
2001 SAN SIRO STADIUM IMPROVEMENTS
AZALP SEITINE
MA/EK
OC
KR
AP T&
TA
00
02
KR
APLLA
B N
ACI
RE
MA
TA
ER
G 8
9
MUIDATS LLABESAB EGELL
OC HT
UO
MT
RA
D 2
00
2
RET
NE
C S
TN
EV
E A
WOI
99-
89
ITANNICNIC FO YTISREVINU-EGALLIV YTI
SR
AV
99-
89
SND P A OA RTN SE R CA O MN PE LK EO XBOH 99 ANERA SPILLIHP 89-79
Hoboken Arena and Sports Complex, New Jersey (Christopher Staggs-Project Planner, Programming, Design w/ HOK Sport, Kansas City)
Arena Section @ The Great Hall of Transportation Concept Sketch
DATA 18,000 SEAT ARENA; 250 ROOM HOTEL; 2500 CAR PARK; HALL OF TRANSPORTATION; RESIDENTIAL, RESTAURANT AND RETAIL.
NARRATIVE POSITIONED AT A TRANSPORTATION CROSSROADS THE PROPOSED NEW HOME FOR THE NEW JERSEY NETS AND DEVILS SITS ADJACENT TO THEHUDSON RIVER. THE ARENA AND ENTIRE COMPLEX TRANSITION FROM THE LOWER SCALE URBAN FABRIC OF HOBOKEN TO THE MANHATTANSKYLINE WITH MATERIALS AND TEXTURE THAT SPEAK TO THE HISTORIC CONTEXT.
99
MUIDATS YRTNEVOC 1002
99-01 WEMBLEY STADIUM
98 GUANGZHOU OLYMPIC VILLAGE
MUI
SA
NM
YG
ECI
TC
AR
P A
NAI
DNI
FO
YTI
SR
EVI
NU
99
2001 SAN SIRO STADIUM IMPROVEMENTS
AZALP SEITINE
MA/EK
OC
KR
AP T&
TA
00
02
KR
APLLA
B N
ACI
RE
MA
TA
ER
G 8
9
MUIDATS LLABESAB EGELL
OC HT
UO
MT
RA
D 2
00
2
RET
NE
C S
TN
EV
E A
WOI
99-
89
ITANNICNIC FO YTISREVINU-EGALLIV YTI
SR
AV
99-
89
SPND O A RA TN SE CR OA MN PE LK EXOBOH 99ANERA SPILLIHP 89-79
Guangzhou Olympic Village, China (Christopher Staggs-Project Planner, Programming, Design w/ HOK Sport)
Overall Planning Concept Digital Model
3d Arena View
DATA 12,000 SEAT ARENA; COMPETITION POOL AND DIVING; OLYMPIC PLAZA; ATHLETE HOUSING AND TRAINING CENTER; PRACTICE GYMNASIUM
NARRATIVE CONCEPTUAL PLANNING AND DESIGN ORIGINATED WITH THE CHINESE CHARACTER; THE ‘RADICAL’ AND THE ‘STROKE’ FORM THE GEOMETRIC BASISOF DESIGN-THE LANGUAGE OF THE DESIGN. SECOND PLACE IN INVITED COMPETITION
98
MUIDATS YRTNEVOC 1002
99-01 WEMBLEY STADIUM
98 GUANGZHOU OLYMPIC VILLAGE
MUI
SA
NM
YG
ECI
TC
AR
P A
NAI
DNI
FO
YTI
SR
EVI
NU
99
2001 SAN SIRO STADIUM IMPROVEMENTS
AZALP SEITI
NEM
A/
EK
OC
KR
AP
T&
TA
00
02
KR
APLLA
B N
ACI
RE
MA
TA
ER
G 8
9
MUIDATS LLABESAB EGELL
OC HT
UO
MT
RA
D 2
00
2
RET
NE
C S
TN
EV
E A
WOI
99-
89
ITANNICNIC FO YTISREVINU-EGALLIV YTI
SR
AV
99-
89
SPND O A RA TN SE CR OA MN PE LK EXOBOH 99ANERA SPILLIHP 89-79
AT&T Park | Coca-Cola Amenities Plaza, San Francisco (Christopher Staggs-Project Planner, Programming, Design w/ HOK Sport, Kansas City)
Schematic Design Study Model Concept Sketch
Realized Project
DATA GIANT COKE BOTTLE AND GLOVE, W/KIOSKS
NARRATIVE THE COCA COLA PLAZA COMPREHENSIVE ENTERTAINMENT ZONE WITH KIOSKS, HISTORIC PLAYERSCRIMS, A GIANT COKE BOTTLE FABRICATED FROM ALASKAN CEDAR GLULAM AND POINT SUPPORTED GLASS SYSTEM, AND TECHNOLOGY RICHAMENITIES.
2000
MUIDATS YRTNEVOC 1002
99-01 WEMBLEY STADIU
M
98 GUANGZHOU OLYMPIC VILLAGE
MUI
SA
NM
YG
ECI
TC
AR
P A
NAI
DNI
FO
YTI
SR
EVI
NU
99
2001 SAN SIRO STADIUM IMPROVEMENTS
AZALP SEITINE
MA/EK
OC
KR
AP T&
TA
00
02
KR
APLLA
B N
ACI
RE
MA
TA
ER
G 8
9
MUIDATS LLABESAB EGELL
OC HT
UO
MT
RA
D 2
00
2
RET
NE
C S
TN
EV
E A
WOI
99-
89
ITANNICNIC FO YTISREVINU-EGALLIV YTI
SR
AV
99-
89
SPND O A RA TN SE CR OA MN PE LK EXOBOH 99ANERA SPILLIHP 89-79
New English National Stadium, Wembley, London, UK (Christopher Staggs-Project Bowl Planner, Programming, Design w/ World Stadium Team/HOK Sport, London)
Seating Bowl/Pitch Birdseye View
Exterior view
Bowl/Video Screen
DATA LARGEST COVERED STADIUM IN THE WORLD WITH THE WEMBLEY ARCH AT 300’ TALL AND A MOVABLE ROOF COVERING ALL SEATSCONVERTIBLE TO ATHLETICS STADIUM, THE PITCH IS CONFIGURED FOR EUROPEAN FOOTBALL; 50 SUITES.
NARRATIVE THE WEMBLEY BOWL WAS CONFIGURED FOR OPTIMAL SITELINES AND DISTANCE TO THE GAME OF FOOTBALL; THE INTERIOR “BOWL” SPACE IS FULLYENCLOSED WITH A COVERED ROOF THAT IS INTEGRATED WITH THE BOWL AND ITS SUPPORTING STRUCTURE. MR. STAGGS SERVED AS PROJECT BOWL ARCHITECT LEADING A TEAM OF (4) FROM THE US IN LONDON. THE ENTIRE 50+ A/E TEAM DESIGNED THE PROJECT FROM AN ON SITE OFFICEIN WEMBLEY. EXTENSIVE INTERACTION WITH THE BUILDER AND SUBTRADES IN SD/DD TO MORE ACCURATELY COORDINATE DRAWINGS WITH ACTUAL CONSTRUCTION METHODS. 99-01
New English National Stadium, Wembley, London, UK (Christopher Staggs-Project Bowl Planner, Programming, Design w/ World Stadium Team/HOK Sport, London)
DATA BOWL-90,000 SEATS; STEEL SUPERSTRUCTURE SUPPORTED BY CIRCULAR TUBE SECTION WING STRUCTURE; PRE-CAST CONCRETE TERRACING; PAINTED STEEL GUARDRAIL/HANDRAILS AND METALWORK; 5MX20M LED VIDEO SCREENS AT EITHER END OF BOWL; ADJUSTABLE CROWD BARRIERS
AT PITCH; SITELINES AND BOWL CONFIGURED FOR FOOTBALL; STADIUM CAN BE CONVERTED TO ATHLETICS BY RAISING PITCH (REDUCTION IN SEATING TO 70,000); ALL SEATS COVERED BY MOVABLE ROOF
NARRATIVE EXTENSIVE SITLINE AND ATHLETICS STUDIES WERE PERFORMED (EVIDENCE OF ATHLETICS CONVERSION)
Bowl/Structure Interface Study Bowl/Roof Structure Interface Study
Bowl/Structure Interface Study Bowl/Structure Geometry/Plan StudyBowl/Structure Construction Athletics Events Layout
Terrace Siteline Analysis
99-01
CHRISTO
PHER T
. STA
GG
S S
PO
RTS
WO
RK
1997-2
009