4
SQTF: Phone Conference G. Darbo- INFN / Genova SQTF, 03/08/2006 o SQTF - Phone Conference G. Darbo - INFN / Genova Indico agenda page:

SQTF: Phone Conference G. Darbo- INFN / Genova SQTF, 03/08/2006 o SQTF - Phone Conference G. Darbo - INFN / Genova Indico agenda page:

Embed Size (px)

Citation preview

Page 1: SQTF: Phone Conference G. Darbo- INFN / Genova SQTF, 03/08/2006 o SQTF - Phone Conference G. Darbo - INFN / Genova Indico agenda page:

SQTF: Phone ConferenceG. Darbo- INFN / Genova SQTF, 03/08/2006o

SQTF - Phone ConferenceSQTF - Phone Conference

G. Darbo - INFN / Genova

Indico agenda page:

Page 2: SQTF: Phone Conference G. Darbo- INFN / Genova SQTF, 03/08/2006 o SQTF - Phone Conference G. Darbo - INFN / Genova Indico agenda page:

SQTF: Phone ConferenceC. Darbo INFN / Genova SQTF, 03/08/2006 2

Pipe InsertedPipe Inserted Staves passed: 17

20212000014007 20212000014021 20212000014024 20212000014038 20212000014039 20212000014040 20212000014041 20212000014042 20212000014048 20212000014064 20212000014082 20212000014086 20212000014088 20212000014091 20212000014092 20212000014099 20212000014100

Staves with not complete QC still in Bonn but qualified: 4 4027: text file, not imported in excel 4035: text file, not imported in excel 4096: text file, not imported in excel 4085: tested in CPPM

Staves that need module replacement: 4066: M6a, M5C 4098: M0 4075: M6C

Stave with high DT/W: 4015: 2.71/3.06 (Mean/Max) 4016: 2.33/2.68 (Mean/Max) 4028: 2.28/2.71 (Mean/Max) 4043: 2.55/3.01 (Mean/Max) 4055: 2.63/2.93 (Mean/Max)

Page 3: SQTF: Phone Conference G. Darbo- INFN / Genova SQTF, 03/08/2006 o SQTF - Phone Conference G. Darbo - INFN / Genova Indico agenda page:

SQTF: Phone ConferenceC. Darbo INFN / Genova SQTF, 03/08/2006 3

Loaded StavesLoaded Staves The loading rate is 0.38 staves/day or 2.7 staves/week. Since last ID week 10 new staves loaded (9 IVW + 1 Repaired) = 71 New Pipe Staves loaded

Loaded Staves

y = 0.686x - 26622

y = 0.3851x - 14881

0

20

40

60

80

100

120

01/08/04 09/11/04 17/02/05 28/05/05 05/09/05 14/12/05 24/03/06 02/07/06 10/10/06Date

No. of Staves

Loaded Staves old Pipes

Original half-shell need

Loaded Staves new Pipe

Trend

Linear (Trend)

Linear (Loaded Staves newPipe)

Genova:GE_42/IVW22: Load/QCGE_43/IVW26: Load/QCGE_44/S4147: Load/QCGE_45/IVW23: Load

Marseille:MA_39/IVW17: Load/QCMA_40/IVW19: Load/QCMA_41/IVW24: Load/QCMA_42/IVW18: Load

Wuppertal:WU_26/S4136: Load/(PDB problem)WU_27/IVW20: LoadWU_28/IVW25: Load

Page 4: SQTF: Phone Conference G. Darbo- INFN / Genova SQTF, 03/08/2006 o SQTF - Phone Conference G. Darbo - INFN / Genova Indico agenda page:

SQTF: Phone ConferenceC. Darbo INFN / Genova SQTF, 03/08/2006 4

Modules Available for Loading

Modules Available for Loading

Grand Total = 71 + 4.8 + 10.9 = 86.7 Staves (need some x-check)

Mod. Stave Mod. Stave

Genova GE_41/IVW23 0 1 0.1 12 0.9Marseilles MA_38/IVW18 0 -8 -0.6 25 1.9Wuppertal WU_26/IVW25 0 3 0.2 77 5.9

Total -0.3 Total 8.8Grand Total 8.5

From ToSiegen Genova 10 0.8

Recoverable 35 2.7Bonn Marseilles 16 1.2 3 0.2Dortmund Marseilles 6 0.5 5 0.4Siegen Marseilles 20 1.5

Total Genova 46 3.5 12 0.9Total Marseilles 14 1.1 53 4.1Total Wuppertal 3 0.2 77 5.9

Grand Total 4.8 10.9

B-layer Layer 1/2 under test recoverable

Bonn 7 15 10 6Dortmund 12 13 7 7Siegen 9 19 4 2 32Genova 15 12 23

Modules 28 47 19 31 68Staves 2.2 3.6ModulesStaves

Available

Additional846.5

Modules available in the Assembly Sites

LaboratoryRanked Not Ranked

FlexMCC

Modules available in the Loading Sites

Staves Available Modules

Last Loaded AvailablesL1/L2 BL