SRS Safeguards and Security:
M&O Responsibilities Associated with EM Facilities and EM Landlord Functions
Savannah River Operations Office
Office of Safeguards, Security, and Emergency Services
UNCLASSIFIED
2
The SRS Management and Operating (M&O) Contractor providesSafeguards and Security support to all facilities on the SRS, including the following EM facilities:
• H-Area, K-Area, and L-Area SNM facilities
• Savannah River National Laboratory
• Liquid Waste & Salt Waste Processing Facilities
• General Site Area
• DOE Savannah River Operations Office
Scope
4
• 1 Material Access Area
• 2 Protected Areas
• 2 Limited Areas (numerous Limited Area Pockets)
• 1 Restricted Area
• SRS Property Protection Area – all area inside fenced
perimeter is (referred to as General Site Area)
Security Areas
5
Includes the following SRS facilities:• Former reactor areas: C-Area, P-Area and R-Area • D-Area • E-Area • Lower B-Area • N-Area & Central Shops • S-Area (Defense Waste Processing Facility) • Z-Area (Saltstone) • F-Area and H-Area Tank Farms• F-Area • A-Area and M-Area • J-Area [Salt Waste Processing Facility (SWPF)] • Ameresco Facility • Advanced Tactical Training Academy (ATTA) containing the Bobby Davis Ranges
SRS General Site Area
6
• Program Management
• Physical Protection
• Information Security
• Personnel Security
• Material Control and Accountability
NOTE: SRS Protective Force Services are provided through a direct contract with DOE-SR.
S&S Program Components
7
• Security Risk Assessments– 20+ Security Risk Assessments, including Vulnerability Assessment Reports
• Security Plans and Procedures– 5 Major Facility Security Plans
• Deviations• Performance Assurance Program• Surveys and Self-Assessments
– 4 DOE-SR Surveys per year with corresponding facility self-assessments• Security Incidents• Foreign Ownership, Control, or Influence (FOCI) & Facility
Clearance– 150+ cleared subcontracts
S&S Program Management
8
• Access Control– Prohibited and Controlled Articles– Lock and Key
• Intrusion Detection and Assessment Systems– Sensor replacements in progress
• Testing and Maintenance• Barriers• Communications
– CCTV replacement project in design phase
Physical Protection
9
• Controlled Unclassified Information
• Technical Security (TSCM, TEMPEST, COMSEC)NOTE: DOE-SR retains a trained and qualified TSCM team responsible for performing services in all SRS Office of Environmental Management facilities requiring the use of technical instruments and equipment (“instrumented services”) for EM contractors and tenants.
• Operations Security
• Classified Matter Protection and Control
• Classification Program
• Export Control
Information Security
10
• Access Authorizations– Badge Office / Visitor Control– Badging– M&O manages ~ 5,800 active DOE “L” and “Q” Access Authorizations
• Human Reliability Program / Investigations
• Classified Visits
• Safeguards and Security Awareness
• Homeland Security Presidential Directive-12
Personnel Security
11
SRS EM Facilities have 22 Material Balance Areas from Cat I to Cat IV
MC&A Functional Areas:• Program Management• Material Accountability• Materials Control• Measurements• Physical Inventory
Other Related Programs:• International Atomic Energy Agency Safeguards Program• Local Area Network Material Accounting Software (LANMAS) Tech Support
Material Control and Accountability
12
The Electronic Safeguards and Security System (E3S) is the SRS-developed alarm management and control system currently deployed in 3 of 4 major SRS areas.
• E3S integrates various security subsystems at SRS:• Intrusion Detection System (IDS)
• Access Control System (ACS)
• Closed Circuit Television (CCTV)
• Plantwide Access Enrollment System (PAES)
• Biometric Access Control Host (BACH) System
• Field installation started in mid 1980’s; Last area became operational in 1994.
SRS Alarm Management and Control System
13
E3S is being replaced with Argus.• The SRS M&O contractor is executing design and construction of 4
Argus subprojects covering all SRS facilities.• H-Area Argus installation was complete in June 2020.
Schedule based on current funding profile:• K-Area Argus final design initiated 2/2020, complete 7/2022 with
construction complete 4Q 2025.• L-Area design to begin in 10/2022 with construction complete 4Q
2027.• SRNL and Balance of Plant design to begin in 2022 with construction
complete 4Q 2028.
SRS Argus Installation