Minutes of 13th
meeting of Sub Committee for Operation and Protection
(SOAP) held at SLDC, Raipur on 28.01.2016
The 13th meeting of Chhattisgarh State Operation and Protection Sub
Committee of SGCC was held on 28th January 2016 at SLDC Conference Hall.
The list of participants is enclosed in Annexure-I.
Shri. W.R Wankhede, Chief Engineer (SLDC) welcomed all the
participants of 13th
SOAP meeting. He further congratulated all the participants,
on successful completion of first year of SOAP Meetings.
Item no. 1 Confirmation of minutes:-
No comments have been received from any office. Therefore
minutes of 12th SOAP meeting are hereby confirmed.
Sub Committee agreed and noted.
Item no. 2 Review of system operation during the month of December
2015:-
Presentation and the performance of Thermal Stations and
Transmission System by SLDC is enclosed in Annexure-II.
Sub Committee noted.
Item no.3 State Energy Audit (SEA) Data:-
The data related to SEA report were already submitted by the
concern offices before the meeting was held.
Sub Committee noted.
Item no. 4 Outage planning for the month of February 2016 & March
2016:-
Outage planning of Transmission feeders, Power transformers for
the month February 2016 & March 2016 submitted by O/o CE
(T&C) is enclosed in Annexure III.
Once again the representatives were requested to submit the
planned outages for next 2 months by 26th of every month so that
Minutes of 13th SOAP Meeting held on 28.01.2016 Page 3
the intra-state outages are discussed & finalize in the SOAP
meeting on 28th
of every month.
Sub Committee agreed and noted.
Item no.5 Real Time Telemetry:
As intimated by the representative of CE (T&C) CSPTCL, the Real
Time Telemetry of 220 KV Churi & Bishrampur is not available
due to non availability of communication and could not give any
time line for its availability. Representative of CE (T&C) has been
once again asked to look into this issue on priority. The committee
felt that the telemetry of 220KV Churi & Bishrampur cannot be
ignored more from the point of view of secured grid operation.
As per the requirement of Grid Code the Voltages of Most
of the 220 KV substations are out from long time hence its
complete Voltage profile report could not be submitted to CSERC
& STU. Both the offices of CE(T&C),CSPTCL & ED(O&M:Gen)
CSPGCL are requested to arrange the telemetry of Bus voltages on
priority.
Further the MVAR telemetry of 400 KV & 220 KV needs
to be verified & made available to SLDC for maintaining the
Voltages in limits in day to day operation and system study
purpose.
This issue is being intimated to the representative from
O/o CE(T&C), in all previous meetings but there is no change in
the status of Real Time Telemetry as mentioned above.
Sub Committee agreed and noted.
ACTION: CE (O&M: Gen), CSPGCL, Raipur & CE (T&C) CSPTCL,
Raipur
Minutes of 13th SOAP Meeting held on 28.01.2016 Page 4
Item no. 6 Status of FGMO {Free Govern Mode Operation } in thermal
units as on 28.01.2016:
The representative of CSPGCL has been requested to submit
detailed status of FGMO/RGMO specifically including the status of
Bango Hydel.
Korba West Unit No.1,2,& 4 and DSPM Unit 1&2- FGMO in
service with manual intervention.
Korba West Unit No 3 - OUT
Korba West Unit No 5 - RGMO
Bango HPS -: OUT
The committee has recommended the Generation representatives to
obtain the approval of competent Regulatory Authorities.
ACTION: CE (O&M: Gen), CSPGCL Raipur
Item no. 7 Status of AUFLS and df/dt relays as on 28.01.2016:
The representative of C.E. (T&C) has intimated that there is no
addition in AUFLS and the status is unchanged.
Sub Committee noted.
Item no.8A Details of new generating units scheduled to be synchronized in
Feb 2016 & March 2016:
The representatives of Generation Company intimated that Marwa
TPP unit # 1 will start functioning in March 2016.
Sub Committee agreed and noted.
Item no.8B Details of new transmission lines transformer or any other
transmission elements to be charged in Feb 2016 & March
2016:
The representative of T&C has intimated that (i) 132 KV M/s
ACME feeder bay charged on 08.01.2016.(ii) 40 MVA Xmer-iv
charged at 220 KV S/s Siltara on 22.01.16.
Minutes of 13th SOAP Meeting held on 28.01.2016 Page 5
132 KV Traction Bay at 220 KV S/s Parswani is likely to be
charged during February 2016.
Sub Committee agreed and noted.
Item no. 9 DR/SER status of 400 KV substations:
The DR/SER status of 400 KV S/s of Korba West was received too
late to this office i.e on 7.01.2016 hence it could not be submitted
to WRPC. It is requested to send the status by all 400 KV s/s by 3rd
day of every month either by e-mail or FAX, so that the same can
be submitted to WRPC timely.
Sub Committee agreed and noted.
The 14th
SOAP meeting is proposed to be held on 29th
February 2016 at SLDC Raipur.
Chief Engineer
SLDC, CSPTCL, Raipur
Annexure-I
S.No. Participants Designation Office Name Mobile No E-mail ID
1 Shri W.R Wankhede CE (LD) SLDC, CSPTCL 9425562412 [email protected]
2 Shri.R.K.Awasthi Addl CE O/o ED(Commercial), CSPDCL 9826116738 [email protected]
3 Shri H.K Deota SE (LD) O/o CE(SLDC), CSPTCL 9893150920 [email protected]
4 Shri.D.K.Khicharya SE (LD) O/o CE(SLDC), CSPTCL 9827117925 [email protected]
5 Shri. Vivekanand Pandey SE (O&M) O/o CE(O&M), CSPDCL 9425204352 [email protected]
6 Shri.J.K Vaidya SE O/o ED(O&M), CSPGCL 9425382836 [email protected]
7 Shri.Vinod Agrawal EE(LD) O/o CE(SLDC), CSPTCL 9300040007 --
8 Shri Girish Gupta EE(LD) O/o CE(SLDC), CSPTCL 9827115065 [email protected]
9 Shri.S.K.Chouhan EE(LD) O/o CE(SLDC), CSPTCL 9981368646 [email protected]
10 Shri.B.C.Biswas EE O/o CE(O&M), CSPDCL 9425566124 --
11 Shri.S.G.Mairal EE(LD) O/o CE(SLDC), CSPTCL 9826129175 [email protected]
12 Shri.S.Lonhare EE O/o CE(T&C), CSPTCL 9406011507 [email protected]
13 Shri.Santosh Soni AE(Testing) O/o SE (ET&I),DSPTPS 9827461184 [email protected]
14 Shri.k.k.Bajaj AE(GCC) O/o ED(O&M), CSPGCL 9424228869 [email protected]
15 Smt.Reena Panda AE O/o CE(T&C), CSPTCL 9826170680 [email protected]
16 Shri.S.Surya Prakash AE (LD) O/o CE(SLDC), CSPTCL 9329012913 [email protected]
17 Ms.Pratibha Khunte AE (LD) O/o CE(SLDC), CSPTCL 8305447363 [email protected]
18 Smt. Roshani Verma AE (LD) O/o CE(SLDC), CSPTCL 9691680505 [email protected]
19 Ms. Namita Vibha Lakra AE (LD) O/o CE(SLDC), CSPTCL 9406122692 [email protected]
20 Rajni Thakur JE (LD) O/o CE(SLDC), CSPTCL 7828290477 [email protected]
21 Ms.Aakansha Gajpal JE (LD) O/o CE(SLDC), CSPTCL 7587365200 [email protected]
List of participants attended the 13th SOAP (Sub-committee of Operation & Protection) Meeting.
19/02/2016
1
2.1 PERFORMANCE OF CSPGCL & CSPTCL• THERMAL & HYDEL Power Plant :
Contd...
*Approved by CSERC in MYT:15-16 for Generating Thermal & Hydel Units during FY: 2015-16
Generation (in MU) PAF (in %) PLF (in %)
DEC-15Progressive from Apr-15
Gross Generati
on Target*
DEC-15Progressive from Apr-15
Normative
Target *
DEC-15Progressive from Apr-15
KTPS 192.26 1627.06 --- 57.20 54.91 78.50 58.73 56.02
DSPM 278.71 3030.81 --- 75.23 93.44 85.00 74.92 91.84
HTPS 501.25 4216.53 --- 79.78 75.74 83.00 80.20 76.05
KWB
Extn210.15 2352.07 --- 57.61 72.59 85.00 56.49 71.27
Thermal 1182.36 11226.48 --- --- --- --- 69.70 74.60
Bango
HPS3.78 271.66 --- --- --- --- --- ---
2.2 PERFORMANCE OF CSPGCL & CSPTCL
Generating
StationAuxiliary Consumption (in %) No. of Forced Outage
DEC-15Progressive from
Apr-15
Target*DEC-15
Progressive from
Apr-15
KTPS 12.81 12.62 11.25 11 72
DSPM 8.12 7.83 9.00 01 17
HTPS 9.46 9.82 9.70 04 26
KWB Extn. 6.25 5.31 6.00 01 09
Thermal 9.12 8.74 --- 17 124
Bango 1.46 0.24 1.00 --- ---
2.3 PERFORMANCE OF CSPGCL & CSPTCL
Performance of CSPTCL : Transmission Loss(%) as per data provided by O/o of
CSPGCL, CSPTCL & CSPDCL.
YR Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15Progr
essive
% % % % % % % % % %
2015
-16 2.86 3.26 2.46 3.35 2.90 2.65 2.66 3.99 3.06 3.01 (Up to
Dec15)
2014
-15 3.69 3.14 3.85 3.33 3.31 2.91 3.23 3.17 2.89 3.28
2.4 FREQUENCY PARTICULARSFrequency status during NOV-15 & DEC-15 and DEC-14 (As per WRLDC)
Other Frequency parameters during the month of DEC- 2015.
Frequency Status NOV-15 DEC-15 DEC-14
% of time % of time % of time
Between
49.90 & 50.05 Hz67.06 66.07 49.43
< 49.90 Hz 11.48 16.38 19.09
> 50.05 Hz 21.46 17.55 31.49
Frequency Status Frequency
{Hz}
Time
{ h:mm}
Date
Average Freq. 49.98 --- ---
Max Instantaneous Freq. 50.32 06:02 06 DEC 2015
Min Instantaneous Freq. 49.59 07:47 30 DEC 2015
19/02/2016
2
2.5 DEMAND & ENERGY PATTERNMax. Demand Met & Max. Unrestricted Demand (in MW) and Supply &
Requirement (in MU)
NOV-15 DEC-15 DEC-14
% Increase
compared to
previous year
Max. Demand Met
3333 MW
03-11-15
18:00
3478 MW
25-12-15
18:00
3249 MW
25-12-15
18:007.05 %
Min. Demand Met1918 MW
12-11-15
14:00
2098 MW
16-12-15
14:00
2033 MW
13-12-15
14:00
3.20 %
Max. Unrestricted
Demand
3423 MW
03-11-15
18:00
3730 MW
28-12-15
18:00
3307 MW
26-12-15
18:00
12.79 %
Supply (MU) 1686.58 1776.35 1705.00 4.18 %
Requirement ( MU) 1686.72 1789.19 1719.70 4.03 %
2500
2600
2700
2800
2900
3000
3100
3200
3300
3400
3500
3600
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
MW
Date
Daily Max Demand met in the month of NOV-15, DEC-15 & DEC-14. MAX 3478 MW on 25.12.2015 at 18:00 hrs.
Average growth of 7.05 % compared to last year
Dec-
2014
Dec-2015
Nov-2015
3005
3293
2327
2098
1800
1900
2000
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000
3100
3200
3300
3400
3500
3600
MW
Date
Daywise Min and Max Demand met in the month of Dec-15, [ Difference : Max 1195 MW on 16 Dec 15 & Min 678 MW on 11 Dec 15 ] MAX MIN
678
MW
1195
MW
BREAK-UP OF GENERATION / INJECTION AT THE TIME OF
MONTHLY PEAK DEMAND :
3478 MW ON 25-12-15 AT18:00 HRS)
MW %
CSPGCL Thermal
(Ex Bus) 1479 43%
CSPGCL Hydel 41 1%CPP/IPP's
(STOA +PPA) Inj 178 5%
Other Injection 105 3%
CS Share 1074 31%Net Import /
Export+BSP SCH 431 12%
OD(+) / UD(-) 170 5%
Demand Met (MW) 3478
19/02/2016
3
1,479
41
178 105
1,074
431
170
0
200
400
600
800
1000
1200
1400
1600
CSPGCL Thermal
CSPGCL Hydel
CPP/IPP's (STOA +PPA)
Inj incl. JSPL& JPL
Other Injection
CS Share + URS
Net Import / Export+BSP
SCH
OD(+) / UD(-)
Max. Demand Met (3478 MW)
on 25-12-15 at 18:00 Hrs.
Contribution
MW
2.6- PERCENTAGE OF BDI COMPLIANCEPercentage Status of Compliances of Backing Down Instruction issued
by SLDC to Generating Stations of CSPGCL from APR 2015 – DEC
2015.
MonthTotal no of
BDI issued
by SLDC
Compliance % by Generators/Generating Stations
Total Non
Compliance< 25% 25 to 50% 50 to 90% > 90%
Apr-15 57 0 1 4 44 8
May-15 48 0 0 3 35 10
Jun-15 85 0 3 5 57 20
Jul-15 30 0 0 5 22 3
Aug-15 11 0 1 3 7 0
Sep-15 16 1 1 4 9 1
Oct-15 16 0 0 6 7 3
Nov-15 46 0 1 11 28 6
Dec-15 6 0 0 1 3 2
2.7 LOAD SHEDDING
Load Shedding during December-15:
Load
Shedding
Duration
(in HH:MM)
Equivalent Load
Relief
(in MU/Day)
Max Load
Shedding Done.
In Groups Feeders 169:29:00 0.346 118 MW
for
2:40 HH:MM
On
18-12-2015
In Industrial feeders 35:27:00 0.069
TOTAL 204:56:00 0.414
S.No. Name of
Substation
Name of feeder / X-
merDate and Duration Purpose Remarks
1 220 KV S/S Raigarh 160 MVA X-mer -304.02.2016 (from 10:00 hrs
to 16:00 hrs)
For preventive
maintenance
2 132 KV I/C -109.02.2016 (from 10:00 hrs
to 16:00 hrs)
For preventive
maintenance
3 132 KV TRACTION -117.02.2016 (from 10:00 hrs
to 16:00 hrs)
For preventive
maintenance
4 132 KV TRACTION -223.02.2016 (from 10:00 hrs
to 16:00 hrs)
For preventive
maintenance
5132 KV S/S
Patthalgaon132/33 KV 20 MVA X-mer
03.03.2016 (from 10:00 hrs
to 16:00 hrs)
For preventive
maintenance
6 132 KV LINE -115.03.2016 (from 10:00 hrs
to 16:00 hrs)
For preventive
maintenance
7 132 KV LINE-229.03.2016 (from 10:00 hrs
to 16:00 hrs)
For preventive
maintenance
8 132 KV S/S Gharghoda 132 KV Pathalgaon 26.03.2016 (from 10:00 hrs
to 16:00 hrs)
For preventive
maintenance
9 220 KV S/S Kotmikala 220 KV Anooppur-129.01.2016 (from 13:00 hrs
to 16:00 hrs)
Replacemnet of faulty MW
MVAR transducer in RTU
10 132 KV S/S Dallirajhara 12.5-I MVA X-merFrom 05.02.2016, 10:00 hrs
to 12.02.2016, 17:00 hrsFor Oil Filteration.
Load will be
managed by 12.5-II
& 20 MVA X-mer.
11 220 KV S/S Bemetara 40 MVA- II X-mer 03.02.2016 (from 09:00 hrs
to 16:00 hrs)
For Pre monsoon &
General Maintenance
This shutdown will
be taken only if
load is manged by
40 MVA -I
12 132 KV S/S Kawardha 40 MVA X-merFrom 15.02.2016, 10:00 hrs
to 20.02.2016, 17:00 hrsFor Oil Filteration.
Load will be
manged by 63
MVA X-
mer.
13 132 KV S/S Rasmada 40 MVA X-mer22.02.2016 (from 09:30 hrs
to17:00 rs)
Post monsoon & General
Maintenance,33KV CT
replacement for SI work
Load will be
managed by
adjceant EHV S/s.
14 220KV S/s Thelkadih 40 MVA X-mer -II24.02.2016 (from 10:00 hrs
to 16:00 hrs)
For Pre monsoon &
General Maintenance
This shutdown will
be taken only if
load is manged by
40 MVA- II
X-mer.
15 132 KV S/S Dallirajhara 12.5-II MVA X-mer25.02.2016 (from 10:00 hrs
to 17:00 hrs)
For Pre monsoon &
General Maintenance
Load will be
managed by 12.5 -
II & 20 MVA X-mer
& adjacent EHV
S/s.
16 132 KV S/S Nawagarh 40 MVA X-mer27.02.16 (from 10:00 hrs to
17:00 hrs)
For Pre monsoon &
General Maintenance
Load will be
managed by
adjceant EHV S/s.
Sr. No. Name of S/S Name of feeder/X-mer Date & duration Remark
400 KV Seoni (Main Only)
From 19.01.16 time 9:00 hrs
to 20.01.16 time 17:00 hrs on
Continuous basis
For replacement of 400 KV
Y phase CT. Line will
remain in service through
Tie bay.
400 KV Raita-I
From 03.02.16 time 9:00 hrs
to 04.02.16 time 17:00 hrs on
Continuous basis
For replacement of 400 KV
Y&B phase LA.
OUTAGE PLANNING FOR THE MONTH OF FEB AND MARCH-2016
132 KV S/ S Raigarh
132 KV S/S Baramkela
OUTAGE PLANNING OF FEEDERS AND TRANSFORMERS AT 400 KV S/S KHEDAMARA
FOR JAN'16 AND FEB'16
1 400 KV S/s Khedamara