14
SPUR July 6 th , 2016

SPUR Design Challenge 070616 (1)...Jul 06, 2016  · HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 19 Implementation Structures Our proposals, particularly

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SPUR Design Challenge 070616 (1)...Jul 06, 2016  · HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 19 Implementation Structures Our proposals, particularly

SPURJuly6th,2016

Page 2: SPUR Design Challenge 070616 (1)...Jul 06, 2016  · HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 19 Implementation Structures Our proposals, particularly

TheThreatClimatechangeandassociatedsealevelrise poserealthreatstotheBayArea.Criticalinfrastructureisatrisk,requiringinnovativedesignandengineeringsolutions.Wemustactnow toprotectourcommunitiesfromdisastrousfloodingthatcouldcausemillionsineconomicdamageanddisruptourqualityoflife.

Page 3: SPUR Design Challenge 070616 (1)...Jul 06, 2016  · HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 19 Implementation Structures Our proposals, particularly

BayAreaResilientbyDesignChallenge• Avisionforthefuture:InnovativeandInspiring

• Asolutionthatworks:BasedonRBD

• Collaborativeandinterdisciplinary

• ReplicableandImplementable

• Aninvitationtoall:Regional&CommunityandDesign-driven

Page 4: SPUR Design Challenge 070616 (1)...Jul 06, 2016  · HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 19 Implementation Structures Our proposals, particularly

AVisionfortheFuture

HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 19

Implementation Structures

Our proposals, particularly those that combine public investment with private support, represent game-changing recommendations for the way the

region, and particularly business communities currently approach resiliency. In the Implementation Strategy chapter of this report, we identify primary

DFWRUV��VRXUFHV�RI�IXQGLQJ��DQG�FULWLFDO�QH[W�VWHSV�WR�PRYH�WRZDUG�SURMHFW�LPSOHPHQWDWLRQ��,Q�HDFK�VWXG\�DUHD��LPSOHPHQWDWLRQ�ZRXOG�SURYLGH�ÁRRG�SUR-tection to critical commercial corridors, community open spaces, and landmark features of each community, as well as strengthen the areas’ commercial

vibrancy and economic health. New funding of $285 million is proposed for planning, design and implementation of capital improvements, technical

assistance, capacity building and incentives. Proposals for funding through Rebuild by Design, including Community Development Block Grant Disaster

Recovery (CDBG-DR) and other mitigation support funds, and for corresponding implementing entities, are summarized on the following page.

Implementing these initiatives through public-private partnerships and through community-based planning processes and programming is criti-cal to success. The example below illustrates our recommended implementation structure for the Red Hook initiative.

Funding Sources

Private FundsPRI & CRA-motivated capital

Resiliency Financing

Business Owners

Small Business Resiliency

Funding Program

Public FundsCDBG-DR Funding

City & State Capital Commitments

Technical Assistance & Training

Property Owners

Private FundsBusiness Dues/

Assessments Grant Funding

Economic Development/Planning

Public/Private

Development Partnerships

Local Development Corporation

(Existing or New Entity)

Actors

Programs

Recipients

HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 199

Commercial Resiliency Financing

Per the previous page, the graphic below communicates the sources of capital that could be leveraged to create a sustainable resiliency funding program for interventions at each scale studied, and which could be disbursed along the appropriate timeline for a wide variety of projects.

Sources of Capital Uses of Capital

CDBG-DRFunds

Tenant

Tenant

Tenant Corridor + District

Building Owner

Building Owner

�� Loans�� Grants�� Financial advisory

�� Technical assistance

�� Advocacy

�� Planning�� Advocacy�� Design�� Implementation

CDFI

BusinessOrganization

Local Government

PhilantropeFunds

Private-SectorCapital

Public-SectorFunding

BY DESIGN

Page 5: SPUR Design Challenge 070616 (1)...Jul 06, 2016  · HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 19 Implementation Structures Our proposals, particularly

CollaborativeattheCore

LANDSCAPE

IMAGE: SCAPE TEAM

ARCHITECTURE

IMAGE: OMA TEAM

URBAN DESIGN

IMAGE: PENN DESIGN / OLIN

URBAN PLANNING

IMAGE: OMA TEAM

REGIONAL APPROACH

SCALES and TIME

IMAGE: BIG TEAMIMAGE: WXY/West8 TEAM

Page 6: SPUR Design Challenge 070616 (1)...Jul 06, 2016  · HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 19 Implementation Structures Our proposals, particularly

AnInvitationtoAll

PhilanthropicFunders NongovernmentalOrgs

Neighborhoods&CommunityCorporatePartners

ThoughtLeaders&Universities

GovernmentAgencies

Page 7: SPUR Design Challenge 070616 (1)...Jul 06, 2016  · HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 19 Implementation Structures Our proposals, particularly

ASolutionThatWorksRebuildbyDesignbeganasaresponsetoHurricaneSandyintheNortheastUnitedStatesasawaytobuildbackbetter.

Itcreatesprocessesforcommunitiesandgovernmenttoworkwithdesignerstoasharedvisionofamoreresilientregion.

Page 8: SPUR Design Challenge 070616 (1)...Jul 06, 2016  · HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 19 Implementation Structures Our proposals, particularly

65

Asbury Park Capacity-Building: The City of Asbury Park

HUD Rebuild by Design | HR&A Advisors with Cooper, Robertson & Partners

THE COMMUNITYTHECOMMUNITY

Page 9: SPUR Design Challenge 070616 (1)...Jul 06, 2016  · HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 19 Implementation Structures Our proposals, particularly

REGIONAL APPROACHREGIONALAPPROACH

Page 10: SPUR Design Challenge 070616 (1)...Jul 06, 2016  · HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 19 Implementation Structures Our proposals, particularly

WhoWeAre:JoinUs!• ChiefResiliencyOfficers– SanFrancisco,Berkeley,Oakland• SanJose,MarinCounty,SanMateoCounty,SCVWD,CHARG,CityofRichmond• BCDC• BARC• ABAG• CoastalConservancy• SPUR• ClimateReadiness Institute• SFEI• FEMA• AndYou

Page 11: SPUR Design Challenge 070616 (1)...Jul 06, 2016  · HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 19 Implementation Structures Our proposals, particularly

NextSteps• Broadenthegroupofsupportersandcollaborators

• CreateauniquelyBayAreabrandandapproachthatinviteseverycommunity

• Outreachtoelectedofficials,municipalleaders,communityorganizationsandpotentialpartners

• Partnerwithphilanthropyandbusinesses

Page 12: SPUR Design Challenge 070616 (1)...Jul 06, 2016  · HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 19 Implementation Structures Our proposals, particularly
Page 13: SPUR Design Challenge 070616 (1)...Jul 06, 2016  · HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 19 Implementation Structures Our proposals, particularly
Page 14: SPUR Design Challenge 070616 (1)...Jul 06, 2016  · HUD Rebuild By Design | HR&A Advisors with Cooper, Robertson & Partners 19 Implementation Structures Our proposals, particularly

THANKYOU

DianaSokolove,SeniorPlannerCitywidePlanningSanFranciscoPlanningDepartmentPH: 415-575-9046EM: [email protected]

Formoreinformation: