SPS 800 MHz RF Power upgrade. Progress report 18 June 2014. SPS 800 MHz power. All eight individual IOT transmitters validated Line #1 tested up to 200 kW CW on load New cavity controllers ready Still very bad news from Electrosys Second Circulator and no spare at all delivered. ?. - PowerPoint PPT Presentation
Citation preview
LIU
-SPS
mee
ting,
18
June
201
4
LHC Inject
orUpgrade
SPS 800 MHzRF Power upgradeProgress report18 June 2014
Eric
Mon
tesin
os
LIU
-SPS
mee
ting,
18
June
201
4
LHC Inject
orUpgrade
SPS 800 MHz power
All eight individual IOT transmitters validated
Line #1 tested up to200 kW CW on load
New cavity controllers ready
Still very bad news from ElectrosysSecond Circulator and no spare at all delivered
Eric
Mon
tesin
os
2
Cavity #2Load
Short
Cavity #1
Load
Short
?
LIU
-SPS
mee
ting,
18
June
201
4
LHC Inject
orUpgrade
SPS 800 MHz powerMoved circulator toline #2
Line #2 tested up to200 kW CW on load
Completed the RF conditioning up to180 kW CW on cavity #2Yesterday
Just started the RF conditioning on cavity #1 (without circulator ! So it will be slow as we will be very careful)
Eric
Mon
tesin
os
3
Cavity #2Load
Short
Cavity #1
Load
Short
?
Load
LIU
-SPS
mee
ting,
18
June
201
4
LHC Inject
orUpgrade
Two x four transmitters
Eric
Mon
tesin
os
4
Front view
Rear view
LIU
-SPS
mee
ting,
18
June
201
4
LHC Inject
orUpgrade
CavitiesAntennas have been added on both cavities
Combiner is still to be provided (LLRF)
Two old filters are overheating (has probably been always the case, discovered while checking the antennas)
We added a heat cooler
Eric
Mon
tesin
os
5
New antenna design
Sébastien adding a new antenna on all 74 cells
LIU
-SPS
mee
ting,
18
June
201
4
LHC Inject
orUpgrade
CavitiesAntennas have been added on both cavities
Combiner is still to be provided (LLRF)
Two old filters are overheating (has probably been always the case, discovered while checking the antennas)
We added a heat cooler
Eric
Mon
tesin
os
6Old filter overheating while having 200 kW CW during several minutes
(NOT the case in operation)
LIU
-SPS
mee
ting,
18
June
201
4
LHC Inject
orUpgrade
Schedule
Eric
Mon
tesin
os
7
2014
Jan Feb Mar Apr May Jun Jul AugDec
8 Individual transmitters
TWC 160 kW total
TWC 260 kW total TWC 1
220 kW total
TWC 2220 kW total
LLRF commissioning
SPS setup with beam
SPS closed
LLRF antennae calibration
TWC 1 & 22 x 220 kW total
+Cavity conditioning
Thank you for your attention