24
6:00 pm – Open House 6:30 pm – Presentation Introduction Kristin Hoffman, Station Project Manager Construction Update Kristin Hoffman Ellen Blair, Community Outreach Specialist Next Steps Questions and Answers 7:30 pm – Return to Open House 8:00 pm – Close Tonight’s Agenda 1

ST PowerPoint Template - Sound Transit

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ST PowerPoint Template - Sound Transit

• 6:00 pm – Open House • 6:30 pm – Presentation

• Introduction – Kristin Hoffman, Station Project Manager

• Construction Update – Kristin Hoffman – Ellen Blair, Community Outreach Specialist

• Next Steps • Questions and Answers

• 7:30 pm – Return to Open House • 8:00 pm – Close

Tonight’s Agenda

1

Page 2: ST PowerPoint Template - Sound Transit

Roosevelt Station Construction Open House October 23, 2013

2

Page 3: ST PowerPoint Template - Sound Transit

Link Light Rail System • 16 miles of light rail with 13

stations currently in service • University Link and Angle Lake

Station under construction; open 2016

• ST2 Plan funded extensions to Overlake, South King County, and Lynnwood

• 54 mile system

3

Page 4: ST PowerPoint Template - Sound Transit

• 4.3-mile light rail extension • Stations at U District, Roosevelt,

and Northgate • Completion: 2021 • 62,000 daily boardings added to

system by 2030

Northgate Link (University District to Northgate)

4

Page 5: ST PowerPoint Template - Sound Transit

Roosevelt Station Key Features

• Station platform 70’-90’ underground

• Elevators, escalators and stairs at both entrances

• Bicycle parking

• Connections to buses on NE 65th St, 12th Ave NE and Roosevelt Way NE

• 8,000 daily boardings (2030)

5

Page 6: ST PowerPoint Template - Sound Transit

Roosevelt Station Schedule

6

Page 7: ST PowerPoint Template - Sound Transit

Construction Work Done Salvage & Demolition

• Building fixtures & materials, Standard Radio façade salvaged

• Townhouses – sold and relocated

• Buildings on site removed • Site graded and paved

7

Page 8: ST PowerPoint Template - Sound Transit

Construction Work Done

8

Overhead Utility Relocation Gas Line Work

Page 9: ST PowerPoint Template - Sound Transit

Construction Site Current

9

Page 10: ST PowerPoint Template - Sound Transit

Construction Wall Photo Simulations

10 Corner of NE 65th St & 12th Ave NE looking north

Corner of NE 65th St & 12th Ave NE looking northwest

Page 11: ST PowerPoint Template - Sound Transit

Construction Wall Photo Simulation

11

NE 67th St looking east

Page 12: ST PowerPoint Template - Sound Transit

Upcoming Work Now to Spring 2014

12

• Jet Grouting – Approximately 3

months of work – Daytime work only – No parking in this

area during this work

Page 13: ST PowerPoint Template - Sound Transit

Upcoming Work Now to Spring 2014

13

• 12th Ave NE, NE 65th St & NE 66th St – Lane closures – Traffic maintained – Detours for turns

Page 14: ST PowerPoint Template - Sound Transit

Upcoming Work Spring to Summer 2014

14

• Weedin Place – Second quarter 2014

start; lasts 3-4 months – Temporary sidewalk,

parking, or lane closures

– Traffic will be maintained

Page 15: ST PowerPoint Template - Sound Transit

• Slurry wall installation – Some equipment may operate at

night; will comply with noise variance

• Station excavation – starts in mid-2014

Upcoming Work Now to End of 2014

15

Page 16: ST PowerPoint Template - Sound Transit

Truck Route (from north)

• Trucks enter site southbound from Roosevelt Way NE

• Trucks leave site northbound on 12th Avenue NE

16

Page 17: ST PowerPoint Template - Sound Transit

Truck Route (from south)

• Trucks enter site southbound from Roosevelt Way NE

• Trucks leave site northbound on 12th Avenue NE

17

Page 18: ST PowerPoint Template - Sound Transit

ST Standard Construction Procedures • Standard provisions written

into contracts • Promote the local business

district • Full-time community outreach

staff for neighborhood • 24-hour construction hotline

(888-298-2395)

18

Page 19: ST PowerPoint Template - Sound Transit

Noise Mitigation • Solid plywood construction wall • Stationary equipment (compressors,

generators) enclosed as needed • Truck operations

– No beeping alarms – Engine idle limit of 5 minutes – No compression brakes – Muck haul bins lined with noise dampening material – No nighttime hauling of “muck” (also known as

“spoils”) unless approved by ST • Monitoring • Contractor incentive to reduce noise

19

Page 20: ST PowerPoint Template - Sound Transit

Contractor Parking • Contractor workers not allowed

to park on city streets • Contractor responsible for

finding parking lot(s) to accommodate all the workers

• ST leasing spaces from Diamond Parking at Calvary church for ST employee parking

20

Page 21: ST PowerPoint Template - Sound Transit

Business Mitigation Marketing Program • Roosevelt neighborhood banners hung

on construction fencing • Installed Roosevelt neighborhood

street pole banners • Roosevelt business map – November • Install wayfinding kiosks – soon

21

Page 22: ST PowerPoint Template - Sound Transit

Project Next Steps • Hold neighborhood construction

update meetings • Station 90% design open house –

fourth quarter 2014 • Surface work along tunnel route

starts in 2015 • Sign up for construction alerts

22

Page 23: ST PowerPoint Template - Sound Transit

Questions?

23

Page 24: ST PowerPoint Template - Sound Transit

Get Involved and Stay Informed • Sign Up to Receive Email Updates

– www.soundtransit.org/subscribe • Sound Transit Website

– www.soundtransit.org/northlink • Contact Ellen Blair:

– 206.398.5300 – [email protected]

24