15
MS1/4, MSV5 & ONU200 Preventive Maintenance Document MARCONI DDN (MS1/4, MSV5 & ONU200) PREVENTIVE MAINTENANCE MARCONI DDN TEST PROCEDURE DOCUMENT STATION NODE ID DATE

SRM O2E01

  • Upload
    mhku1

  • View
    19

  • Download
    3

Embed Size (px)

DESCRIPTION

SRM O2E01

Citation preview

Page 1: SRM O2E01

MS1/4, MSV5 & ONU200 Preventive Maintenance Document

MARCONI DDN(MS1/4, MSV5

& ONU200)PREVENTIVE MAINTENANCE MARCONI DDN

TEST PROCEDURE DOCUMENT

STATION NODE ID DATE

SPG.RENGAM SRM O2E01 12/5/08

Page 2: SRM O2E01

MS1/4, MSV5 & ONU200 Preventive Maintenance Document

2. IntroductionThe tests described in this document are designed to provide Telekom Malaysia with a confidence level that the MS1/4, MSV5 & ONU200 will perform acceptably. This platform and particular features tested are based on in-station and system tests by the vendor. All tests are to be performed on a node to node basis and require (optional) staff at the two nodes at the same time. This test plan should be read once in it’s entirely paying particular attention to the cautions and the procedures. If any procedure is not understood get a clarification before starting.

2.1 Required Equipment1. SDH / PDH / ERROR RATE TEST EQUIPMENT.2. OPTICAL ATTENUATOR3. OPTICAL POWER METER. 4. ANALOG / DIGITAL MULTIMETER.5. COAXIAL CABLES WITH BNC, SIEMENS CONNECTORS.6. PATCH CORDS.7. PERSONAL COMPUTER WITH MARCONI LOCAL MAINTENANCE TERMINAL (LMT)

3. Subrack Statement

Objective : To make sure that the subrack is running properly, also the connection between personal

computer (LMT) and subrack be able to establish.

Procedure : Login on the online LMT session, get the equipment module layout window in order to

check the following points :

SUBRACK SERIAL NO. 62258812

EQUIPMENT SITE NAME SRM ONU 200E

DMP VER. 7-0-0

NSU

Internet Address 10.101.0.43

TSAP ID 57

TCP/IP -

4. Database Backup

Objective : Perform database backup for every node. Save the database as MIB file to the laptop

before executing preventive maintenance procedures.

Database Backup (OK / NOT OK) O.K

5. Software Verification

Page 3: SRM O2E01

MS1/4, MSV5 & ONU200 Preventive Maintenance Document

Objective : To verify that all the cards is running on the correct software version.

Procedure : Open the Equipment – Card Information, get the inventory and software version then

record in the table below.

(a) ONU200E :SRM O2E01SLOT NO. MODULE PART

NOSERIAL

NO

SOFTWAREVERSION REMARK

201 CMM-16E1 00096307 41515049 363

202 CMM-16E1 00096307 41515029 363

203 SU-16-UKOQ 00226473 41101051 375

204 SU-16-UKOQ 00226473 41100979 375

205 - -

206 - -

207 - -

208 SU-8SDSL - 62078174 309

209 - - - -

210 - - - -

211 - - - -

212 - - - -

213 SU-VAR2 00096305 51125447 354

214 SU-VAR2 00096305 51125450 354

215 SU-VAR2 00096305 51125456 354

216 SU-VAR2 00096305 51125428 354

217 CCU-16 00049549 62174346 414 -

218 TMU 00049553 62172870 370 -

219 PSU 00226336 00000236 - -

220 PSU 00226336 00000247 - -

Page 4: SRM O2E01

MS1/4, MSV5 & ONU200 Preventive Maintenance Document

6. Optical Measurements

6.1 OPTICAL TRANSMIT AND RECEIVE

Objective : To verify that the transmit & receive power within the range state in the table below.

Procedure : Connect the optical card under test with the optical power meter. Connect the optical power to the fiber tail from remote station. Observe the value shown and record in the result table. The received optical power should be equal to the launch power plus fibre attenuation, in any case shall not exceed the limits as side :

MS1/4 or MSV5 :

Module TX Power [dBm] RX Power [dBm]

Range SH LH SH/LH 1300 SH/LH 1550

LM4 -9 1 -1 1 -28 to –6 -28 to –6

AM-2STM1 -10 2 -2 2 -34 to –8 -34 to –8

AM-STM1 -9 1 -1 1 -34 to –8 -34 to –8

Result:

SLOT NO MODULE TX POWER (dBm) RX POWER (dBm)

302 LM4-Opt.

303 LM4- Opt.

314 LM4-Opt.

315 LM4- Opt.

Page 5: SRM O2E01

MS1/4, MSV5 & ONU200 Preventive Maintenance Document

7. Redundancy test

Objective : Verify that the following functional blocks on M S1/4 or MSV5 work in redundancy by performing swap on the functional blocks:

Result :

Functional Blocks Expected Results Pass/Fail Remarks

V5CM System remains operational

SWM64 System remains operational

SWM4M System remains operational

AM-34 System remains operational

8. Path Protection Test

Objective : To verify that all the path protection available is able to reroute if any case of interruption

on the worker side.

Procedure : The MS1/4, MSV5 & ONU200 equipment is able to manage the path protection of an

individual access unit or service unit. It is possible to perform this function between tributary access module and line module. In such a way, a service unit that is normally connected to the worker line, the path protection will work is case of interruption of the normal path with traffic routing to the protection path.

Interrupt the worker line. Check the status of the path protection at the online LMT session. Check the status of Service Units or Access Modules or Line Modules on the LMT

session. Report the result in the table below.

(a) ONU200 Result :

NO. MODULESERVICE

UNITTYPE

PATH PROTECTION

(OK / NOT OK)

REMARK

1 SU-2-HDSL HDSL

2 SU-16-UKOQ U-Line

3 SUVAR2(S2M) G.703

4 SU-1-E3/DS3 34/45M

(b) MSV5 Result :

Page 6: SRM O2E01

MS1/4, MSV5 & ONU200 Preventive Maintenance Document

SLOT NO. MODULE

ACCESS/LINE UNIT

TYPE

PATH PROTECTION

(OK / NOT OK)

REMARK

305

306

307

308

309

310

9. Synchronization Settings

Objective : To make sure that all the clock source feeding to the subrack is tested and configured.

Procedure : To test the clock source from SSU before connecting to the equipment. Print the result

and attached to this document. The MS1/4, MSV5 & ONU200 automatically selects the best available clock signal. By using STS, measure the clock output for 8 hours. Record the all the available clock status/setting in the table below.

Priority Generator Sync. Source

STM1(T1), 2M(T2)Quality Level

(G811,812T,812L,DUFS)TS(0) Internal Oscillator SETS

TS(1)

TS(2)

TS(3)

TS(4)

TS(5)

TS(6)

TS(8)

Result Clock Output Test:Synch. Sources Pass/Fail Node ID Remarks

Clock Output Refer to attachment

10. Clock Switching

Page 7: SRM O2E01

MS1/4, MSV5 & ONU200 Preventive Maintenance Document

Objective : To verify that all the clock source configured is able to switch each other.

Procedure : In case more than one clock sources available input to the MS1/4, MSV5 & ONU 200 test

also the automatic clock switching. This test can be done by disconnected one of the clock source, and observe the clock

status at the clock window.

Automatic Clock Switching (OK / NOT OK)

11. Check the Functional of Integrated Test Unit (Two-wire test) Objective : By means of local terminal, enable subscriber line test unit. The 2-wire test will be done

by using one free U-line channel for ONU200 only. Verify the test result. Replaced the unit involved if necessary.

Result :

2 Wire Test Pass/Fail Channel ID

Test Circuit PASS

12. AC/DC Converter/Rectifier System Alarm Extension

Page 8: SRM O2E01

MS1/4, MSV5 & ONU200 Preventive Maintenance Document

Objectives :To verify the continuity of the Alarm signal Outputs and the alarm visibility on the Local Maintenance Terminal(LMT).

(a) Test Procedures (ONU200) :

- Set up the test circuit as shown in the figure 1 below.- Configure the Mechanical Alarm as “High Priority” (SDH NE - Control – NUControl – NUControl Alarms)- Monitor for Alarm from Mechanical Input – No alarm should present (1) (SDH NE - Control – NUControl – NUControl Alarms)- Pull out the Rectifier Unit 1 from the AC/DC Converter – Monitor for Alarm (2)- Insert Rectifier Unit 1 back into the AC/DC Converter – Monitor for Alarm (3)- Pull Out Rectifier Unit 2 from the AC/DC Converter – Monitor for Alarm (4)- Insert Rectifier Unit 2 back into the AC/DC Converter – Monitor for Alarm (5)

Test Set-up :

Fig. 1: Set-up for Alarm Visibility Test

Results :

Description Expected Result Message 1-4

Pass/Fail Comments

AC/DC Converter With all Rectifier Units Equipped (1) No Alarm

Remove Rectifier Unit 1 (2) Alarm(Message 1 & 2)

Insert Rectifier Unit 1 back into Subrack (3) No Alarm

Remove Rectifier Unit 2 (4) Alarm(Message 1 & 2)Insert Rectifier Unit 2 back into Subrack (5) No Alarm

Note: EDU Module is required to perform the above test.

(b) Test Procedures (M5V5) :

- Remove the 9-Pin-D-Sub female Connector from MSV5 CPM-PRM Panel.

ONU200

LMT

AC/DCConverter (1)

Page 9: SRM O2E01

MS1/4, MSV5 & ONU200 Preventive Maintenance Document

- Measure the Voltage level of the Alarm signal as shown in the Figure 1 below.

Test Set-up :

Fig. 1 : Set-up for Alarm Signal Level Measurement for MSV5

Results :

Description Expected Value VDC

Pass/Fail Comments

Voltage Level AC/DC 1 (Pin3/8) -53 to –55 V

Voltage Level AC/DC 2 (Pin4/9) -53 to – 55 V

Alarm visibility on the Local Maintenance Terminal (LMT)

(b) Test Procedures (MSV5) :

- Set up the test circuit as shown in the figure 2 below.- Configure the Contact 1-2 as “Break Contact” and Contact 3-4 as “Operating contact”

(SDH NE - Control – EDI_NEControl – NEControl EDI Configuration)- Configure the Message 1 and 2 as “High Priority”

(SDH NE - Control – EDI_NEControl – NEControl EDI Contact Alarms)- Monitor for Alarm from User Input 1-4 – No alarm should present (1)

(SDHNE - Control – EDI_NEControl – NEControl EDI Contact Alarms)- Pull out the Rectifier Unit 1 from the AC/DC Converter 1 and 2 – Monitor for Alarm (2)- Insert Rectifier Unit 1 back into the AC/DC Converter 1 and 2 – Monitor for Alarm (3)- Pull Out Rectifier Unit 2 from the AC/DC Converter 1 and 2 – Monitor for Alarm (4)- Insert Rectifier Unit 2 back into the AC/DC Converter 1 and 2 – Monitor for Alarm (5)

Test Set-up :

D-SubConnector

9-Pin

AC/DCConverter (1)

DigitalMultimeter

Pin-No 8 +-Pin-No 3

To MSV5

DigitalMultimeter

Pin-No 9 +-Pin-No 4

AC/DCConverter (2)

Message 1

Message 2

Page 10: SRM O2E01

MS1/4, MSV5 & ONU200 Preventive Maintenance Document

Fig. 2 : Set-up for Alarm Visibility TestResults :

Description Expected Result Message 1-4

Pass/Fail Comments

AC/DC Converter With all Rectifier Units Equipped (1) No Alarm

Remove Rectifier Unit 1 (2) Alarm(Message 1 & 2)

Insert Rectifier Unit 1 back into Subrack (3) No Alarm

Remove Rectifier Unit 2 (4) Alarm(Message 1 & 2)Insert Rectifier Unit 2 back into Subrack (5) No Alarm

13. Temperature on NE

Objective : To verify that the common module card and power supply card on network element I working in environmental condition

Result :No Description Temp.

Measurement Value ( C)

ActualResult

(OK/Not OK)

Reference

1 Power Supply Card unit (PSU)

32 OK-5C to 40C

2 Common Card (CMM,CCU, PRM)

29 OK-5C to 40C

3 Average on NE temperature

25 OK Temperature must not exceed 30C

14. Environment Condition

MSV5

LMT

AC/DCConverter (1)

AC/DCConverter (2)

Pin No 3Message 1Pin No 8 Pin No 9

Pin No 6

Pin No 4Message 2Pin No 9 Pin No 9

Pin No 6

Page 11: SRM O2E01

MS1/4, MSV5 & ONU200 Preventive Maintenance Document

Objective :To verify that environment in room is good for network element.

Result :

No Description Expected ResultActualResult Remarks

1 Cabinet The condition of cabinet is good OK

2 Room temperature Temperature must not exceed 30C 24C

3 Labels Equipment and DDF are labeled correctly OK

4 Coax Cables All coax connectors are tightened OK5 Fibre cables All fiber connectors are locked OK

6 Grounding Grounding connection is good OK

Attended / Test Performed by : FM Centre Coordinator (NMS) :

……..………………………..……………………………………

Name : SULAIMAN B. MOHAMAD Name :

Date : 12/5/08 Date :

Verified by :

……..………………………..Name :

Date :

Page 12: SRM O2E01

MS1/4, MSV5 & ONU200 Preventive Maintenance Document