St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

e9b0430024i 9b0423PDR ADQCK 05000335P PDR

Page 2: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 3: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST. LUCIE STATUS MEEllNG AGENDAFOR APRIL 18, 1996

9:00 AM. SSB ROOlyI 4011

NIN

CONDENSER WATERBOX PIPING

MAINTENANCERULE

STORES INVENTORY REDUCTION

W. Bohlke

J. Scarola

D. Denver

M. Snyder

L. Rogers

IHE 96-030RCS LEAKAGEE-PLAN REPORTING

J. PorterK. Heffelfinger

FFD AUDITSUMMARY

MODIFICATIONCONTROL

C. Burton

J. Holt

A. Pell

S/G INSPECTION

RX VESSEL/CORE SUPPORT BARREL INSPECTION

G. Boyers

K. Mayhew/G. Pustover

MAINGENERATOR INSPECTION

PRESSURIZER CODE SAFETY VALVES

R. Ball

J. Price

HUMAN RESOURCESOPERATOR ATTRITION 8c ASSUMPTIONS

OPERATIONS

MAINTENANCE

SYSTEMS/COMPONENTS

ENGINEERING

CORRECTIVE ACTIONS

QUALITYASSURANCE

LICENSING

SERVICES

MATERIALS

L. Morgan

B. Frechette

N. Motley

C. Wood

D. Denver

B. Dawson

W. Bladow

E. Weinkarn

C. Burton

D. Quilty/T. Kreinberg

Page 4: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 5: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

OPERATING REPORTREC

Page 6: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Unit 1

Equivalent Availability

DAILYEQINVALKNTAVAILABIUTY 51 DaYS on4ne es or 4/l6$95

«vgS«.'«aa~~v"„",'«V)t«p,,«a)err «: Wr)t "crvs'frt««rtrtot5$ 4~ittf'"Wjtttf)kc«'Nc$)$$«cc««cf4@4rtt «I)',«wrcst"r«$ .'-'~'1 ~vJS'.""tfr«5/j:",$~~ S5)r'c rrrst>p

so

~t~«

)

tf

9I )s )) rt) )t)iI ~g)

stS«

«M

P,A

IS

)c)

c)

MonfhiyAverage EAFsg551)k

Lost Generation

SertiH Loss~1st

4S94

TatsoatsD$0$

~$ 502

Ba)rn rn a Not)tta)~ Cln)dlt rr asa snv

EOUIVALENTAVAILABILIIYFACTOR UNIT1

100 ~ ~ssk Sr,e

754JJOC%?as') Vmrs ( ~ ~ ~ ~

Goo4

Zl~ «

50

Page 7: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Unit2Equivalent Availability

OAILYEQUIVALENTAVAILAEIUTY 98 O070 ocv7cne es ot 4/15/96

00

xc~ccc

00SA

; et/ +,'„.I/n'0

I

9 I

«/ad+~

4

c~c

p

lc

It

l'

Al

L'15~7'd!.~4$

-'cCX

Fl /4

«".Sc'c'p"; oc'~~c "/3c. cc'a»n/xr ~J7>, c. ~dx ..~~a~>W'dccCXC i Pi a'40, .

cc

II

Ii, " "'cl» xxc te/'7,

~ c

xi

fi

lC

xl

g gr,'~Tl

Soups 4ISate

;I

~/

/c

g

In

4WSS enxn 4IS/00 4l1ccce xntl90 4nel90 4/10I00 4h850ldaCC007AVOI09e EAFe95.7800

Last Gene/Stion

SIVVIILoss410~ 177

77$

4000407041014177410741S1

Vvbi»Velve 7en

VAcccctxxptline cepex,

vcceccxx pipins ceps.Vececixxc pfpia cepex.

cccxcxec pccno cepec.

vnceecx p'ceo cepev.

Veccctxx p'Ciine cepar.

Reason

Oeccci en 0 IxxvEcexn Pcnsedcce Cepccey ei 000 Cln/

EQUIVALENTAVAILABILflYFACTOR UNIT2

100 ~tetccxC ~ ~

75 Jxcactx CXLO . $ ~ ~ ~ ~ ~ ~ ~

xc50

~n

Feb

Page 8: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

AUTOMATICREACTOR TRIPSJeff West - Operations

Good

Legend

~Actual———Target

4II-

3O

0R

2 2 2 2

Target ~ 1

0 0 0

Oct Dec Jan '98 Mar May

Date

Jul Sep Nov

Data Source: Jeff West

Page 9: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

CONDENSER XATERBOXPIPING

Page 10: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 11: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST. LUCIE UNIT 2CONDENSER WATERBOXCORROSION

I. Current Situation

2A1 Waterbox: Out-of-service for repairs.

II. Problem Statement:

Two through-wall holes identified in the 2A1 and 2B1 outlet water boxes on

4/9/96.

III. Background:

~ 84" diameter stainless steel components installed upstream and downstreamthe condensers during the 1995 refueling outage.

~ The installation coupled stainless steel with the carbon steel waterboxes and

cast iron piping. The failures were in the carbon steel waterboxes.

IV. Root Causes:

The failure mechanism for the through-wall holes and wall thinning wasgalvanic corrosion.

The galvanic corrosion resulted from the coupling of dissimilar metals(stainless and carbon steels) in a conductive, corrosive environment.

The large surface areas of the new stainless steel components and the smallsurface areas in the carbon steel (pinholes in the coating system) caused thecorrosion rates to be extremely high.

~ The modified cathodic protection system installed concurrent with thestainless steel components did not adequately protect the carbon steelwaterboxes.

~ The Design Review Process was also inadequate in that it did not identifythis problem.

~ Post Modification Testing indicated less than adequate protection but thecognizant engineer did not believe change was necessary.

5

Page 12: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

IV. Repairs

~ Areas of wall degradation have been weld repaired to restore wall thickness.

~ Breaches of the carbon steel coating system have been repaired.

~ Corroded portions of the baffle plates, installed at the condenser discharge,have been repaired or replaced.

V. Corrective Actions:

Ac ions Com le ed:

The internal surfaces of the S.S. components have been coated (as much aspractical) to reduce the area of the stainless steel.

Additional anodes and reference cells have been installed in the proximity ofthe S.S. components in the 2A1 &. 2B1 loops.

\

Temporary power has been provided to the 2B1 cathodic protection anodes.

An independent industry expert has provided input corrective actions.I

Testing has been conducted to determine the required number of anodes andproper operating levels of current.

Actions ln ro ress:

Installation of additional independent rectifiers and controllers will be,implemented when parts are available.

An independent consultant is to prepare the Unit 1 &. 2 long term designpackages,

Corrective Actions are being incorporated into the Unit 1 design scheduledfor implementation during the upcoming refueling outage.

Future Actions:

~ ln future efforts, outside engineering resources will be utilized to supportextraordinary engineering problems.

~ Use FPL Staff as a second opinion or alternate outside sources for designreview of these problems.

Page 13: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 14: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 15: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

IMPLEMENTATIONSCHEDULE FOR THE MAINTENANCERULE1996

Updated 4/17/96

LEGEND:xxxxxxxxxxxxxxxxxxxxmcolxxxxxxxxxxxxxxxxxxxxxxxxxxxxxII

Description

Person ResponsibleDate Comptete

= Scheduled

= Working

= Complete

rea e pePanel MemberflockCtmfnoIIExpert PanelReview Ol PerformCriterfeCfmtnoII

TeesrrrrQ

nantsfelts

0 n

.repose'rIItel

ttntrrftl::< r.:.:::

ntrfr Perform SecondITR Of Mafnt Rufefgrn emAtSt.Lucre

II

JAN 10 JAg 31 FEB 16 FEB 28 MAR 16 MAR22 MAR 31 APR 7 APR 30 JUL 10

PMSERSujouNTRV2.PRE

Page 16: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

TASKS COMPLETED FOR MAINTENANCERULE SINCE 10 JANUARY

PROGRAM UPGRADES

MRule procedure revised wrt QA ITR, NUMARC 93-01, Turkey Point

New system Performance Criteria wrt technical basis

SYSTEM OWNERS

MRule 'system owners'dentified

System owners and supporting component engineers trained on MRule-

Expert Panel members identified and trained on MRule

ROOT CAUSE

Trained system owners on RCA (Used INFO Good Practice techniques}

Developed site procedure on 'how to'or Root Cause Analysis

Implemented SCE Guideline for ERT and RCA teams.

HISTORICALREVIEW

3 year review of SSC performance to ID potential a(1)s

System Owner involvement

BEN

Limerick MRule Peer review

NEI MRule conference (CE peer discussions)

NEI peer review at PSL

Page 17: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

REVISED IMPLEMENTATIONMAINTENANCERULE SCHEDULE1996

Updated 4/t7/96

LEGEND:XXXXXXXXXXXXXXXXXXOOOQOQOIXXXXXXXXXXXXXXXXXXXXXXXXXXXX//

Descrlptfon

Person ResponsibleDate Complete

= Scheduled

w= Working

w CompleteIssue 5'I

Qtr Maht RuteReportSnyderIIExpert PanelReview a(I) sAnd GoalsSnydsrIIExpert PanelReview PerformCriteriaSnyderIISystemFalufeNotebookClmlnoII

Maht Rute ImputFor POD

Welch»skiIIExpertPanel MemberNotebookClmlnoII

Site TV ForIncreased MRAwarenessSnyderIISite NewsletterFor Msinl RuteAwarenessWatch»skiIIContractorOrlenlagon

SnydsrIIReformatSystemOescripthnContractorII

oot xla eMalnt RiskAssess maniaV/ncentII

MR TermhofogyRoslers Made 8,PhcedCfmhoII

ADM 17.08ProcedureUpgradesWalchosklIIQA PeerReview AtSONGsWatchesklIl

Mahl RuleTralnhg ForManagementSnyderII

eSSEScophgContractorII

Compiet

ewewOIPSLMaintenance Rule

alchesklII

oveop rogramFor Structures

EngineeringII

sFor ExctudingSystems From MRContractorII

neo as

~naITR Of Mahtenac»RuteQA/SnyderII

DocumentBash Ol PerformCriteriaSnyderIIExpert PanelReview OfPCPSnydsrIIProgramCompliance Plan-FinatrzeSnyderII

pgra e a tRufo QuarterlyReport FormatWalchesklII

perl ansReview OlPerformance BashSnyderIIncorpora oScophg SysOescdptfonContractorII

r ntDNerence lnSys OesaiptionContractorIIMshlenance RuteTie ToTEDBCimlnoII

Revise SystemEngheer 4Initai TrainingWatch»skiIIDocument Ba sFor Sys Not InMaht RuleSnyderIITrain/Inform GenPop Of PfsntMahlRuieTralnhgII

Create SystemHealthReportSnyderIIPer/orm FirstPerlodhAssessmentSnyderII

APR16 APR 30 MAY16 MAY30 JUN 15 JUN 30 JUL 30 AUG 30

FaUSERSV/IAINTRU3.PRE

Page 18: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

REMAININGTASKS FOR MAINTENANCERULE IMPLEMENTATION

RESOURCES FOR FINALMRVLEIMPLEMENTATION

Dedicated - 3 SCE engineers- 1 ERIN contract engineer

Supporting - 3 SCE technicians- System Owners- Expert Panel members- Engineering (Civil, PSA)

PROGRAM IMPROVEMENTS

Expand scope of systems in MRule

Update scoping documentation

System Descriptions improvements

On-line risk assessments

COKIINUEDIMPLEMENTATION

General plant population awareness - Flyers, posters, TV, newsletter, post outage training

Evaluate a(1)s w/ System Owners 8c Expert Panel

Documentation - System Failure History, Expert Panel notebooks

Periodic Assessment

BEN

April - ERIN contractor (MRule experience at Diablo Canyon, Limerick, Peach Bottom)

May - Turkey Point critique of PSL MRule program- San Ono&e QA ITR exchange

June - St. Lucie QA ITR

July - Palo Verde NRC MRule baseline inspection 4

10

Page 19: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

STORES I ORYREDUCTION

Page 20: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 21: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

'INVENTORYREDUCTION SUMMARY

~ Review $ 8,700,000 Identi6ed as DME Without PlantReview (Rogers-indicator)

~ Walkdown Warehouses to Identify Additional Large DMEItems (Rogers)

~ Inventory Bench Mark (Rogers)

~ Identify Problem Areas and Apply Additional Resources

(Rogers - valve & I&C parts)

~ Auction $ 14 MillionApproved DME MaterialJuly/November 1996 (Quilty - indicator)

~ Track Effectiveness ofReviewed DME Material Removalform Site (Quilty - indicator)

LAR4-17-96dmesumry

Page 22: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

14 ~

12

4 ~

NUCLEAR MATERIALS MANAGEMENTWEEK ENDING APRIL 12, 1996

DME MATERIALREMOVED FROM SITE GOOD

10

8W

8

4 ..TARGET > ZERO DOLLARS BY IO/Se

I I I I I I I I I I I I

1 1 g m'

10

8,8.7 8.1

DME VERIFICATIONREVIEWGOOD

7

e.

8.1

TARGET ~ZERO DOLLARS BY 10/88

oI I I I I

g Ro, i3

o o4

~ IoIO

UPDATED AND SUBMITTEDBY: MATERIALSMANAGEMENT- N. QUESADA DME.ÃLS

Page 23: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

IHE 96-030RCS L GE

E-P REPORTING

Page 24: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Unit 2 RCS Invento Loss Greater than Technical S ecifications

Problem: An Unusual Event was declared on March 31 at 1430 afterOperations discovered and secured an approximate 30 GPM inventoryloss from the CVCS System.

Root Cause:

-Relief Valve V2531 lifted to the HUTs due to high pressure in theion exchanger supply header.

-The high back pressure was the result ofV2382 being in a throttledposition versus fullyopen.

-V2382 was not adequately confirmed to be in the fullopen positionafter a routine de-lithiating evolution.

Corrective Actions:

-Add a pressure gage to the ion exchanger inlet header to improve methodofconfirming proper system operation.

-Review plant policy on use and maintenance ofvalve position indicators.

-Revise operating procedures to improve understanding ofpropermethods for valve position verification.

Page 25: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

CVCS I.ETOOWN

/SHUIOOWHCOOLIHOf

~CY 220 IP

~CV 22010LSTDOWH SACK

fAKNUI%COHNOL VALVEPISVP. fILT2 II 2h U2

OHLY

TPIIC IIAOLIHT

lOCAlflOWWOCATNI

LCV2 I ISO

ACE IS

LSTDOWHISQLAllPI NISI~ la 00

VALVSS OWKWASYSTEM PLOW

INST fITOSIICS LCVSI

LS TOOWH LSVSLCOHThOL VALVS

TO fLASH TQSI

RGHX'. REGENERATIVE HEATEXCHANG|IR

LOHX:LETOOWN HEAT EXCHANGER

LSTDOWIISTAAWITPUfllfflLTSA

$ 1

( lOOP lSEAL

eP~T5fI~ I cI fIII

Page 26: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Fault TreeUn@2 R|:.S..lwontory Loco of 3Q1i98

'APPARENT RCS INVENTORYLOSS WAS CALCULATEDTO SE -1.B GPM, THEN -30 GPM FOLLOWINGA DELITHIATINGEVOLUTION'VCS

LEAKAGEIN RAB RCS GE INCONT ENT

Rubd out baaed on CWSump, QT, RDT levela

INTERSYSTEMLEAKAGE

- Nut level Increau I-30 GPM.- Leakage ceaaed vrLIXRS bypaaaad

EXE Waiukwn Preaaure Teat

RELIEF VALVEFLOW -ERDADS conltmNTO HUT tV2531) -2MO GPM leak

SPENT INTANKOF S

Preaaure Teat

RE VALVES LOW Bench Teat SaUafactory

DRAINC CTIONHEADE EDT/CDT

Preaaure Teat

CHARGE P PACIONO Wa~

TKRO ALLLEAKAO H ~INT Pfeaaure Teat

PACKING GE Preaaute TealRELIEF V LEAKAGE Bench Teal SaUafactory

HIGH SYSTEMPRESSURE ATV2631

VGCH KAGE

Preaaure TeatIN

Preaaure Teat

KlhP ION CHANGER

Hlhp S INER

VALVEPOSITIONINO

- OPSlog-- OburvaUon on return

to aervke

- No atarm receivedOPS Iog

-ObaewaUon on returnto aarvke MIS EO VALVE

- V2382 reported aa 2-3 turne from fullopenOPE ACR ERROR

- No credible falure modefor HlhP

-ObaarvaUon on returnto aervk»

PR

MECH NOSYP ALVE VAL TOR

- Allvatvea contlnned to cydo aat.

roeRanvacE/Faut neo os& <

Page 27: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

6-0 E-Plan Event1 tl

Conflicting Views of the Leakage Situation:1. Tech Spec RCS leakage detection systems did not indicate leakage and it was thought to

be isolable.

2. PSL historically has not considered itRCS leakage ifit is known to be isolable.

Telecon with NRC on 4/4/96, PSL stated:1. The UE declaration was based on valid criteria because leakage did exist, but procedural

criteria were not clear.

2. Declaration was not timely.

3. Procedures willbe changed to ensure consistency.

4. We willinstill culture "ifunsure...you are in the E-Plan".

Corrective Actions:1. Reinforce management expectations.

2. Develop procedural guidance to define RCS leakage.

3. Evaluate the training program E-Plan content and frequency on event declaration,timeliness and communications with oK-site agencies.

4. Revise EPIP EALfor Unusual Event on RCS leakage.

6. Revise RCS Inventory Balance Data Sheet 1.

Page 28: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

FFD AUDIT S

Page 29: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 30: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

RTNE F R DUTY/ACCE AUTHORlZATIONAUDlT

Summary: The audit acknowledged that we are in compliance with regulations, buthave numerous opportunities to improve our program and comply with our internalimplementation documents.

Findings regarding site implementation activities:

Finding 1. Follow up testing for personnel in the conditional access program has notbeen administered consistently.

Response: Ihe tracking mechanism for the site FFD coordinator will be improved torequire monthly vermcation of program compliance. A cross check by Securitysupenrision will be performed.

Finding 2. The implementation of random testing has been inconsistent. Some peopleselected for testing have not been tested, and the reason for not testing has not beenproperly documented.

Response: The random test process will be improved to veriiy that the selectedemployee is on site, before any test form is issued. Adherance to documentationrequirements will be improved through revision of the test form, and a routine review oftest forms by Security Supenrision.

Finding 3. The Site FFD Coordinator did not have a 3 year background checkperfomed.

Response: This check has now been performed. The mechanism for ensuringcompliance with this program requirement in the future is under review.

17

Page 31: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

MODIFIC'ATION CO OL

Page 32: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 33: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ModTiication Control Improvements

Actions Complete

Reestabiished Configuration Control group

Revised Procedures to implement NP - 703

Generated 1996 Top 20 List

Generate 1996 top 30 list

Initiate Real Time Engineering List

Present Initiatives

Generate 1997 Top20/30 List

Future Initiatives

Improve PCM closeout process

18

Page 34: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 35: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

OUTAGE PREP TIONS

Page 36: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 37: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

IMPROVEMENTS/ACTIONS

OUTAGE MANAGEMENT

r vement

Complete Unit 2 Refueling Outage Self-Assessment/Critique and identify additional Complete

improvement actions

Establish contingency plans for significant outage activities:

Core Baricl Examiiiation

Westinghouse SG Tube Plugs

Pressurizer Code Safety Valves

Reactor Vessel 0-Ring Replacements

Main Generator In@ection

4/23/96

4/23/96

4/23/96

4/23/96

4/23/96

Issue Opemtions and Maintenaiice procedure upgrades Due:

Maine Target:

3/29/96

Complete

4/26/96

Improve Outage Management:

~ Complete the addition of Schedulers for future outage planning

Re-Establish use of Critical Mainteriance Management Process

Institute outage work scope controls for Unit 1 1996 Outage

Assess other plants'M processes

Upgrade site-wide scheduling system

Complete

Complete

Complete

4/20/96

8/30/96

19

Page 38: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

17APR96

Span

04:00

16:00

624:00

112:00

120:00

120:00

671:00

30:00

281:00

12:00

42:00

30:00

24:00

628:00

18:00

30:00

30:00

24:00

67:00

240:00

80:00

240:00

09:00

120:00

240:00

08:00

80:00

60:00

16:00

66:00

64:00

84:00

16:00

32:00

103:00

01:00

APRIL

Turbine and Rx ShutdownHang Turbine Clearances

Draft Outline PSL Unit 1 Refueling Outage 1996.47 Days

JUNE

Generator DisassemblyPerform Initial Generator Test

Gen, Stator Wed e Re lacement

LiftTest Main Steam Safety ValvesBegin Cooldown

Safeguards TestComplete Cooldown and Depressurlze

HP Overhaul and Blade Rin Re iacement

Gen. Winding Module InstallationGenerator Final Stator Testing

Generator ReassemblyReturn Main Steam and Draw Vacuum

SG Ins ection and Tube PluggingRx Disassembly

Polar Crane Load TestComplete Rx Disassembly

LiftRx Head and Inspect 0-ringsFill Cavity, Unlatch CEA's, Remove 8 Incores, Remove UGS

'A'PSI, SDC, CCW Work WindowCore Offload

'B'PSI, SDC, CCW Work WindowRemove Core Support Barrel

Rx Vessel ExamValve Work with Freezes

Reinstall Core Supprt BarrelCore Reload

Install 8 New Incore Detectors, UGS and Latch Extension ShaftsSet Rx Head and Final 0-ring Inspection

Rx Reassembly,Fill and Vent

Heat-up and PressurizeNOP NOT, Ql-11's and PMT's

Rx Start-upHold In Mode 2 for Turbine Completion

Roll Tur

Page 39: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

UNlT 1 '|996 OUTAGE

1400

1200

PWO Planning Curve

1287100%

IQ 1000

IllI-

O800

URZ

600

0CL 400

200

2/9/96 2/16/98 2/22/96 2/28/98 3/6/96 3/13/96 3/20/96 3/27/96 4/3/96 4/10/96 4/17/96 4/24/96 4/29/98

Page 40: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Report Date: 16-A r-96Data From: 16-A r-96

LMD DepartmentA

-" APPROVED

'16-Apr-96E

= E-WORK

NPWO's

U= UNAPPROVED

To DateTotals

GRANDTOTALS

After27 FEB 96

1 MECHANICALMAINTENANCE 40 67

2 INSTRUMENT& CONTROLS 0 30 40

3 ELECTRICALMAINTENANCE 13 10 26

C PROJECTS /MAINTENANCESUPT. 21

TOTALS

EMERGENT NPWOs PLANNED (Status >=30):A92

E21

26 163

TOTAL113

EMERGcvn.xts No/e: EWORK requires evaluation an proval prior to betng APPROVED 4ltrvss 5.

Page 41: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Unit 1 Outage PCMs

Total for oUtage ................ 68Major Packages ................Minor Packages .................

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 1 1 3~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 55

Total Delivered ................. 49

Not Yet Delivered............... 19

Page 42: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST. LUCIE NUCLEAR ENGINEERINGUNIT 1 1996 OUTAGE SCHEDULE

BASELINE SCHEDULE JAN. 2, 199B UPDATE AS OFAPR12,1998R, ENSLEY

LEGEND:

TT

C3HEB

+C

~ REA NumberW DescrlptlonM DateDuea Resp. Disc.

~ Engr'd Matte. Ordered~ Engr'd Matte. RequiredM Orlglnal Plant UstW Emergent Packages

~ By Outage StartrDurtng Outage

W PC/M Not RequiredW Capital

sstMittll N!! !

WBhaded Box Represents

~ ---',!;:!,'.',..:,:Completed Package

SLN 95411 3.10NONDERNCORE41298FUELS

PMAI984I3 777 PMAI98412492EDG COP TUBE EDG UNLDVLV4.19.98 4.28.98SITE MEC SITE MEC

REWINDCWP4-19.98PEG ELE

STAR9510491A2 DIESEL TK4.26-96SITE MEC

PMAI96.0347024 SPOOL PCE CIAS EDG START4.19.98 4 28.98SITE MEC PEG EI.E

SLN 93461.11 STAR 950970AIDcRNs poLAR cRANE4.15.98 4 2448ITEMECtCI + SITECIV +

STAR 951667 TAR 950323ASNUBBER CRIT CP LKOFF4 15 98 4 19.96SITE CIV ITE MEC

EDG RAD PLNM4.29.98SITE MEC

TAR 951 080RTGB GR ALRM4.2948SITE EI.E

PMAI96-03479DIG IND LIGHTS4 29.98ITE ELE/SC

PMAI96 03453DBLJAC BONET440-96SITE MEC

PMAI98 02452480V LC LIFT4.2646SITE CIV

PMAI984I3 785CNTMTRNG LGT4<0.98PEG ELE

PMAI 964I2-148EDG EXHAUST440.98SITE IV

STAR 9S1283RCP SWEEPS440.98SITE LIC

STAR 951136MV08.1 B MTR440.98SITE ELE

MSIVBXUP4.29.98PEG MEC

PMAI96.03 7281B EDG VLTREG540.98SITEELE

PMAI9603 11S

RCP VIBPROB540 98SITE ELE

STAR 9511971A1 RCP CCW540.98SITE MEC

PMAI98 03 277LCV 11 24 A/B5.17.98SITE MEC

PRESS INSL540.96SITE MEC

STAR 95056S1B2 ANNA 13540.96PEG ELE

STAR950428MV09.13 ST NUT

540-98PEG MEC

STAR 950582EXCORE POS540-98SITE MEC +

APR MAY

G.COMMONDRBSICLNESu998PIEPRE

Page 43: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Operations Outage Preparations

Procedures;

-13 procedures remain to be revised to support"VerbatimCompliance" for outage.

-Operations outage procedures will be FRG approved priorto 29 April.

Clearances:

-237 Clearances have been identified to Operations as of 17April 1996

-111 Clearances have been created for the outage as of0800, 17 April 1996.

-100% of clearances are expected to be complete prior tostart of outage.

25

Page 44: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

1996. SPRING OUTAGE GOALSUNIT I

1. Personnel Safety - Lost Time Injuries .. ~............... ~ . 0

2. Doctor Case Injuries ................................ z6

3. NRC Violations ...................................04. Outage Duration .............. ~......... s49

5. Personnel Radiation Exposure .. ~.............. ~316 MRem

6. Personnel Contaminations (any ContaminationResulting in a Skin Dose) ............................ z10

7. Contaminated Floor Space within 14 DaysPost Outage ................................. <1,500

ft'.

Cubic Feet of Radiological Waste Gen............. <6,300ft'.

Outage Budget .......,.............'......... ~$25 Million

10. Unit Performance- 60 days Post Outage Availability................... ~93%

26

Page 45: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

FIGURE l-2

UNIT4 '96 REFUELING

, OUTAGE GOALS

1'. NUCLEAR SAFETY PROBLEM

GOAL

ZERO

ACTUAL

ZERO

2. PERSONNEL SAFETY

- LOST TIME ACCIDENTS ZERO ZERO

3. DOCTOR CASE INJURIES

4. MEET OR BEAT THE OUTAGE

- SCHEDULE DURATION

5. MEETOR BEATTHEOUTAGE

< 40 DAYS

35 DAYS

11 HOURS

21 MINUTES

- BUDGET < $22.5 MILLION < 22.5 MILLION

6. PERSONNEL EXPOSURE LIMITS < 215 MANREM

by dosimeter

7. PERSONNEL CONTAMINATIONS

(ANYCONTAMINATIONRESULTINGIN A SKIN DOSE)

8. CONTAMINATEDFLOOR SPACE

WITHIN14 DAYS POST OUTAGE

<10

2<1750 ft

3

469 ft

9. CUBIC FEET OF WASTE GENERATED - <6400 ft3

2400 ft

10. OUTAGE RELATED SIGNIFICANT

CONDITION REPORTS <10 6

27

Page 46: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

HOURS

100

UNIT 4 1996 REFUELINGAHEAD OR BEHIND SCHEDULE

31 DAYS, 19 HOURS

80

60

40

20

(20)

2$ tdta2723

2$

(40)

(60)

(80)

76 15 Ie 1215

10 11 It 135

1220 21

3132

ACTUAL

(100)I I 5 I ~ I I 1$ 1112 II 21 212121 2$ $ 1 $ $ $$ $ $ I~

1112 ovrxos

+>+>+v @>@>@-@-@>@>@-@>@>gg e e e e e ~e e e e.e~~e'e~e e'e eve.emcee

rb ~0 ~+ ~b ~co ~rb (0 ~2)r ~Tx ceo ~rb ~0 w 152 43

OUTAGE DAYS

I) 3 Loss Polar Crane Inspection/Torque Aad Ctps

2) 44 Loss Polar Crane Large Hoo'k Impacted Stops/Caused Damage

3) 14 Loss Pokrr Crane cable replacement on Ihe man hoist

4) 16 Loss Polar Crane cabte replacement/rework theslack cable grist swdch

5) 5 gan CADMductwork removaVcondsaals

6) 14 gain Rx vassal datensenkig set up7) 5 gsn Axhead delension 6 stud removal

8) 9 gain Ax stud eqvymenVcavd y seal ring

9) 8 toss polar crane repax aux hoot gear box gasket replacement

moving eqrdpment into containment

10) 12 loss as (ound rod drag test dursten axtendded/SF G crane south hoist load cable lorn Irom ds (emanation

11) Core unload progressng on schedute

12) 6/G lube ptuggingis crit+a(path13) S/G tube plugs ahead ol schedule/

CADMcanopy seals have Iha crdrcat path

14) 5 gain canopy seal clamps on crilioal path

15) I galri csnopy seatclarrps ahead

16) 4A RHR Hx repair now has crilrcsl path

17) 4AAHAHxoncrdicalpath18) MOV.750packng gland damage and

movals lasting has crdical path

19) 24 gain commenced core on load/bvtk work activities (<rushed

20) cora on load progressing21) core on load progressing22) Axcavdy dian/Rx head seVrx cavity decon 6 paint23) Rx head stud hold plug removals cteanng

Sel vp (or lensiolng24) 7 gain Axhead stud insenion 6 tansiorung

25) On schedule

26) Gn schedule

27) On schedule

28) 8 loss Sslegusrds lasting ~ Bus cles my relay (aded

29) 4 loss Sategusrds lasting/MG 6 relay/Kesavi relay (sited

30) 15 loss CV 2906/2908 laded to stroke ~ 4A CSP akgnmeritIL IST/TE432 RSC TC replacement

31) 18 toss RHR kitadock teal laded. MOV 863/VB (use blown/TE432 ACS TC reptacemenl

32) 4 gan Aeschedrda Rx protection teal 5 RCP cossl down data

33) (7 toss CV 2908 pdot valve tailed

34) ~ 1 loss API'5 K 8/D 10 signal condikoner/connector

ctearxng delayed start o( lower power physios

35) 29 loss lvrbna tube od system msllunction 6 repair

36) UNIT Otd LIRE

0 Cue JILVLIIIJIWIAtNrrr sr

Page 47: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

SHIFT DIRECTORS

SHIFT DIRECTORS DEPUTIES DIRECTOR

JEFF WEST FRANK McGLYNN

JOHN BRADY

DONNACALABRESE

CHRIS BURTON

TSBOB FRECHETTE LEE LARGE

HARRY BISHOP

ROBIN MIXON

TONY MENOCAL

*UNIT2- FRED GIGELE, CARL CRIDER

Page 48: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Outage Projects - SL1-14

Project Lead/Task Manager

ResponsibleManager

10 Year Reactor Vessel and Core Barrel inspectionsContingency plan for repairs

K. Mayhew(Supv:G. Pustover)

March eseDenver

Pressurizer Code Safety Valve replacementsFlange work/mods

C. Ward Denver

RPS NIS UpgradeRepair detector positioning devicesHardware replacement (detectors, drawers, etc.)

G. PustoverR. Olson

Marchese

Steam Generators(Overall)Westinghouse SG Tube Plugging 8 PAP

RWI bottom inspectionwater management plan

R. Ball(Supv:Flowers)

R. Frechette

Marchese

H. Johnson

RCGVS Valve replacements and piping modification

Incore Instrument Assembly replacements

V07161 and bypass replacement

Polar'crane load test

TCV-1~B replacement

1A 81B LPSI common piping valve work

G. Rodgers

R. Olson

G. Rodgers

D. English

H. Fagley

N. Motley

Marchese

March ese

Marchese

Marchese

Marchese

Marchese

EDGs overall McLaughlin/Ware Wood

Charging header isolation valves repairSE-02-1,2,3

T. Sanders Marchese

FCV%7-1A/1B maintenanceSprings, Airpress s.p., elastomers

T. Sanders March ese

SIT valve maintenanceQuantify leakage pr~utageV3634 stem replacement

N. Motley'. FulfordN. Motley

Marchese

ICW piping at intake structure external corrosion inspectionRepair contingency

Purge Valves

RCB permanent A/C modification,

HJTC replacements

HP turbine 8 seal ring replacement

R. Ball(Supv: Yates)

C. Swiatek

H. Fagley

R.'Olson

R. Ball

Marchese

Wood

Marchese

Marchese

Marchese

30

Page 49: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Main GeneratorMaintenance/ModiTication

R. BallNichols/Wolaver

a Condenser Tube Cleaning System and Debris Filter installation D. Sipos

Atmospheric Steam Dump valves seat repair N. Motley

D. Sipos

Marchese

Marchese

Turbine turning gear auto/remote engagement repair

RCPs (all issues)

ESF testing

SIT dump testing

ECCS fullflow testing

OPS-reduced inventory/mid loop mgr

OPS-refueling

Clearances

OPS procedures

OPS-vent and drain hoses

MOVCoordinator-Ops

Pressurizer(Overall)

Reactor Maintenance

Pre/Early and Post RCS 8 RCB Inspections

Relief Valves

Cranes

RCB Cleanup

Reactor Cavity Seal Ring

Maintenance Procedures

Engineering Packages

NPWO Planning

Wolaver

B. Haines

P. Fulford

J. Hallem

P. Fulford

R. Weller

R. Weller

R. Lamb

R. Weller

C. Johnson

A. Haii

C. Ward

B. Haines

R. Riha

N. Motley

English

M. Goodiel

T. Kreinberg

Menocal

Denver

Menocal

Wood

Marchese

H. Johnson

H. Johnson

H. Johnson

H. Johnson

H. Johnson

H. Johnson

H. Johnson

H. Johnson

H. Johnson

Marchese

Marchese

H. Johnson

Marchese

Marchese

Marchese

Dawson

Menocal

Denver

Menocal

Page 50: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

OUTAGE PROZECTS

Page 51: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

S G INSPECTION

Page 52: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST. LUCIE STATUS MEETINGAPRIL 18, 1S96

STEAM GENERATOR INSPECTION

I EDDY CURRENT TESTING

SCOPE OF TESTING

Bobbin Coil Testing: - all active tubes full length

MRPC Testing: - all active hot leg tube expansion transitions.- 20% of cold leg tube expansion transitions.- 20% of dented hot leg tube support inter.- selected bobbin coil indications (diagnostic).

- - 1200 indications at drilled supports.

CONTINGENCY PLANNING

Back up equipment 8 components

Data analysis personnel scheduled for 8 hr shifts

24 hr LAN support for transfer of examination data.

Qualified Bobbin Coil Sizing for IGAJSCC damage

Applies to tube damage except at drilled supports

Review Inspection Plans with NRC next week

32

SG4-1 B.WPD

Page 53: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST. LUCIE STATUS MEETINGAPRIL 18, 1996

STEAM GENERATOR INSPECTION

II MECHANICAL8 WELDED TUBE PLUGGING

SCOPE OF PLUGGING

Mechanical Plugging: 400-500 tubes expected

Welded Tube Plugging: None Expected

CONTINGENCY PLANNING

Welded tube plugging

Plug repair/replacement- drilling and EDM.

Plugs in sufficient numbers to meet site needs

Mechanical &welded tube &, tubesheet plugs

Oversize welded tube and tubesheet plugs

Tube stabilizer cables for circumferential cracks at:

Top of the Tubesheet

Upper Drilled Support Plates

SG4-18.WPD

Page 54: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST. LUCIE STATUS MEETINGAPRIL 18, 1996

STEAM GENERATOR INSPECTIONII

Ill REPAIRS FOR WESTINGHOUSE ALLOY600 PLUGS

REASON FOR REPAIRS

WCAP-12245 Revision 3, Addendum 4 to "Steam Generator Tube

Plug Integrity Summary Report", May 1995.

Prevent tube perforation due to plug top release

SCOPE OF PLUG REPAIRS (Framatome)

Install Plug-A-Plug (PAP) into base of plugs'I

r

A S/G Hot Leg -254 PAPsB S/G Hot Leg - 234 PAPs

PC/M in place for PAP Installation

PAP also limits leakage through plug 8 perforated tube

CONTINGENCY PLANNING

Cleaning 8 tapping plug threads for installation.

Replace any plugs not suitable for PAP installation

PAPs acceptable without final crimp to lock cup 8 cap sere

W Plug Top Remnants can remain in the tube

34

SG4-18.WPD

Page 55: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST. LUCIE STATUS MEETINGAPRIL 'I8, 1996

I

$TEAIN GENERATOR INSPECTION

IV IN-SITU HYDRO TESTING OF S/G TUBE DEFECTS

REASON: NRC Concern - Plants operating with IGA/SCC Flaws.Demonstrate Structural Integrity of Tubing.Demonstrate Adequacy of Inspection Program.

SCOPE OF IN-SITU HYDRO TESTING

4-6 Most Severe Flaws -. Circumferential-8 Axial Orientation

CONTINGENCY PLANNING

Industry Results Favorable

Flaws at PSL-1 not as Severe

Test Pressures Limited: P 1.4P 3P

Adjusted for Temperature 8.Locked Support Plates

Bladder Installation to Mitigate Leakage during Test

Bladder Tested for Extrusion Through Fracture Face

IfTube Burst Occurs:

Stabilize Tube 8 Evaluate Adjacent Tubes for PluggingEvaluate Inspection Program 8 Implement Repairs

35

SG4-18.WPD

Page 56: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST. LUCIE STATUS MEETINGAPRIL 18, 1996

STEAM GENERATOR INSPECTION

V SECONDARY SIDE ISSUES

SCOPE OF WORK

NONE: Last Cycle of Operation for S/Gs,

Additional Sludge Loading is a Long Term Concern

Prior Inspections for Steam Separation 5 FeedringEquipment Acceptable

PROJECTED SAVINGS

$350,000 (Contractor Costs)

36

SG4-18.WP0

Page 57: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

~ VESSEL COppSUvvonz s

INSPECTzo

Page 58: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

0

Page 59: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

REACTOR VE SEL EXA1VHNATION

TOTALSCHEDULED DURATION:144 HOURS ( 6 DAYS)

EXAMSERVICES PROVIDED BY: SOUTHWEST RESEARCH INSTITUTE

~ EXAMINATIONS OPE:

- VESSEL EXAMINATIONREQUIRED EACH 10 YEARINTERVAL(ASMESECTION XI&REG. GUIDE 1.150 )

- CIRCUMFERENTIAL,LONGITUDINALANDMERIDIONALWELDS

- INLETANDOUTLETNOZZLETO SHELL WELDS

- INLETANDOUTLETNOZZLE INNERRADIUS

- INLETANDOUTLETPIPING WELDS

~ EXAMINATIONMETH D

- ALLEXAMINATIONSWILLBE PERFORMED FROM THE ID OF THE VESSEL

- EXAMINATIONEQUIPMENT: "PAR DEVICE"OPERATED BY SWRI

- SUSCEPTIBLE AREAS WILLBE EXAIVQNEDFIRST (IE NOZZLETO VESSELWELDS)

~ PREVIOUS ULTRASONI EXAMSPERFORMED:

- BASELINEKDQdINATION(PRIOR TO OPERATION)

- FIRST 10 YEARINTERVAL(APtuL 1983)

37

Page 60: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

e CONTINGENCYPLANNING

- SWRI EXAMINATIONEQUIPMENT FAILURES / CORRECTIVE ACTION

- FLAWEVALUATIONS(FRACTURE MECHANICS):

JPN: SUBHASH KURANA

TRIICtUI Itlll!GRI ROC O APtBCH

~ KNO INDICA

- APREVIOUSLY UNRECORDED ASME SECTION IIIREJECTABLE FLAWHAS BEEN DETECTED DURINGAREVIEW OF RADIOGRAPHS.

- LOCATION:CIRC. WELD 10-203 (LOWER SHELL TO BOTTOMHEAD WELD)ADJACENTTO THE CORE BARRELLUG@60 DEG.

- FLAWHAS BEEN CHARACTERIZED,BY CSI AND IDENTIFIEDON STAR951893.

- WELDAREACONTABKMGFLAWWILLBE EXAMINEDFIRST TO ALLOWFOR FURTHER EVALUATION.

38

Page 61: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

'IR 4 CORE E~UPPO T 4 RREI REPRI ~

~ REPAIRS PERFORMED ON 8 OF 9 LUG AREAS

~ REPAIRS CONSISTED OF CRACK ARRESTING'HOLES AND BYPASSLIMITINGPLUGS AND PATCHES

~ DESIGN MET ASME CODE AND CSB DESIGN BASIS REQUIREIVlfNTS

~ REPAIR NOT STRUCTURAL

~B INSPECTI N SC PE PLAN

~ VI LINPE I N

~ TO PERFORM VISUAL INSPECTION PER NRC COMMITMENTS

~ ABB TO PERFORM USING HIGH RESOLUTION CAMERA MOUNTED INSUB

EXPECTED DURATION 2 DAYS.

~ I I N N Y

FPL SUB FOR VISUAL EXAMINATION

USE OF ECT AND/OR UT FOR FURTHER CHARACTERIZATIONOFINDICATIONS

D BL

~ CSB PER ASME SECTION XI VT 3

~ REPAIR CONSISTENT TO 1986 VISUAL

Page 62: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ATI

INITIALENGINEERIN EV LUATI N

~ PREVIOUSLY DISPOSITIONED CRACKS ACCEPTABLE

~ NEW CRACKS TO 3" ACCEPTABLE FOR AT LEAST ONE OPERATINGCYCLE.

~ CRACKS IN EXCESS OF 3" REQUIRE ADDITIONALEVALUATION.MAYNOT BE ACCEPTABLE.

~ Pl. ND

~ CRACKS IN PLUGS ACCEPTABLE.

~ CRACKS IN PATCH PLATES ACCEPTABLE

~ COMPLETE LOSS OF PATCH PLATE NOT ACCEPTABLE

~ LOSS OF ONE PLUG.TO 8" ACCEPTABLE FOR CYCLE 14

~ PLUG ROTATION ACCEPTABLE

CONT NGENCIE

ABB REACTOR INTERNALS ENGINEER WILLBE ON SITE

MOST CONDITIONS CAN BE EVALUATEDFOR AT LEAST ONE CYCLE

MAJOR FINDINGS REQUIRE FURTHER ANALYSIS/POSSIBLE REPAIR

COMPLETE PATCH FAILURE UNLIKELY.DESIGN REVERIFICATION REQUIRED.REPAIR REQUIRED.

~ CSB CRACKS IN EXCESS OF 3" REQUIRE FURTHER EVALUATIONINCLUDINGFRACTURE MECHANICS. REPAIR MAYBE REQUIRED

~ PHYSICAL REPAIRS THIS OUTAGE NOT REQUIRED UNLESS EXTENSIVEPROBLEM DISCOVERED.

~ REPAIR BY WELDING NOT LIKELY-

I REMOVALAND REINSTALLATIONOF PATCHES AND/OR PLUGS REQUIRENEW TOOLING, TESTING ETC.

40

Page 63: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

MAIN G ROTORzzsmCrION

Page 64: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

MAINGENERATOR OVERVIEW

~ Stator Winding Improvement Modules Installation~ Generator Testing (Electrical and Mechanical)~ Complete Stator Rewedge - (all 42 slots)~ Core Torque Check

~ Generator Clearance (including Hydrogen Purge, Main Steam, Generator) (2 Days)~ Remove Generator Rotor (Craft Labor) (5 Days)~ Generator Work(by Westinghouse) (27.5 Days)~ Reassembly ofGeneratorfExciter (Craft Labor) (10 days)

8—""~ Vibration Levels on Coil Ends are moving in an upward level. Started at 3 mils, presently at

13.4 mils, Target is 20 mils in which it is recommended to reduce power until vibration levelsgo below 20 mils, which could be approximately 1 to 30 percent power reduction.

~ Based on Trending ofEnd Turn Baskets, they are no longer functioning as a consolidated unit.~ We are only monitoring 6 Coil Ends on each end ofthe generator out ofa total of42 coils or

84 End Turns.

Qgtions:~ Install RF Monitorper Factory Mutual ifwe do nothing (Cost Approx. 100K)~ Do partial module installation ofmodule package (Cost Approx 750K plus labor)

~ No one has had success doing a partial~ Westinghouse has never performed a partial of this type based on their proposal to us.

~ Do complete Module Mod. (Cost 23 Mil)~ Do Rigi-Flex Rewind which includes modules - new Design - (Cost approx. 6 Mil)

~ Main Steam and Generator Clearance in 24 hours, with Generator Degassed &Purged.~ Develop Contingencies for what could happen.~ Westinghouse to start work prior to rotor removal to initiate work on critical path item.~ Pre-job planning and setup.

~ Hydrogen Leak Rate Test Prior to Shutdown~ Pre-job material staging on turbine deck~ Staging contingency material in Orlando

Wh Westin h u e:,

~ They have performed same modification on numerous other units with success~ ABBwanted a 6 month lead time~ ABBhas never done a 4 pole end turn modification on a Nuclear Unit.~ Keystone could only install Westinghouse Materials but has no Nuclear Experience or Nuclear

background.

See Attached List

41

Page 65: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

t9lE AJz'nag' ngoduMSDirc/C rc orppporcpea P S'rPp r/srrv + u

~ g~~oeo 7lPrce. ~ 'ccrc'.amoMXP~ce,c"

~ g po/lrpL cur'ed'Nq c /prrppr 5

~ +Cocr/Pr/~g Co /guppOr 8 JrrPCcs

~ roy 5; / ScPPPOrt rb'+CD

~ m~4'/oui'Af

rP

//Or AL CC//arm Was/cc.H Cd>~+ g6'y c cerPPerCP r /rcP CorcpSoer'OPPP:a9

l/P c. <icPD cu"rrrPrrr9 ggrucfureKW.R//y .

~ g C re ~pg RC ere r gW'g 8 Po rC COru P oP R~c/8crWW C'o'//

Prrre5''~+

C row/ly rerecIuceg roc/:u/r/cr~/COi~ V.brgfrOrP ~

'7O O:L Sc/ pOie <IZ/

~ uv;c/ZoO PPo/Prourde Ac/>Igesfrriuf of Prhe co.l d&sccP/P.~ ecr Pc/ heC/P aorPSol'c/A/cp/fe QJiPurjtiug S Irclc'Iufe

gun oa jc

'/c,<y~le~e~r./u S7"Cfr~9 f/ccui~iAI95rrpruo /fjezsrru) r p $ A/AfurrflPcop cugll44fode /2o icrZ.

~ CoicrSoc,rORP F fAe crud rurrrc/rP9C orC A'ec/ueec/ erP.'I &rJ V'8 M 7'ibr/

+~8BSR F'4~X d~ye-<~oNDFO Wo Co/Lg. y/pFAWP/4, De cocpPCcO

r CCF 4igrP/or4i

y gePr/gce.g g}c 's/ uy O:gntouc/ Spence'rpg Jglecr/ecf rrrPcrP /i'ops {4&e>-

cl+Acerc/ 7 Co/L S' o cctrtrso/i c/g/+ III c E'rvc/ccJ 'ice/ icr9 C rcuwfcre&s" 9-'/Ie//Ps4Uoitl /cPcAI lfgzorv>rue+f

up /I gowfro/ +~rye. arrfuPP rcI Areas<.

4/P/P fe/Joc/IC/ ogc~ a/ur m9 >guaIC/e u SIPorf 8/ACV"

Q AzcoaPS X'r/4P dr4c'Prp'~ ~g~r/ rare/gS preaoruH 0.3f wdru ~gggcec r.oaseruc,SS ~

e Ver.V.cnfou /esses A~uc sou~&prPudec/ d/RrPPoicrcPS/Accr +<> P~go $ e, wu'errt/P. mes Pirrrugcr 4 Pr +

l'orvvercrf:AIAJW&dticS rru8 '+i l+ s/pc~re reiuc/ggAPZrorCP Si re~nv-

5.I'-CCPu

W ~d< DAAC 7

I~ J

ik

,c5PI'

gener/geek pgisTircr& su/PPo rf JrrPc c ic+c/ yhPPQCOCCPJ fge +rue CCPr'rCPC/i&/ f0 PPPOVF iRV/e IC/oc/r rc/9 PIPernt~L c'>IP/ws'dms'ruclc~frAc iorc/r+/PuS rPP"~r~r'Z rug S'P'reSS cS'~ P'he eruCur'ru Dr'rCJ9 SfruCHLe ~

~~g/eL sv scruE5$ s c uf //ec/P ACLrcP I rc/c,

fIP c rru/roc/iris focPn.ger84 /PPOoe rcrAYurnL Fi'c9uerrc fcue//rPdoUc HAe, /Zo W2. c=wc-'P/rrcrg prc~uorupy.

~ /roc/r'OC S rgef Al/J9rCh'f// Scar,aq 4 Aucl 7Gar/fIPs/~~ shor+ 0 're,c,u '+ fe rd es ouzfIPoc/rAecsglue Co:I deffec.f.o< a~c/sfrar> o~ g4C,g ruurCrO CuA// r rCPJ'P7VOrCP

Page 66: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

PRESSURIZER CODESAFETY VMVES

Page 67: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST. LUCIEUNIT 1PRESSURIZER SAFHY VALVE

SPRAY UNE

PRESSURIZERCUBICLE

V.1200

PRESSURIZER

V-1202

]

V 1201

QUENCH TANK

NEW HANGER

43

Page 68: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST LUCIE PRESSURI2ZR SAFETY VALVE

SEAT LE%KM& ELIMINATION

ACTIONS

SEAT LAPPINGINCfKASED DIMENSIONAL CHECKSSTA5tDAIK)IZATION

2 'ESTING PRACI'ICES

'ISEZMAL BINDING CHECKINCREASED TEST PRESSURE FOR LEMQ~ TEST

. FINAL AIRTEPI'ATCZKDAMBIENT AIR TEMPERATURFS AT TEST STANDS

3 SEAT DESIGN IMPROVENEÃIS

INSTM~X) PLEXIDISC

4 TEIL PIPE LOAD REDUCrIGN

M05KTORED WITH INSTALLED SIHAIN GAGES EACH (X7IRGEADJUSTED LOADS WITH FLANGE WEDGECOÃlROLLED HEATUP RATE

5 S VALVE BODIES- 1630 LBS TO 10000 LBS

PURCHASED NEW BLOCK VALVE BODIESl TP~'ED FOR THERMAL EFFECZSTFATK) FOR TAIL PIPE LOAD EFFECIS

Page 69: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

PZR SAFETY VALVENOZZLE LOADS

14000

12000-

MY Mz M x

m 10000

8000II-zeooo-

04000

2000

4033

2507

456753 693 790

168517631803

5867

6640

981 763357

31122914

992

Ag/

V-1200 V-1201 V-1202 V-1200 V-1201 V-1202 V-1200 V-1201 V-1202

Before Mod 1992 'fter Mod 1993 Cycle 13 SNO 2/96

Page 70: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Von Mise

5~WM~', ~

~5'

'555

gc

A5'

W

5" W

cc5~

20164.117301.414438.811675.B871S.085850.302987.53124.757-

'4'A:::5............5

55

":CrayCC-..C

"V5'.''CCC

C

.5

C

'C:"5

Q@ 'g''.. ' '""5+ X- + 'jg '" ~+ "+PE/piieRi~~V<~~~~%

46

Page 71: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 72: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 73: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

IlNPROVEMENTStAGTIONS

V

Strengthen the Management Skills of our Supervision:

Include the following attributes in personnel performance

appraisals:- Adherence to procedures- Compliance with Industrial Safety Program

Develop and issue guidelines to foreman and supervisory

personnel on assessing employee performance.

Evaluate and modify, ifnecessary, accountabilities of foremen/

supervisors to ensure handling employee perfonnance is a keyresponsibility. Ensure these accountabiTities are clearly

identiQed in the foreman/ supervisor selection process.

Complete

Interview forenoon and supervisor incunkents to ensure they '/30/96are willingto meet the eyectations of the position in handling

employee performance issues.

Improve Labor Relations:

~ Reduce number ofunion grievances not handled within10 days. Include indicator for review.

47

Page 74: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST LUCIE PLANTTotal Employees

Lynn Morgan - Human Resources

830 27 . 83828

820

810

I 800

~ 790

Te>sel 1905eas

811

802

780

770 .

Tarsat 1000710

UZI

760

Sept Oct Nov Oec Jan Feb Mar Apr May June July Aug Sept Oct Nov Oec'95 '96

~Employees Target

Page 75: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

GRIEVANCES

Grievances > 10 Days - Total Grievances > 10 Days - by Dept

25

20

15

10

26

18

1412

10

28/96 3/8/96 3/18/96 3/25/96 4/1/96 4/8/96 4/15/96 4/17/96.Oate

ops MM TRNGData aubmlted by: CD Scott- HFt

340

320

300

280

260

240

220

Download Population

'/30/95

1/31/96 2/29/96 3/31/96331 224 216 214

'GOAL - Comptete by December 31, 1168

Page 76: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

NUCLEAR DIVISION EXEMPT ABSENTEEISMMARCH, 1996

12 Month Average

~ 9

8

>. 5

4

—3O

621

NUCLEAR DIVISION NON-EXEMPT ABSENTEEISMMARCH, 1996

12 Month Average

q6>. 5

4

O3

821

B STAFFSLTN

2.74 2.80 2.682.01 2.07 2.031.93 1.88 1.79

12 months endtn A M J J A2.59 2.571.95 1.841.90 1.?7

6 0 N2.57 2.61 2.491.89 2.01 2.131.83 1.92 1.90

2.042.251.77

J F1.98 1.91

2.15 2.132.13 2.14

1.781.991.99

PSLPTN

2.48 2.30 2.074.41 4.69 4.71

12 months endln A M JJB STAFF 6.85 6.51 6.56 6.57

2.024.67

7.242.034.41

S 06.21 5.932.04 2.324.49 4.68

5.64

4.69

0 J5.95 5.162.57 2.784.46 4.60

5.452.714.55

6.372.874.40

NUCLEAR DIVISION BARGAININGUNITABSENTEEISMMARCH, 1996

12 Month Average9

>- 8

P~ 5

4O~ 3

<2

12monthssndln A M J A S 0 N D J F MPTN 5.14 5.11 5.23 5..52 5.48 5.50 5.35 5.49 4.82 4.71 4.56

5.64 5.66 5.69 5.58 5.56 5.62 5.70 5.90 6.19 6.76 6.99 6.76PSL

Page 77: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

PSL OPERATIONS STAFFING COMPLEMENT

40

II COMPLEMENT Q CURRENT 35

~0 300I-

u„200EL

~ 107 7

12

3 t 3p28

t pOPS SUPV NPS ANPS NWE SRO/RCO TECH SNPO PIPELINE

CLASSIFICATION

Page 78: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

145144

OPERA TlONS STAFFING ~P OF POSITIONS---.-.MIN—.. —MAX

140

135

0130

00 125

00

120

115

110

143

.136~ ~

'

'

'

134

131

~ ~

~ 124 124 . ~ '~

120

115

'

l1

\

'

\

1

W ~

~ ~ .'3'~

~ H'36136

\127

\

124

*115

112

Jan.90 Jan.91 Jan.92 Jan.93 Jan-94 Jan.95

.YEAR

Jun-95 Jan-96 Mar-96

'3/98 Support Resources transferred to OST OPS STAFForo DA'8TAFF-R

4I

Page 79: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

OPERATIONS ATTRITION

8 NON-LICENSEO OPERATORS

9 LICENSED OPERATORS

1990 1991 1992 1993 1994 1995 1996

DPS STAFFIIIGDISKAIATTRIT.R4

4117/98

Page 80: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 81: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

OPERATIONS

Page 82: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

IMPROVEMENTS/ACTIONS

OPERA'HONS

r vement

Reduce the Number of Operator Work Arounds:

Reduce the number of OWAs to less than 15 by December 31, 1996.

Currently working oF as per target goal.

Improve Operator Procedures to ensure technical accuracy and ensure theycan support operation under verbatim procedural compliance.

Phase 1 procedures (16) are on schedule for completion date of 17 May1996. Willbe on track as of4/19/96.Unit 1 procedures have been identi6ed to support Unit 1 outage and have

been prioritized to support schedule.

54

Page 83: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

OPERATOR WORK AROUNDSUpdated and Submitted by: OST- Fulford

MONTH Aug-95 Sep-95 Oct-95 Nov-95 Dec 95 Jan-QB Feb.QB Mar-QB Apr.ge May-98 Jun-98 Jut-98 Aug.se Sep-QB Oct-QB No v.98 Dec.se

OPEN

TARGET

79 98 103 101 41

45

55 47

48

44

43 40. 38 30 20 18 17 18 15

120

operator ln performing duties within the approvedprocedures or ln accordance with the intended design.

100

g- Decrease due to separation of OWAs from Operator fnconveniences.

80

rs 60OPEN

~ % ~ TARGET

40

~ -l.-- ~ ~

Year End Target=15

20

Aug.95 Oct.95 Dec-95 Feb.96 Apr-96 Jun.96 Aug.96 Oct-96 Oec-96

Time (Month)

Page 84: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST. LUCIE NUCLEAR PLANTOPERATIONS DEPARTMENT

PROCEDURE UPGRADEPHASE 1

LEGEND:XXXXXXXX

XXXXXX

XXXXXX

XXX

PROCEDURE¹

DESCRIPTION

DATE OUE

RESPONSIBLE

1.0030121

Rx Plt Heatup

D. Wislams~o S

2-0030121

Rx Plt HeatupD. WilsamsheccrieieXeo S

14I030122

Rx Stertup

M. Koeebchetc

IND REVIE R

2-0030122

Rx Startup

ILKoyebchetc

SHADED BOX

REPRESENTS

COMPLETED PROCEDURE

UPGRADE

D DRAFT

S SUBCOhllMITTEE

R INDEPENDENT REVIEWF FRG APPROVAL

D1 DISTRIBUTION

1k''

. '81-00301 27

Rx COOIBown

O. Williams

50.59 Req. F

2.0030125 2 ON0127

rorhrrre axeman RX COOI5OWn

D. Brown D. Witsams

FRGApprov F IND REVI R

1.0030120

Pre ebii Chock&a

D. Brown

DRAFT D

2.0030120

PlosQrr Chechorl

D. Brown

DRAFT D

1 0030124

Turbtne Starlup

D. Brown

~eo S

2.0030124

Turbtne Startup

O. Brown

hcbcccrneee S

3I22I9B 4I4/96 4I19196 513195 . 5I17IBBopERAtloxs pRocEouRE upoRAoE

PHASE 1 JKSe/rrrre

Page 85: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST. LUCIE NUCLEAR PLANTOPERATIONS DEPARTMENT

PREOUTAGE PROCEDURE REVIEW

LEGEND:XXXXXXXX

XXXXXX,

XXXXXX

XXX

PROCEDUREB

DESCRIPTION

RESPONSIBLE

STATUS

SHADED BOX

REPRESENTS

COMPLETED PROCEDURE

UPGRADE/REVISION

1.01 20021

Drain RCS

Kogelschatz

Processhg P

1.0210021

VCT H2/N2

Bonsatl

Processing P

141 10022 C

Eiden esca

Kogefschatz

Processing P

1-1800024

Fa S Dice Cevay

Kogefschatz

Processing P

1-230020N2 Sys NormalBonsag

FRG F

1.080050

MSIVTest "

Scott

FRG . F

14410021

SIT Normal

Pennenga

svbeeeeii/see D

1-1010020

Inst AlrSys OP

Lorenlzen

FRO F

1-081 0021

a/cede X Se

WEEams

Draft D

1.0910024 D

Bus Removal

Pennenga

seeeeeiersee S

1.0120023RCP Normal

Lorentzen

Draft D

1.0700028

FdrwbTeel

Lorentzen

Draft D

1.0210020

Chg-t/D Normal

Patterson

Dratt D

1 0700021

Cond/Feed Norm

Pennenga

Draft D

1-1210051

WR Nl Func

B. Scott

Draft D

14120020

FIB &Vent RCS

D. Brown

Dra/t D

D

DlP

F

S

DRAFT COMPLETE

DISTRIBUTION

P/ocessfng

T FRG

SUBCOMMITTEE

3/16/98 3/27/98 4/6/98 4/12/98 4/19l98 4l28//98

OPERATIONS PRE4WTAOE PROCEDURE REVIEWOIITAOE

Page 86: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

1996 lIANREM TARGET

400

300

5200

Unit 1 Refuegng OutageOutage Budget~ 310 ~ r

~ ~

~Actual----- Target

1004 582 4.718

Jan Feb Mar Apr May 'un Jul Aug Sept Oct Nov Dec

Time (Month)

1996 PERSONNEL CONTA(ilNAT(ONSTARGET

80

70

60

o 50

Unit 1 Refueling Outage

~Actual~ - Target

20

10

0 2, 2

r~ ~

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

Time (Month)

Page 87: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST. LUCIE PLANT CONTAIIINATEDFLOOR SPACE

4000

3500

3000

2500

2000

1500-

1000

500

Inaccessible creef~BstÃtÃlserhs wrrh

Twkey PoH end

ksspksa wkhkskssky preclksss.

Post outage recovery ofcontaminated floor space.

250 280 12

~ ~ ~

\~ I

~ ~

~ ~

'

Unit 1 Refueling Outage

~Actual- - - - - Target

Sep- Oct95

Nov Oec Jan- Feb Mar Apr May June Jul Aug Sept Oct Nov Dec95

Time (month)

Page 88: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Unit 0 CPI(Chemistry Performance Index)

1AO

120

C7

1.10

O~ y~ y~ ~~ ~~ ~

~ ~~ ~~ ~

~~

~~

~ ~~ ~~

~

~I~ ~ '

~ ~~ ~

~ ~~

~~ ~ ~ ~ ~

~ ~

~ ~~ ~~ ~~ ~~ ~~, ~~ ~~ ~~ ~~ ~

~ ~ ~

~ ~ ~ ~

~ ~ ~

~ ~ ~ ~

~ ~

~ ~

~ ~~ ~I~ ~

~ ~

~ 0

~~

~ ~

~ \

'C

~ I~ ~

~ ~~ ~

~ ~~ ~

~ ~

~ ~~ ~~ ~~ ~~ ~~ ~

~ ~~ ~ ~ ~~ ~ ~ ~~ ~ I ~~ ~ ~ ~~ ~ ~ ~~ ~ g~ ~

~ ~~ Oi ~~ OI ~

C

~ INPOGOALcc125

DAILYCPI

QTR AVG CPI

g CO CO CD g g R 8 S CO R5 8 R R

S

RDATE

IR R

Unit 2 CPI(Chemistry Performance Index)

1.40

1.30

1.20 ~ - ~ ~ ~ ~

1.10

~ ~

~ ~~ ~~ ~

~ ~'C

' ~ ~ i ~ ~

'I

~~~~

~ ~ ~~ ~~ ~ ~

~ ~

~ ~

~ ~ ~

INPO GOALo125

- - ~ - ~ DAILYCPI

QTR AVGCPI

g CO CD CO g CD CO CO CO CD CO CD CO CO CD CO CO CD CO CO

DATE

60

Page 89: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 90: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 91: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

IMPROVEMENTS/ACTIONS

r yement

Program/Procedures Status Update:

~ Maintenance Procedure Upgrade Project

~ Pro Group

~ Minor Maintenance Process

Plant Material Condition (Key Performance Indicator):I

~ PWO Backlog'

Control Room Green Tags (C-Tag')

~ Aged PWOs (>12 months - Golden Oldies)

~ Leaks (Primary/Secondary)

~ Temporary Leak Repairs

Valves:

~ Integrated Qews

~ Leaks

~ Valve Program

61

Page 92: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

K'sTs LUCIEPLANTMAINTENANCEPROCEDURE UPGRADE PROJECT

TASKN: DEVELOP PROCEDURES/GUIDELINES FOR FREQUENTLY PERFORMED MAINTENANCEACTIVITIESWHICH CURRENTLY EMPLOYTHE USE OF VENDOR TECHNICALMANUALS

1&C

SPC/t FI>d PS

Level Swlkhss

mugs4Cricher Level

Co/Craters

101/gs

4C

V«$SUC Cht

Bd tndcuass0ugs

4CMagneecl

Level Swschcs

S0ugs

4CHO0085: Add

Rcw Ec&rprnc/C

$01/98

4CRoscmcurc

Trsnsntscrs

t00/$ $

1&C

Bench

Calhrascn

1100/gs

t0t)tds@i.;,w

&Cc px U~xwo«% 14C

Fo>d>«o Pneu

C«trot«s

C00/gs

4C&chero0

Press Swschcs

muss

14C IS,C 14C

V2 Ccru Atontc Setup Rod Crop VI 4 V2 Rchdrdn

SSOP/co M«>ta Computer TCV 12 IS0I/gs S00/gs 1001/gs

I&C

CEOM Cahle

Regal/

I t00/CS

,,@ltd+/I/tt„„;";4!'cs')'LIc&«t,"":'.:.>~

4CUl Cat SCBO

Rad Mo/Rota

S00138

14C

Ut Letdown

Process Men\ore

101/td

4CV2 Ccru Alom/c

PIO Proc MCCR

10108

4C 14C

V2 Can Alon/C VtCd Oeckrecrce

CM M«tror 4cs. IS&el,vv&0M

S0008 '0010$

MC

Unit 2 LPM

&CK@>@cK;mc

SSCc,.,.cw >un 'g '

I'Ugt!/'Ss'T(CIsc

,'kO'OS";ALII)"''"K~c

"2;"'&CVICalofCCW

Rad Montors

10008

MECH

Oregon Vaue s

mmsMKCH

Tergal Rodr

Vel/es

101/$ 8

MECH

Borg Warner

clues

&0108

MECH

ye/wsy Vsuca

S010$

1&C

V2 Cen Atcntc

SSL Proc Mont

t/3008

MKCH

Wcssnghcusc

Valves

S00/3$

14C

ul Scone Op 0 ca

«n Proc Mcn

I00ugs

MKCH

Wc51«l IIScg cute

Vat/ca

10010$

4CV142C«rcLolProc Mont Rct>y

Iu3008

MECH

/amc sbury

Vahres

It0008

I&C

tcc Is/yaI«s

Cathreson

120 ugs

14C

U2 Safeguards

Mere/a CSL

12010$

ICC

OP.K-ISCOO23

1&C Procectce

101/ST

I&C

ITT Baden

IryclAclual as

I/3ugt

Psgccssd s(u

«Mcc'JSIUta % dcdtcFOII'

hlECH

Ocrtng

SS«CK$ >$0'~S .!F!S Jt'I'nU~W>

MECH

Coal Cony.

Leldownulvs

1010$

MECH

Herry Pran

Vst/esVCI/ca

&0108

MECH

Cress«

(Ccnsotdatedt

&00/38

MECH

Vaka &yVahras

100108wcc>.$>dtt cu.AT $IScuALI

"Oltl 8 dttt5$ ?:»-''«"'Octobey>EK

MKCH

Valsir tac

Vnucs'1/3008

"-">togsr'ii5eTS

circe Procedures~cry/amah>/ng PSL.2 Plant Spe

1201/gs

ODUSO'11USdtc «<Bsris 'l4 IIIFOb

Page 93: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST. LUCIEPLANTMAINTENANCEPROCEDURE UPGRADE PROJECT

TASK ¹2: REVISE AND ENHANCE EXISTING MAINTENANCEPROGRAM ANDEQUIPMENT PROCEDUREs KNOWN' REQUIRE IMPROVEMENTS

To Cofncfde viith DMslon Work Process

tfftff4'»ff2ftf&~4

f/8]f88<;::-".,~"-":;.if'~

Ef,BCT,';:-::,"";„':,;:;";,"-"

0'nylon'-2:"'.020067;:@

Timp'.F)vi/Jiimjyery

1A1f88KCP~%kf

082007ff,! i''<g",;'

f81/tiff!."."»"-'-""-%%4

Rafts'e':;:,,":,.g':,,'!,.

Rb'dsd'Jfrrtt fry(.-'w..

aiid*f;f(e'dlgidPjyPi'o'ci'lfiirej<~';yoii'",.<~

ffXGTjij$$+g~

eiivc)oillINga'a>

f,'esj:bj:doIinti.y';

Re~ac'pPWQi!,.0

0,,'00)'0'0%pi) '~<~<

KCG<TRv~~~'~

SitNff8K.";;~;~'f,hCTi<f4Gg",,'»~ Revhe Conduct

of Mafntenance

ADM.08.02

Page 94: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

POWER BLOCK PWO BACKLOGJoe Marchese - Maintenance

PWO Backio

- PWO backlog are non-outage corrective work orders (Work Type 5 status 22-4S) oncomponents/equipment in the power block. Total includes ail Work Type 1, Work Type 3 & Work Type 5.,all hold codes

900

800

700

600O0 600

4000

300 .

200

100

TOTALRR 2030

Good

t. end - tur5~urtt 1

~urrit2

~Corecn—X—Total

Terrtet

Tergel ~ 350 ToteltrSMech155 taC20 Efect

Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jut Aug Sep Oct Nov Dec

'95 '96 Date

octa Source: perrrort

SUMMARYSTATUS

Discipline

Mechanical

Electrical

I&C

ProJects

Total

Unit 1

71

80

160

Unit 2

117

10

110

239

Common

13

14

27

Total

201

17

204

426

Page 95: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

CONTROL ROOM DEFICIENCIES C-TAGSRandy Olson - l&C

- The number of Control Room/Board Green Tags. It provides an tndlcatlon of theattention given to maintaining control room Instruments in an operable condition.

80

70

Bo-

50Cg

c) aoO

>o 30

20

".OUTAGE 11.UNIT1~7 UNIT2cn4

4Oed ~raneocdnge—x—regni

Nnccecgn rncgcl

10~ MO+OAyernegeeng

Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jut Aua Sep Oct Irov Dec'95 '9B

Date

Data: M. VWas

SUMMARYSTATUS

Ready to Workor Workln

Engineering! RTA

AWP

Other Holds

Total

Non-Outage Outage Total

12

20

Oldest

PWO ¹Discipline

Unit 1

10/2/94

0137

EM (OUTAGE)

Unit 2

5/4/94

3017

1&C (OUTAGE)

Page 96: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

AGED PWOs > 12 MONTHS GOLDEN OLDIESJoe Marchese - Maintenance

~Aed P Woe:

- Non-outage corrective maintenance work type 5 PWOs older than.12 months.

50

40

0530

q 20

0

Good ~ urrtt 1~ unit 2

~CommonX Total

Target

10Target ~ 0

Sep Oct Nov Dec 'an Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec'SS 'S6 Date

cata Source: paatport

SUMNIARYSTATUS

Unit1 Unit 2 Common Total

Mechanical

Electrical

I&C

Construction

Total

0

0

17

Oldest

PWO ¹Discipline

8/11/94

2093

Mech

7/25/94

0562

Mech

Page 97: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

LEAKSN. Motley

Leaks:

- Active leaks (primary and secondary)

70

60

50

rrr 40

V

302:

20

OUTAGEUNIT 1 = 25 UNIT2 = 10

As of 4/6/96

Legend

Good

J~ Non.Outage

Non.Outage Target

10 . a 0 8 $ *$ 0 0 P P P 8 0 . Non-Outage Target~10

0 ~

Sep Oct Nov Dec Jan'95 '96

Feb Mar Apr May Sun Svt Aug Sep Oct Nov Dec

Date

Data Source: passport

SUMMARYSTATUS

Unit1 Unit 2 Total

Non-Outage 21 29

Oldest (Non.outage)

PWO¹

Status

2/9/95

4560

AWP

12/5/95

5730

ENG

Page 98: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

LEAKREPAIRS FITTINGSGreg Pustover - Programs

Leak Re airs:

- Leaks that have been temporarily repaired.

55

50 ~

45

Ln40

a. 35

"„3025

o 200

15

10

tegend

Good ~ Una1

~unlt2

Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec'95 '95 Date

Data Source: JoelKagan(SCE)

SUMMARYSTATUS

Unlt1 Unlt2 Total

Total 21 10 31

Page

Page 99: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

SYS z COMPOENGlNEERING

Page 100: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

IMPROVEMENTS/ACTIONS

SYSIXÃS &CChVIÃÃ6ÃISENGPKERlNG

r vement

Improve Equipment Reliability:

~ Emergency Diesel Generators

~ Reactor Coolant Gas Vent Valves

~ " Pressurizer Code Safeties

(Unit 1/Unit 2)

(Unit 1)

(Unit 1/Unit 2)

6/96

5/97

Strerg6~ System Perfonnance Monitoring

~ Maintenance Rule

PM Basis Program

7/96

12/96

Strengthen Root, Cause Analysis:

~ System &Component Engineers Trained

~ Event Response Guidelines

~ Root Cause Analysis Guidelines

Complete

Complete

Complete

69

Page 101: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Plant St. Lucie Emergency Diesel Generator Reliability improvement Plan Matrix

Problem Root Cause

Units 1 & 2 Governor Actuator Vendor teardown: report

Corrective Actions

Plant initiated 6 yearfailures identified fatigue due to length overhaul Preventative Maint

service; recommended 6 year item.

periodic factory overhaul.STARS 950059 & 950529

1. Replaced all suspect

electronic components andUnit 1 EDG Governor unstable Older design electronics

during surviellances (tied to grid) very susceptible to "NOISE" optimized alignment with

Status and Long Term Notes

Allunit 2 actuators overhauled Nov-95Unit 1 actuators replacement and set up May 96 outage.

NOTE: EDG's are in MAINTRULE "A-1"due to governoractuator failures. This is the get well item.

Engineering evaluating upgrade of governor system to

more current design (Woodward 2301A)with proven noise rejection features.

"NOISY" inputs identified. vendor rep support.NPWOs: 1A: 950261661B: 95026332

Unit 1 8 2 EDG GovernorActuator Wiring grounds rough surface; vibration

induced abrasion.Raychem sleeve covering forabrasion protection

STARs 951062 and 951055 PWOs 95024478 95026057

Two failure modes Identified: Allfour EDGs inspected and

Vendor design: governor wiringharness wires in contact with Completed repairs and added Engineering developing improved design to eliminate

abrasion concern:Unit 1: 97 outageUnit 2: April97 outage

PC/M 030-196M Issued for unit 1. New design relay andUnit 2 Control Relaysockets failures

Pins relaxation and solder'oint failure due to cracks.

suspect sockets replaced.NPWOs: 1A: 95031756

sockets. Work willbe accomplished during the May 96outage.

(Unit 1 has similar design) Removal / insertion (PM) and 1B: 950316762A: 95031265vibration. STAR 951721

Report JPN/CSI MET 95-223 2B: 95032588

Unit 2 PC/M to be issued and work accomplishedduring the April97 unit 2 outage.

Unit 1 fuel oil piping failureFatigue due to vibration;this engine had underwenthigh vibration during 8-31-95valve fail event. STAR 951322

Pipe replaced: others inspectedNPWO: 6035

System engineer monitors engine piping closely;visual exam of fuel line components at leastmonthly.

Identified during trend analysis Radiator replacement is

May 96 outage replacement.

PC/M implemented on 1B1

(leaking)Unit 1 cooling water relief valves Vendor design; valves

placed in flow stream.weeping and not seating.

Units 1 and 2 diesel fuel Underground piping; corrosion PC/M implemented on 1A, 2A,

Unit 1 Radiator performance of engine jacket water temp. scheduled as an outage Job

STAR 951575 provided safetyassessment to operate until

System engineer monitors and trends performance.

All four PSL 1 EDG radiators to be replaced during theMay 96 outage.

Other three engines valves to be completed May 96Unit 1 outage (PC/M 171-195 issued)

New design piping incorporates stainless steel guard pipe.transfer piping failures of unprotected carbon steel. and 2B: 92-225 8 95-096.

4/17/96

Page 102: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

3.5 .

>. 2.5 .

D

3.22~

''OST AVAILABILITYDUE TO EQUIPMENT PROBLEMS - UNIT 1

~MTLYAGTUALS~YTD AVERAGETARGET

1.671.64

~ g g ~ Q I ~oog g ~o% % ~ 0 8 ~ % % ~ g g ~ Q ~ + oo1.3

0.5

0.11

Jan-96 Feb-96 Mar-96

I—I

Apr-96 May-98 Jun-96 Ju!.96

I

Aug-96 Sep.98 Oct-98 Nov-98 Dec-98

3.5-LOST AVAILABILITYDUE TO'EQUIPMENT PROBLEMS - UNIT 2

3-

th>.2.5. -- ~

D

2.53

~ MTLYACTUALS~YTD AVERAGE

TARGET

V a a ~ & W ~ W H ~ W W ~ R % ~ W W ~ % W

1.28

0.85

0.5

0.0.03 0

I

Jan-96 Feb-96 Mar-96 Apr-96 May-96 Jun-96 Jul-96 Aug-96 Sep-96 Oct-96 Nov-96 Dec-96

4/17/96 SCE Dcpf. f/xmx(prrI.xlx

Page 103: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ENGINEERING

Page 104: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 105: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ENGINEERING

Na or Im rovement Areas

Improve Configuration Management Controls:

Implement Temporary System Alteration

Reduce Open TSAs

Reduce Age ofOldest PCMs

Complete

6/30/96

12/31/96

Improve FSAR:

Assessment Team Effort

Corrective Actions Unit 1

Corrective Actions Unit 2

Maintenance Procedure Review:

Program to review procedure for QC holdpoints in QI 7

Site Contract Coordinator identifies target procedures

SCE/JPN performs review

'tatus being reviewed in Outage Meeting

SL1-14 Outage Modifications

68 PC/Ms approved for Outage

49 PC/Ms issued by Engineering

19 remaining PC/Ms to be issued

Complete

12/15/96

9/30/96

2/97

LEFM

72

Page 106: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

TEMPORARY SYSTEM ALTERATIONS TSAKris Mohindroo - Engineering

50

45

40

35

30

v- 25

20

15

10

Good Legend

~unit t~untt2—X—Total

Target

.Verget ae- ..--.

Oct Dec Feb Apr Jun

Date

Aug Oct Dec

Data Source: Kris Mohtndroo

SUMMARYSTATUS

Disci lineMechanicalElectricalI&CEn Ineerln0 BratlonsHealth Ph sleeConstructionSCETotal

Unlt1

0

14

Unit 2

0

Total

14

0

21

Oldest TSADisci line

3/4/95I&C

5/10/94I&C

Page 107: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

PLANT CHANGE/MODIFICATIONSKris Mohlndroo - Engineering

1 50 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

Good Legend

125

g100

O75

00

50

Open PCrMTergal ~ 80

~unit1~unlt2~Common—X—Total———Target

25

0

Oct Dec Feb Apr Jun

Date

Aug Dec

Data Sovrce: Krta MoMndroo

SUMMARYSTATUS-WORKING

Disci line0 enPC/MPC/Ms >24 Mo.

Unlt155

Unit 220

Common Total81

Page 108: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

0ST. LUCIEPLANT- 10 OLDEST OPEN PC/M's

PC/MNUMBER

DESCRIPTIONDATE

ISSUEDDATEFRG'D

SCHCLOSEDATE

STATUS ANDACTIONS REQUIRED TO CLOSE

193-189 Open Blowdown Cooling Water Heat Exchanger

Vacuum Breaker Valve Changeout

2/I I/89 12/11/89 5/30/96 PC/M implemented. Action plan to resolve slight periodic leakage

problems withpermanent drain catcher. Engr PC/M planned for 4/19/96

276-189 ICW Isolation Valve V21165 Relining

335-190 Check Valve Hinge Pin and Bonnet Modifications

on CCW pump discharge check valves V14143,

V14147 and V14151

171-191 Resizing and replacement ofMOV '11iermaI

Overload Devices on 137 MOV's

186-191 Intake Cooling Water Support Modifications

086-292 Radiation Monitoring Computer Replacement

203-192 Replacement of95 Sigma Meters in the. ControlRoom and Hot Shutdown Panel do to obsolesence

Issues.

12/6/89

7/18/91-

Sup 03/25/93-

Su I7/17/91

7/I/92-Su I

4/22/92

12/21/92

2/7/90

4/13/93-

Sup 0

4/13/93-

Su I9/19/91

NotFRG'd

5/7/92

4/6/93

UNIT I PC/M work activities placed on hold U194 fall outage due to required

OUTAGE duration- work scope needs to be reviewed and planned for the upcomingU196 outage or PC/M cancelled.

UNIT I PC/M implemented on valves V14147 and V14151. Modifications to

OUTAGE V14143 planned for next refueling outage. Willclose PC/M upon

completion ofthe work activity

UNIT I PC/M implemented on 122 valves. 15 valves remaining to be modified.

OUTAGE EM needs to schedule remaining work Willclose PC/M upon

corn letion ofthe work activityUNIT I Sup 0 Complete. Sup. I was budget approved at the MRB I/30/96 for

OUTAGE im lementationdurin the1996Unit I outage.

5/24/96 PC/M implemented. ICMhas one PWO associated with two remainingCRN's which is required to be worked to close the PC/M. Willclose

PC/M u n completion ofthe work activity.

5/24/96 PC/M partially implemented with 15 instruments installed. Recommend

as-building what work has been completed and close PC/M. NewPC/Ms can then bc gcncratcd based on planned work activities.

235-992 Supp. 0 -Replace 8h remove Pax Phone Sys 8h install 10/1282fiber o tio cables

11/3/92 6/30/96 Partial implementation - Final scope to be reviewed and completed

235-992 Su . I -U adin ofCommunication S stem 5/13/93 5/14/93 6/30/96 Partial im lementation - Final sco to be reviewed and corn leted

094-293 Thcnnal Overload replace, EMT forcondenser

sam ling um s

5/17/93 6/15/93 6/30/96 Replace incorrectly sized thermal overload (TOL)heaters for Condenser

Sam ling Pm s 2AI,2A2,2B1,8h 2B2

Page 109: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST. LUCIE NUCLEAR ENGINEERINGUNIT 1 1996 OUTAGE SCHEDULE

BASELINE SCHEDULE JAN. 2, 1996 UPDATE AS OF APR 8, 1998 R. ENSLEY

LEGEND:

TTFUhNOrrOAl A

0H

+C

MRlll@Qilrr

IF!%lot !

W REA NumberW DescrfptlonM Date DueW Resp. Disc.

~ Engr'd Matls. Ordered~ Engr'd Matls. RequiredM Orlglnal Plant ListW Emergent Packages

~ By Outage Start/During Outage

W PC/M Not Required

W Capital

MShaded Box RepresentsCompleted Package

SLN95413 10 PMAI9843.777NONDEPINCORE EDG COP TUBE

4.12.98 4-1S48FUELS 'ITEMEC

PMAI 9642492EDG UNLDVLV4-26 98SITE MEC

PMAI9843 785EDe RADPLNM CNTMTRNe LeT4-29 SB 440.96SITE MEC PEG ELE

STAR 951089B13308XEVWV REWINDCWP

4.12-98 4.19.98SITE MEC PEG ELE

STAR 94110488RWT INSP41298PEG CIV

PMAI96-0347024" SPOOL PCE4.1946SITE MEC

SLN 93461.11A/DCRN'S4-15.98ITE MEC/Cl +

O.'F.UEL'tt!i!$

35 5RPSWtG

Jlf'lilt ll I

STAR 9516S7SNI/BBER CRIT4.15 98SITE CIV

STAR 9510491A2 DIESEL TK4.28-98SITE MEC

STAR 951080 PMAI9842-148RTGB GR ALRM EDG EXHAUST4.2948 440-98SITE ELE SITE CIV

PMAI98.03479 STAR 951283CIAS EGG START D/G INDLIGNTS RCP SWEEPS4 2848 4.29-S6 440.98

ITE ELE/SC SITE UC

STAR 950970 PMAI 98.03 453 STAR 951138POLARCRANE DBLJACBONET MV08.1BMTR4 2448 440-98 440-98SITE CIV ~ SITE MEC SITE ELE

AR 950323ACP LKOFF

4 19.98ITE MEC

PMAI98.02452480V LC LIFT MSIVBXVP4-28 98 4 29.98SITE CIV PEG MEC

PMAI96-03.728IB EDG VLTREG540.96SITE ELE

PMAI98.03.115RCP VIBPROB540.96SITEELESTAR 9511971A1 RCP CCW54046SITE MEC

PMAI 98.03.277LCV-11.24 A/85.17-98SITE MEC

PRESS INSL5404SSITE MEC

STAR9505851B2 ANN A-13540 98PEe ELE +STAR950428MV09.13 ST NUT

540.96PEG MEC

STAR 950882EXCORE POS540.98SITE MEC +

APR MAY

0:COMMCNIDREISKfla!ESIISSBPIEPRE

Page 110: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

COPROG

Page 111: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

0

'7

Page 112: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

IMPROVEMENTS/ACTIONS

ACIIONPROGRAM

r "v nt

Standardize Process:

~ Implement PMAIprocess

~ Implement CR process

~ Transfer all STARs to CR process

Status as of4/15/96:

~ Only 5 original STARs remain (none are overdue)

~ No overdue CRs

~ 120 overdue PMAB

Complete

Complete

Complete

ACIIONS

1. PMAIprocedure (AP0006129) lacks

instructions necessary for successful use byplant personnel/training not corxhctaK

2. STARs were closed without initiatingdepartrrrerrt concurrence.

* Training conducted.'* Procedure revised.

* Licensing/QA/PGM/ corrcurrcn~e

mallltalIled.* Inrleperrdent Review substituted.* PCR was never approved.* Con!roHed copy distribution of

CR/PMAI procedure.* Implemented CR process (CR process

does not require the concurrence)

3. Technical issues requiring near termcorrective action are currently documerded on

PMAZs with extended due dates.

* Technical issues identified have been

corrected.* Review a random sample of closed

STARs to ensure no unresolved

technical issues associated withnuclear safety.

77

Page 113: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

coI

CORRECTIVE ACTIONPROGRAM

TR 1996 REPORT

Page 114: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

CRs Generated By Quarter

1,200

1,000

1,073

800

600

400 374329

565

480

200

1st Qtr 95 2nd Qtr 95 3rd Qtr 95 4th Qtr 95 1st Qtr 96

~ 130iMonth - Non outage

~ 360/Month - Outage

1QTR015.pre

Page 115: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

CRs Stratified By Initiating Department1st Qtr 1996

100

80

60

40

20

57

45

36 36

27 27 2622 2P

16

6 4 2 2 '2 2 2

A B C D E F G H I J K L M N 0 P Q R S T U - V W

~ A"-OPS g B=LIC g C"-QA II D=IC ~ E"-OM nil F-"OST g G=QC g H=CA ~ I=MM Q J=SCE ~ K=ENG g L=PM

g M=MP ~ N"EM ~ 0"PS g P"RE S Q"NMM IH R=IS 5 S=HP ~ T"SEC, Q V=CHEM 1 V=MPRJ ~ W=RC

~ Operations was the highest contributor

~ QA/Licensing participate fully

1QTR001. re

Page 116: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

140

120124

CRs Stratified By Causal Factors1st Qtr 1996

100

80

60

40 33 33

20 13 13 12 12 12 11 7 4 4 4'

1 1

0taCp VC

A B C D E F G H I J K L M N 0 P Q

g A~WritComm g B*WorkPractices g C~Malnt/Test 59 D=Equlp Spec 8 Mfgr ~ E=Des Contlg lHF~Worir/Org Plan g G=Man-Mach Interface g H~Plant/Sys Ops ~ I~Tmg/Qual

Lrg JiEqutp Cond gK~Mgmt Methods (QL~VerbComm QM~SupvMelhods ~ N~ChgMgmt 5O~EnvtronCond iIP~ResourceMgmt ~ Q~Exlemat

The top four causal factors or root causes for all CRs issued in the 1st Qtr of 1996 were:

- Written Communication - Deficiencies in the written presentation or exchange of information; e.g., procedures, drawings,vendors manuals, Tech Specs, etc.

— Work Practices - The method a worker routinely uses to ensure the safe and successful performance of a task; e.g., lackof self checking, failure to use/follow procedures, etc.

- Maintenance/Testing - The process of ensuring that components/systems are maintained in optimum condition andtested for operability; e.g., inadequate PM, improper reassembly, etc.

— Equipment Specification, Manufacture, and Construction - The process that includes the manufacture and installation ofequipment in the plant; e.g., inadequate/incorrect spare parts, inappropriate service req'mts., etc.

1QTR002.pre

Page 117: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Written Communication Trend1st Qtr 1996

140

120124

100

80

60-

4045

69

78

20

01st Qtr 95 2nd Qtr 95 3rd Qtr 95 4th Qtr 95 1st Qtr 96

~ Written Communication - Deficiencies in the written presentation orexchange of information; e.g., procedures, drawings, vendor manuals, TechSpecs, etc.

1QTR011.pre

Page 118: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Written Communication Stratified byDocument Type and Department

1st Qtr 1996

Procedures

100

80 75

Written Communication

50

40

30

20

10

48

10

4

60'0

A B C D E F

40 34 I=A~Inadequate Oocumenl ProvtstonsR8~Techntcat Inaccuractes NC~OtherD=lmproper Chg Implementation g E~Omfssion of Relevant InfoQF~tnsufttctent Info

20

A B C D E F

inadequate Documentational Provisions

OPS 32.6%

+A=Procedures g 8=Engr Docs (Dwg, PCM, TEDB)g C=Regulatoy PSiF SAR)QD=PWO gE=Other gF=PO

SCE 14.9%

IC 11.9%

MP 9.0%

MM 76%

P 1.6%Chem 3.0%

OM 4.6%

OST 4.6%EM 4.6%

IS 6.0%

1QTR005.pre

Page 119: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Written Communication-Engineering Documents"Technical Inaccuracies" Causal Sub-Factor

Stratified By Document Type

100

80 75

Written Communication

30

25

20

15

10

26

Engineering Oocuments

60

40

20

34A=Technical Inaccuracies g B=lmproper Chg ImplementationC=lnadequate Document ProvlslonsiID-"Omission of Relevant Info

0A B C D E F

gA-"Procedures g B~Engr Docs (Dvttg, PCM, TEDB)pc=Regulatory (TS/FSAR)QD=PWO gE~Other Q~F=PO

Technicai inaccuracies

Drawings 50.0%

1QTR006 re

TEDB 26.5% PCM 23.5%

Page 120: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Work Practices Trend1st QTR 1996

80

60

40

48

3944

20

24

1st Qtr 95 2nd Qtr 95 3rd Qtr 95 4th Qtr 95 1st Qtr 96

~ VVork Practices - The method a worker routinely uses to ensure the safe andsuccessful performance of a task; e.g., lack of self checking, failure touse/follow procedures, etc.

1QTR012.pre

Page 121: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Work Practices Stratified By Department1st Qtr 1996

50

40

30

38

Work Practices

Documents Not FollowedCorrectly

OPS 273%

IC 15.9%

20

10MM 11.4%

PLT 2.3%LIC 2.3%MPRJ 2.3%MP 2.3%

HP 45

0A 8

SCE 9.1% NMM 6.8%

EQG 9 1% EM 6 8%

gA=Docs Not Followed Correctly '8 Req'd Vertf Not Performed pc~OthergD=Up-To Date Documents Not Used g E~Self Checking Not Applied

1QTR007.pre

Page 122: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

CONDITION REPORTSCONSOLIDATION OF PROCESSES

**FROM STAR PROCESS

CORRECTIVE ACTION REQUESTQUALITY CONTROL(form 3900)NON CONFORMANCE REPORTDEFICIENCY REPORTOPEN ITEM NOTICEDISCREPANT FIELD CONDITION REPORTCONSTRUCTION CORRECTIVE ACTION NOTICBQA AUDIT FINDINGSISEG RECOMMENDATIONS10 CFR21 NOTIFICATIONSOPERATING EXPERIENCE FEEDBACK(FOP)OUTAGE CRITIQUE ITEMSPOST TRIP REVIEW ITEMSFIELD CHANGE NOTXCEDRAWING DISCREPANCIESIN HOUSE EVENTSENVIORNMENTAL CORRECTIVE ACTION RBPORTPLANT LABELLING DEFICIENCIES

**ADDED ON 4/1

OPERATIONS FEEDBACK(Data Sheet 7)RADIOLOGICAL OCCURRENCES/INCIDENTS/TRENDSNRC SPECIAL REPORTSPBRSONNEL SAFETY(Doctor cases/LTI/trends)

**NOT INCLUDED IN CR PROCESS

PLANT WORK ORDERSRELAY WORK ORDERSNUCLEAR SAFETY SPEAKOUT CONCERNSREQUEST FOR ENGINEERING ASSISTANCEPERSONNEL SAFETY FORM 1880/1880ATRAINING TSARSLOGGM3LB SECURITY EVENTSRADIOLOGZCAL DEFICIENCIES

87

Page 123: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

0

Page 124: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

QUALITY ASS

Page 125: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c
Page 126: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

QA AUDITS/PERFORMANCE MONITORING5 findings and 1 weakness identified;

Finding; Program deficiencies for tracking component cycles and transient events. Repeat from1993.

Finding; Failure to strictly adhere to plant procedural compliance in Operations and Maintenance.

3 Findings; STAR/PMAItransition implementation.

Weakness; Failure to self-assess error in estimating critical condition,

INDEPENDENT TECHNICALREVI'EWSHVE 41-B PM parts availability, preparation and staging.Reviewing IHE-96-030, Unit 2 RCS leakage and letdown system reliefvalve lift.Ongoing assessment ofOEF program compliance and effectiveness.

Facilitating plant self-assessment with support from outside PSL technical specialist,A series of24 hour Conduct ofOperations observations.

QC INSPECTION PROGRAM93 surveillances were conducted during the 1st quarter '96 resulting in an 8% error rate for the

Maintenance Dept. Procedural non-compliance was the principal cause, split between EM, MM8c Pxoject Groups, IEcC 0% error. (5 STARs, 3 unsat/sat reports were written by QC),

OTHER QA ACTIVITIESFollow-up audit/survey on Plan to Improve Operational Performance.

Unit 1 outage safety review.Peak shift Maintenance Performance Assessment.

~ OVERALLASSESSMENTNeed to continue to focus on procedural compliance and attention to detail.Maintenance rule implementation, July 10, 1996; we are behind the industry.

Rcv. 2 4-l2-96

Page 127: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

LI SING

Page 128: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

'

Page 129: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

,IMPROVEMENTS/ACTIONS

r vement

Improve Support to Operations in the Use and Interpretation of the PSL

Technical Specifications:

~ Further evaluate co.benefi of implementation of Improved

Standard Technical Specifications gSTS).

~ Improve the Technical Specifications BASES:

Submit PLAs to remove the BASES &om the

PSL Technical Specifications Index

Use the ISTS BASES for PSL BASES

improvements.

~ Evaluate the need for Technical Specifications position

statements.

6/30/96

6/30/96

On-going(post-PLA

approval)

6/30/96

Address and improve the implementation of the Operating Experience

Feedback (OEF) Pmgram.

Detemine the need to track both 10 CFR $50.72 and 10 CFR.)50.73.

Reportable Event notifications,

89

Page 130: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

REGULATORYSTATUS

Recent NRC Ins eckions

RESIDENTS'ERIODIC: 2-21-96 to'3-30-96 (3 inspectors)

HEALTHPHYSICS/RADIATIONPROTECTION: 2-26-96 to 3-1-96 (1 inspector)

SPECIAI INSPECTION - UNIT1 DROPPED CEAAND REACTOR TRIP: 2-24-96 to 2-29-96 (3 inspectors)

MAINTENANCE/SURVEILLANCE:3-4-96 to 3-8-96 (1 inspector)

MAINTENANCE/SURVEILlANCE:3-25-96 to 3-29-96 (1 inspector)

OPERATOR UCENSING: 3-25-96 to 3-29-96 (1 inspector)

OPERATOR LICENSING EXAMS: 3-25-96 to 3-39-96 (2 inspectors)

PHYSICALSECURITY PROGRAM FOR POWER REACTORS: 4-1-96 to 4-5-96 (CANCELLED)

Estimated NRC ins ector man-hours as of March 31 1996: 1904

Violations Status

. Four Cited Violations as of March 31, 1996One Non-Cited Violation as'of March 31, 1996

Potential Violations

1) LER 9&03; Failure to acces procedure when sampling containment2) LER 9843; Failure to conduct adequate log readings and reviews3) LER 9&03; Violation ofTechnical Specification 3.0.44) IHE 9842; Failure to access procedure5) IHE 9842; Failure to report completion of procedure6) Failure to properly disposition out of specification CEDM coil stack readings7) Reactivity manipulations not properly logged

Potential Nonunited Violations

1) Improper Health Physics Practices2) Control of contaminated tools in Hot Tool Room

U comin Ins ections throu h June 1996

EMPLOYEE CONCERNS PROGRAM: 4-29-96 to 5-3-96 (2 inspectors)

MAINTENANCEIMPLEMENTATION:S4-96 to 5-1 0-96 (2 inspectors)

ENGINEERING/10 CFR 50.59: 5-13-96 to 5-17-96 (1 inspector)

INSERVICE INSPECTION: 5-13-96 to 5-17-96 (1 inspector)

CORRECTIVE ACTION PROGRAM: 6-24-96 to 6-28-96 (3 inspectors)

MAINTENANCE/SURVEILLANCEOBSERVATION: 6-24-96 to 6-28-96 (1 inspector)

90

Page 131: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

NRC VIOLA IONS15

Good Legend

ur10

S~

O

o 5X

~Actual Vtotettons

~Actual Has

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

'9B

Date

LICENSEE EVENT REPORTS

20

15

Legend

10 CFR 50.73 LER

~10 CFR 50.72Phone calls

v- 100

5

5

Jan Feb Mar Apr May 'un Jul Aug Sep Oct Nov Dec

'9B

Date

Data Source: Ed Wetnkem

Page 132: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

FOP's TO BE PROCESSED

30

20

h.o 15

10

10

17 28

Good

~Actual

0

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

Time (Month)

FOP's IN REVIEW

25

20

15

h.

10

12 12 Good

~Actual

0

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec

Time (Month)

Page 133: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

FOP's TO BE CLOSED (CLOSE-OUT SUMMARY)

35

30

2527

31

Good

~Actual

20

015

10

Jan-96 Feb Mar Apr May June Jul Aug Sept Oct Nov Oeo

Time (month)

Page 134: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

Szavrczs

0

Page 135: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

IMPROVEMENTS/ACTIONS

r m vement

Improve the Procedure Administration Process to Blare Quality Procedures:

~ Temporary Change Action Plan

~ Convert Procedures to Guidelines

Improve the Safety Focus of the FRG:

~ Tech Spec Improvement

~ Allother items

Improve Training Dept Contribution to Conservative Plant Ops

~ IHE Training Review Team

~ Nuclear Policy 914 implementation

~ Enhance L.O. Requal Exam Practices

Improve Plant's ability to implement the E-Plan efBciently

~ Upgmde and Revise the ERO

More &quent limited scope drills

ValidattJUpdate EP Training Content

Implement Configurafion Control process

~ Reestablish Configuration ManageLna)f Group

~ Revise AP 0005745 "Request for Engineering Assistance"

~ Initiate Real Time List for Minor Modifications

Develop 20/30 Lists

~ 1996 Top 20 list

~ 1996 Top 30 list

~ 1997 Top 20/30 list

Complete

Complete

6/96

4/25/96

4/25/96

4/18/96

3rd Qtr/96

, 7/96

9/96

Complete

Complete

4/15/96

Complete

4/18/96

5/5/96

94

Page 136: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

l

0

Page 137: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

TEMPORARY CHANGES TO PROCEDURESJim Holt - Information Services

350

300

250

0 200

0cr 150R

100

Legend

~Untt1~Vntt2~common—X—Total

Target

50

Oct Dec Feb Apr Jun

Date

Oct Dec

Oata Source: Jtm Holt

SUMMARYSTATUS

Oldest TC(daVs)

898989896768

Dlsclpllne

0 eratlonsMechanicalElectricalILCReactor En ~

SCEHPTotal

Unit 1

23

26

Unlt2

18

25

Common

25

Total

50

76

Page 138: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

INDUSTRlALSAFETY - RECORDABLE DOCTOR CASESKlm Heffelflnger - Protection Services

35

30

25

5nI 20

15

X'to

~ ~ ~ ~ ~22

16

~ ~ ~ 4 ~ \11

23

3 3 4

Target ~18

GoodLegend

~Actual1996

~Actuat1996

———Target

Oct Dec Feb Apr Jun

Date

Aug Oct Dec

Data Source: Ktm HeffeNnger

Page 139: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

ST. LUCIE PLANTt BUDGET PERFORMANCE INDICATOR

10v 1996 O626 BUDGET PERFORMANCEACTUAISTHROVCH MARCH1000

100

M

O 10

I0

0O

0ZO

OO

10

1996 CAPITALBUDGET PERFORMANCEACTUALSTTNOVCHMARCH 1010

4X0

E

5IC

OO

'XIX0 ~

X''X'8VCCET20 IMONTNLV)

~ACTUAIS20 IMONAC.YJ~ FORECAST

2A (MONKEY)~SVOCET

gUMAATIVQQ ~ACTUAlS

FXRRAAmg~ X FORECAST

(CVUAAATIVE)

~>

E~I

12

10

CAN FES MAR APR MAY AJN AA AUC SEF OCT NOV OEC

97

Page 140: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

PSL TRAINlNGOBSERVATIONS

100'/o

80/o

70/o

80/o

50'/oJ20c 40%

30o/o

~Actual

20/o

10/i

0i/o

~Wgp~ ~ y832 ~8M yeats~ "1885'~ ~$ ~ 4088 ~' 7/98 'oI88 9N881 Aluaa". 55jw'2/38i&%Actual~

Data Source: P. Fincher

1IXr/o 35i/i 0i/o 2/o 95%

98

Page 141: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

N'ATERIALS

1

Page 142: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

INIPROVEMENTS/AGTlONS

r yement

Outage Material Availability:

~ Delivery ofmaterial has been expedited for 90 Pcs~ No PWOs have been canceHed for lack ofparts

Reiuce the Cost of Carried Inventory:

Reduce value of inventory to $38 million

Reduce the value ofovermax inventory to $2 million

12/31/96

12/3V96

Increase Spare Part Availability:

~ Reduce the number ofrestocks to 500

Reduce the mrmber and age ofnon-outage clerk order AWPs to 70

Reduce the nurnlxr ofpurcb~ requisitions older than 30 days to 20

Complete

7/1/96

7/1/96

99

Page 143: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

C

Page 144: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

INVENTORYVALUEDan Quilty - Nuclear Materials Management

ro

O

100

75

42.3 43.5

Good

Legend

~Actual———Target

50

Ol5

25

45.2 44,239.4

42

~ Target ~ 38

Oct Dec Feb Apr Jun

Date

Oct Dec

Data Source: Norman Quesada

Page 145: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

WAREHOUSE RESTOCKS

3000

25002672

2000nE

15008.8

1000

500

0.Jan

1280

Feb Mar

116

Apr June July

Date

Aug Sept

~ ~ ~ ~

Oct Ncv Oec

~Actual----- Target

Good

OVERIWAXINVENTORYVALUE

3.5

Lr 2.s

1.5

3.3 . ~ 4.0~ e

2.6~ L '

~

- - 0 - Actual- - - ~ ~ Target

0.5

0

Jan Feb Mar Apr May 'une July Aug Se pt Oct Ncv Oec

Oate

Page 146: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

NONUTAGE AWP (STATUS 45 8 48)

180

160

140

120

80604020

135

188

~Actual----- Target

Good

Jan Feb Mar Apr May June July Aug Sept

Date

Oct Nov Dec

OPEN REQUISTIONS OVER 30 DAYS

250

200

150

100C

50

111126

e

~Actual----- Target

Jan Feb — Mar Apr May June July Aug Sept Oct

Date

Nov - Dec

Page 147: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

l

NUULhAMMAI EHIAI.S MANAGEMENT 10 OLDEST AWP'SWEEK ENDING

APRIL 12, 1998

UN ORIGINATIONDATE

1/14/93

COMPONENT/ASSOCIATE/NAME

V14143 CHECK VALVEFORCOMPONENT COOLING WATERPUMP 1A DISCHARGE

TITLE

IMPLEMENTPCM¹335-190M

9300144401 SL1-14 177522-1

WORK ORDER SCHEDULE STOCK CODE P.O./P.R.

P 015383

ACTION COMMENTS

PUR DELIVERYDATE 5/6/98

3/18/93SR-07-1B/SAFETY RELIEF VALVE PERFORM ISTFOR LPSI 1B & HPSI 1B PP INSPECTION & RPRSUCTION FLNG LK.

9300884501 SL1-1437251-357194-1

PO 14283PO 13496

PURDELIVERYDATE 4/5/96DELIVERYDATE 5/10/96

8/4/93J5-1 GRAPHITE ANODE FORINTAKESTRUCTURE

REPLACETRAVELLINGSCREEN ANODES

9302132001 SL1-14 217764 P 014417 PUR DELIVERYDATE4/26/98

9/28/94

9/26/94

9/26/94

FCV-24-107/VALVE/CONTROL DISASSEMBLE ANDVALVEFOR ES DRAINTO CNDSR INSPECT REPAIR

1A FROM HP EXH - AS NEEDED

FCV-24-108/VALVE/CONTROL DISASSEMBLE AND

VALVEFOR ES DRAINTO CNDSR INSPECT REPAIR

1A FROM HP EXH AS NEEDEO

FCV-09-1A2 FLOE CONTROLDISASSEMBLE AND

VALVEFOR FEEDWATER PUMP 1AAS NEEDED

8402438601 SL1-14

8402439701 SL1-14

9402439801 SL1-14

594784595674595334594784595674595334178731428004-158288458297456314-1

PO 14506PO 14417PO 14417PO 14506PO 14417PO 14417PO 13477

PO 14489PO 13539

PUR DELIVERYDATE 4/26/98

PUR DELIVERYDATE 4/26/96

PUR DELIVERYDATE 4/26/96

9/28/94 CONTAINMENTSPRAY PUMP 1ABORIC ACID BUILDUP ON SUCTIONFLANGE

9402441501 SL1-140

27837-127972-127977-129493-1

PO 14609PO 14489PO 14489PO 14308

PUR DELIVERYDATE 4/24/96

9/26/94

9/26/94

9/26/94

FCV-09-1 B2/VALVE/FLOWCONTROL VALVEFORFEEDWATER PP 1B DISCHARGE

FCV-24-100/VALVE/CONTROLVALVEFOR ES DRAINTO CNDSR

1A FROM HP EXH

FCV-24-101NALVE/CONTROLVALVEFOR ES DRAINTO CNDSR1A FROM HP EXH

DISASSEMBLE ANDINSPECT REPAIRAS NEEDEO

DISASSEMBLE ANDINSPECT REPAIRAS NEEDED

DISASSEMBLE ANDINSPECT REPAIRAS NEEDED

9402443101 SL1-14

9402443801 SL1-14

9402443901 SL1-14

30300-158315456289458334459478459587417873141787344594784595874

„17873141767344

PO 15018PO 13539PO 13539PO 13539PO 14508PO 14417PO 13477PO 13892PO 14506PO 14417PO 13477PO 13892

PUR DELIVERYDATE 5/3/96

PUR DELIVERYDATE 4/22/96

PUR DELIVERYDATE 4/25/96

UPDA D SUBMITTEDBY: MATERIALSMANAGEMENT~ N. QUESADAp'4050LD.

Page 148: St Lucie Nuclear Plant,Status Meeting for Units 1 & 2.'General plant population awareness-Flyers, posters, TV, newsletter, post outage training Evaluate a(1)s w/ System Owners 8c

SL1-14 PURCHASING BACKLOG

350

g 300

250

200

150

SL1-14 PWO'S WITHA DELIVERYDATE PAST 429

REVIEWED BYMAINTENANCE

ACCEPTABLE DELIVERY

NUMBER TO EXPEDITE

OP's REVIEW"MUSTS"TO WORK

PWO'S CANCELLED

267

240

148

92

82

0 ~ C4 tA CD h 4 0 FOR FULL EXCEPTION LISTINGREFERENCE

FILE F:tCOMMONWMMPSL'KXCEP483(LS

~TOTALBACKLOG~ LINE ITEMS ORDERED

Previous Da 's BackloIncomin P.R.'sLine Items OrderedLine Items To P.E.Total Backlo

4/09 4/10 4/11 4/12 4/15235 208 196 146 11944 43 13 24 30

71 51 61 50 254 2

208 196 146 119 124

4/161242240

106

4/1 7 4/18 4/19 4/22

PURBKLOG.XLS