Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Sheet1
Page 1
Sr.No. Name of the Project
1
Name and Address of the Employer
Description of the assignment
Preparation of DPR for the water supply system of Chandrapur city, Maharashtra, India
Chandrapur Municipal Council, Gandhi Chowk, Chandrapur – 442 402 Maharashtra India
Preparation of DPR including detailed design, GIS base data, technical specifications, bill of quantities, rate analysis and cost estimates, Preparation of bid document, support evaluation of bids, Project management services during execution including project scheduling, quality management, bill certification and on the site technical support
Sheet1
Page 2
2
3 IL&FS
Preparation of master plan and DPR for the sewerage system of Chandrapur city (Area 56.4 sq. KM)
Chandrapur Municipal Council, Gandhi Chowk, Chandrapur – 442 402 Maharashtra India
Preparation of DPR including detailed design, technical specifications, GIS base data, bill of quantities, rate analysis and cost estimates, Preparation of bid document, support evaluation of bids, Project management services during execution including project scheduling, quality management, bill certification and on the site technical support
Preparation of DPR and Pretender activities for Storm water drainage master plan of Pune Under JNNURM
Developing a detailed project report for execution of storm water drainage project for Pune City – with an area of 300 sqkm. Preparation of detailed drawings, designs, GIS base data, estimates, tender documents and follow up with JNNURM for funding.
Sheet1
Page 3
4
5
6
Planning and designing of Watersheds and storm water management system for Pune City
Pune Municipal Corporation Shivajinagar, Pune – 411 005
Planning of storm water management system based on principles of watersheds. Preparation of GIS base data.
Preparation of DPR and Pretender activities for Storm water drainage master plan Under JNNURM for Mira Bhayandar Under MMRDA
Mira Bhayandar Municipal Corporation Chhatrapati Shivaji Maharaj Marg, Bhayandar(W), Mumbai – 401 101
Developing a detailed project report for execution of storm water drainage project for Pune City – with an area of 300 sqkm. Preparation of detailed drawings, designs, GIS base data, estimates, tender documents and follow up with JNNURM for funding.
Project Management consultants for Road projects in Pune City (7 projects)
Pune Municipal Corporation Shivajinagar, Pune – 411 005
Project management consultants on new and resurfacing of roads in a total of 7 different packages (Seven different projects)
Sheet1
Page 4
7
8
Integrated Road Development Phase I and III in Thane city
Prasad Architect/ Thane Municipal Corporation Mumbai Maharashtra
Plane table survey for city roads and chowks, Marking boundaries as per Development Plan, Preparing Autocad drawings for surveyed length of road, Marking of boundaries on site as per DP Plan for execution, L section and Cross section survey of roads, Surveyed length of roads 100 Km and 33 crossings and junctions.
Social Assessment & Resettlement Action Plan for Andhra Pradesh/ Karnataka – Avathi village (NH-7) Road Project
Sheladia Associates & Consultants (India) Pvt. Ltd. NHAI
Feasibility design and preparation of DPR including preparation of resettlement and action plan for 4 lanning of NH-7 Hyderabad – Bangalore road (463/600 to 524/000).
Sheet1
Page 5
9 Survey and Design of entire Horizontal Alignment including curves on Pune Nashik road from Km. 12/190 to 42/00
ATR Infrastructure Pvt. Ltd. India
Survey of existing alignment of road by using Total station instrument for collection existing road details, Study of existing Horizontal curves and Design of new horizontal curves as per I.R.C. standards and preparation Autocad drawings, Setting out entire alignment including horizontal curves by using Total station instrument.
Sheet1
Page 6
10 Provide capacity development experts in 'Aaple Pani' Project for Pune district under RSPMU - KfW
RSPMU 1st Floor, SIDCO Bhawan, South Section, New Mumbai – 400 614 (ZP Pune)
Community based participatory development including social, technical, personnel and community hygiene and financial aspects in the Pune Districts.Capacity building plans for district village level stakeholders, through hands on training, implementation of the training modules.To plan, implement, manage, own and sustain water supply and sanitation services.
Sheet1
Page 7
11 Feasibility Study and report for water related works for Mulshi project
Capricon Developers and Homes Pvt. Ltd. Pune
Carryout preliminary Geo hydrological survey of the site. Carryout water balance study to evaluate the availability of ground water Vs the requirements. Present proposal on options for procuring additional water as required. Conspectual layout options of bulk water supply system. Finding source for water and obtaining permission.
Sheet1
Page 8
12 Conducting Quality Audit for 24 water supply schemes in 3 districts (Pune, Ahmednagar & Aurangabad) of Aaple Pani Project
RSPMU, 1st Floor, CIDCO Bhawan, South Section, New Mumbai – 400 614
To ensure that the works executed by material procured under project meet the accepted quality standards. To take corrective measures based on the audit observation at various level. To verify through third party interaction that the facilities created are sustainable in the long run and plan necessary intervention for ensuring sustainability. Improving the infrastructure implementation in Aaple Pani project as well as in other Community Demand Driven programme.
Sheet1
Page 9
13 Conducting Sustainability Audit for 24 water supply schemes in 3 districts (Pune, Ahmednagar & Aurangabad) of Aaple Pani Project
RSPMU, 1st Floor, CIDCO Bhawan, South Section,New Mumbai – 400 614
Increase rural households’ access to improved and sustainable water and sanitation services & Institutionalize decentralization of rural water supply and sanitation (RWSS) service delivery to rural local governments & communities. To ensure The overall quality of the works carried out, scheme runs satisfactorily. Source of the Scheme have adequate yield throughout the year. Increase in the usage of sanitation practices. Overall Environmental sanitation.
Sheet1
Page 10
14 Fixing alternative alignment for NH4 at Khambatki Ghat
ATR Infrastructure Pvt. Ltd. India
Alternative alignment for NH4 at Khambatki ghat. Survey and preparation of detailed working estimates including alignment finalisation, tunnel alignment, for a section of Pune to Bangalore highway (NH4) at Khambatki Ghat including tunnel alignment, Encoding the data, preparing computerized design and GIS, Quality control and quantity checking for works done and monitoring earthwork vis-à-vis planned alignment
Sheet1
Page 11
15
16
Infrastructure Development at Mauli Hills – township project over 100 acres
Four Eyes, Bhandarkar Institute Road, Pune, Maharashtra India
Detailed planning and designing for ghat road, water supply system, land development, lakes and water resource development, including topographical surveys, geological investigations, fixing alignment and ground acquisition, preparation of bill of quantities and tender documents. Project management of the contract.
Developing rehabilitation action plan/ community development for affected villages of Mouda TPP
NTPC LTD. Mouda TPP, Krishi Utpanna Bazar, Samiti Bldg.1st floor, Nagpur - 441104
To carry out development rehabilitation action plan/ community development for affected villages of Mouda TPP
Sheet1
Page 12
17 Govt. of Maharashtra, P.W.D.
18
19
20
Realignment of Mahad Pandharpur Road SH 70.
Plane table Road survey for preparation of land plans, Collection of 7/12 extracts for all survey nos. under acquisition, Preparation of land acquisition proposals and submitting it to the District Collector, Carrying Joint measurement survey for land acquisition
Water Supply & Sanitation program management
Oxfam GB Oxfam GB 274 Banbury Road, Oxford, OX2, 7 DZ, U.K.
Technical Advisors to water supply and sanitation component of emergency response missions in Sierra Leone, W. Africa.
Development of water supply & sanitation project in Sierra Leone
Oxfam GB Oxfam GB 274 Banbury Road, Oxford, OX2, 7 DZ, U.K.
Development of a project proposal in Sierra Leone to access EU funding for water supply and sanitation.
Development of watershed management program strategy in Lesotho
GTZ, Box 988 Maseru – 100 Lesotho
Development of program strategy to operationalise watershed management program through Local government in Lesotho
Sheet1
Page 13
21
22
Assessment of Public Private Partnership approaches for improving service delivery under Public Programs for NRM/ Rural development
Government of Himachal Pradesh, GTZ (German Technical Cooperation) GTZ, Jor Baug, New Delhi
Analysis and document selected PPP initiatives under public program for NRM/ Rural development and recommended practical approaches for promotion of PPP under Public Programs for NRM.
Scoping Exercise for the national capacity building project for decentralized water management
Government of Himachal Pradesh, GTZ (German Technical Cooperation) GTZ, Jor Baug, New Delhi
Review present capacity development system of the large public investment programs, analyze new approached for capacity building and recommend scope of interventions and operational plan for the project.
Sheet1
Page 14
23 Conceptual and strategic support in the field of watershed management under GTZ supported projects
Government of Himachal Pradesh, GTZ (German Technical Cooperation) GTZ, Jor Baug, New Delhi
(a) Develop concept note on capacity building in NRM sector through certification.
(b) Develop approach and strategy paper for promoting involvement of private sector in capacity building and training of PRIs and commercial sector.
(c) Support product and program development for NABARD.
Sheet1
Page 15
24 Project management consultancy and Preparation of DPR for South Nanded Road development Project
Nanded Municipal Corporation Nanded Maharashtra, India
Finalisation of road alignments based on the development plan & transferring it on the ground, Preparation of land acquisition proposal is government prescribed format , Preparation of DPR including detailed design, GIS Base data, technical specifications, bill of quantities, rate analysis and cost estimates, Preparation of bid document, support evaluation of bids, Project management services during execution including project scheduling, quality management, bill certification and on the site technical support
Sheet1
Page 16
25
26
Technical & Capacity Building Support to (Indo-German Changar Eco Development Project)
GTZ P.O. Box No. 25, Palampur District Kangra, Himachal Pradesh.
Consultants to GTZ, for bilateral project on natural resource development in Himachal Pradesh. The assignment involved providing management, technical and capacity building consultancy to the project
Development, Monitoring and Assessment of project for repair of Dams in India
Kutch Nav Nirman Abhiyan /UNDP/ NGOs. 104/a Lotus Colony, Opp. General Hospital, Bhuj, Kutch, Gujarat.
Assessment and post-earthquake monitoring of repair of dams in Kutch district, Gujarat in India
Sheet1
Page 17
27
28
29
Development of WASH project in Himachal Pradesh, India
GTZ/ Government of Himachal Pradesh, India, Irrigation and Public health department, Government of Himachal Pradesh, GTZ, New Delhi
Review of guidelines and relevant GRs issued by the government of Himachal Pradesh and other relevant documents. Extensive and close interaction with GO and NGO functionaries at village, block, district and state level to identify bottlenecks in implementation of reforms in water supply and irrigation sectors Preparation of situation report, elaboration of project result areas, its link with current government policy and proposed activities.
Development and support implementation of Watershed Development Project
Irrigation and Public health department, Government of Himachal Pradesh, GTZ, New Delhi
Consultancy to GTZ for a German Tanzanian Bilateral program for integration of watershed management
Technical Advisors Water Supply & Sanitation, Sierra Leone, West Africa
Oxfam GB 274 Banbury Road, Oxford, OX2, 7 DZ, U.K.
Technical Advisors to water supply and sanitation component of emergency response missions in Sierra Leone, W. Africa.
Sheet1
Page 18
30
31
32
Technical Advisors Water Supply & Sanitation, Eritrea, East Africa.
Oxfam GB 274 Banbury Road, Oxford, OX2, 7 DZ, U.K.
Technical Advisors to water supply and sanitation component of emergency response missions in East Africa.
Sanitation and hygiene promotion strategy for World Bank aided rural water supply and sanitation project
PPMU, Water Supply and Sanitation Department, Government of Maharashtra, Navi Mumbai-73 India
Assessing existing strategy and propose Health, Education, Sanitation strategy (HESS) for behavioral change and better environmental sanitation.
Capacity Building, technical and management Support to Stakeholders under world bank supported rural water supply sanitation Project in Maharashtra state of India
RSPMU, Water Supply and Sanitation Department, Government of Maharashtra, Navi Mumbai-73 India
This was a three year project covering a range of services like technical support, training support, project monitoring for design, implementation and O&M of the water supply projects funded by the world bank. It also had a component of knowledge management
Sheet1
Page 19
33
34
Design of Minor Irrigation and Rural Water supply projects in Himachal Pradesh, India
GTZ/ Government of Himachal Pradesh, Irrigation and Public health department, GTZ,New Delhi
Assessment of the status of implementation of new demand led approach for rural drinking water supply programAssessment of water sector reform and Swajaldhara program policies, strategies and approaches towards community participation in planning and management.Recommend program components & operational plan.
Technical Support to design Water and Sanitation Programme
DFID & UNICEF B 28 Tara Crescent, Qutab Institutional Area, New Delhi – 110 016.
Consultant to DFID for providing technical support to design the Child’s Environment Program for 2004-08 for UNICEF India
Sheet1
Page 20
35
36
Assessment and pilot study of Operation & Maintenance for world bank supported rural water supply and sanitation project
RSPMU, WSSD GOM RSPMU, Water Supply and Sanitation Department, Government of Maharashtra, Navi Mumbai-73 India
Jalswarajya project commissioned this study of existing operation and maintenance practices in rural water supply sector. Our firm conducted a detailed assessment of existing practices in nine pilot districts of the project covering 45 water supply schemes, and suggested potential strategies for implementation of O&M phase in all Jalswarajya districts.
Capacity Building Support to Implement Reforms in Rural Water Supply and Sanitation Sector in Nanded and Raigad districts of Maharashtra, India
RSPMU, Water Supply and Sanitation Department, Government of Maharashtra, Navi Mumbai-73 India
Providing capacity building, technical planning and project management support to water supply schemes under Sector reform project
Sheet1
Page 21
37 Capacity Building Support to Stakeholders under Jalswarajya Project in Sangli, Buldana, and Nashik districts.
ZP Sangli and Buldana, Nasik, RSPMU (Government of MH) Navi Mumbai–73 India
Providing capacity building, technical planning and project management support to over 180 water supply schemes in three districts under world bank supported Jalswarajya project
Sheet1
Page 22
38
39
Study of O&M systems of existing water supply schemes and suggest strategy for improvement and handing over to local self government agencies Documentation of Best practices in Himachal Pradesh, India (NRM) Study of legal and institutional issues related to operationalisation of water sector reforms and recommendations for policy formation
GTZ P.O. Box No. 25, Palampur District Kangra, Himachal Pradesh. India
Irrigation and Public Health Department (IPHD), Govt. of Himachal Pradesh (GoHP), India and German Technical Corporation (GTZ) are implementing a project – called WASH project, to facilitate the process of reforming the water sector in the state. The project includes implementing water supply and sanitation projects on demand led principles. The project also aims to study current policies and implementation strategies in the WATSAN sector and arrive at mechanisms to implement the reforms in the state.
NGO capacity Assessment for World Bank aided water supply and sanitation project
PPMU, Water Supply and Sanitation Department, Government of Maharashtra, Navi Mumbai-73 India
Assessing existing capacity of NGOs to carry out water sector related projects at the village level and prepare strategy for their selection and capacity building.
Sheet1
Page 23
40
41
Develop a Knowledge Management Strategy for water and sanitation department of Maharashtra government
Project Director and Deputy Secretary, Reform Support and Project Monitoring Unit, Department of water and Sanitation, CIDCo Bhawan, Navi Mumbai – 400 073 Mantralaya, India
Design a strategy for Knowledge Management for water and sanitation sector in the state of Maharahstra. The assignment had to produce three major deliverables User requirement document assessing the needs of various stakeholdersIT integration solution studying various IT applications in placeKnowledge Management Strategy
Water Supply & Sanitation program management
Oxfam GB 274 Banbury Road, Oxford, OX2, 7 DZ, U.K.
Technical Advisors to water supply and sanitation component of emergency response missions in East Africa.
Sheet1
Page 24
42
43
Preparation of projects for Water Supply Schemes for Bagli Town, Dist. Dewas
Samaj Pragati Sahayog and Nagar Panchayat, Bagli, India
Feasibility report preparation, Survey of pipe alignment and geological investigations for source, design of water supply scheme, estimation and preparation of detailed project report for each scheme.
Design and project preparation of Water Supply Schemes for hilly villages in Pune district of India
Sadhna Village, Pune, At post Kule, Tal: Mulshi, Dist. Pune.
Drinking water supply schemes were designed in a participatory way with communities in hilly villages of Mulshi block in Pune district of India. Normally water supply schemes in hilly areas are not economically viable due to high pumping and O&M costs. In this project optimum water requirement per person per day and the technology options suitable for the same were worked out in a participatory way with the communities.
Sheet1
Page 25
44
45
Preparation of 50 Water Supply Projects for The government of Maharashtra covering small towns and villages
Maharashtra Jeevan Pradhikaran, Mumbai Maharashtra India
Feasibility reports preparation, Survey of pipe alignment and geological investigations for source, design of water supply scheme, estimation and preparation of detailed project report for individual and regional water supply schemes
Project Management Construction of Training Centre Campus including building and other infrastructures.
AFARM, Market Yard, Pune – 37 Maharashtra, India
Project Management construction of AFARM Training centre Campus at Pune including building and other Infrastructure works.
Sheet1
Page 26
46 Preparation of Perspective Plan under NFFWP Scheme for Nanded District and modification for National Rural Employment Guarantee Scheme (NREGS) also adhering to Maharashtra Rural Employment Guarantee Scheme (MREGS) norms
District Collector, Nanded, Government of Maharashtra, India
Nanded district of Maharashtra state in India was chosen amongst the first pilot district for National Food For Work (NFFW) programme of Government of India. PriMove prepared a perspective plan for five years based on principles of participatory planning and adhering to the norms set under the guidelines of NFFWP. Later the programme was modified to NREGS and further to MREGS. The necessary modifications in the perspective plan and addition of tools for monitoring was developed
Sheet1
Page 27
47 Social Assessment for Sustainable Groundwater Management under Maharashtra Water Sector Improvement Project (MWSIP), India
Groundwater Surveys and Development Agency (GSDA), Govt. of Maharashtra, Shivajinagar, Pune 411 005 Maharashtra, India
This is an innovative project initiated under Maharshtra Water Sector Improvement Project funded by the world bank focusing at four aquifers. The social assessment is aimed at understanding potentials and constraints for social acceptance of the proposed aquifer management approach.
Sheet1
Page 28
48 Construction of Ghat Road and Infrastructure Development works at Aglambe Village, India
Four Eyes, Bhandarkar Institute Road, Pune, Maharashtra India
Detailed contour & topographic survey, its computerization & generation of maps, Detailed feasibility of road for the hill road of 8-Km including geological investigations, fixing alignment & ground acquisition, preparation of bill of quantities and tender documents. As well as project implementation support, Survey, design, preparation of tender documents and consultancy for execution of water supply project. This was a project for water supply to a proposed township – pumping water from Khadakwasla dam to the proposed site with an elevation difference of 120 m.