3

 · SRDC SRDC th st This pre-bid conference was held for the 56 Street to 61 Street trail extension project (SRDC Project No. 56/61-001). Due to the COVID-19 pandemic, the meeting

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1:  · SRDC SRDC th st This pre-bid conference was held for the 56 Street to 61 Street trail extension project (SRDC Project No. 56/61-001). Due to the COVID-19 pandemic, the meeting
Page 2:  · SRDC SRDC th st This pre-bid conference was held for the 56 Street to 61 Street trail extension project (SRDC Project No. 56/61-001). Due to the COVID-19 pandemic, the meeting
Page 3:  · SRDC SRDC th st This pre-bid conference was held for the 56 Street to 61 Street trail extension project (SRDC Project No. 56/61-001). Due to the COVID-19 pandemic, the meeting