UBS Investment Bank
( )
( )
Your project, your needs, our construction expertise
Your project, your needs, our construction expertise
Confidential Financial Services Client
UBS Investment Bank49th Floor, Two IFC, 8 Finance Street, Central, Hong Kong
Our Role: Main ContractorArchitect: Goudie AssociatesConsulting Engineer: CSAQuantity Surveyor: Widnell Sweett LimitedCompletion Date: November 2011Scope: Fit-Out Work / Renovation
Description:
StructureTone Asia was engaged by UBS to downsize their existing Data Centre on the 49th Floor of Two IFC, and to convert the reclaimed space to General Office, Cellular Offices, IT Operator Room, Tape Library and HUB Room.
Highlights of the project included:-
• WorkingentirelyonovertimewithinanoccupiedBankingenvironment
• Demolitionofexistingsystemandarchitecturalcomponents
• Powerdown'sofexistingsystemstostrictBuildingRules&Regulations
• InstallationofnewequipmentincludingSTS,PDU,ATS,MCCBBoards
• RelocationofequipmentincludingSTS,PDU'sandCRACUnits
• RelocationofsystemsincludingWaterLeakage,FireAlarmPanel,VESDAPanel
• SupplyofnewVAVsystemforreclaimedofficespace
• Modificationsofmultiplesystemstoaccomodatethe downsizing project
• Architecturalworkstocreatethenewofficespace
• Testing&Commissioningofallsystemsuponcompletion
• TechnicalCleaning
• CoordinationofmultipledirectVendorsandLandlord designated contractors
Confidential Financial Services ClientKowloon, Hong Kong
Size: 18,000sf
Achievements: Description: StructureTone was commissioned to perform the general construction for the new Disaster Recovery Centre. The project was completed in 10 weeks, which included a Data Centre withseparateUPS&Batteryroom.Thedatacentreisequippedwithalltherequiredcritical equipmentandbuilttothehigheststandards.Thegeneralofficeconsistsoftwodepartmentsone set up for permanent staff and the other as an emergency work area. The pantry area allows the staff a place to relax on built-in sofas and a separate seating bar. The two conferences rooms have highendfinishesandareequippedwithaudiovisualequipment.
Digital Savvis Investment Management Hong Kong LimitedTseung Kwon O, Hong Kong(InProgress)
Our Role: Main ContractorContractType: DesignBuild/GMPSize: 18,000sqmProjectManager: ConfluenceArchitect: Nicholas Webb ArchitectsConsulting Engineer: DSCOContractPeriod: 10months(Phase1)ProjectedCompletion: Q42013
Description:
TheprojectcomprisesthedeliveryofadatacentrefacilitylocatedwithintheHongKongScienceandTechnologyPark.ThisistobethelargestHongKongDataCentreprojecttodatewithPhaseItobedeliveredinQ4of2013.
OnceallphasesarecompletedtheDataCentrewillhousesix(6)PODSwithatotalof18,000sqmofpurposebuiltdatacentredevelopmentoverthreephases.PhaseIisunderwayandconsistsof5.7MWITCapacityand2,500sqmoftechnicalspace.Otherproject details are currently confidential.
these – SEP is one of our key initiatives.